JPS6011164Y2 - Construction equipment for earth retaining method at right-angled bends in excavated trenches - Google Patents
Construction equipment for earth retaining method at right-angled bends in excavated trenchesInfo
- Publication number
- JPS6011164Y2 JPS6011164Y2 JP11768280U JP11768280U JPS6011164Y2 JP S6011164 Y2 JPS6011164 Y2 JP S6011164Y2 JP 11768280 U JP11768280 U JP 11768280U JP 11768280 U JP11768280 U JP 11768280U JP S6011164 Y2 JPS6011164 Y2 JP S6011164Y2
- Authority
- JP
- Japan
- Prior art keywords
- fitted
- earth retaining
- support
- groove
- columns
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【考案の詳細な説明】
本考案は、掘削溝の直角屈曲部に於ける土留工法の施工
装置に関するものである。[Detailed Description of the Invention] The present invention relates to a construction device for an earth retaining method at a right-angled bend in an excavated trench.
近時、上下水道、ガス等の配管、電信電話ケーブル、送
電線等を埋設する為の溝を掘削するに際して、溝内の側
壁の土砂くずれを防止する為に、第1図に示す如く掘削
溝1の内壁に沿って一定間隔に相対向して立設圧入した
両側面に案内溝2を有し正面に連結部材3を垂直に有す
る支柱4と、相対向する支柱4の間隔を保持したサポー
トジヤツキ5と、各支柱4の案内溝2間に嵌合張設した
土留板6とから戒る土留構体7を、掘削溝1の長手方向
に組立て接続していく土砂工法が施工されている。Recently, when excavating trenches for burying water, sewage, gas, etc. piping, telegraph and telephone cables, power transmission lines, etc., in order to prevent the side walls of the trench from collapsing, the excavated trench is dug as shown in Figure 1. support columns 4 that are erected and press-fitted facing each other at regular intervals along the inner wall of 1, have guide grooves 2 on both sides, and have a connecting member 3 vertically on the front; and supports that maintain the spacing between the opposing columns 4. An earth and sand construction method is being constructed in which an earth retaining structure 7 is assembled and connected in the longitudinal direction of the excavated groove 1 from a jack 5 and an earth retaining plate 6 fitted and stretched between the guide grooves 2 of each support 4. .
ところで、かかる土留工法は掘削溝1が直進する場合は
何等問題はないが、上下水道、ガス等の配管、電信電話
ケーブル、送電線等の埋設方向を直角に屈曲させる為に
、掘削溝1の掘削方向を直角に屈曲させた場合には、そ
の直角屈曲部の内壁に沿って前記土留構体7を組立て接
続していくことができないので、直角屈曲部で中断せざ
るを得ないものぜある。By the way, there is no problem with this earth retaining method when the excavated trench 1 goes straight, but in order to bend the direction of burying water, sewage, gas, etc. piping, telegraph and telephone cables, power transmission lines, etc. at right angles, the excavated trench 1 is bent at right angles. When the excavation direction is bent at right angles, it is not possible to assemble and connect the earth retaining structure 7 along the inner wall of the right angle bend, so there is no choice but to interrupt at the right angle bend.
この為、掘削溝1の直角屈曲部の土留は、従来第2図に
示す如く直角屈曲部1aの大隅部内壁と出隅部内壁に沿
って約1.577L間隔にH杭8を土中に圧入立設し、
このH杭8のフランジ間に横矢板9を入れ(又は鋼矢板
を打ち込み)、H杭8の内側面にH形鋼の復起し10を
架設し、対向する復起し10同志の間隔を保持する為に
切梁11を装架し、出隅側の復起し10にはひうぢ粱1
2を張架している。For this reason, earth retaining at the right-angled bent portion of the excavated trench 1 is conventionally done by placing H piles 8 in the soil at intervals of about 1.577L along the inner wall of the large corner and the inner wall of the protruding corner of the right-angled bent portion 1a, as shown in Fig. 2. Press-fitted and installed
Insert a horizontal sheet pile 9 between the flanges of this H pile 8 (or drive a steel sheet pile), and erect an H-beam steel backing 10 on the inner surface of the H pile 8, and set the interval between the opposing uprights 10. A strut 11 is installed to hold it in place, and a steel rod 1 is installed on the raised corner 10 on the projecting corner side.
