JPS6016631Y2 - Boom head structure - Google Patents

Boom head structure

Info

Publication number
JPS6016631Y2
JPS6016631Y2 JP14087478U JP14087478U JPS6016631Y2 JP S6016631 Y2 JPS6016631 Y2 JP S6016631Y2 JP 14087478 U JP14087478 U JP 14087478U JP 14087478 U JP14087478 U JP 14087478U JP S6016631 Y2 JPS6016631 Y2 JP S6016631Y2
Authority
JP
Japan
Prior art keywords
boom
wire rope
sheave
hook
opening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14087478U
Other languages
Japanese (ja)
Other versions
JPS5558592U (en
Inventor
周二 片山
Original Assignee
株式会社多田野鉄工所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社多田野鉄工所 filed Critical 株式会社多田野鉄工所
Priority to JP14087478U priority Critical patent/JPS6016631Y2/en
Publication of JPS5558592U publication Critical patent/JPS5558592U/ja
Application granted granted Critical
Publication of JPS6016631Y2 publication Critical patent/JPS6016631Y2/en
Expired legal-status Critical Current

Links

Description

【考案の詳細な説明】 (産業上の利用分野) 本考案は、ブームの先端に継足ブームを装着することの
できるクレーンのブームヘッドに関するものである。
[Detailed Description of the Invention] (Industrial Application Field) The present invention relates to a boom head for a crane, in which a boom can be attached to the tip of the boom.

ある種の中型クレーンではクレーンブームに主フックを
吊下げて行う荷役作業(第3図a)と、ブーム先端に装
着した継足ブームから副フックを吊下げて行う荷役作業
(第3図b)の二通りを作業内容に合せてとりうるよう
にしており、同図aの作業姿勢から同図すの作業姿勢に
するには、主フックをブームヘッドに固定し主フックに
巻掛けたワイヤロープの先端をブームヘッドの中を貫い
て前方へ取出し継足ブーム先端に導くようにし、また同
図すの作業姿勢から同図aの作業姿勢に直すには再びブ
ームヘッドの中を通してワイヤロープ先端をブームヘッ
ド下部に止着するようにして行う。
For some types of medium-sized cranes, cargo handling operations are carried out by hanging the main hook from the crane boom (Figure 3 a), and cargo handling operations are carried out by hanging the secondary hook from the foot boom attached to the tip of the boom (Figure 3 b). The main hook can be fixed to the boom head and the wire rope wrapped around the main hook can be used to change from the working posture shown in figure a to the working posture shown in figure 2. Pass the tip of the wire rope through the boom head and take it forward to guide it to the tip of the connecting boom.To change the working position from the working position shown in Figure A to the working position shown in Figure A, pass the end of the wire rope through the boom head again. Make sure to attach it to the bottom of the boom head.

このワイヤロープを通す作業はできるだけ簡便であるこ
とが、作業能率を高める為に強く望まれている。
In order to improve work efficiency, it is strongly desired that this work of threading the wire rope be as simple as possible.

(従来の技術) 従来この分野には実公昭46−34510号公報にみら
れるものがあった。
(Prior Art) Conventionally, there has been a technique in this field as seen in Japanese Utility Model Publication No. 46-34510.

これは第4図に示すようにブームヘッド4下面適所にワ
イヤロープ7の端末を索端止金具9を用いてピン連結す
るものである。
As shown in FIG. 4, the end of the wire rope 7 is pin-connected to the lower surface of the boom head 4 at a proper location using a cable end fastener 9.

一般にブームヘッド4はフックで吊下げた荷物の重量が
直接作用して大きな力がかかることから十分に強度を持
たせるため、その箱組構造の前後方向寸法は必要最小限
に設計してあり、シーブを軸着しワイヤロープを通す空
間の他には内部空間の余裕はほとんど無いようになって
いる。
In general, the boom head 4 is designed to have sufficient strength because the weight of the load suspended by the hook directly acts on it, and therefore the front and rear dimensions of the box structure are designed to be the minimum required. There is almost no internal space other than the space where the sheave is attached and the wire rope is passed through.

