JPS60141965A JP25193183A JP25193183A JPS60141965A JP S60141965 A JPS60141965 A JP S60141965A JP 25193183 A JP25193183 A JP 25193183A JP 25193183 A JP25193183 A JP 25193183A JP S60141965 A JPS60141965 A JP S60141965A
Authority
JP
Japan
Prior art keywords
wall
guide rail
large panel
fixing
panel unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP25193183A
Other languages
Japanese (ja)
Other versions
JPH0420070B2 (en
Inventor
明 大杉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP25193183A priority Critical patent/JPS60141965A/en
Publication of JPS60141965A publication Critical patent/JPS60141965A/en
Publication of JPH0420070B2 publication Critical patent/JPH0420070B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明はカーテンウオール」二法における壁体取付工法
の改良に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an improvement in the wall mounting method in the "curtain wall" method.

従来、カーテンウオール」二法における壁体の取り付け
は9通常足場を組まずに行われ、まず壁体をレッカー車
または仮設クレーンで吊り下げて所定取付箇所までIM
送し2次に該箇所で待ち受りている作業員が壁体を引き
寄セで躯体に取り付けることにより行っている。
Conventionally, wall installation using the ``curtain wall'' method was usually carried out without constructing scaffolding, and the wall was first lifted by a tow truck or temporary crane and then IM'd to the designated installation location.
Next, workers waiting at the location pull the wall and attach it to the frame.

ところが、上記従来の方法は、空中に吊り下げられて不
安定な状態の壁体をq一体に引き寄せて取り付けるもの
であるため、取イ」作業に大変手間取るといった問題が
あった。また、レッカー車の設置スペースを必要とする
等建築現場のスペースの面で様々な制約を受けるもので
あるため、建物同士が隣接する現場、いわゆる狭小地で
は実施することができないといった問題があった。さら
に。
However, in the conventional method described above, since the walls, which are suspended in the air and are in an unstable state, are pulled together and attached, there is a problem in that it takes a lot of time to remove the walls. In addition, since it is subject to various restrictions in terms of space at construction sites, such as the need for installation space for a tow truck, there is a problem that it cannot be implemented at sites where buildings are adjacent to each other, so-called narrow areas. moreover.

壁体を1枚ずつ取りイリけていくものであるため。This is because the walls are removed one by one.

施工工期が長く掛り、建築コストが嵩むといった問題も
あった。
There were also problems such as a long construction period and an increase in construction costs.

本発明は、上記の如き諸問題を悉く解消すべく創案した
もので、無足場で行なえることは勿論のこと5 レッカ
ー車等を一切使用せず、また狭小地においても容易且つ
迅速に壁体を躯体に取り付りることができ、しかも施工
工期の大幅な短縮も図ることのできる壁体取付工法を提
供することを目的とする。
The present invention was devised to solve all of the problems mentioned above, and it is possible to easily and quickly install walls even in narrow spaces without using any tow trucks or the like. To provide a wall mounting method that can be attached to a building frame and also significantly shorten the construction period.

尚9本発明においていう壁体とは、串にパイル状のもの
だけを意味するのではな(1例えば、後述するような窓
を備えた箱体状の窓ユニット、外壁パネルとバルコニー
とが一体化されたバルコニーユニット等1通雷外壁に設
けられる耐暑設備をフーニノト化したものも意味する。
9. The term "wall" used in the present invention does not mean only a pile-like structure (1). It also refers to heat-resistant equipment installed on the outer wall of a lightning-conducted balcony unit, etc.

以下2本発明の構成を実施例について図面を参照して説
明する。
Hereinafter, two embodiments of the structure of the present invention will be described with reference to the drawings.

第1図に本発明に係る壁体数例工法による各種壁体の数
句作業を示し、各挿壁体として大型パネルユニソHxl
、 gユニット(21、ハルコニ−ユニット(3)が用
いられている。
Figure 1 shows several works of various wall bodies by the wall body several example construction method according to the present invention.
, g unit (21) and Halcony unit (3) are used.