2 is hanging.
しかしこのような掘削溝1の直角屈曲部1aの土留工法
では、前述の土留構体7を全く使用できず、別途前材記
料を調達しなければならないので費用が嵩み、その上組
立が面倒である為施工に時間がかかり、甚だ能率が悪い
ものである。However, in this earth retaining method for the right-angled bent portion 1a of the excavated trench 1, the earth retaining structure 7 described above cannot be used at all, and the preliminary materials must be procured separately, which increases costs and makes assembly difficult. Therefore, construction takes time and is extremely inefficient.
本考案はかかる諸事情に鑑みなされたものであり、掘削
溝の直角屈曲部の内壁に沿って土留構体を組立て接続し
て土留できる施工装置を提供し、もって土留工法を中断
することなく連続して施工しようとするものである。The present invention was developed in view of the above circumstances, and provides a construction device that can assemble and connect earth retaining structures along the inner wall of a right-angled bent part of an excavation trench, thereby allowing the earth retaining method to be continued without interruption. This is what we are trying to construct.
以下本考案による掘削溝の直角屈曲部に於ける土留工法
の施工装置の実施例を図によって説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a construction device for earth retaining construction at a right-angled bent portion of an excavated trench according to the present invention will be described below with reference to the drawings.
第3図に示す如く直進した掘削溝1の内壁に沿って一定
間隔に、両側面に案内溝2を有し正面に連結部材3を垂
直に有する支柱4が相対向して立設圧入され、この相対
向する支柱4の連結部材3にサポートジヤツキ5が張架
されて支柱4間の間隔が保持され、掘削溝1の長手方向
の支柱4間には両側端面にガイドローラ6aを有する土
留板6が、そのガイドローラ6aを支柱4の案内溝2に
嵌合して張設されて、土留構体7が掘削溝1の長手方向
に組立て接続されて土留工法が施工されている
かかる土留工法に於いて、例えば下水管の埋設方向を直
角に屈曲させる為に、図示の如く掘削溝1の掘削方向に
直角に屈曲させる場合、その直角屈曲部1aつまり掘削
溝1の末端を土留する為の本考案の施工装置は、直進し
た掘削溝1の末端部に於いてその直前の支柱4から略溝
幅の距離を隔てて相対向して土中に立設圧入され且つサ
ポートジヤツキ5にて間隔が保持される支柱4の外側面
に、第4図a及びbに示す如く直角に隣り合せに立設圧
入される支柱4の正面の連結部材3に嵌着固定して隣り
合う支柱4の外側面の案内溝2に嵌入し、その間口縁2
aに係止するハツト形断面のコネクションプレート15
と、このコネクションプレート15を取付ける第4図す
に示される一側の支柱4とその外側面に平行に隣り合せ
に立設圧入される支柱4とを結合する為に両者の案内溝
2内に嵌入し、その開口縁2aに係止する。As shown in FIG. 3, struts 4 having guide grooves 2 on both sides and vertically connecting members 3 on the front face are press-fitted at regular intervals along the inner wall of the excavated trench 1, which extends straight ahead. Support jacks 5 are stretched over the connecting members 3 of these opposing columns 4 to maintain the spacing between the columns 4, and between the columns 4 in the longitudinal direction of the excavation groove 1 are earth retainers having guide rollers 6a on both end surfaces. In this earth retaining method, the plate 6 is stretched by fitting its guide roller 6a into the guide groove 2 of the support column 4, and the earth retaining structure 7 is assembled and connected in the longitudinal direction of the excavated groove 1. For example, when the excavation trench 1 is bent at right angles to the excavation direction as shown in the figure, in order to bend the sewer pipe at right angles to the buried direction, the right-angled bent portion 1a, that is, the end of the excavation trench 1, is The construction device of the present invention is erected and press-fitted into the soil at the end of an excavation trench 1 that is running straight, facing away from a support 4 immediately in front of it at a distance of approximately the width of the trench, and is installed by a support jack 5. The connecting members 3 on the front side of the columns 4 are fitted and fixed to the outer surfaces of the columns 4 where the distance is maintained, and the connecting members 3 are installed and press-fitted adjacent to each other at right angles as shown in FIGS. 4a and 4b. It fits into the guide groove 2 on the outer surface, and the mouth edge 2
A connection plate 15 with a hat-shaped cross section that locks on a
In order to connect the support column 4 on one side, shown in FIG. It fits in and locks onto the opening edge 2a.
