Prior art keywords
work
shoring
erector
vehicle
dozer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP57149735A
Other languages
Japanese (ja)
Other versions
JPS6225840B2 (en
Inventor
規雄 山内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YAMAUCHI KOGYO KK
Original Assignee
YAMAUCHI KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YAMAUCHI KOGYO KK filed Critical YAMAUCHI KOGYO KK
Priority to JP57149735A priority Critical patent/JPS5938500A/en
Publication of JPS5938500A publication Critical patent/JPS5938500A/en
Publication of JPS6225840B2 publication Critical patent/JPS6225840B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 この発明は、建設車両に係り、例えばトンネル工事等に
特に有効な建設車両に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a construction vehicle, and particularly to a construction vehicle that is particularly effective for tunnel construction, for example.

一般にトンネル工事を行う場合、掘削作業後において、
核掘削作業によって生じた抗優茫支持するだめの、7.
; 曲物が建造される。いわゆる支保工と呼ばれるもの
である。このように、トンネル工事では掘削と支保工の
建込み、という少くとも2棟側の1・[梁がイテわれる
。そして、従来はこの作業毎に専用の単画、すなわちグ
ルドーザ等の掘削作業卓および支保工の建込み作業車を
必要とした。しかしながら、このように作業毎に専用車
両を安することは、作業車両を現場へ搬入する上からも
、また現場に装置しておく上からも、不都合と言わざる
を得ない。
Generally, when carrying out tunnel construction, after the excavation work,
7. Damages caused by nuclear drilling operations.
; A curved object is constructed. This is what is called shoring. In this way, during tunnel construction, at least two beams on the sides of the two buildings are damaged during excavation and erection of support. Conventionally, each of these operations required a dedicated unit, ie, an excavation work table such as a gludozer, and a shoring work vehicle. However, having to use a dedicated vehicle for each job in this way is inconvenient, both from the perspective of transporting the work vehicle to the site and from the standpoint of maintaining equipment at the site.

本発明は、上記に鑑みて開発されたものである。The present invention has been developed in view of the above.

すなわち、本@萌が目的とするところは、作業車両に対
しその必要とされる作業に応じた機能を元押しうる建設
車両を提供することである。
In other words, the purpose of Hon@Moe is to provide a construction vehicle that can perform functions appropriate to the work required of the work vehicle.

以下、不発1、明の一実施例を四囲にしたがってi)ル
明する。
Hereinafter, an example of misfire 1 and light will be explained in accordance with the following four boxes.

図面において、1はドーザシロベル本体であり、その上
部にはリフトシリンダ2に連繋された一対のパヲレμア
ーム6.6がそれぞれ前方へ向けて並設されている。ま
た、前記リフトシリンダ2は図示しない油圧回路に組込
まれて、その伸側動作にて両パラレルアーム6.3を同
期してリシト作動させうる。そして、この両パラレルア
ーム6.6の■IJ端には、要求される作業に応じて各
種作業’t& uイが盾睨口」能に取付けられる。本例
では、4ffll削作柴による土掘寺全排出するときに
は、図ボしない通冨のショベルパケットが装着され、支
保工の建込みを行うときには、図示の如きアタッチメン
トAが装着される。以下、このアタッチメン)Aについ
て説明する。
In the drawings, reference numeral 1 denotes a dozer whitebel body, on the upper part of which a pair of pawl arm μ-arms 6.6 connected to a lift cylinder 2 are arranged in parallel toward the front. Further, the lift cylinder 2 is incorporated into a hydraulic circuit (not shown), and can synchronously lift both parallel arms 6.3 by its extension side operation. Various workpieces are attached to the IJ ends of both parallel arms 6.6 in accordance with the required work. In this example, when the entire excavation temple is to be completely discharged by the 4ffll excavation site, a shovel packet with no dents is attached, and when the shoring is being erected, attachment A as shown in the figure is attached. This attachment A) will be explained below.

