JPS5981026A - Disassembly and assembly device - Google Patents

Disassembly and assembly device

Info

Publication number
JPS5981026A
JPS5981026A JP18928082A JP18928082A JPS5981026A JP S5981026 A JPS5981026 A JP S5981026A JP 18928082 A JP18928082 A JP 18928082A JP 18928082 A JP18928082 A JP 18928082A JP S5981026 A JPS5981026 A JP S5981026A
Authority
JP
Japan
Prior art keywords
truck
rail
rotor shaft
casing
transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18928082A
Other languages
Japanese (ja)
Inventor
Yasuhiko Isomura
磯村 弥彦
Nobuhiko Hasegawa
長谷川 信彦
Mitsuharu Hatanaka
畑中 光晴
Kazuo Ushiyama
牛山 和夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP18928082A priority Critical patent/JPS5981026A/en
Publication of JPS5981026A publication Critical patent/JPS5981026A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes

Abstract

PURPOSE:To facilitate reassembly by installing a body truck on a rail stretching in the longitudinal direction, furnishing two or more transverse rails perpendicular to this rail, on which a plurality of trucks with adjustability for the level of mounting, and thereby providing possibility of easy disassembly and accurate location. CONSTITUTION:A longitudinal rail 15 stretches in the central part of a basis 14, and transverse rails 16, 17 are installed at its X station part while another transverse rail 18 at the Y station part. A truck 20 for an air inlet casing 19 is placed on the transverse rail 16 while a truck 24 for a convolution chamber 23 on the transverse rail 18, and they shall be capable of moving on the respective rails freely. A balancer 30 for the rotor shaft 29 is fixed at the Y station on the basis 14, where a jig 31 for mounting and demounting of the rotor shaft 29 is hung at all times at the hanging point. The truck 20 is equipped with an elevating device, while the truck 22 has a level adjusting bolt for the installation table.

Description

【発明の詳細な説明】 本発明は大型機器の分解組立装置に関するものである。[Detailed description of the invention] The present invention relates to an apparatus for disassembling and assembling large equipment.

第1図は従来の過給機の全体図を示すもので、本発明の
分解組立装置と対応して説明するために示すものである
。過給機はガス入口ケーシング(1八ガス出ロケーシン
グ(2)、軸受台(3)、渦外室(4)、洞内室(5)
、及び空気入口ケーシング(6)により外郭が構成され
、内部にはロータ軸(力、羽根車(8)、及び軸受ケー
シング(9)が設けられている。
FIG. 1 shows an overall view of a conventional supercharger, and is shown for explanation in correspondence with the disassembly and assembly apparatus of the present invention. The supercharger has a gas inlet casing (18), a gas outlet casing (2), a bearing stand (3), an external vortex chamber (4), and an internal cavity chamber (5).
, and an air inlet casing (6), and the rotor shaft (force), an impeller (8), and a bearing casing (9) are provided inside.

そしてこの過給機にはディーゼル機関の排気ガスがイ部
より入り、口部でタービン翼を高速回転させ、ハ部へ排
気している。この為ロータ軸(7)に連結している羽根
車(8)が高速回転され、空気入ロクーシング(6)の
二部より空気を吸込み、洞内室(5)のホ部を通り、羽
根車(8)で加圧された空気は、渦外室(4)のへ部を
通り、ディーゼル機関の爆焼室へ送り込み熱効率を上昇
させている。
Exhaust gas from the diesel engine enters this turbocharger from part A, rotates the turbine blades at high speed at the mouth, and exhausts it to part C. For this purpose, the impeller (8) connected to the rotor shaft (7) is rotated at high speed, and air is sucked in from the two parts of the air intake locusing (6), passes through the hole part of the sinus chamber (5), and the air is drawn into the impeller. The air pressurized in (8) passes through the bottom of the outer vortex chamber (4) and is sent into the combustion chamber of the diesel engine to increase thermal efficiency.