皿形断面のコネクションプレート16を2枚背中合せに
止ねじにて結合したコネクター17と、掘削溝1の末端
の直前に於ける一側の支柱4とその背面に隣り合せに直
角に立設圧入される支柱4とを結合する為に第4図Cに
示す如く前記−側の支柱4の背面に固定し隣り合う支柱
4の案内溝2に嵌入係止する皿形断面のコネクションプ
レート18とより戊るものである。A connector 17 is formed by connecting two connection plates 16 with a dish-shaped cross section back to back with a set screw, and the support 4 on one side immediately in front of the end of the excavated groove 1 is press-fitted vertically adjacent to the back of the support 4. In order to connect the supporting columns 4 to each other, as shown in FIG. It is something that
次にかかる施工装置により掘削溝1の掘削方向を直角に
屈曲させる場合に掘削溝1の末端である直角屈曲部1a
の内壁に土留構体7を組立て接続していく土留工法を図
面に基いて説明する。Next, when the construction device bends the excavation direction of the excavation groove 1 at right angles, the right-angled bent portion 1a is the end of the excavation groove 1.
The earth retaining method for assembling and connecting the earth retaining structure 7 to the inner wall of the building will be explained based on the drawings.
第3図に示す如く掘削溝1を所要位置まで直進掘削した
ならば、該掘削溝1の末端近くに於いてその直前の支柱
4から略溝幅の距離を隔てて支柱4を相対向して土中に
立設圧入し、サポートジヤツキ5にてその間隔を保持す
る。Once the excavated trench 1 has been excavated straight to the required position as shown in FIG. It is press-fitted vertically into the soil, and the spacing is maintained using support jacks 5.
次にこの相対向する支柱4の掘削溝1の端壁側の案内溝
2内に第4図a、 bに示す如く夫々、別の支柱4の正
面の連結部材3に予め嵌着し止ねじにて固定したハツト
形断面のコネクションプレート15を嵌入し、末端の支
柱4に別の支柱4を直角に隣り合せに接続して土中に立
設圧入する。Next, set screws are inserted into the guide grooves 2 on the end wall sides of the excavated grooves 1 of the opposing columns 4, as shown in FIGS. 4a and 4b. A connection plate 15 having a hat-shaped cross-section fixed at is inserted, and another support 4 is connected to the end support 4 adjacent to it at a right angle, and the connection plate 15 is press-fitted into the ground.
次いで末端の支柱4に隣り合せに接続した別の支柱4の
案内溝2間及び末端の支柱4とその直前の支柱4の案内
溝2間に夫々第3図の如く横幅の短い土留板6′を嵌合
張設して掘削溝1の末端を土留する。Next, retaining plates 6' having a short width are installed between the guide grooves 2 of another support 4 connected to the end support 4 adjacently, and between the guide grooves 2 of the end support 4 and the support 4 immediately before it, as shown in FIG. The end of the excavated groove 1 is secured by fitting and tensioning.
そして掘削溝1の末端部を所要の深さまで掘削するのに
合せて各支柱4及び土留板6′を更に深く土中に圧入し
、その上に夫々支柱4及び土留板6′を積載接合する。Then, as the end of the excavation trench 1 is excavated to the required depth, each support 4 and retaining plate 6' are pressed deeper into the soil, and the respective supports 4 and retaining plate 6' are loaded and connected on top of them. .
掘削溝1の末端部の掘削が完了したならば、直角に屈曲
する掘削溝1′を掘削する側の末端の支柱4に隣り合せ
に接続して立設した支柱4の空いている案内溝2内に、
第4図すに示す如くコネクター17の一側の皿形断面の
コネクションプレート16を嵌入する。When the excavation of the end of the excavation groove 1 is completed, the open guide groove 2 of the support 4 is connected to the support 4 at the end of the excavation groove 1' which is bent at right angles, and is erected next to the support 4. Inside,
As shown in FIG. 4, a connection plate 16 having a dish-shaped cross section is fitted on one side of the connector 17.