Wは格子状に枠組みされた支持枠体であシ、その後1…
1縁に同所された一対の取付はブラケット4゜4にて前
記両パフレμアーム5.6に対しインサートピン5,5
を介して水平状にかつ着脱可能に取付けられている。ま
た、この支持枠体Wには作業用メインデツキ6が乗載さ
れるとともに該メインデツキ6は、メインデツキ6の下
面側においで支持枠体Wの中央部に水平状に支持された
センタシリンダ7にて前後方向へのスライドをなしうる
。次に、メインデツキ6のスライド動作を支持するため
のm Wについて説明する。
W is a support frame framed in a grid pattern, and then 1...
A pair of attachments located at the same location on one edge are attached to the insert pins 5, 5 to both the puffer μ arms 5.6 at the bracket 4゜4.
It is installed horizontally and removably through the Further, a main deck 6 for work is mounted on this support frame W, and the main deck 6 is supported by a center cylinder 7 horizontally supported at the center of the support frame W on the lower surface side of the main deck 6. It can slide forward and backward. Next, mW for supporting the sliding movement of the main deck 6 will be explained.

メインデッキ6下面の左右両端縁には、同メインデツキ
6の後方へ!9「定長さ延出されるアウタレール8.8
が心情されている。そして、各7ウタレー/I’ a 
8の後部には一対のサイドローラ9,9が前後方向へn
r定の間隔をおいて醸隔配瀦されている。
On both the left and right edges of the bottom surface of the main deck 6, to the rear of the main deck 6! 9. Outer rail extended for a fixed length 8.8
is deeply felt. And each 7 utare/I'a
At the rear of 8, a pair of side rollers 9, 9 move forward and backward.
They are distributed at regular intervals.

各サイドローラ?、9は支持枠体Wの左右両側に配置さ
れたチャンネル状の両スフイドレー/L’IO,10に
対しそれぞれ転勤可能に嵌合されている。一方、支持枠
体Wの前縁にはそれぞれ回転iJ能に取イ・1けられた
図示4個のフロントローラ12〜12がほぼ等間隔毎に
配設されておシ、前述サイドローラ12〜12とfy、
 I#Jt、てメインデツキ6のスライド動作を支持し
うる。
Each side roller? , 9 are removably fitted into both channel-shaped spheres /L'IO, 10 disposed on both left and right sides of the support frame W. On the other hand, on the front edge of the support frame W, four front rollers 12 to 12 are arranged at approximately equal intervals as shown in the figure, each having a rotary function. 12 and fy,
I#Jt can support the sliding movement of the main deck 6.

なお、前記センタシリンダ7Fi前述油圧回路に接続さ
れており、この油圧回路の統括的制御を行う図示しない
操作装置にて緩速で伸縮−動作をなしうる。また、14
は支持枠体Wに張設された安全用ネットである。
The center cylinder 7Fi is connected to the aforementioned hydraulic circuit, and can be expanded and contracted at a slow speed by an operating device (not shown) that performs overall control of the hydraulic circuit. Also, 14
is a safety net stretched over the support frame W.

15.15はメインデツキ6の両側線にヒンジ16ケ介
して折り・縁み可能に支持された一対のサブデツキであ
シ、両サブデツキ15.15はメインデツキ乙の両側縁
にそれぞれプラケッ)17.17を介して取付けられた
折夛優みシリンダ18.18の各ロッド端に連繋されて
いる。この円!JTD−mみシリンダ18.18は前述
の油圧回路に接続されて、走行時にはサブデツキ15.
15を起立状態に保持すべく伸長状顧にあシ、作業時に
は[縮されて相互に同期しであるいは個別に水平位置へ
顛倒しうる。
15.15 is a pair of sub decks that are supported by 16 hinges on both sides of the main deck 6 so that they can be folded and folded. It is connected to each rod end of a folding cylinder 18.18 which is mounted through. This yen! The JTD-m cylinder 18.18 is connected to the above-mentioned hydraulic circuit, and when traveling, the sub-deck 15.
15 are placed in the extended position to hold them in an upright position, and during operation they can be retracted and folded into a horizontal position either synchronously with each other or individually.

次に、建込み作業時において支保工25を支持するため
のエレクタ24について説明する。
Next, the erector 24 for supporting the shoring 25 during erection work will be explained.

19.19i1:プーム20のガイド筒であシ、それぞ
れは支持枠体Wの上面後端部において適宜プラケットを
介して水平状に支持されている。
19.19i1: The guide tubes of the pool 20 are supported horizontally at the rear end of the upper surface of the support frame W via appropriate plackets.