ところで過給機は、組立後陸上運転を行ない、テスト後
分解し、所要の検査を行なっている。そして検査後再組
立てし、発送している。この分解、所要の検査、再組立
ては第2図に示すような要領で施行しており、作業は全
てクレーン作業で各締付ボルトを取外し、次の手順で行
なう。
By the way, the turbocharger is operated on land after being assembled, and after being tested, it is disassembled and the necessary inspections are performed. After inspection, they are reassembled and shipped. This disassembly, necessary inspection, and reassembly are carried out in the manner shown in Figure 2. All of the work is done using a crane to remove each tightening bolt and perform the following procedure.

■ 空気入口ケーシング(6)の取外し。■Remove the air inlet casing (6).

■ ガス出口ケーシング(2)の取外し。■Remove the gas outlet casing (2).

■ 洞内室(5)のケーシング取外し。ただしこの場合
には吊上げる個所がない為、治具00)を取り付けて分
解する。
■Remove the casing of the cave chamber (5). However, in this case, there is no place to lift it, so attach jig 00) and disassemble it.

■ 羽根車(8)の取外しく軽いので人力で施行)。■ Since the impeller (8) is removable and lightweight, it can be carried out manually).

■ ロータ軸(力と軸受ケーシング(9)の搬出。この
場合には長物の治具α11(121を利用し、ロータ軸
(力を半分出し、再度吊り直し搬出する■ 軸受ケーシ
ング(9)の取外し。なお、この場合は上部への搬出が
楽であるので、ロータ軸(7)を立てて行なう。
■ Removal of the rotor shaft (force and bearing casing (9). In this case, use the long jig α11 (121) to apply half the force to the rotor shaft, then hang it again and carry it out. ■ Removal of the bearing casing (9) In this case, the rotor shaft (7) is placed upright because it is easier to carry it out to the top.

次に所要の検査の後、逆の順序で再組立てを施行する。Then, after the necessary inspections, reassembly is performed in reverse order.

なお、囲は製品置きの木材である。しかしながら前記の
従来の場合は全てクレーン作業である為、2大作業とな
っていた。また各部品の取り付けが嵌め合いの為、クレ
ーンでの取り付け、外しに時間がかかる欠点があった。
The surrounding area is wood for the product. However, in the conventional case described above, all work was done with a crane, resulting in two major works. In addition, since the parts were fitted together, it took time to install and remove them using a crane.

。 本発明は前記従来の欠点を解消するために提案されたも
ので、縦方向に走るレール上に分解する部品を塔載する
本体台車を設置すると共に、前記レールき直角方向に走
る横レールを複数個設け、これに前記本体台車と位置決
めでき、かつ取り付は高さが調整できるような複数個の
台車を備えてなるもので、簡単に分解できると共に、正
確に位、  置決めして再組立てが容易に可能な、省人
化を図ることができる分解組立装置を提供せんとするも
のである。
. The present invention was proposed in order to eliminate the above-mentioned drawbacks of the conventional art, and includes installing a main body truck on which parts to be disassembled are mounted on rails running in the vertical direction, and a plurality of horizontal rails running in a direction perpendicular to the rails. It is equipped with a plurality of carts that can be positioned with the main cart and whose height can be adjusted, and can be easily disassembled and reassembled after accurate positioning. It is an object of the present invention to provide a disassembly and assembling device that can easily perform operations and save labor.

、   以下本発明の実施例を図面について説明すると
、第3図は本発明の実施例における全体図を示し、分解
作業が終了した状態の図である。図において台板aa上
の中央部に縦レール09が走り、Xステーション部に横
レール(16)(1’l)が、Xステーション部に横し
−/l/ Qlが夫々取り付けられている。横レール(
16)上には、空気入ロケ−シングミω用台車c2(1
1が、また横レールθη上にはガス入口ケーシング(2
1)用台車(2湯が、更に横レールaFj上には渦内室
(ハ)用台車(財)が塔載され、横レールaeaη及び
(18)上を自由に移動できるようになっている。また
縦レールQ5)上には渦外室Q511軸受台(ハ)、ガ
ス出口ケーシングeηを塔載する本体台車(ハ)が設置
されている。
An embodiment of the present invention will be described below with reference to the drawings. Fig. 3 shows an overall view of the embodiment of the present invention, and is a diagram in a state where disassembly work has been completed. In the figure, a vertical rail 09 runs in the center of the base plate aa, horizontal rails (16) (1'l) are attached to the X station part, and horizontal rails (16) (1'l) and -/l/Ql are attached to the X station part, respectively. Horizontal rail (
16) On top is the pneumatic locating truck c2 (1
1, and a gas inlet casing (2
1) A cart for the vortex chamber (c) is mounted on the horizontal rail aFj, and can be moved freely on the horizontal rails aeaη and (18). Further, on the vertical rail Q5) there are installed a bearing stand for the external vortex chamber Q511 (c) and a main body truck (c) on which the gas outlet casing eη is mounted.