そしてこのコネクター17の2枚のコネクションプレー
ト16間に別の支柱4の一側の案内溝2の開口縁2aを
嵌入し、該支柱4を隣り合せに接続して土中に立設圧入
する。Then, the opening edge 2a of the guide groove 2 on one side of another support column 4 is fitted between the two connection plates 16 of this connector 17, and the support columns 4 are connected side by side and press-fitted into the ground.
またこれと相対向するように末端の支柱4の直前の支柱
4の背面に第4図Cに示す如く予め止めねじにて背中合
せに固定した皿形断面のコネクションプレート18と支
柱4の背面との間に、別の支柱4の一側の案内溝2の開
口縁2aを嵌入し、該支柱4を隣り合せに接続して土中
に立設圧入する。Also, as shown in FIG. 4C, a connection plate 18 with a dish-shaped cross section is fixed back to back with a set screw on the back side of the column 4 immediately in front of the terminal column 4 so as to face this, and the back surface of the column 4. In between, the opening edge 2a of the guide groove 2 on one side of another support column 4 is inserted, and the support columns 4 are connected side by side and press-fitted into the soil.
そしてこの支柱4と相対向する支柱4との間隔をサポー
トジヤツキ5にて保持する。The distance between this support 4 and the opposing support 4 is maintained by a support jack 5.
次に掘削溝1の末端部−側の横幅の短い土留板6′を抜
き取り、この部分から直角方向に溝1′を掘削していき
、そのあとから相対向する支柱4の他側面の空いている
案内溝2内に第3図に示されるように夫々通常の横幅の
土留板6の一側端面のガイドローラ6aを嵌入して、該
各土留板6を直角に屈曲して掘削した溝1′の内側壁に
沿って張設する。Next, remove the short retaining plate 6' from the end of the excavated groove 1, and excavate the groove 1' from this part in a perpendicular direction. As shown in FIG. 3, a guide roller 6a on one side of each retaining plate 6 of a normal width is inserted into the guide groove 2 in which the retaining plate 6 is located, and each retaining plate 6 is bent at a right angle to form a groove 1. ’ along the inside wall.
次いで各土留板6の他側端のガイドローラ6aに夫々支
柱4の一側面の案内溝2を嵌合して土中に立設圧入し、
サポートジヤツキ5にてその間隔を保持する。Next, the guide roller 6a at the other end of each retaining plate 6 is fitted into the guide groove 2 on one side of the support column 4, and the retaining plate 6 is press-fitted into the soil.
The spacing is maintained using the support jack 5.
以後順次この工程を繰り返す。かくして掘削溝1の層端
である直角屈曲部1aの内壁には土留構体7が組立接続
されて土留され、且つ土留構体による土留工法を中断す
ること掘削溝1の末端から直角方向に掘削した溝1′の
内壁にも施工されることになる。Thereafter, this process is repeated one after another. In this way, the earth retaining structure 7 is assembled and connected to the inner wall of the right-angled bent portion 1a, which is the layer end of the excavated groove 1, and the earth retaining structure 7 is assembled and connected, and the earth retaining method using the earth retaining structure is interrupted. It will also be installed on the inner wall of section 1'.
従って下水管は何ら支障なく直角に屈曲して埋設するこ
とができる。Therefore, the sewer pipe can be bent at right angles and buried without any problem.
以上詳記した通り本考案の掘削溝の直角屈曲部に於ける
土留工法の施工装置によれば、掘削溝の掘削方向を直角
方向に変えた場合、掘削溝の末端の直角屈曲部の内壁に
沿って土留構体を組立接続して完全に土留でき、しかも
この直角屈曲部の土留構体から引き続き直角方向に掘削
した溝の内壁に沿って土留構体を組体接続して土留でき
、即ち土留構体による土留工法は中断することなく連続
的に施工できるので、作業性が良くて施工能率が向上し
、工期の短縮に貢献するところ大なるものである。As described in detail above, according to the construction device of the earth retaining method for the right-angled bend of an excavated trench according to the present invention, when the excavation direction of the excavated trench is changed to the right-angled direction, the inner wall of the right-angled bend at the end of the excavated trench is It is possible to completely retain the earth by assembling and connecting the earth retaining structure along the right angle bending part, and further, by assembling and connecting the earth retaining structure along the inner wall of the trench that is excavated in the perpendicular direction from the earth retaining structure at the right angle bend, that is, by the earth retaining structure. Since the earth retaining method can be constructed continuously without interruption, it is easy to work with, improves construction efficiency, and greatly contributes to shortening the construction period.