躯体(4)の四隅には鉄骨柱体(5)・・・が立設され
、該柱体(51(51間に所定間隔(D)隔てて複数の
案内レール(7)が平行且つ垂直に立設されている。該
案内レール(7)は、壁体を案内し、且つ固定支持する
レールで、断面り字状のチャンネル(6)を2本お互い
の背面同士を向き合ね一〇で固定し断面1゛字状になし
またものである。
Steel columns (5) are erected at the four corners of the frame (4), and a plurality of guide rails (7) are arranged parallel and perpendicularly to each other at a predetermined interval (D) between the columns (51). The guide rail (7) is a rail that guides and fixedly supports the wall, and has two channels (6) each having an angled cross section with their backs facing each other. It is fixed and has a 1-shaped cross section.

上記案内レール(7)の設置間隔(D)は、各種壁体を
案内して上方に引き一トげるのに適した間隔。
The installation interval (D) of the guide rails (7) is an interval suitable for guiding various wall bodies and pulling them upward.

即ち、各種壁体の横幅(W)に略等しい間隔に決められ
る。尚、前記案内レール(7)は2本のチャンネル(6
1(61を組合せた場合に限らず1例えばT字状の鉄柱
やI]形鋼或いは■形鋼であってもよい。案内レール(
7)・・・は、第4図に示すように、各階の床面(8ン
に取付けられた取イ」金具(9)・・・により躯体(4
)に固定される。
That is, the intervals are determined to be approximately equal to the widths (W) of the various wall bodies. Note that the guide rail (7) has two channels (6
1 (Not limited to the case of combining 61, 1 For example, it may be a T-shaped steel column, I] section steel, or ■ section steel. Guide rail (
7) As shown in Figure 4, the frame (4
) is fixed.

−に記数付金具(9)は、第5図に示すように、長孔と
なされた取付穴(13)が2箇所設けられた固定板00
)と、該固定板00)の−側端より垂直に起立する起立
板(11)と、該起立板(11)の背面中央から突設さ
れる支持板(12)とからなり2該支持板(12)には
ボルト挿通孔(14)が2箇所穿設されたものである。
- The bracket (9) marked with a number is attached to the fixing plate 00, which has two elongated mounting holes (13), as shown in Fig. 5.
), an upright plate (11) that stands up vertically from the negative end of the fixed plate 00), and a support plate (12) that projects from the center of the back of the upright plate (11). (12) is provided with two bolt insertion holes (14).

上記の如くなる取付金具(9)は、第6図に示すように
、その固定板00)を各階の床面(8)の周囲6、二亘
っζ設けたアンカーボルト (15)に締着プレート 
(29)を介してナンド(30)で固定するごとにより
床面(8)に取り(=jげられている。そして、案内レ
ール(7)は取付金具(9)に、取付金具(9)の支持
板(12)を前記チャンネル(61+6)の昔面間で挾
み、これら支持板(12)、両チャンネル(+3) +
6)とをボルト(25)で締結するごとにより取り伺け
られている。ここで、取イ」金具(9)の固定板00)
の取付穴(13)を長孔となし°Cいるので、取付金具
((]lを横方向にすらし−ζ隣り合う案内レール(7
1(71間が所定間隔(I〕)を保ち且つ圧いに平行に
なるように位置決め調整を行なうことができる。
As shown in Fig. 6, the above-mentioned mounting bracket (9) is attached to the fixing plate (00) to the anchor bolt (15) provided over 6 and 2 ζ around the floor surface (8) of each floor.
The guide rail (7) is attached to the floor (8) by fixing it with the Nand (30) through the (29).The guide rail (7) is then attached to the mounting bracket (9). The supporting plates (12) of the channels (61+6) are sandwiched between the front faces of the channels (61+6), and these supporting plates (12) and both channels (+3) +
6) and each time they are fastened with bolts (25). Here, fixing plate 00 of metal fitting (9)
Since the mounting hole (13) is a long hole, it is necessary to slide the mounting bracket (() horizontally through the -ζ adjacent guide rail (7).
1 (the predetermined interval (I) between 71) can be maintained and the positioning can be adjusted so that it is parallel to the pressure.

