JPS6013101A JP12057383A JP12057383A JPS6013101A JP S6013101 A JPS6013101 A JP S6013101A JP 12057383 A JP12057383 A JP 12057383A JP 12057383 A JP12057383 A JP 12057383A JP S6013101 A JPS6013101 A JP S6013101A
Authority
JP
Japan
Prior art keywords
groove
train control
adhesive
automatic train
monorail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP12057383A
Other languages
Japanese (ja)
Other versions
JPH0261565B2 (en
Inventor
幹友 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DAIKI KOGYO KK
Original Assignee
DAIKI KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DAIKI KOGYO KK filed Critical DAIKI KOGYO KK
Priority to JP12057383A priority Critical patent/JPS6013101A/en
Publication of JPS6013101A publication Critical patent/JPS6013101A/en
Publication of JPH0261565B2 publication Critical patent/JPH0261565B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Railway Tracks (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は跨座式モノレール用&4M道桁において、四桁
の上面と側面との交差角部に沿って凹溝を形成し、同門
溝の内面に接着剤を塗布し、その後同門溝内に上面と側
面yの交差角部に同両面の交差線方向に配管を支持した
非磁性構造体を挿入し、同構造体を上記凹溝の内部に上
記接着剤の支持力によって保持し、同構造体の上記上面
と側面とを上記動道桁の上面と側面とに揃えた状態にお
しAで同接着剤を硬化させることを特徴とする自動列車
制御装置用配管施工法に関するものである。
[Detailed Description of the Invention] The present invention is a straddle type monorail & 4M road girder in which a concave groove is formed along the intersection corner of the top surface and side surface of the four girders, and an adhesive is applied to the inner surface of the groove. Then, a non-magnetic structure supporting piping in the direction of the intersection of both surfaces is inserted into the groove at the intersection corner of the top surface and the side surface y, and the structure is placed inside the groove with the supporting force of the adhesive. piping construction for an automatic train control device, characterized in that the above-mentioned upper surface and side surfaces of the structure are aligned with the upper surface and side surfaces of the above-mentioned channel girder, and the adhesive is cured at A. It is about law.

跨座式モノレールの鋼動道桁に自動列車制御装置(AT
O)用配管を固定する場合は桁上部コーナーに設けられ
た凹溝にATC用硬Jp.塩化ビニール製配管を配置し
て管体保持部材を鋼製の桁に溶接し凹溝の残余の空間に
g脂モノレタノレを打設していたがこの工法には次のよ
うな欠点があった。
An automatic train control device (AT) is installed on the steel road girder of the straddle type monorail.
When fixing the ATC piping, use the ATC hard Jp. PVC pipes were arranged, the pipe body holding members were welded to steel girders, and G fat monorethane was poured into the remaining space of the groove, but this method had the following drawbacks.

即ちコーナ一部に管体を配置する結果樹脂モノレタルの
打設時に仕上げ精度を上げる為型枠の使用が余儀なくさ
れていた。又型枠使用の為モノレタルの充填の度合いも
確認出来ず成品のノ{ラツキを生じモノレールの重量や
熱膨張率の差に起因する舶道の撓みに追随出来ない結果
モノレタルに亀裂力{生じたり軸道と桁の間に間隙が生
じたりしていた。
That is, as a result of arranging the tubular body in a part of the corner, it was necessary to use a formwork to improve finishing accuracy when casting the resin monolith. In addition, due to the use of formwork, it is not possible to check the degree of filling of the monometal, resulting in unevenness of the finished product, and the inability to follow the deflection of the ship channel due to differences in the weight and coefficient of thermal expansion of the monorail, resulting in cracking forces in the monometal. There were gaps between the shaft and the girder.

又一度打設を行うと桁と完全に接着固定している為破損
等の事故及び補修の除るグリ出し取替えるという欠点が
あった。
Furthermore, once the concrete is poured, it is completely adhesively fixed to the girder, which has the disadvantage of causing accidents such as damage and having to take out the bore and replace it to avoid repairs.