よって先に説明した第3図a、b間の作業姿勢変更に伴
うワイヤロープ通し作業は、第5図に示すように索端止
金具9を取外したワイヤロープ7だけの状態にして通さ
なければならなかった。
Therefore, the wire rope threading work that accompanies the change in working posture between FIGS. 3a and 3b described earlier must be performed with only the wire rope 7 with the rope end stopper 9 removed, as shown in FIG. did not become.

この索端上金具9の取外しは第6図に示すようにポルト
91をほどき、ピン92を抜いて金具9全体を取外しク
サビ93を抜き、Uボルト94を外したうえでソケット
95からワイヤロープ7を抜きとるというもので、結構
手間がかかり再び組付ける工数も必要なので、ワイヤロ
ープの掛替え作業は大変非能率なものであった。
To remove the cable end upper metal fitting 9, as shown in FIG. The process of replacing the wire rope was very inefficient, as it required a lot of effort and man-hours to pull out the wire rope and reassemble it.

(考案が解決しようとする問題点) そこで本考案は、索端止金具を分解組立てしなくてもワ
イヤロープの掛替え作業をできるようにしたブームヘッ
ドを提供しようとするものである。
(Problems to be Solved by the Invention) Therefore, the present invention attempts to provide a boom head that allows wire ropes to be rehanged without disassembling and reassembling the cable end fasteners.

(問題点を解決するための手段) 本考案は、クレーンブーム先端に設けられ、継足ブーム
を前方に向は装着しうるようにした箱状構造物のブーム
ヘッドを有し、ブームヘッド内部の上方位置に軸着した
上部シーブと同内部の下方位置に軸着した複数の下部シ
ーブとを備え、上部シーブに案内させてブームヘッドの
上端開口よりワイヤロープを導き、下部シーブとフック
シーブとの間で任意の掛数に掛は廻して主フックを吊下
げるようにし、また前記フックシーブに掛は廻したまま
のワイヤロープを下部シーブに案内させて継足ブームの
先端へ導き、そこから副フックを吊下げるようにしたブ
ーム装置において、ブームヘッドの前面に開口とこの開
口部近傍にブラケットを設け、継足ブームによる荷役作
業時にはワイヤロープを開口を通して継足ブーム先端へ
導くようにし、クレーンブームによる荷役作業時にはワ
イヤロープを開口に通した状態でその先端にある索端止
金具をブラケットに着脱自在にピン連結できるようにし
たものである。
(Means for solving the problem) The present invention has a boom head that is a box-like structure that is installed at the tip of the crane boom and allows a connecting boom to be mounted forward. Equipped with an upper sheave that is pivoted at an upper position and a plurality of lower sheaves that are pivoted at a lower position inside the same, the wire rope is guided by the upper sheave and guided from the upper end opening of the boom head, and is connected between the lower sheave and the hook sheave. Then turn the hook to any number of hooks to hang the main hook, and let the wire rope still hooked to the hook sheave be guided by the lower sheave to the tip of the extension boom, and from there attach the secondary hook. In a suspended boom device, there is an opening in the front of the boom head and a bracket near this opening, so that when carrying out cargo handling operations using the extended boom, the wire rope is guided through the opening to the tip of the extended boom, allowing for cargo handling using the crane boom. During work, the wire rope is passed through the opening, and the end stopper at the end of the wire rope can be removably connected to the bracket with a pin.

(作 用) よって本考案では、ワイヤロープ端末をブラケットに止
着している状態で索端止金具はブームヘッドの外に位置
しており、ワイヤロープを掛替えする際にブームヘッド
の中を通す必要はなくなる。
(Function) Therefore, in the present invention, when the wire rope end is fixed to the bracket, the cable end stopper is located outside the boom head, and when changing the wire rope, the inside of the boom head cannot be removed. There is no need to go through it.