第2図に、壁体の一例としての大型バネルユニソl−(
11を背面から見た図を示し、該大型パネルユニット(
1)は、建築物の側壁を形成するパネルであり2背面の
−L部及び下Oiに補強プレー)(17)が留イ」ボル
トl()によって添着され、予め工場において吹き付は
塗装が施された完成品である。上記大型パネルユニy 
I−(11としては9例えば1枚ものの金属製パネルや
ALC版或いはpc版等が用いられる。その他複数の中
空部を有する押出し成形セメント製品を用いてもよい。
Figure 2 shows a large panel Unisol l-(
11 seen from the back, and shows the large panel unit (
1) is a panel that forms the side wall of a building, and the reinforcing plate (17) is attached to the -L part and the lower Oi on the back side of the building using bolts l (). This is the finished product. Large panel unit above
For example, a single metal panel, ALC plate, PC plate, etc. is used as I-(11).An extruded cement product having a plurality of hollow parts may also be used.

大型パネルユニノ1−(11の上端面、下端面は、第3
図に示すように、」二下に接合される他の壁体と相欠き
継ぎができるよ・うな形状にしておくと都合がよい。
The upper end surface and lower end surface of large panel Unino 1-(11 are
As shown in the figure, it is convenient to make the shape so that it can form a recessed joint with the other wall that will be joined below.

大型パネルユニノl−(11の背面に取りイ」りられた
補強プレー) (17) (17)には、前記案内レー
ル(7)の設置間隔と略等しい距&11を隔てて固定金
具(20)・・・か2対取り(=Jりられている。これ
ら1IIIll定金具(20)・・・は、前記案内レー
ル(7)と係合して大型パネルユニット(1)を案内レ
ール(7)に沿っ−C案内し。
Large panel unit (reinforcing plate installed on the back of 11) (17) (17) has fixing fittings (20) and 11 spaced apart by a distance approximately equal to the installation interval of the guide rail (7). ... or two pairs (=J).These 1IIIll fixed fittings (20)... engage with the guide rail (7) and move the large panel unit (1) onto the guide rail (7). Guide along-C.

且つ最終的に大型パネルユニット(+1を案内レール(
7)に固定支持する金具′(ある。この固定金具(20
)は、 Ili面コ面状字状され1;I記案内レール(
7)に係合する保合部(20a)に取付部(2(ILI
)が溶接等により連結されたものである。尚、ごれに限
らず。
Finally, the large panel unit (+1) is connected to the guide rail (
There is a metal fitting (20) that fixes and supports it on the
) is Ili face-shaped and 1; I guide rail (
The attachment part (2 (ILI)
) are connected by welding etc. In addition, it is not limited to dirt.

固定金具(20)は一体ζこ形成し大皿ものであっても
よい。また、保合部(20a>の内面に摺動時の抵抗か
少な(しかも0;i記案内レール(7)を緩f#i し
て押圧する硬質ナイロン等を設けてもよい。
The fixing fitting (20) may be integrally formed into a large plate. Further, the inner surface of the retaining portion (20a) may be provided with hard nylon or the like that has little (and 0;

また、大型パネルユニノ)l)の背面に取り伺りられた
一F側の補強プレー1−(+7)には、引上ローブ(2
2)を係止する係11−板(23) (23)か適当間
隔で設し〕られている。面、該係止板(23)の設りる
位置は図示例に限らず、大型パネルユニ7)Fl)の背
面中程に取り付けてもよいし、該ユニ・y I・(1)
の中央部に1ヶ設けてもよい。
In addition, the reinforcing play 1-(+7) on the 1F side, which was taken up on the back of the large panel Unino) l), has a pulling lobe (2
2) are provided at appropriate intervals. The position where the locking plate (23) is installed is not limited to the illustrated example, and it may be installed in the middle of the back of the large panel unit 7) Fl), or the locking plate (23) may be installed in the middle of the back of the large panel
One piece may be provided in the center of the area.

l’l’J 、!Nl 記窓ユニソl−(2+ ヤハル
コニ−ユニソ) (31■・4)、その1¥面、上端面
及び下端面の構成は」二記大型バ不ルコーニソl−(1
1に準する。
l'l'J,! Nl Window Unisol l-(2+ Yahalconi Uniso) (31■・4), the configuration of its 1 yen surface, upper end surface, and lower end surface is 2 Large window Unisol l-(1
Conforms to 1.