本発明はこれらの問題を解決し自動列車制御装置用管材
・を含む構造体を工場にて製作し、現場で挿入すること
でのq動道桁の伸縮や撓みにも追随できるようにするこ
とを目的としたものである。
The present invention solves these problems by manufacturing a structure containing pipe materials for automatic train control equipment in a factory and inserting them on site so that it can follow the expansion, contraction, and deflection of the Q-way girder. The purpose is to

この技術課JVを解決する為に本発明では#動道桁コー
ナ一部にある凹溝内のスタッドジベルを撒宍し自動列車
制御装置用管体を含む構造体の挿入を安易にし桁を構造
体の接暗によって構造体の剥離鍼防止したものである。
In order to solve this technical section JV problem, in the present invention, stud dowels are installed in the grooves in some corners of the channel girder to facilitate the insertion of structures including pipes for automatic train control equipment and to structure the girder. This prevents the acupuncture needles from peeling off the structure by keeping the body in the dark.

又構重体そのものも工場による品)J!/ ’(i’ 
1146でより生産されたもので品質のバラツキが少な
く仕上がり精度が高くコストも安くなるという利点があ
る。
Also, the structure itself is manufactured by the factory) J! / '(i'
1146, which has the advantage of less variation in quality, higher finishing accuracy, and lower cost.

本発明をし3面に示す実施例について説明すると、跨座
式モルレール用hl+f9+道桁]の上面2と両側面3
.3との交差角部に両面2.3の交差線に沿って第1図
実線で示すように凹溝4を形成するものである。一方、
工場では樹脂モルタル等による非磁性構造体5を製造す
る。この構造体5はその上面6と一側面7との交差角部
に同両面6.7の交差線方向に上記ATC用の硬質塩化
ビニール製配管8を埋設するものである。この構造体5
の内部には第2図に示す補強筋9を埋設しても良いし、
スタッドジベル10用四部11を形成して置くこともで
きるし1間構造体5の材質はモルレールの走路としての
強度の出るものであれば良い。本発明では上記凹溝4内
において上記桁1に対する防吟)爛を行い、かつ構造体
5との接着性の良好なプライマー処理を施し、さらに凹
溝4の内面に沿って同格1と構造体5との間隙を埋める
ためのパテ状接着剤12を塗布する(第1図参照)。こ
の状態において上記構造体5を同凹溝4の内部に挿入し
、同構造体5をパテ状接着剤12の支持力によって同門
溝i内に保持する。そして]形の取付補助具13等を用
い、かつ構造体5を押し込みその上面6および側面7を
上記軌道桁1の上UiJ2と側面3に揃えるものである
。その際上記接着剤12は塑性変形して揃えられた状態
か保持され、経時変化によりその状態のまま同接着剤1
2か硬化かそれぞれ同一平面にあることを意味するもの
でなく整然と配置(/さitた状態でも差支えない。こ
の固定状態において弾性シーリング14を施し作業を終
了する。
To explain the embodiment of the present invention shown on the third side, the upper surface 2 and both side surfaces 3
.. A concave groove 4 is formed along the intersection line of both surfaces 2.3 at the intersection corner with 3, as shown by the solid line in FIG. on the other hand,
At the factory, a non-magnetic structure 5 is manufactured using resin mortar or the like. In this structure 5, the hard vinyl chloride pipe 8 for ATC is buried at the corner of the intersection between the upper surface 6 and one side 7 in the direction of the intersection between the same two surfaces 6.7. This structure 5
Reinforcement bars 9 shown in FIG. 2 may be buried inside the
The four parts 11 for the stud dowel 10 may be formed and placed, and the material for the one-way structure 5 may be any material that has sufficient strength to serve as a running path for the mole rail. In the present invention, the girder 1 is protected from corrosion in the groove 4, and is treated with a primer that has good adhesion to the structure 5, and furthermore, the girder 1 and the structure are coated along the inner surface of the groove 4. A putty-like adhesive 12 is applied to fill the gap with 5 (see FIG. 1). In this state, the structure 5 is inserted into the groove 4, and the structure 5 is held in the groove i by the supporting force of the putty adhesive 12. ]-shaped installation aid 13 or the like, and push the structure 5 so that its upper surface 6 and side surface 7 are aligned with the upper UiJ2 and side surface 3 of the track girder 1. At that time, the adhesive 12 is plastically deformed and maintained in an aligned state, and due to changes over time, the adhesive 12 remains in that state.
It does not mean that they are on the same plane; they may be arranged in an orderly manner. In this fixed state, the elastic sealing 14 is applied and the work is completed.