プーム20は両ガイドM 19.19に対しそれぞれ前
後方向への括j !!(IJ IIJ能に織入されると
ともにガイド肖19の前後部においてそれぞれ内蔵され
た口〜う対21.21にて水平状態に支持されるととも
にそのスライド(動作の円滑性が保持されている。
The poom 20 is attached to both guides M19.19 in the front and rear directions. ! (It is incorporated into the IJ IIJ function, and is supported in a horizontal state by the mouth pairs 21 and 21 built in at the front and rear of the guide port 19, respectively, and its sliding (smoothness of movement is maintained).

また、両ガイド簡19.19の下面側jにはプーム20
の送シ装置22が装7aされている。なお、この送り装
置22は、詳しくは図示しないが前述の油圧回路に接続
された油圧モータ寺を駆動源とするラック、ビニオン舒
のA:■合わせからなる。
In addition, there is a pool 20 on the bottom side of both guides 19 and 19.
A feeding device 22 is installed 7a. Although not shown in detail, this feeding device 22 is composed of a rack and a pinion shaft A: ■ combination whose driving source is a hydraulic motor connected to the aforementioned hydraulic circuit.

また、両ブーム20.20の前端部には、平行四辺形リ
ンクよシなるエレクタハンガ26を介してエレクタ24
が装着されるとともに該エレクタ24は前述した油圧回
路に接続されるティルトシリンダ26にてチルト動作を
なしうる。さらに、各エレクタ24.24は支保工25
を確実に挾持しうるように形成されるとともに特に図ホ
の如くアーチ型支保工25のためにその挾み込み部分に
おいて上端部は内側から外側にかけて下向き勾配の面取
シ2乙27が施されている(第6図P−J’1K()。
Also, an erector 24 is connected to the front end of both booms 20, 20 via an erector hanger 26, which is a parallelogram link.
is installed, and the erector 24 can be tilted by a tilt cylinder 26 connected to the aforementioned hydraulic circuit. Furthermore, each erector 24.24 has a shoring 25
In particular, as shown in Figure E, for the arch-shaped support 25, the upper end is chamfered 27 with a downward slope from the inside to the outside. (Figure 6 P-J'1K ()).

なお、28はドーザショベル本体1の後部に78脱ij
能に装着されるバランスウェイトであシ、また29は本
体1の前則れを防止するためのリガーである。
In addition, 28 is a 78 removal ij at the rear of the dozer excavator body 1.
29 is a rigger for preventing the main body 1 from shifting.

引き続き、上記構成に係る本例のf[用と幼果釦具体的
に説明する。
Continuing on, the f[ use and young fruit button of this example related to the above configuration will be specifically explained.

トンネルの掘削作業後、支保工25の建込みを行う染付
、−まずドーザシラペルのパケットケ取り外し、本例ア
タッチメントAの装)M作う碍rイ1う。
After the tunnel excavation work, the shoring 25 is erected - First, the packet of the dozer shell is removed, and the installation of attachment A in this example is made.

該装盾作柴はインサートピン5の抜き点しにて容易に竹
うことができ、またこの際においてアタッチメントA倶
jの各シリンダ弄の油圧系1烙と、ドーザショベル本体
1側の油圧回路との接続作業も併せて行われる。
The mounting plate can be easily removed by pulling out the insert pin 5, and at this time, the hydraulic system 1 of each cylinder of the attachment A and the hydraulic circuit of the dozer shovel body 1 are removed. Connection work will also be carried out at the same time.

かくして、アタッチメン)Aの取シ換え作業が完了すれ
ば、ドーザショベル本体1がトンネル内にキ入される。
When the replacement work of the attachment member A is thus completed, the dozer shovel main body 1 is inserted into the tunnel.

但し、この搬入の際における走行中には、両サブデツキ
15.15は起立状態で折シ畳み保持されている。
However, while the vehicle is being carried in, both sub decks 15, 15 are held folded in an upright state.

そして、ドーザショベルに対し作業現場において、すz
ゴー29.29%Jのセットにより前則れ防止等の予鋪
作業を行う。この後、アーチ型支保工25の一端四をg
lijエレクタ24,2.4間に架は渡し、各エレクタ
24.24にて挾持させる。そして、作業者がメインデ
ツキ6に乗シ込んだ下で、リフトシリンダ2を伸長させ
て、アタッチメント全体を持上げる。このとき、メイン
デツキ6はパラレルアーム6にて常に水平状態に保持さ
れながら、上方へ平行移動される。このアタッチメン)
Aの持上げ!II rffに伴い、支保工25はエレク
タ24にて接地端を中・0として適宜高さまで持上けら
れる。
Then, at the work site, the dozer excavator
Go 29.29%J is set to perform preliminary work such as preventing slippage. After this, one end of the arched shoring 25 is
The rack is passed between the lij erectors 24 and 2.4, and is clamped by each erector 24.24. Then, while the operator is seated on the main deck 6, the lift cylinder 2 is extended to lift the entire attachment. At this time, the main deck 6 is always held in a horizontal state by the parallel arm 6 and is translated upward. this attachment)
Lifting A! According to II rff, the shoring 25 is lifted to an appropriate height by the erector 24 with the grounding end set to 0.