躯体4の屋上には、引上手段として1例えばウィンチ(
24)が設けられ、該ウィンチ(24)によっ°C前記
引上ロープ(22)を介して大型パネルユニット(])
等の各種壁体を引き上げる。ウィンチ(24)は、屋上
において9目体4の周囲に沿って移動できるようにして
おくと作業性がよく、その場合は例えば屋上に仮敷設し
たレール上を移動するよう乙こずればよい。また、複数
のウィンチを同時に設置使用してもよく、そうすれば、
躯体(4)の全周囲で一度に壁体取付工法作業が行え1
作業能率を一段と+1’J+ くすることもできる。
A winch (for example, a winch) is installed on the roof of the frame 4 as a lifting means.
24) is provided, and the winch (24) moves the large panel unit (]) through the pulling rope (22).
Pull up various walls such as The winch (24) is operable if it is movable along the circumference of the nine-eye body 4 on the rooftop, and in that case, it is only necessary to move it on a rail temporarily laid on the rooftop, for example. Also, multiple winches may be installed and used at the same time.
Wall installation method work can be done all around the frame (4) at once 1
It is also possible to further increase work efficiency by +1'J+.

次に9本発明に係る壁体取付工法によって壁体を取りイ
【1げる手順を、前記大型パネルユニ;/H1lを例に
とって説明する。
Next, the procedure for removing a wall using the wall mounting method according to the present invention will be explained using the large panel unit /H1l as an example.

91体(4)側において、各階床面(8)の周囲に亘っ
て。
On the 91 body (4) side, around each floor surface (8).

所定間隔隔ててアンカーボルト(15)を設υノ、該ア
ンカーボルト(15)に前記取イ」金具(0)を仮留め
しておく。次に、チャンネル(6)・・・を)“ノ′(
て取(=J全金具9)に固定し案内レール(7)を構成
していく。そして、総ての案内レール(7)が立設てき
たら隣り合う案内レール(71(7+の間隔か所定間隔
(D)を保ぢ。
Anchor bolts (15) are set at predetermined intervals, and the metal fittings (0) are temporarily fastened to the anchor bolts (15). Next, channel (6)...)"ノ'(
The guide rail (7) is constructed by fixing it to the handle (= J metal fittings 9). Then, when all the guide rails (7) are erected, maintain the distance between adjacent guide rails (71 (7+) or the predetermined distance (D).

且つ案内レール(力(7)同士が互いに平行となるよう
に取付金具(9)を適宜動かし゛C位置決めを行なう。
Then, move the mounting bracket (9) appropriately so that the guide rails (forces (7)) are parallel to each other to perform positioning.

上記のようにして案内レール(7)・・・の位置決めを
完了したら、数例金具(9)を本締め固定して案内レー
ル(7)・・・を最終的に固定゛Jる。また、案内レー
ル(7)の下端をアンカー(121示省略)を介して基
礎(31)に固定する。
After completing the positioning of the guide rails (7) as described above, the metal fittings (9) are finally fixed in some cases to finally fix the guide rails (7). Further, the lower end of the guide rail (7) is fixed to the foundation (31) via an anchor (121 not shown).