またYステーション上にはロータ軸Cω用バランサー(
至)が合板θ4上に固定されており、その吊点にはロー
タ軸(至)の取り付け、外し用の治具01)が常時吊ら
れている。Oaはロータ軸(2ωを立てる為の治具てあ
り、合板(14)上に固定されている。また台板a<上
には作業し易いように波板鋼板G東が全面に取り付けら
れている。
Also, on the Y station is a balancer for the rotor axis Cω (
(to) is fixed on a plywood board θ4, and a jig 01) for attaching and removing the rotor shaft (to) is always suspended from the suspension point. Oa is a jig for erecting the rotor shaft (2ω), and it is fixed on the plywood (14). Also, a corrugated steel plate G east is attached to the entire surface of the base plate a to make it easier to work. There is.

□l11g、八ヶーッ5へ、。作業。状態図4オしたも
ので、04)は本体台車(ハ)の架台で下部に車輪C3
51を有し、上部に過給機を塔載し、台車中心に位置決
めを行なう定盤間があり、ボルト07)により固定され
ている。また架台04)上には、左右に各専用台車中心
との芯合せを行なう芯出し用の軸受(至)が設置しであ
る。
□l11g, to Yatsuka 5. work. 04) is the frame of the main body truck (c) with wheels C3 at the bottom.
51, the supercharger is mounted on the upper part, there is a surface plate for positioning at the center of the cart, and it is fixed with bolts 07). Further, on the pedestal 04), centering bearings are installed on the left and right sides to perform centering with the center of each dedicated cart.

一方横し−ルαG)上には空気入口ケーシング用台車(
201が配され、架台0!j1架台下部に車輪Cω、上
部′に油圧シリンダー(4〃の押し引きにより、勾配の
ついた摺動板(42)で据付台(431が上下する昇降
装置を配備している。また架台0Iの前面には本体台車
架台04)と芯出しを行なう芯合せ棒(4勾が配備され
ている。
On the other hand, the air inlet casing trolley (
201 is placed, 0 mounts! j1 There is a wheel Cω at the bottom of the pedestal, and an elevating device that moves the installation pedestal (431) up and down on a sloped sliding plate (42) by pushing and pulling a hydraulic cylinder (4) at the top. On the front side, there are provided a main body cart mount 04) and a centering rod (4 angles) for centering.

また他方の横し〜ル(17]上にはガス入口ケーシング
用台車(221が配備され、架台(49の下部には車輪
(461が、上部には据付台(4ηが配備され、据付台
(4r)上にはガス入口ケーシングc〃と据付台の高さ
調整用ボルト(4〜及び113?付用ボルト(4ωが取
り付けられている。
A gas inlet casing trolley (221) is installed on the other side rail (17), wheels (461 are installed at the bottom of the pedestal (49), and an installation stand (4η) is installed at the upper part of the frame (49). 4r), the gas inlet casing c〃 and installation base height adjustment bolts (4~ and 113? attachment bolts (4ω) are attached.

また架台(49の前面には本体台車架台04)と芯出し
を行なう芯合せ棒(5〔が配備されている。I!5oは
レールのストッパーで、各台車が暴走するのを防止する
ものである。
In addition, a mount (on the front of 49, the main body cart mount 04) and a centering rod (5) for centering are provided.I!5o is a rail stopper that prevents each cart from running out of control. be.

