JPS60253611A JP11038884A JP11038884A JPS60253611A JP S60253611 A JPS60253611 A JP S60253611A JP 11038884 A JP11038884 A JP 11038884A JP 11038884 A JP11038884 A JP 11038884A JP S60253611 A JPS60253611 A JP S60253611A
Authority
JP
Japan
Prior art keywords
wall
water
sandbags
bag
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11038884A
Other languages
Japanese (ja)
Inventor
Toshiaki Yoshida
俊明 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HOUSHIN SEISAKUSHO KK
Original Assignee
HOUSHIN SEISAKUSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HOUSHIN SEISAKUSHO KK filed Critical HOUSHIN SEISAKUSHO KK
Priority to JP11038884A priority Critical patent/JPS60253611A/en
Publication of JPS60253611A publication Critical patent/JPS60253611A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/122Flexible prefabricated covering elements, e.g. mats, strips
    • E02B3/127Flexible prefabricated covering elements, e.g. mats, strips bags filled at the side

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

PURPOSE:To simply construct a cut-off wall by vertically and horizontally stacking up sandbags formed by packing a hydraulic powdery granules into a bag made of porous material. CONSTITUTION:A hydraulic powdery granule 2 (e.g., of Portland cement, etc.) is packed into a bag 1 of a porous material (e.g., jute fiber cloth, canvas, etc.) of meshes to form a sandbag 3. A large number of the sandbags 3 are horizontally and vertically stacked up in a multistage and in a multi-row on the broken places of a dam, etc. Then, the hydraulic powdery granules 2 go out and diffuse from the sandbags 3 and harden hydraulically among the sandbags 1 to form a sealed wall or cut-off wall.

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は、主として、河川が氾濫したり、堤防が決壊し
たような場合にその泌濫箇所や決壊箇所の応急的な止水
にとどまらず、修復並びに再度のミe濫、決壊予防のた
めに本設的に構築される止水壁の構築工法に関する。
[Detailed Description of the Invention] <Industrial Application Field> The present invention is mainly applicable not only to temporary water stoppages at overflowing or levee-ruptured areas in the event of a river overflowing or a levee breaking. , relates to a construction method for a water-stop wall that is temporarily constructed for the purpose of repair and prevention of repeated flooding and collapse.

〈従来の技術〉 上記のような目的で構築される所の止水壁の構築工法と
して従来から一般的に実行されている方法は、土を袋内
に詰め込んだ土嚢を積み上げて応急的、仮設的な止水壁
を構築し、その後の修復に際して積上げ土tを撤去した
所に新たなコンクリート打設により本設コンクリート裂
上水壁を構築していたの!ある。
<Conventional technology> The conventional method of constructing water-stop walls for the purposes mentioned above is to pile up sandbags filled with soil for temporary or temporary construction. A permanent water cutoff wall was built, and a permanent concrete water wall was constructed by pouring new concrete in the place where the piled soil was removed during subsequent repairs! be.

〈発明が解決しようとする問題点〉 然しなから上記の従来工法による場合は、本設上氷壁の
構築にあたり、仮設使用した土嚢の撤去作業を要するば
かりでなく、その土質群が占有していた体積分以上の容
積に相当するコンクリート打設が必要で%型枠の組立、
コンクリートの打設など工事全体が大掛りとなり、工費
が嵩み、かつ構築能率の悪いものであった。
<Problems to be solved by the invention> However, in the case of using the above-mentioned conventional construction method, when constructing the permanent ice wall, it is not only necessary to remove temporarily used sandbags, but also to remove the sandbags that are occupied by the soil group. It is necessary to pour concrete equivalent to a volume greater than the volume, and the assembly of the formwork is required.
The entire construction work, including pouring concrete, was a major undertaking, increasing construction costs and resulting in poor construction efficiency.

本発明はかかる実情に鑑み、応急的な止水に要する手間
は従来と何等変わりないものでありながら、本設上氷壁
を非常に能率的、経済的に構築1きる工法を提案する点
に目的を有する。
In view of these circumstances, the purpose of the present invention is to propose a construction method that can construct a permanent ice wall very efficiently and economically, although the time and effort required for emergency water stoppage is no different from conventional methods. has.