次に、まず最」二階に取イ」ける大型パネルユニット(
Ia)を前記案内レール(7)(力量に外側から寄り添
わして立設し、固定金具(20)・・・を躯体(4)側
から大型パネルユニノh (11の背面の1IIr定↑
7iiす「に取イ」す、固定金具(20)の係合部(2
0a)で案内レール(7)を挟持することにより大型パ
不ルユニノh(1)を装着する。
Next, first of all, a large panel unit that can be installed on the second floor (
Ia) is placed upright against the guide rail (7) (from the outside), and the fixing metal fittings (20)... are attached to the large panel unit h (1IIr setting on the back of 11) from the frame (4) side.
7ii.
Attach the large pallet unino h (1) by holding the guide rail (7) between the guide rails (7).

その後、屋上に設けたウィンチ(24)がら下ろした引
上ロープ(22)を大型パネルユニット(1)背面の係
止板(23)に係止し、ウィンチ(24)を作動させて
引上ローブ(22)を巻上げ、大型パネルユニソ1(I
a)を前記案内レール(7)に沿わせて引き−1−げて
いく。大型パネルユニット(1a)は、所定取付箇所、
即ち最終固定位置よりやや高いところまで引き上←ノ、
固定金具(2o)の係合部(20a)に螺入されるポル
) (27)で大型パ不ルユニノ1− (1,)を案内
レール(7)に仮固定する。
After that, the lifting rope (22) lowered from the winch (24) installed on the roof is locked to the locking plate (23) on the back of the large panel unit (1), and the winch (24) is activated to remove the lifting rope. (22), and roll up the large panel Uniso 1 (I
a) along the guide rail (7). The large panel unit (1a) has a designated mounting location,
In other words, pull it up to a point slightly higher than the final fixed position ←ノ,
Temporarily fix the large pawl unino 1- (1,) to the guide rail (7) with the pin (27) screwed into the engaging part (20a) of the fixing fitting (2o).

以下順次上記と同様にして各階に相当する大型パネルユ
ニット(lb) 、(lc)・・・を引き」−けて案内
レール(7)に仮固定していく。
Thereafter, in the same manner as above, large panel units (lb), (lc), etc. corresponding to each floor are pulled out and temporarily fixed to the guide rail (7).

そし”0最下階の大型パネルユニット(le)の仮固定
が終了したなら、シール板材(26)を土台基礎(31
)上に固定する。次いで、最下階の大型パネルユニット
(le)をウィンチ(24)により下ろしシール板+A
(2G) J−に載置し、固定金具(20)のポルl−
(27)の本締めを行い大型パネルユニット(le)を
最終的に固定する。この後順次下方に位置する大型パネ
ルユニノ1−(ld)・・・から案内レール(7)に仮
固定していたポルh (27)を緩めると共にウィンチ
ク24)により最終固定位置まで下げ、ポルI−(27
)の本締めを行い大型パイルユニット(1)の固定作業
を終了する。
After temporarily fixing the large panel unit (le) on the bottom floor, attach the sealing board (26) to the foundation (31).
) to fix it on top. Next, lower the large panel unit (le) on the bottom floor using the winch (24) and remove the seal plate +A.
(2G) Place it on J- and attach the port L- of the fixing bracket (20).
Perform final tightening in (27) to finally fix the large panel unit (le). After this, from the large panel unino 1-(ld) located below, loosen the port h (27) temporarily fixed to the guide rail (7) and lower it to the final fixing position using the winch 24). (27
) is finally tightened to complete the fixing work of the large pile unit (1).

上記固定作業が完了したならば、最後に、最−]二階に
取付げられる大型パネル1とソh (la)の4一端面
を被覆して笠木及O・パラペットを設けると共に適当な
防水処理を施し、また各種壁体間の縦目地のコーキング
処理を行って全作業を終了−」る。
Once the above fixing work has been completed, the final step is to cover the large panel 1 and the 4 end faces of the upper and lower panels that will be installed on the second floor, install a cap and O/parapet, and apply appropriate waterproofing treatment. The entire work was completed by caulking the vertical joints between the various wall bodies.