このため索端止金具の分解組立も不要となる。This eliminates the need for disassembly and assembly of the cable end fastener.

(実施例) 本考案実施例を第1図及び第2図に基づき説明する。(Example) An embodiment of the present invention will be explained based on FIGS. 1 and 2.

第1図はクレーンブームによる荷役姿勢を示している。Figure 1 shows the cargo handling position using the crane boom.

1.2はクレーンブームを構成する基端ブーム、先端ブ
ームであり、その先端にはブームヘッド4が設けられて
いる。
Reference numeral 1.2 denotes a base boom and a tip boom that constitute the crane boom, and a boom head 4 is provided at the tip.

ブームヘッド4は中空立方体をなす箱状構造物で上端面
と下端面を開口し、上方位置に上部シーブ5を軸着し、
下方位置に複数の下部シーブ6を軸着している。
The boom head 4 is a hollow cubic box-like structure with open upper and lower end surfaces, and an upper sheave 5 is pivotally attached to the upper position.
A plurality of lower sheaves 6 are pivoted at the lower position.

またその前面には開口11を形威し、その間口11の横
にはブラケット12を取付けている。
Further, an opening 11 is formed on the front side, and a bracket 12 is attached to the side of the opening 11.

13は継足ブーム3を連結する為のブラケットである。Reference numeral 13 denotes a bracket for connecting the leg boom 3.

ブーム基端方向に備えているウィンチ(図示せず)から
繰出されたワイヤロープ7は上部シーブ5に案内させて
ブームヘッド4内に導き、更に下部シーブ6とフックシ
ーブ8′との間で任意の掛数に掛は廻して主フック8を
吊下げ、その端末を索端止金具9をブラケット12にピ
ン連結することにより止着している。
The wire rope 7 let out from a winch (not shown) provided at the base end of the boom is guided by the upper sheave 5 and guided into the boom head 4, and is further passed between the lower sheave 6 and the hook sheave 8'. The main hook 8 is hung by rotating the hook, and its end is fixed by connecting the cable end fitting 9 to the bracket 12 with a pin.

この状態ではワイヤロープ7の端末部は下部シーブ6を
経由して開口11を貫いた姿勢にある。
In this state, the end portion of the wire rope 7 is in a position passing through the opening 11 via the lower sheave 6.

この状態でウィンチを巻取り巻戻しすると主フック8は
上昇下降し第3図aに示すような荷役作業がなされる。
When the winch is wound and unwound in this state, the main hook 8 rises and falls, and the cargo handling operation shown in FIG. 3a is performed.

第2図は継足ブーム3による荷役姿勢を示している。FIG. 2 shows the cargo handling posture using the extended boom 3.

継足ブーム3はその基部をブラケット13にピン連結す
ることによりブームヘッド4前方に装着している。
The leg boom 3 is attached to the front of the boom head 4 by connecting its base to a bracket 13 with a pin.

この作業姿勢による場合、ワイヤロープ7はブラケット
12からピンを抜き索端止金具9を取外してそのまま前
方へ引き抜き、次いで継足ブーム3先端のシーブ14に
掛は廻して副フック10をピン連結して吊下げる。
In this working posture, the wire rope 7 is pulled out by pulling out the pin from the bracket 12, removing the cable end stopper 9, and pulling it forward. Then, the wire rope 7 is hooked onto the sheave 14 at the tip of the connecting leg boom 3, and the sub hook 10 is connected with the pin. and hang it.

なおこの荷役姿勢によるとき主フック8はブームヘッド
4下面に適宜手段で当接させ拘束しておく。
In addition, when this cargo handling posture is used, the main hook 8 is brought into contact with the lower surface of the boom head 4 by appropriate means and restrained.