く問題点を解決するための手段〉 上記の目的を達成するために本発明に係る止水壁構築工
法は、メツシュの小さい有孔材料製の袋内に水硬性粉粒
材を充填してなる土・軌状体の多数個を横方向及び上下
方向に積重して、各土雪状体の袋から外部への粉粒材の
浸透及び水化硬化により止水壁を溝条するという点に特
徴を有するものである。
Means for Solving the Problems> In order to achieve the above object, the water-stop wall construction method according to the present invention comprises filling a hydraulic powder granule material into a bag made of a porous material with a small mesh. The point is that a large number of soil/track bodies are stacked horizontally and vertically, and the water stop wall is grooved by permeation of the powder and granular material from the bag of each soil/snow body to the outside and hardening by hydration. It has the following characteristics.

く作用〉 上記のような特徴を有する本発明工法によれば、河川の
冷温や堤防決壊が生じた場合、その箇所に前記の土偕状
体をランダムに積重することにより応急的な出水が行な
えるとともに、積重された土嚢状体の袋カシら一部の粉
粒材が外部に徐々に浸透し拡散してそれら拡散粉粒材が
水と混和した状態7水化硬イヒし、もって相隣る各々の
袋間に水化物によるシール壁が形成される一方、袋内へ
の浸水に伴なって各袋内の大部分の粉粒材も水化硬化し
て、組成に多少のばらつきがあるものの土i状体積重範
囲の全体に亘ってほぼ連続一体化された水化硬化壁が構
成され〈実施例〉 以下本発明工法の実施例を図面に基づいて詳述する。
According to the construction method of the present invention having the above-mentioned characteristics, when a cold river or a levee burst occurs, the above-mentioned earthen bodies are piled up randomly at the location to prevent emergency flooding. At the same time, some part of the powder and granule material from the piled sandbags gradually penetrates into the outside and spreads, and the dispersed powder and granule material mixes with water. While a sealing wall made of hydrate is formed between each adjacent bag, most of the powder and granule material in each bag also hardens due to hydration as water enters the bag, resulting in some variation in composition. However, a hydration-hardened wall that is substantially continuous and integrated over the entire soil I-shaped volume weight range is constructed.Example: Examples of the construction method of the present invention will be described in detail below with reference to the drawings.

第1図において、(1)は麻繊維やキャンパスなどメツ
シュの小さい有孔材料製の袋!あり、この袋(1)内に
ポルトランドセメント、混合セメント、生コンクリート
等で代表される水硬性粉粒材(2)を充填密封して土嚢
状体(蔚が作製されている。
In Figure 1, (1) is a bag made of a perforated material with a small mesh such as hemp fiber or canvas! The bag (1) is filled with a hydraulic granular material (2) such as Portland cement, mixed cement, ready-mixed concrete, etc. and sealed to make a sandbag-like body.

上記土嚢状体Cs)の任意多数個を、例えば堤防の決壊
箇所などに@2図及び第8図で示すように横方向及び上
下方向に多数列、多段に積重することによって応急的止
水を行なう。
An arbitrary number of sandbag-like bodies Cs) can be stacked horizontally and vertically in multiple rows and stages, as shown in Figure 2 and Figure 8, for example, at the site of a broken embankment to temporarily stop water. Do the following.

この状態のまま放置しておくと、各土嚢状体(8)の袋
(!)からは一部の粉粒材(りが外部に浸透拡散し、相
隣る袋(1) 、 (13間において拡散粉粒材が水と
混和した状態で水化硬化して袋(1) 、 (1)間に
水化物によるシール壁が形成されるとともに、6袋(1
)内の大部分の粉粒材も水化硬化し、もって土俊状体(
3)の積重範囲の全体に亘ってほぼ連続一体化された水
化硬化土氷壁(4)が形成されるに至る。
If left in this state, some of the powder and granule material (!) from the bags (!) of each sandbag-like body (8) will permeate and diffuse to the outside, and the adjacent bags (1), (13 In the process, the diffused powder granules are mixed with water and hardened by hydration to form a sealing wall of hydrate between the bags (1) and the six bags (1).
) is also hydrated and hardened, resulting in a clay body (
A substantially continuous and integrated hydration hardened soil ice wall (4) is formed over the entire stacking range of 3).