また本考案は施工装置は、ハツト形断面のコネクション
プレートと、皿形断面のコネクションプレートを背中合
せに結合したコネクターと、皿形断面のコネクションプ
レートの3点の部材から戊るので、これに要する費用は
微々たるものである。In addition, in this invention, the construction equipment consists of three members: a connection plate with a hat-shaped cross section, a connector that connects the connection plates with a dish-shaped cross section back to back, and a connection plate with a dish-shaped cross section, so the cost required for this is reduced. is insignificant.
第1図は溝掘削用土留構体による土留工法を示す斜視図
、第2図は掘削溝の直角屈曲部に於ける従来の土留工法
を示す平面図、第3図は掘削溝の直角屈曲部に於ける本
考案による施工装置による土留工法を示す平面図、第4
図aは第3図のA部拡大平面図、第4図すは第3図のB
部拡大平面図、第4図Cは第3図のC部拡大平面図であ
る。
1・・・・・・掘削溝、1a・・・・・・掘削溝の直角
屈曲部、1′・・・・・・直角方向に屈曲した掘削溝、
2・・・・・・支柱の案内溝、2a・・・・・・案内溝
の開口縁、3・・・・・・連結部材、4・・・・・・支
柱、5・・・・・・サポートジヤツキ、6・・・・・・
土留板、6′・・・・・・横幅の短い土留板、6a・・
・・・・ガイドローラ、7・・・・・・土留構体、15
・・・・・・ハツト形断面のコネクションプレート、1
6,18・・・・・・皿形断面のコネクションプレート
、17・・・・・・コネクター。Figure 1 is a perspective view showing an earth retaining method using an earth retaining structure for trench excavation, Figure 2 is a plan view showing a conventional earth retaining method at a right angle bend in an excavated trench, and Figure 3 is a perspective view showing a conventional earth retaining method at a right angle bend in an excavated trench. Plan view showing the earth retaining method using the construction device according to the present invention, No. 4
Figure a is an enlarged plan view of part A in Figure 3, Figure 4 is B in Figure 3.
FIG. 4C is an enlarged plan view of section C in FIG. 3. 1... Excavation groove, 1a... Right angle bent part of the excavation groove, 1'... Excavation groove bent in the right angle direction,
2...Guiding groove of the pillar, 2a...Opening edge of the guide groove, 3...Connecting member, 4...Strut, 5...・Support jack, 6...
Earth retaining board, 6'...Short width earth retaining board, 6a...
... Guide roller, 7 ... Earth retaining structure, 15
...Connection plate with a hat-shaped cross section, 1
6, 18...Connection plate with dish-shaped cross section, 17...Connector.