本発明は上述の施工法によったので跨座式モルレールの
鋤4ilE道桁1の上面2と両側…13.3との交差角
部に自動列車ル1j御装置杓用配R・8を迅速催し実に
施工し得ると共にお産に適し、施工能率を向上し得るば
かりでなく上述の欠陥を解消しかつ上述の利点を発揮す
ることかできる。
Since the present invention is based on the construction method described above, it is possible to quickly install the automatic train rail 1j control device ladle arrangement R/8 at the intersection corner between the upper surface 2 of the plow 4ilE road girder 1 and both sides...13.3 of the straddle type mole rail. It can be constructed in a ceremonial manner, is suitable for childbirth, and not only can the construction efficiency be improved, but also can eliminate the above-mentioned defects and exhibit the above-mentioned advantages.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本促明の跨圧式モル−ル用鋼軌道桁における自
助)列車制御装憤用配管施工法の凹渦部を示す細断面図
1、第2図は施工後の状態の、縦断面図である。 1・・Y91座式モル−ル用鋼献道柘、2.6・・上面
、3.7・・側面、4・・凹溝、12・・接着剤、8・
・配管、5・・非磁性構造体。 特許出願人 ダイキ工業株式会社 才1n 才2凶 手続補正書(自発) 1事件の表示 昭和58年勉許願第120573号 2発明の名称 跨座式モルレール用鋼軌道桁における自動列車制御装置
配管施工法 3補正をする者 4代理人 〒81() 亀 092−741−1148住 所 福
岡市中央区大名2丁目4番22七 新日本ビル5補正の
対象 )!i:f−iJ3行ノ図面 6補正行内図 面1) 11面の第2図を別紙のように補正致します(
符号のみ)。
Figure 1 is a fine cross-sectional view showing the concave vortex section of the self-supporting train control installation method for steel track girders for straddle-type mortar steel track girders developed by the present company, and Figure 2 is a longitudinal cross-sectional view of the concave vortex section after construction. It is a front view. 1...Y91 seated molding steel plate, 2.6...Top surface, 3.7...Side surface, 4...Concave groove, 12...Adhesive, 8...
- Piping, 5... Non-magnetic structure. Patent Applicant Daiki Kogyo Co., Ltd. Sai1n Said2 Written amendment to the procedure (voluntary) 1 Indication of the case 1982 Study Application No. 120573 2 Name of the invention Automatic train control device piping construction method for steel track girder for straddle type mole rail 3. Person making the amendment 4. Agent 〒81 () Kame 092-741-1148 Address 2-4-227 Daimyo, Chuo-ku, Fukuoka City New Japan Building 5. Target of amendment)! i: f-iJ 3rd line drawing 6 correction line drawing 1) I will correct the 2nd drawing on page 11 as shown in the attached sheet (
(sign only).