上記作業において、各種壁体を前記案内レール(7)ま
で搬送させるには人手に依ってもよいが7例えばベルト
コンヘア等を躯体(4)周りの池十に仮設しておき、そ
れに壁体を載−Uて所定の装着位置まで搬送するように
ずれば極めて作業性かよい。’1.’rに、隣接する建
物との間隔が極めて狭く5人手に依って壁体を運ぶごと
が困ゲVな場合に適−Jる。
In the above work, it is possible to manually transport the various wall bodies to the guide rail (7). It is extremely easy to work if the parts are loaded and transported to a predetermined mounting position. '1. It is suitable when the distance between adjacent buildings is extremely narrow and it is difficult to move the wall by five people.

尚、」二記本発明実施例でシJ、各種壁体を・lbすi
定数付箇所より上方に仮固定し1基礎上にシール板材を
固定してから各種壁体を下ろし゛ζ最終的に固定してい
るが、当初から各種壁体を所定取付箇所に固定し、最後
にシール板材を取り(=Jげてもよい。また、各種壁体
の固定方法は、上記実施例のように、案内レールに直接
固定することに限らず従来のように躯体のスラブ等に溶
接等して固定してもよい。さらに、引上手段はウィンチ
に限らずクレーン等を用いることもできる。
In addition, in the second embodiment of the present invention, various wall bodies are
The various walls are temporarily fixed above the fixed point, and the sealing plate is fixed on the foundation, and then the various walls are lowered and finally fixed. In addition, the method of fixing various walls is not limited to directly fixing them to the guide rail as in the above example, but also by welding them to the slab of the frame, etc. as in the past. Furthermore, the lifting means is not limited to a winch, but a crane or the like can also be used.

以上説明した如く1本発明壁体取付工法は、躯体の屋上
に引上手段を設けると共に躯体の周囲に案内レールを立
設固定し、上階に設りられる壁体から順次前記引上手段
により前記案内レールに沿わせて引き上げ、それら壁体
を所定数イ」箇所に固定するものであるため、レッカー
車や仮設クレーンを一切必要とせず、いかなる狭小地に
おいても極めて容易且つ迅速に壁体を躯体に取付けるこ
とができ作業能率の向上が回れる。また1強風時におい
ても風に煽られる心配がないため安全に作業することが
できる。さらに、引上手段により壁体を案内レールに沿
わせて引き上げ躯体に取り付けていくため、従来のレッ
カー車等を用いる方法よりも作業能率が非常に高く、従
って施工工期を短縮することができ、建築費の低減が図
れる等のliすれた効果を奏する。
As explained above, in the wall mounting method of the present invention, a lifting means is provided on the roof of the building frame, and a guide rail is erected and fixed around the building frame, and the lifting means is installed in order from the wall installed on the upper floor. Since the walls are pulled up along the guide rails and fixed at a predetermined number of locations, there is no need for tow trucks or temporary cranes, and the walls can be assembled extremely easily and quickly even in narrow spaces. It can be installed to improve work efficiency. In addition, even in strong winds, there is no need to worry about being blown by the wind, so you can work safely. Furthermore, since the wall is pulled up and attached to the frame along the guide rail using the lifting means, the work efficiency is much higher than the conventional method using a tow truck, etc., and therefore the construction period can be shortened. This has significant effects such as cost reduction.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は1本発明に係る壁体取付工法による各種壁体の
取付作業を説明する斜視図、第2図は壁体ユニットの一
例として、大型パネルユニソ[・を示ず背面図、第3図
は同側面図、第4図は第1図におけるIV −IV線断
面図、第5図は取イ」金具をンI<ず斜視図、第6図は
第4図にお&JるV−V線断面図である。 (1)・・・大型パネルユニット(壁体)(2)・・・
窓ユニット(壁体) (31・・・バルコニーユニy I・C壁体)(4)・
・・躯体 (7)・・・案内レール(24)・・・引上
手段 ほか1名
Fig. 1 is a perspective view illustrating the installation work of various wall bodies using the wall installation method according to the present invention, Fig. 2 is a rear view of a large panel unit as an example of a wall unit; is a side view of the same side, FIG. 4 is a sectional view taken along the line IV-IV in FIG. 1, FIG. 5 is a perspective view of the metal fittings shown in FIG. FIG. (1)...Large panel unit (wall) (2)...
Window unit (wall) (31... Balcony unit I/C wall) (4)
...Structure (7) ...Guide rail (24) ...Lifting means and 1 other person