第5図はYステーションでの作業状態図を示すものであ
る。図において本体台車(ハ)上には空気入口ケーシン
グ(II、ガス入ロケーシングレυを分解した過給機が
塔載されている。また横レールU樽上には渦内室用台車
(24+が配備され、束合−1架台下部に車輪−、上部
に取付台−が配備されている。
FIG. 5 shows a working status diagram at the Y station. In the figure, the air inlet casing (II) and the supercharger, which is a disassembled gas-filled casing GRE υ, are mounted on the main body trolley (C).In addition, a whirlpool indoor trolley (24+) is installed on the horizontal rail U barrel. Wheels are provided at the bottom of the bundling 1 frame, and a mounting base is provided at the top.

取付台−には渦内室(ハ)と取付台−との間隔を調整す
る調整ボルトに)が渦内室(ハ)の取付用ボルト6呻が
取り付けられ、下部には渦内室(ハ)の高さ調整用ボル
ト(ロ)が取り付けられている。また乗台←櫓の前面に
は、本体台車架台図と芯出しを行なう芯合せ棒(財)が
配備されている。
An adjustment bolt for adjusting the distance between the vortex inner chamber (C) and the mounting base is attached to the mounting base, and a mounting bolt 6 for the vortex inner chamber (C) is attached to the lower part of the vortex inner chamber (H). ) height adjustment bolt (b) is attached. In addition, on the front of the turret, there is a centering rod for centering the main body carriage frame diagram.

更に左側にはロータ軸用バランサー(3o)が配備され
、ロータ軸囮の取り付け、外し用治具−が吊下げられて
いる。取り付け、外し用治具争9)には、口−タ1u1
1取付ボルト輪、ロータ軸(社)と治具輪間に緩衝用樹
脂知)、ロータ軸C!■を立てる為のi+l1ll受働
が取り付けられている。輪はロータ軸を立てる為の治具
で、軸受−吉ビン(財)より構成されている。また第4
図のO・はフランジ部、第5図の(6すは軸受ケースで
ある。
Furthermore, a rotor shaft balancer (3o) is provided on the left side, and a jig for attaching and removing the rotor shaft decoy is suspended therefrom. For installation/removal jig dispute 9), use the port 1u1.
1 Mounting bolt ring, cushioning resin between rotor shaft and jig ring), rotor shaft C! ■I+l1ll passive is installed to set up. The ring is a jig for setting up the rotor shaft, and consists of a bearing and Yoshibin Co., Ltd. Also the fourth
O in the figure is the flange part, and (6 in Fig. 5 is the bearing case).

次に第4・図、第5図により作用を説明すると、第4図
はXステーションで過給機を本体台車(281上に塔載
し、ボルト07)、定盤−により同台車中心に取り付け
た図である。
Next, to explain the operation with reference to Figures 4 and 5, Figure 4 shows that the supercharger is mounted on the main body truck (281, bolt 07) at the This is a diagram of the installation.

さて空気入口ケーシング(11の分解には、まず昇降装
置により油圧シリンダー(4υを押し、据付台(431
が下降した状態で空気入口ケーシング(1CJの下部に
(第4図実線)台車が移動され、本体台車架台04)の
軸受(至)に芯合せ棒(4力が挿入され位置決めされる
Now, to disassemble the air inlet casing (11), first push the hydraulic cylinder (4υ) using the lifting device, and then press the installation stand (431).
With the air inlet casing (1CJ) lowered, the truck is moved to the bottom of the air inlet casing (1CJ (solid line in Figure 4)), and the centering rod (4 forces) is inserted into the bearing (to) of the main body truck mount 04 to position it.

その状態で昇降装置で油圧シリンダー(4υを引き、据
付台(431を空気入口ケーシング(11の下部に当る
まで上昇さぜる。そして完全に当った後渦外室(ハ)よ
り空気入ロケーシング四を取外し、空気入口ケーシング
用台車(20)を後退させる(第4図の2点鎖線)。
In this state, use the lifting device to pull the hydraulic cylinder (4υ) and raise the installation base (431) until it touches the bottom of the air inlet casing (11).After it has completely touched the air inlet casing from the outer vortex chamber (c). 4 and move the air inlet casing trolley (20) backward (double-dashed line in Fig. 4).