この下で、支保工25のcW M作業がなされる。すな
わち、センタンリンダ7を伸長させて、メインデツキ6
を支持枠体Wに沿って緩速前進させ、作業者を所望の作
業位置へ導く。そして、必要に応じてティルトシリンダ
26を伸縮作動させ、支保工25の持上げ高さを所定高
さに調整した下で、該締盾作業がなされる。また、本例
では折シ畳みシリンダ18を収縮作動させれば、サブデ
ツキ15を水平位置へ旋回させうるため、これにより作
業の足場をよシ広く確保しうる。さらに、本例ではエレ
クタ24を前後方向へ反位させうるため、支薯 保工をトンネルの掘削方向へ順に建込んでゆく際プーム
20のエクステンシロン範囲内においてドーザシロベル
本体1を移動させることなく、上記した作業を行うこと
ができる。
Under this, the cWM work of the shoring 25 is performed. That is, by extending the center cylinder 7, the main deck 6
is slowly advanced along the support frame W to guide the worker to a desired work position. Then, the shield tightening work is performed while the tilt cylinder 26 is expanded and contracted as necessary to adjust the lifting height of the shoring 25 to a predetermined height. Furthermore, in this example, by contracting the folding cylinder 18, the sub-deck 15 can be turned to a horizontal position, thereby making it possible to secure a wider platform for work. Furthermore, in this example, since the erector 24 can be reversed in the front-back direction, the dozer whitebell main body 1 can be installed without moving the dozer white bell body 1 within the extension range of the pool 20 when the shoring supports are erected sequentially in the tunnel excavation direction. The above operations can be performed.

このように本例によればドーザシロベルに対しそのパケ
ットと111m装屑し装作。このことによシドーザショ
ベルは掘削機能と支保工建込みとの両機能を発揮し得、
作業に応じてこの両機能を迩冗選択することができる。
In this way, according to this example, the packet and 111m of waste are attached to the dozer whitebell. This allows the Sidozer excavator to perform both excavation and shoring functions.
You can choose between these two functions depending on your work.

従って、従来と異なり、作業毎に専用車t−要しないと
いう合れた効果を奏する。
Therefore, unlike the conventional method, there is an advantage that a dedicated vehicle is not required for each task.

なお、本例のものは支保工の建込み用アタッチメントを
例示したが、本例エレクタ24に代えて、例えば削岩装
置ヒtを装rM L、でもよく、つまりはトンネルニE
 :i4に必要とされる作業の種類に応じて、各411
(アタッチメントが4吻される。
Although this example is an attachment for erecting a shoring structure, instead of the erector 24 of this example, it may be possible to install a rock-drilling rig, for example, in place of the erector 24.
:411 each depending on the type of work required for i4
(The attachment is kissed 4 times.

以上tシ己明したように、本発明は引降iJ能に取付け
られた作画装置l17を有する土木建築寺に用いられる
建設車両にあって、前記作業装置は要求される作業の種
イ1に応じて作業用デツキを備え/ζ別段の作業装置と
「り換装+1されるようになしたことをその要旨とする
ものである。
As explained above, the present invention is directed to a construction vehicle used in civil engineering and construction temples, which has a drawing device 117 attached to a pull-down iJ. The gist of the system is that it is equipped with a working deck and can be retrofitted with a separate working device.

そして、本究明は上記構成によシ一台の建設車両金作栗
の柿舶毎に対応させることができる。これによって、作
業毎の専用車両を費せず、従って本発明によれば現場へ
の搬入作業の手111]がkかれ、また留14聞慎も多
くを安しない箸、各種利点が発1車される。
According to the above-described structure, this investigation can be carried out for each construction vehicle. This eliminates the need for a dedicated vehicle for each task, and therefore, according to the present invention, transporting the chopsticks to the site is simplified. be done.