而して、水がひいて決壊箇所等を修復する場合は、前記
水化硬化壁(4)の両側又は片側にコンクリート壁(i
)を打設形成することにより、両壁(4) 、 (6)
が一体化されたi!4図で示すような本設止水壁(5)
を完成するのである゛。
When repairing a collapsed area due to water subsidence, a concrete wall (i.e.
) by pouring and forming both walls (4) and (6)
The integrated i! Permanent water stop wall (5) as shown in Figure 4
It is to complete the.

〈発明の効果〉 以上詳述したことからも明らかなように、本発明方法に
よる時は、 (1) 従来の土嚢による応急的止水手段と同様に土を
状体をランダムに積層するだけで所期の応急的化氷壁を
簡単に能率良(作製できるものでありながら、 (!) その積重範囲の全体に亘ってほぼ連続一体化さ
れた水化硬化壁が得られて止水効果を増進できるととも
に、 (8) 修復に際して上記の水化硬化壁を本設止水鴎小
−☆π Ll プL^☆ 祷≦「1屯 −一 啼 ν 
隻−上!哨 −るから、コンクリート打設の必要容積が
少なくて済むことと、仮設壁の撤去が不要であることと
の相乗によって修復工費の大巾節減並びに能率向上が図
り得る。
<Effects of the Invention> As is clear from the detailed explanation above, when the method of the present invention is used, (1) similar to the conventional emergency water stoppage method using sandbags, it is possible to simply layer soil in a random manner; Although the desired temporary ice wall can be easily and efficiently produced (!), it is possible to obtain a water-hardened wall that is almost continuous and integrated over the entire stacking area, and has a water-stopping effect. (8) At the time of restoration, the above-mentioned hydration-hardened wall was permanently installed.
On the boat! Because of the construction, the volume required for concrete pouring is small, and there is no need to remove temporary walls, which makes it possible to significantly reduce repair costs and improve efficiency.

といった顕著な効果を奏するに至ったのである。This resulted in remarkable effects.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は土嚢状体の一部切欠き斜視図、第2図、第8図
は応急的化氷壁の作製要領を示す側面図と平面図、第4
ei!3は本設止水壁の断面図である。 (1目よ袋、a目よ水硬性粉粒材、(nは土嚢状体、(
4)は止水壁。
Figure 1 is a partially cutaway perspective view of the sandbag-like body, Figures 2 and 8 are side views and plan views showing the procedure for making an emergency ice wall, and Figure 4
ei! 3 is a sectional view of the main water stop wall. (The 1st item is a bag, the a item is a hydraulic granular material, (n is a sandbag-like body, (
4) is a water stop wall.

Claims (1)

【特許請求の範囲】 ■ メツシュの小さい有孔材料製の袋(1)内に水硬性
粉粒材(齢を充填してなる土質状体(8)の多′ 数個
を横方向及び上下方向に一積重して、各土書状沫l)の
袋0)から外部への粉粒材(2)の浸透及び水化硬化に
より止水壁(番)を構築することを特徴とする止水壁構
築工法。 ■ 前記粉粒材(齢が士メント類である特許請求の範囲
第0項に記載の止水壁構築工法。
[Scope of Claims] ■ A plurality of earthen bodies (8) made of hydraulic powder and granular material (old material) are placed in a bag (1) made of a small perforated material in the horizontal and vertical directions. A water-stopping method characterized in that a water-stopping wall (number) is constructed by permeating the powder material (2) from the bag 0) of each soil letter (1) to the outside and hardening it by hydration. Wall construction method. (2) The water-stop wall construction method according to claim 0, wherein the powder and granular material (older than wood) is used.
JP11038884A 1984-05-29 1984-05-29 Construction work for cut-off wall Pending JPS60253611A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11038884A JPS60253611A (en) 1984-05-29 1984-05-29 Construction work for cut-off wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11038884A JPS60253611A (en) 1984-05-29 1984-05-29 Construction work for cut-off wall