この状態でウィンチを巻き取り巻戻しすると副フック1
0による第3図すに示す荷役作業が行われる。
When the winch is wound and rewinded in this state, the secondary hook 1
The cargo handling work shown in Figure 3 is carried out by No. 0.

またこの状態から第1図に示す荷役姿勢にするには、索
端止金具9を副フック10から外し再びブラケット12
にピン連結することで行える。
In addition, in order to shift from this state to the cargo handling position shown in FIG.
This can be done by connecting the pins to the

このように本実施例によるとワイヤロープ7の掛替え作
業はブームヘッド4の外で行われ、その中を通す必要が
ないので、索端止金具9の分解組立も必要なく迅速に行
える。
As described above, according to this embodiment, the wire rope 7 is rehanged outside the boom head 4, and there is no need to pass it through the boom head 4, so that disassembly and assembly of the cable end fastener 9 is also not necessary, and can be performed quickly.

なお、継足ブーム3はブームヘッド4の前面に装着する
ものでも、ブームヘッド4の上部に装着するものでも同
様に扱いうる。
It should be noted that the extension boom 3 can be handled in the same way whether it is attached to the front of the boom head 4 or attached to the upper part of the boom head 4.

(考案の効果) 本考案によるとワイヤロープの掛替え作業は索端止金具
を分解したり組立てたりする手間がかからないので、極
めて簡便であり、クレーン作業の能率を高めうるもので
ある。
(Effects of the invention) According to the invention, the work of rehanging wire ropes is extremely simple because it does not require the effort of disassembling and assembling the rope end fasteners, and the efficiency of crane work can be improved.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案実施例のブームによる荷役作業を示す要
部断面正面図、第2図は本考案実施例の継足ブームによ
る荷役作業を示す要部断面正面図、第3図は本考考案に
係るクレーンのブームによる荷役作業aと継足ブームに
よる荷役作業すを示す図、第4図は従来例のブームヘッ
ドの構造を示す図、第5図は従来例のワイヤローブ掛替
時におけるワイヤロープ通し作業を示す図、第6図は索
端止金具の分解工数を説明する為の図である。 1.2・・・・・・クレーンブーム、3・・・・・・継
足ブーム、4・・・・・・ブームヘッド、5・・・・・
・上部シーブ、6・・・・・・下部シーブ、7・・・・
・・ワイヤロープ、訃・・・・・主フック、9・・・・
・・索端止金具、10・・・・・・副フック、11・・
・・・・開口、12・・・・・・ブラケット。
Fig. 1 is a cross-sectional front view of main parts showing cargo handling work using the boom according to the embodiment of the present invention, Fig. 2 is a cross-sectional front view of main parts showing cargo handling work using the boom with extended legs according to the embodiment of the present invention, and Fig. 3 is a cross-sectional front view of main parts showing cargo handling work using the boom of the present invention. Figure 4 shows the structure of the boom head of the conventional example, and Figure 5 shows the wire during the wire rope change of the conventional example. FIG. 6 is a diagram showing the rope threading work, and is a diagram for explaining the number of steps required to disassemble the rope end fastener. 1.2... Crane boom, 3... Extension boom, 4... Boom head, 5...
・Upper sheave, 6...Lower sheave, 7...
・・Wire rope, butt・・・Main hook, 9・・・・
... Cable end fastener, 10 ... Secondary hook, 11 ...
...Opening, 12...Bracket.

Claims (1)