次にガス入口ケーシング(2υとガス出口ケーシング(
27)の取外しは、ガス入口ケーシング用台車(2っで
行なわれ、調整ボルト(4g)を下限へねじ込んだ状態
でガス出口ケーシング(27)の下部に移動し、本体台
車の軸受(至)に位置決め棒60)を入り込ませて位置
決めする。その状態で調整ポルI−(48)を上限へ上
げ、ガス出口ケーシングC27)のフランジ部(6fl
ilに当て、高さ調整後、フランジ部16f9のポルト
穴に取付ボルト(49)を差込み、据付台(4ηにねじ
込んでガス入口ケーシング(2+)を固定する。固定後
ガス出口ケーシング(27)よりガス入口ケーシング(
2+)を分解し、台車シフを後退させる(第4図の2点
鎖線)。
Next, the gas inlet casing (2υ) and the gas outlet casing (
27) is removed using the gas inlet casing trolley (2), which moves to the lower part of the gas outlet casing (27) with the adjustment bolt (4g) screwed to the lower limit, and attaches to the bearing (toward) of the main body trolley. Insert the positioning rod 60) to position it. In this state, raise the adjustment port I-(48) to the upper limit and adjust the flange part (6fl) of the gas outlet casing C27)
After adjusting the height, insert the mounting bolt (49) into the port hole of the flange part 16f9, and screw it into the installation base (4η) to fix the gas inlet casing (2+). After fixing, from the gas outlet casing (27) Gas inlet casing (
2+) and move the cart shift backward (two-dot chain line in Figure 4).

次に渦内室(ハ)とロータ軸(29+、軸受ケーシング
−の分解は、第8図で示すように本体台車(28)をX
ステーションに移動させる。その作業状態図が第5図に
示されている。
Next, to disassemble the vortex inner chamber (c) and rotor shaft (29+, bearing casing), move the main body truck (28) to the
Move to station. A diagram of its working state is shown in FIG.

即ち、第5図において、渦内室用台車(2力を調整ポル
) I’/lを下限位置にした後、渦内室(至)下部に
移動し、本体台車(ハ)の軸受(至)に芯出し棒輪を入
り込ませて位置決めする。その状態で高さ調整ボルト0
収高さ調整及び間−ボルトに)で調整を行ない、渦内室
(ハ)の加工ねじ穴に取付ボルトに)をねじ込み渦内室
C濁吉取付板←◆とを固定する。その後渦外室(2暖よ
り渦内室(23)を分解し、台車(24)を後退させる
(第5図の2点鎖fs)。
That is, in Fig. 5, after setting the vortex inner chamber trolley (two force adjustment poles) I'/l to the lower limit position, it moves to the lower part of the vortex inner chamber (to), and the bearing (toward ) to position the centering rod. In that state, the height adjustment bolt is 0.
Adjust the storage height and screw the mounting bolt () into the machined screw hole of the vortex inner chamber (c) to fix the vortex inner chamber C and the mounting plate ←◆. Thereafter, the inner vortex chamber (23) is disassembled by heating the outer vortex chamber (2), and the cart (24) is moved backward (two-point chain fs in FIG. 5).

またロータ軸I2ω、軸受ケース−の分解は、バランサ
ー(至)と取り付け、外し治具−により行なわれる。即
ち、ロータ軸c!1の端面にあけられたねじ穴に取付ボ
ルドーをねじ込み、治具−に固定する。
Further, the rotor shaft I2ω and the bearing case are disassembled using a balancer and an attachment/removal jig. That is, the rotor axis c! Screw the mounting Bordeaux into the screw hole drilled in the end face of 1 and fix it to the jig.