Claims (1)

【特許請求の範囲】[Claims] 1)躯体の屋上に引上手段を設けると共に躯体の周囲に
案内レールを立設固定し、上階に取り付けられる壁体か
ら順次前記引上手段により前記案内レールに沿わせて引
き上げ、それら壁体を所定取付箇所に固定することを特
徴とする壁体取イ1]二法。
1) A lifting means is provided on the roof of the building frame, and a guide rail is erected and fixed around the building frame, and the lifting means is used to pull up the walls one by one along the guide rail, starting from the wall that will be attached to the upper floor. 1) Method 2 for mounting a wall body characterized by fixing it at a predetermined mounting location.
JP25193183A 1983-12-27 1983-12-27 Wall body attachment method Granted JPS60141965A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25193183A JPS60141965A (en) 1983-12-27 1983-12-27 Wall body attachment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25193183A JPS60141965A (en) 1983-12-27 1983-12-27 Wall body attachment method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
JP10741691A Division JPH0639848B2 (en) 1991-05-13 1991-05-13 Wall panel mounting method
JP10741591A Division JPH04363441A (en) 1991-05-13 1991-05-13 Structure for mounting wall panel

Publications (2)

Publication Number Publication Date
JPS60141965A true JPS60141965A (en) 1985-07-27
JPH0420070B2 JPH0420070B2 (en) 1992-03-31

Family

ID=17230097

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25193183A Granted JPS60141965A (en) 1983-12-27 1983-12-27 Wall body attachment method

Country Status (1)

Country Link
JP (1) JPS60141965A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5177837U (en) * 1974-12-17 1976-06-19
JPS55132861A (en) * 1979-03-30 1980-10-16 Takenaka Komuten Co Method and device for lifting exterior finish panel of skyscraper

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5177837U (en) * 1974-12-17 1976-06-19
JPS55132861A (en) * 1979-03-30 1980-10-16 Takenaka Komuten Co Method and device for lifting exterior finish panel of skyscraper

Also Published As

Publication number Publication date
JPH0420070B2 (en) 1992-03-31

Similar Documents

Publication Publication Date Title
US5063718A (en) Curtain wall for a building
US5388663A (en) Portable walkway systems
JP2010065378A (en) Hanging scaffold and method for erecting the same
CZ308008B6 (en) Stacked steel structure for lifting equipment
US20050066609A1 (en) Preassembled roof and floor deck panel system
JP3250764B2 (en) Building exterior curtain wall assembly equipment
JPS60141965A (en) Wall body attachment method
US3292313A (en) Tensile system of building construction
JP2931761B2 (en) Fixing device for outer wall material and laminating method for middle and high-rise buildings using the fixing device
JPH09296610A (en) Outside curing unit
JPH0543817B2 (en)
JP2669254B2 (en) Side wall panel mounting method
JP3137257B2 (en) Scaffolding equipment and scaffold construction method
CN209855224U (en) Device is established to outer wall department floor edge side template
JPH04363469A (en) Method of attaching wall body panel
JPS588829Y2 (en) Scaffolding restraining device
JP2849355B2 (en) Exterior wall construction method and preset exterior wall used for it
JP2625309B2 (en) Unit building
JPS58143065A (en) Remodeling construction of wall surface of building
JP4018000B2 (en) Construction method of unit type building
JPH084277A (en) Temporary scaffold unit for multistoried parking garage, and construction method of multistory parking garage using the same
JPS6246758Y2 (en)
JPS61106867A (en) Construction of outer wall by two-stage suspension scaffold
JPH08246676A (en) Wall panel installing method
JPH0886021A (en) Fitting structure of balcony and fitting method thereof