【図面の簡単な説明】[Brief explanation of the drawing]

+gl囲は本発明の一夾施例全ボすものでろって、第1
図は本例車両の叫面図、凍2図は四半開用、第6図は同
正閣・傾、第4図はサイドローラ付近の拡大1jJr而
図である。 1 ・・・ドーザシロベル本体     6・・・メイ
ンデツキ15・・・サブデツキ   24・・・エレク
 タ25・・・支  保  工       A・・・
アタッチメント出  頒  人  山内工業株式会社 代 理 人 弁坤士岡田英彦
+gl will be used for all embodiments of the present invention, and the first
The figure shows the front view of the vehicle in this example, the second figure shows the quarter open, the second figure shows the front view of the same building, and the fourth shows an enlarged view of the vicinity of the side rollers. 1...Dozer whitebell body 6...Main deck 15...Sub deck 24...Erector 25...Shoring work A...
Attachment Publisher: Yamauchi Kogyo Co., Ltd. Managing Director: Hidehiko Okada, Attorney-at-Law

Claims (1)

【特許請求の範囲】[Claims] 昇降口■能に取付けられた作業装置を有する土木建染等
に用いられる建設車両にあって、前記作業装置I#け要
求される作業の神畑に応じて作業用テ゛ツキを鋪えた別
設の作業装置と可換装置されるようになしたことを特徴
とする建設車両。
For construction vehicles used for civil engineering, dyeing, etc., which have a work device attached to the elevator door, a separate work site with a work table prepared according to the requirements of the work required for the work device I#. A construction vehicle characterized in that the device is interchangeable with the device.
JP57149735A 1982-08-26 1982-08-26 Building vehicle Granted JPS5938500A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57149735A JPS5938500A (en) 1982-08-26 1982-08-26 Building vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57149735A JPS5938500A (en) 1982-08-26 1982-08-26 Building vehicle

Publications (2)

Publication Number Publication Date
JPS5938500A true JPS5938500A (en) 1984-03-02
JPS6225840B2 JPS6225840B2 (en) 1987-06-04

Family

ID=15481662

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57149735A Granted JPS5938500A (en) 1982-08-26 1982-08-26 Building vehicle

Country Status (1)

Country Link
JP (1) JPS5938500A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62130352U (en) * 1986-02-08 1987-08-18
JPS63167398A (en) * 1986-12-28 1988-07-11 有限会社 桜屋 Voice synthesization recorder

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0577749U (en) * 1992-03-26 1993-10-22 日本郵船株式会社 Water sampling tool

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5738900U (en) * 1980-08-09 1982-03-02

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5738900B2 (en) * 1974-09-20 1982-08-18

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5738900U (en) * 1980-08-09 1982-03-02

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62130352U (en) * 1986-02-08 1987-08-18
JPS63167398A (en) * 1986-12-28 1988-07-11 有限会社 桜屋 Voice synthesization recorder

Also Published As

Publication number Publication date
JPS6225840B2 (en) 1987-06-04

Similar Documents

Publication Publication Date Title
US4091936A (en) Apparatus for extending a boom assembly
JPH11193543A (en) Building method of construction machinery front device, and posture holding device of working device used therefor
JPS5938500A (en) Building vehicle
JP2888505B2 (en) Work trolley
CN109798136A (en) Tunnel support vehicle
US3734211A (en) Mobile drilling unit
US2833540A (en) Stacking device for printing and the like machines
US4116486A (en) Retractable rock guard for a dump truck body
US4222492A (en) Method for extending a boom assembly
JP2524537Y2 (en) Multifunctional tunnel construction equipment
US4256186A (en) Roof drilling and bolting apparatus
GB2142902A (en) Folding tower crane with automatic jib extension
JP3876042B2 (en) Auger screw detachable low skyhead pile driver
US2335858A (en) High gantry for load-handling machines
CN217380564U (en) Trestle facilitating operation in tunnel
CN211737158U (en) Sectional type bow member installation platform truck
SU767323A1 (en) Movable form
US3172484A (en) Pile driving apparatus
JPH04203020A (en) Pile driver
JP2941638B2 (en) Emergency bridge erection equipment
JP6554434B2 (en) Placement device for construction machine work equipment
SU1021685A1 (en) Machine for laying motor load track covering
JP2999724B2 (en) Workbench elevating device for pile construction machine
SU1113560A1 (en) Support-gripping arrangement mounted on heading machine