その状態で軸受台(イ)よりロータ軸Q!3、軸受ケー
スに)を抜取る。この時ロータ軸(2)、軸受ケースに
)はほぼ水平になるように、治具−)の吊点位置は事前
に調整されており、また市販のバランサー(至)で無重
力状態となる為、作業者は簡単に水平移動でき、軸受台
(2のより抜出すこさができる。
In this state, the rotor shaft Q from the bearing stand (A)! 3. Remove the ) from the bearing case. At this time, the hanging point position of the jig (2) is adjusted in advance so that the rotor shaft (2) and the bearing case (2) are almost horizontal, and a commercially available balancer (2) is used to create a zero gravity condition. The operator can easily move horizontally and pull out the bearing stand (2).

抜出されたロータ軸(ハ)、軸受ケース−は、取り付け
、外し用治具に)の軸受−と治具−の軸受−とを、ピン
eので連結し、バランサー(至)を下げることにより、
ピン−を支点とし、90回転し簡単にロータ軸(2)、
軸受ケース←りを立てることができる。
The extracted rotor shaft (c) and bearing case are attached to the mounting/removal jig) by connecting the bearings of the jig and the bearings of the jig with pins e, and lowering the balancer. ,
Using the pin as a fulcrum, it rotates 90 times and easily rotates the rotor shaft (2).
The bearing case can be erected.

この状態でロータ軸し特より軸受ケース(6f)を上部
に抜出、ず為、作業性が良くなる。
In this state, the rotor shaft is moved and the bearing case (6f) is pulled out to the top, which improves work efficiency.

次に解放後の所要の検査は、各台車に搭載状態で行なう
。この為再組立は分解と逆の手順で行なうが、分解時に
行なった調整作業は不要で、そのまま各ケーシングを組
込むことができる。
Next, the necessary inspections after release are carried out while mounted on each trolley. For this reason, reassembly is performed in the reverse order of disassembly, but the adjustment work performed during disassembly is not necessary, and each casing can be assembled as is.

本発明は以上の如く構成されているので、天井クレーン
を使用する必要がない。なお、天井クレーンは他場所で
作業している場合は、作業終了まで待つ必要がある。こ
の為クレーン待ち時間が発生するが、本発明ではクレー
ン待ちがない。また天井クレーンでは、操作者と組立分
解作業者との2人が必要であるが、本発明装置では1人
で簡単に作業できるので省人化できる。
Since the present invention is configured as described above, there is no need to use an overhead crane. Note that if the overhead crane is working in another location, it will be necessary to wait until the work is completed. For this reason, crane waiting time occurs, but in the present invention, there is no crane waiting time. In addition, an overhead crane requires two people, an operator and an assembly/disassembly worker, but the device of the present invention can easily be operated by one person, resulting in labor savings.

また本発明によると、分解組立時間の短縮を図ることが
できる。即ち、本体台車と位置決めされた各台車を利用
し、かつ本体台車に過給機を塔載した高さのままで、各
ケーシングを分解するので、再組Vては本体台車の軸受
と各台車の芯出し棒を合わせるのみで、位置調整なしで
可能となり、大l1’?tに時1+41短縮ができる。
Further, according to the present invention, it is possible to reduce the disassembly and assembly time. In other words, each casing is disassembled using the main body truck and each positioned vehicle, and each casing is disassembled while keeping the height of the supercharger mounted on the main body truck. It is possible to do this without adjusting the position by simply aligning the centering rods. Time 1+41 can be shortened to t.

更に本発明装置は組立装置としても利用できる。即ち、
単に分解組立装置だけでなく、組立装置としても利用可
能である等の多くの優れた効果を奏する。
Furthermore, the device of the present invention can also be used as an assembly device. That is,
It has many excellent effects such as being usable not only as a disassembly and assembly device but also as an assembly device.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は従来の過給機の全体を示す側断面図、第2図は
第1図の分解状態の説明図、第3図は本発明の実施例装
置の分解作業が終了した状態を示nl ステーゾョンでの作業の状態を示すイit面図である。 図の主要部分の説明 ■4・・・台板15・・・縦レール 28・・・本体台車    44.50.58・・・芯
合せ棒48・・・高さ調整用ボルト 57・・・高さ調整用ボルト
Fig. 1 is a side sectional view showing the entire conventional supercharger, Fig. 2 is an explanatory diagram of the disassembled state of Fig. 1, and Fig. 3 shows the disassembled state of the device according to the present invention. FIG. 2 is an IT diagram showing the state of work at the nl station. Explanation of the main parts of the figure ■4... Base plate 15... Vertical rail 28... Main body truck 44.50.58... Centering rod 48... Height adjustment bolt 57... Height Adjustment bolt