Claims (1)
た両側面に案内溝を有し正面に連結部材を垂直に有する
支柱と、相対向する支柱の間隔を保持したサポートジヤ
ツキと、各支柱の案内溝間に嵌合した土留板とから戊る
土留構体を、掘削溝の長手方向組立て接続していく土留
工法に於いて、直進した掘削溝の末端部に於いて相対向
して土中に立設圧入され且つサポートジヤツキにてその
間隔が保持される支柱の外側面に直角に隣り合せに立設
圧入される支柱の正面の連結部材に嵌着固定して隣り合
う支柱の外側面の案内溝に嵌入しその開口縁に係止する
ハツト形断面のコネクションプレート、このコネクショ
ンプレートを取付ける一側の支柱とその外側面に平行に
隣り合せに立設圧入される支柱とを結合する為に両者の
案内溝内に嵌入しその開口縁に係止する皿形断面のコネ
クションプレートを2枚背中合せに結合したコネクター
と、掘削溝の末端の直前における一側の支柱とその背面
に隣り合せに直角に立設圧入される支柱とを結合する為
に前記−側に支柱の背面に固定し隣り合う支柱の案内溝
に嵌入係止する皿形断面のコネクションプレートとより
成る掘削溝の直角屈曲部に於ける土留工法の施工装置。A column that is press-fitted into an excavated groove at regular intervals facing each other along the inner wall, has guide grooves on both sides and has a connecting member vertically in front, and a support jack that maintains the spacing between the opposing columns. In the earth retaining method, in which the earth retaining structure formed from the earth retaining plates fitted between the guide grooves of each support column is assembled and connected in the longitudinal direction of the excavated groove, the earth retaining structure is assembled and connected in the longitudinal direction of the excavated groove. Adjacent columns that are fitted and fixed to the connecting member on the front of the columns that are erected and press-fitted into the ground at right angles to the outer surfaces of the columns that are erected and press-fitted into the soil and whose spacing is maintained by support jacks. A connection plate with a hat-shaped cross section that fits into a guide groove on the outside surface and locks on the opening edge thereof, a support on one side to which this connection plate is attached, and a support that is erected and press-fitted parallel to the outside surface of the connection plate. In order to connect, there is a connector which is made by joining two connection plates with a dish-shaped cross section back to back, which fit into the guide groove of both and lock onto the opening edge of the guide groove, and a support on one side just before the end of the excavation groove and the back of the support. In order to connect columns that are installed vertically and press-fitted next to each other, an excavated groove consisting of a connection plate with a dish-shaped cross section that is fixed to the back side of the columns on the negative side and is fitted and locked into the guide groove of the adjacent column. Construction equipment for earth retaining method at right angle bends.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11768280U JPS6011164Y2 (en) | 1980-08-20 | 1980-08-20 | Construction equipment for earth retaining method at right-angled bends in excavated trenches |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11768280U JPS6011164Y2 (en) | 1980-08-20 | 1980-08-20 | Construction equipment for earth retaining method at right-angled bends in excavated trenches |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS5741941U JPS5741941U (en) | 1982-03-06 |
JPS6011164Y2 true JPS6011164Y2 (en) | 1985-04-13 |
Family
ID=29478438
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11768280U Expired JPS6011164Y2 (en) | 1980-08-20 | 1980-08-20 | Construction equipment for earth retaining method at right-angled bends in excavated trenches |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6011164Y2 (en) |
-
1980
- 1980-08-20 JP JP11768280U patent/JPS6011164Y2/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
JPS5741941U (en) | 1982-03-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011046054A1 (en) | Earth retaining wall and method of constructing same | |
JPS6011164Y2 (en) | Construction equipment for earth retaining method at right-angled bends in excavated trenches | |
KR200369479Y1 (en) | The land-side protection wall panel | |
JP3059051B2 (en) | Construction method of water stop wall by steel tube column | |
KR200258921Y1 (en) | construction of panel | |
KR100724781B1 (en) | A sheathing board | |
JPS5845321Y2 (en) | Gable retaining board in earth retaining structure | |
JPS5838021Y2 (en) | Earth retaining support board for trench excavation | |
KR200258922Y1 (en) | construction of panel | |
CN219410828U (en) | Spliced prefabricated underground continuous wall | |
KR200421809Y1 (en) | A sheathing board | |
JPS6017898B2 (en) | Construction method of pile foundation with underground wall | |
JPH053545Y2 (en) | ||
KR101915189B1 (en) | Temporary retaining wall structure | |
JPH0315624Y2 (en) | ||
JPS6133066Y2 (en) | ||
KR101877407B1 (en) | Temporary retaining wall structure | |
JPS5918491B2 (en) | Construction method for expanding portions of simple earth retaining | |
JPS5840608B2 (en) | Earth retaining method for ditch side walls | |
JP2565452B2 (en) | Construction method of self-supporting retaining wall | |
JPS6011966Y2 (en) | Excavation trench earth retaining panel | |
JP2761531B2 (en) | Construction method of guide for underground diaphragm wall | |
JP3142519B2 (en) | Formwork for building foundation | |
JPS6310250B2 (en) | ||
JPS6346514Y2 (en) |