Publications (1)

Publication Number Publication Date
JPS60253611A true JPS60253611A (en) 1985-12-14

Family

ID=14534540

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11038884A Pending JPS60253611A (en) 1984-05-29 1984-05-29 Construction work for cut-off wall

Country Status (1)

Country Link
JP (1) JPS60253611A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008138503A (en) * 2006-11-07 2008-06-19 Takagi Kensetsu Kenzai Kk Sandbag and bag used for it
JP2015190178A (en) * 2014-03-28 2015-11-02 住友大阪セメント株式会社 Filler supply method and repair method for maintenance-free track
CN108360451A (en) * 2016-12-30 2018-08-03 孙永森 A kind of automatic stack equipment of sandbag and stacking method
CN108589644A (en) * 2017-02-23 2018-09-28 孙永森 A kind of bank against flood sandbag stacker
GB2609452A (en) * 2021-07-30 2023-02-08 Dp World Fze An underwater structure construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4932435A (en) * 1972-07-22 1974-03-25

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4932435A (en) * 1972-07-22 1974-03-25

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008138503A (en) * 2006-11-07 2008-06-19 Takagi Kensetsu Kenzai Kk Sandbag and bag used for it
JP2015190178A (en) * 2014-03-28 2015-11-02 住友大阪セメント株式会社 Filler supply method and repair method for maintenance-free track
CN108360451A (en) * 2016-12-30 2018-08-03 孙永森 A kind of automatic stack equipment of sandbag and stacking method
CN108385611A (en) * 2016-12-30 2018-08-10 孙永森 A kind of flood control stifled dam device of sandbag esting
CN108589644A (en) * 2017-02-23 2018-09-28 孙永森 A kind of bank against flood sandbag stacker
CN108589644B (en) * 2017-02-23 2020-02-11 山东浩博水利建设有限公司 Sand bag stacking machine for flood prevention dam
GB2609452A (en) * 2021-07-30 2023-02-08 Dp World Fze An underwater structure construction method
GB2609452B (en) * 2021-07-30 2024-02-21 Dp World Fze An underwater structure construction method

Similar Documents

Publication Publication Date Title
US3726950A (en) Method for producing sub-aqueous and other cast-in-place concrete structures in situ
US11674393B2 (en) Method for constructing dam inside dump of inner-dump strip mine
CN107574842A (en) Basement post-pouring zone advance water stop construction method
US4011728A (en) Means for producing subaqueous and other cast-in-place concrete structures in situ
CN201554493U (en) Quick water-retaining wall in mine
CN111877397A (en) Rapid construction cutting retaining wall and construction method thereof
WO2019214701A1 (en) Modular soil pressure applying and molding device and soft soil foundation treatment method
CN216304557U (en) Column cage stone pile supporting plate-shaped cage type flashboard for blocking breach and dike burst
JPS60253611A (en) Construction work for cut-off wall
CN105756100A (en) Basement post-pouring belt system and making method thereof
CN108677911A (en) A kind of processing method of modular soil body pressing formation device and soft soil foundation
CN108677980B (en) Upstream cofferdam heightening method and structure taking traffic function into consideration
CN111139789A (en) Assembled tailing dam building and construction method thereof
JPS59150810A (en) Coastal structure with caisson and its construction
CN212294762U (en) Side wall post-cast strip plugging structure
JPH04108916A (en) Construction method for reinforced banking body
RU2026122C1 (en) Method of storing industrial waste
JP2579733B2 (en) Sandbag for civil engineering
JPH09158158A (en) Filling type concrete dam and construction method thereof
CN112323726A (en) Artificial lake enclosure structure for collapsible loess high-fill area and construction method
CN212294737U (en) Rapid construction cutting retaining wall
CN214193982U (en) Pile-supported embankment
CN114059458B (en) Temporary blocking method for flood control of cross-dike box culvert
CN112030870B (en) Building rubbish reinforcing river levee under sandy soil geology
CN220246997U (en) Utilize geotechnique to add extension rubbish dam of muscle mould bag solidification soil