Claims (1)

【特許請求の範囲】[Claims] 組立てた部品を分解し再組立てを行なう装置において、
縦方向に走るレール上に分解する部品を塔載する本体台
車を設置すると共に、前記レールと直角方向に走る横レ
ールを複数個設け、これに前記本体台車と位置決めでき
、かつ取り付は高さが調整できるような複数個の台車を
備えたことを特徴とする分解組立装置。
In equipment that disassembles and reassembles assembled parts,
A main body truck on which parts to be disassembled are mounted is installed on rails running in the vertical direction, and a plurality of horizontal rails are provided that run perpendicularly to the rails, which can be positioned with the main body truck, and can be mounted at a height. A disassembling and assembling device characterized by being equipped with a plurality of carts that can be adjusted.
JP18928082A 1982-10-29 1982-10-29 Disassembly and assembly device Pending JPS5981026A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18928082A JPS5981026A (en) 1982-10-29 1982-10-29 Disassembly and assembly device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18928082A JPS5981026A (en) 1982-10-29 1982-10-29 Disassembly and assembly device

Publications (1)

Publication Number Publication Date
JPS5981026A true JPS5981026A (en) 1984-05-10

Family

ID=16238671

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18928082A Pending JPS5981026A (en) 1982-10-29 1982-10-29 Disassembly and assembly device

Country Status (1)

Country Link
JP (1) JPS5981026A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06262449A (en) * 1993-03-11 1994-09-20 Honda Motor Co Ltd Method for dismantling automobile
WO2012070647A1 (en) 2010-11-26 2012-05-31 三菱重工業株式会社 Tool for assembly and disassembly of turbine device, and method of assembly and disassembly of turbine device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06262449A (en) * 1993-03-11 1994-09-20 Honda Motor Co Ltd Method for dismantling automobile
WO2012070647A1 (en) 2010-11-26 2012-05-31 三菱重工業株式会社 Tool for assembly and disassembly of turbine device, and method of assembly and disassembly of turbine device

Similar Documents

Publication Publication Date Title
JPS5981026A (en) Disassembly and assembly device
CN214005430U (en) Bridge stand roll-over stand
GB2177160A (en) Servicing gas turbines
JP2001107745A (en) Turbine building structure and suction duct
CN213950418U (en) Portable prefabricated plate hoist device
CN211229634U (en) A demolish frock for indoor MARK3 mounting platform
CN211028010U (en) Casting weight supporting device for wind power product casting
CN113549718A (en) Replacement method of blast furnace cooling wall
CN206467781U (en) A kind of steel box column docking structure
CN211949625U (en) Large-span spatial structure TMD mounting system
CN213085264U (en) Online dismouting auxiliary device of subway train unit brake
CN220264949U (en) Safety valve mounting device of speed regulating system
CN219861428U (en) Tool frame for integrally pushing steel-making converter equipment
CN216608849U (en) Disassembling tool for upper cover of compressor bearing seat of gas power plant
CN220866928U (en) ALC partition plate handling and installation device
CN113803532B (en) Moving mechanism for water outlet pipeline of large centrifugal pump performance test
CN216190533U (en) Lifting appliance device for overhauling converter station
CN219429524U (en) A finished product hoist device for draining cast iron pipe warehouse entry
CN220766299U (en) Direct air cooling limit for height passageway equipment overhauls overhead hoist
CN115230835B (en) Movable walking part dismounting equipment
CN215048074U (en) Hoisting device for air compressor housing
CN218950852U (en) Gantry structure frame of tracheal vacuum suction crane
CN218454204U (en) Balanced blast furnace tuyere loading and unloading device
CN218025016U (en) Furnace shell hoisting device for blast furnace overhaul
CN219466048U (en) Dismantlement platform with preliminary treatment clearance function