【実用新案登録請求の範囲】 クレーンブーム1,2先端に設けられ、継足ブーム3を
前方に向は装着しうるようにした箱状構造物のブームヘ
ッド4を有し、ブームヘッド4内部の上方位置に軸着し
た上部シーブ5と同内部の下方位置に軸着した複数の下
部シーブ6とを備え、上部シーブ5に案内させてブーム
ヘッド4の上端開口よりワイヤロープ7を導き、下部シ
ーブ6とフックシーブ8′との間で任意の掛数に掛は廻
して主フック8を吊下げるようにし、また前記フックシ
ーブ8′に掛は廻したままのワイヤロープ7を下部シー
ブ6に案内させて継足ブーム3の先端へ導き、そこから
副フック10を吊下げるようにしたブ下ム装置において
、 ブームヘッド4の前面に開口11とこの開口部近傍にブ
ラケット12を設け、 継足ブームによる荷役作業時には、ワイヤロープ7を開
口11を通して継足ブーム3先端へ導くようにし、クレ
ーンブームによる荷役作業時には、ワイヤロープ7を開
口11に通した状態でその先端にある索端止金具9をブ
ラケット12に着脱自在にピン連結できるようにしたこ
とを特徴とするブームヘッドの構造。
[Claim for Utility Model Registration] A boom head 4 is provided at the tips of the crane booms 1 and 2 and is a box-like structure to which a connecting boom 3 can be attached in the forward direction. It is equipped with an upper sheave 5 pivoted at an upper position and a plurality of lower sheaves 6 pivoted at a lower position inside the same, and a wire rope 7 is guided by the upper sheave 5 from the upper end opening of the boom head 4, and the lower sheave 6 and the hook sheave 8' so that the main hook 8 is suspended, and the wire rope 7, which is still hooked on the hook sheave 8', is guided to the lower sheave 6. In the boom device which is guided to the tip of the extended boom 3 and from which the sub-hook 10 is suspended, an opening 11 is provided in the front of the boom head 4 and a bracket 12 is provided near this opening, so that cargo handling by the extended boom can be carried out. During work, the wire rope 7 is guided to the tip of the leg boom 3 through the opening 11. During cargo handling work using a crane boom, the wire rope 7 is passed through the opening 11 and the cable end stopper 9 at the tip is connected to the bracket 12. A boom head structure characterized by a pin connection that can be detachably attached to the boom head.
JP14087478U 1978-10-14 1978-10-14 Boom head structure Expired JPS6016631Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14087478U JPS6016631Y2 (en) 1978-10-14 1978-10-14 Boom head structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14087478U JPS6016631Y2 (en) 1978-10-14 1978-10-14 Boom head structure

Publications (2)

Publication Number Publication Date
JPS5558592U JPS5558592U (en) 1980-04-21
JPS6016631Y2 true JPS6016631Y2 (en) 1985-05-23

Family

ID=29116220

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14087478U Expired JPS6016631Y2 (en) 1978-10-14 1978-10-14 Boom head structure

Country Status (1)

Country Link
JP (1) JPS6016631Y2 (en)

Also Published As

Publication number Publication date
JPS5558592U (en) 1980-04-21

Similar Documents

Publication Publication Date Title
JPS6016631Y2 (en) Boom head structure
US2617677A (en) Pipe sling
JP2521598Y2 (en) Hanging device
JP6969281B2 (en) Crane and crane disassembly method
JP2547044B2 (en) Jib loading and unloading method and device in crane
CN209740506U (en) Spool lifting appliance
CN214653248U (en) Pulley rope winding switching device for head of double four-bar crane
JPH1135284A (en) Mobile crane
JP3036563U (en) Jib crane
JPH075109Y2 (en) Sheave block device
JPH07291587A (en) Tower crane
JPS6218624Y2 (en)
JPH05105386A (en) Automatic slinging device for roll
JPH06183692A (en) Crane boom
JPS6214067Y2 (en)
JPH051781U (en) Hanging beam for cargo handling
JPH0640667Y2 (en) Pile driver that doubles as a cargo crane
JPS6122953Y2 (en)
JPH0460996U (en)
JPH019833Y2 (en)
SU1615144A2 (en) Boom self-propelled crane
CN113148888A (en) Hydraulic valve table capable of lifting hydraulic control valve block in labor-saving manner
JPH08333076A (en) Hanger for take-up drum or the like
JP2002046983A (en) Derricking cylinder load reducing device for mobile crane
JPS6216469Y2 (en)