Claims (1)

【特許請求の範囲】[Claims] (1)跨座式モノレール用一動道桁1において、四桁】
の上面2と側面3との交差角部に沿って凹溝4を形成し
、同門溝4の内面に接着剤12を塗布し、その後同門溝
4内に上面6と側面7との交差角部に同両面6、7の交
差線方向に配管8を支持した非磁性構造体5を挿入し、
同構造体5を上記凹溝4の内部に上記接着剤12の支持
力によって保持し、同構造体5の上記上面6七側面7と
を上記動道桁】の上面2と側面3とに揃えた状態におい
て同接着剤12を硬化させることを特徴とする自動列車
制御装置用配管施工法。
(1) Four digits in single-stroke girder 1 for straddle type monorail]
A concave groove 4 is formed along the intersection corner between the top surface 2 and the side surface 3, an adhesive 12 is applied to the inner surface of the groove 4, and then a groove 4 is formed along the intersection corner between the top surface 6 and the side surface 7 within the same groove 4. Insert the non-magnetic structure 5 supporting the piping 8 in the direction of the intersection of the same both sides 6 and 7,
The structure 5 is held inside the groove 4 by the supporting force of the adhesive 12, and the upper surface 6 and the side surface 7 of the structure 5 are aligned with the upper surface 2 and side surface 3 of the channel girder. A method for constructing piping for an automatic train control device, characterized in that the adhesive 12 is cured in a state where the adhesive 12 is cured.
JP12057383A 1983-06-30 1983-06-30 Arranged pipe construction for automatic train control apparatus in steel track beam for monorail Granted JPS6013101A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12057383A JPS6013101A (en) 1983-06-30 1983-06-30 Arranged pipe construction for automatic train control apparatus in steel track beam for monorail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12057383A JPS6013101A (en) 1983-06-30 1983-06-30 Arranged pipe construction for automatic train control apparatus in steel track beam for monorail

Publications (2)

Publication Number Publication Date
JPS6013101A true JPS6013101A (en) 1985-01-23
JPH0261565B2 JPH0261565B2 (en) 1990-12-20

Family

ID=14789634

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12057383A Granted JPS6013101A (en) 1983-06-30 1983-06-30 Arranged pipe construction for automatic train control apparatus in steel track beam for monorail

Country Status (1)

Country Link
JP (1) JPS6013101A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7087012B2 (en) 2002-02-28 2006-08-08 Olympus Corporation Endoscope hood

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7087012B2 (en) 2002-02-28 2006-08-08 Olympus Corporation Endoscope hood

Also Published As

Publication number Publication date
JPH0261565B2 (en) 1990-12-20

Similar Documents

Publication Publication Date Title
JP5920774B2 (en) Bonding method and structure of old and new concrete
JPS6013101A (en) Arranged pipe construction for automatic train control apparatus in steel track beam for monorail
JPH08260716A (en) Repairing method for corroded concrete
JPH07233620A (en) Floor structure
CN206941523U (en) Slabstone connection wall
JPS61165441A (en) Apparatus for inducing crack of concrete earthquake-proof wall
JPS60126448A (en) Crack inducing structure of concrete structure
JP4601400B2 (en) Construction method and structure at the intersection of facilities
JPS5858308A (en) Repairing of bridge beam floor plate by steel floor panel
JPH07317211A (en) Steel pipe reinforced concrete pile
JP4697739B2 (en) Bridge girder reinforcement structure for girder bridges
El-Esnawi Evaluation of improved shear key design for multi-beam prestressed concrete box girder bridges
JP3261449B2 (en) Construction method of corrosion resistant lining
JP2857643B2 (en) Construction method of corrosion resistant lining
JPH09143930A (en) Column reinforcing structure and elevated bridge using the same
JPS6340579Y2 (en)
JP2958509B2 (en) Construction method and level adjuster of track girder for straddle type monorail to lay piping for train control device
JPS6324166Y2 (en)
ATE21380T1 (en) METHOD OF REFURBISHING REINFORCED CONCRETE.
JPS5820845A (en) Connection of concrete pipe
JPH036282B2 (en)
JPS59134205A (en) Structure expansion joint having float preventing apparatus
CN115233812A (en) Node of precast beam and precast slab and construction method thereof
JPH0596143U (en) Civil / construction structure
JPH0331767Y2 (en)