Beam receiving device for concrete construction work

Info

Publication number
JPS597962Y2
JPS597962Y2 JP15833979U JP15833979U JPS597962Y2 JP S597962 Y2 JPS597962 Y2 JP S597962Y2 JP 15833979 U JP15833979 U JP 15833979U JP 15833979 U JP15833979 U JP 15833979U JP S597962 Y2 JPS597962 Y2 JP S597962Y2
Authority
JP
Japan
Prior art keywords
temporary
support
side frame
construction
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP15833979U
Other languages
Japanese (ja)
Other versions
JPS5675257U (en
Inventor
豊 森田
Original Assignee
ホリ−株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ホリ−株式会社 filed Critical ホリ−株式会社
Priority to JP15833979U priority Critical patent/JPS597962Y2/en
Publication of JPS5675257U publication Critical patent/JPS5675257U/ja
Application granted granted Critical
Publication of JPS597962Y2 publication Critical patent/JPS597962Y2/en
Expired legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【考案の詳細な説明】 コンクリート建築物の工事において、天井あるいは階上
の床部分を構築するときに、コンクリートを打設する仮
床板はパネル等を並べて構戒するが、この仮床板を支え
るのは根太や大引を介して工事用梁でこれを行なう。
[Detailed explanation of the idea] In the construction of concrete buildings, when constructing ceilings or floors above floors, the temporary floor boards on which concrete is poured are lined up with panels, etc. This is done with construction beams via joists or daihiki.

この工事用梁を支持するのはサポートによってこれを行
なっていたが、サポートで直接工事用梁を支承するのは
非常に多くのサポートを必要とすると共に、工事用梁の
下の空間が少くなって工事に際して不便を感じることが
多かった。
This was done using supports to support construction beams, but supporting construction beams directly with supports requires a large number of supports and requires less space under the construction beams. The construction work was often inconvenient.

そこで、コンクリート建築物の階上の床部分と梁部を同
時に建築するときに、梁部分の周囲を囲む仮側枠の上部
に工事用梁の受金具を固定して、この受金具で工事用梁
の両端を支持することも考えられるが、階上の床部分を
構威する仮床板、根太、大引、工事用梁及びコンクリー
ト等を仮側枠の上部のみで支えることは仮側枠の強度を
非常に大きなものとしなければならず、従来の合板製の
如き簡単な仮側枠では仮側枠自体が破壊されてしまうこ
とがあった。
Therefore, when constructing the upper floors and beams of a concrete building at the same time, we fix construction beam brackets to the top of the temporary side frames that surround the beams, and use these brackets to It is possible to support both ends of the beam, but supporting the temporary floorboards, joists, construction beams, concrete, etc. that make up the upper floor only with the upper part of the temporary side frame is not recommended. The strength must be extremely high, and if a simple temporary side frame such as a conventional temporary side frame made of plywood was used, the temporary side frame itself could be destroyed.

本考案は上記に鑑みて仮側枠の強度があまり大きくない
場合でも仮側枠部分において工事用梁を支持することが
できるようにしたもので、以下図面について本考案の実
施例を説明すれば、コンクリート建築物の梁部分を構戒
するための仮側枠15の上部に係合したり、釘打ち等で
仮側枠15の上部に固定する結合部2と楔3と共同して
工事用梁22を支承する受部4を有する梁受主部1の下
に雄ネジ部材5をその中心軸線方向が縦となるようにし
て固着し、上記雄ネジ部材5に螺合する雌ネジ部材6を
頂部に回転自在に取付けたパイプ状の支持杆7に上下に
間隙をおいて複数の横礼状のピン挿通部8を設け、コン
クリート建築物の梁部分を構或するための仮底板16あ
るいは仮底板16を支える大引17、仮底板16と一体
とした開き止め桟本18等の仮底板16の近傍部分に固
定する受体9に貫通礼状のピンの支承部10を設けてな
るコンクリート建築用梁の受装置を構或して本考案を実
施する。
In view of the above, the present invention is designed to support construction beams in the temporary side frame even when the strength of the temporary side frame is not very high.The following is an example of the present invention explained with reference to the drawings. , engages with the upper part of the temporary side frame 15 for guarding the beam part of a concrete building, or works in conjunction with the coupling part 2 and wedge 3 that is fixed to the upper part of the temporary side frame 15 by nailing etc. A male threaded member 5 is fixed under the beam support main part 1 having a receiving part 4 that supports the beam 22 so that its central axis direction is vertical, and a female threaded member 6 is screwed into the male threaded member 5. A pipe-shaped support rod 7, which is rotatably attached to the top of the pipe, is provided with a plurality of horizontal pin insertion parts 8 with gaps above and below, and is used as a temporary bottom plate 16 or a temporary base plate for constructing a beam part of a concrete building. For concrete construction, a support part 10 for a penetrating pin is provided on a receiver 9 that is fixed to the vicinity of the temporary bottom plate 16, such as a large drawer 17 that supports the bottom plate 16, and a stopper 18 that is integrated with the temporary bottom plate 16. The present invention is implemented by constructing a beam receiving device.

しかして図中11は受体9の取付片、12は受体9を仮
底板16、大引17、桟本18等に固定するための釘挿
通孔、13は支持杆7と雌ネジ部材6が引抜けないよう
にする止ネジを螺合するネジ孔、14は雌ネジ部材6に
設けた止ネジが嵌人する環状溝、19は仮底板16と大
引17の間に介在させた端太材、20はサポート、21
は仮側枠15の上端に固定した仮側枠15の補強のため
の桟木で、本考案の装置は仮側枠15の上端に上記の桟
木21が横架されていて、梁受主部1の結合部2を仮側
枠15を形或する例えば合板の如き構戊部分と上記桟木
21とに跨がらせて懸掛したときに、梁受主部1と仮側
枠15の合板との間に隙間が生じたときにも梁受主部1
を変形させることなく工事用梁22を支持することがで
きる。
In the figure, 11 is a mounting piece for the receiver 9, 12 is a nail insertion hole for fixing the receiver 9 to the temporary bottom plate 16, the main drawer 17, the crosspiece 18, etc., and 13 is the support rod 7 and the female screw member 6. 14 is an annular groove into which the set screw provided on the female threaded member 6 is fitted; 19 is an end interposed between the temporary bottom plate 16 and the main drawer 17; Thick wood, 20 is support, 21
is a crosspiece fixed to the upper end of the temporary side frame 15 for reinforcing the temporary side frame 15. In the device of the present invention, the above-mentioned crosspiece 21 is horizontally suspended over the upper end of the temporary side frame 15, and the beam support main part 1 When the connecting portion 2 of the temporary side frame 15 is hung across a structural part such as plywood forming the temporary side frame 15 and the above-mentioned crosspiece 21, the gap between the beam receiver main portion 1 and the plywood of the temporary side frame 15 is suspended. Beam receiver main part 1
It is possible to support the construction beam 22 without deforming it.

23は工事用梁で支持した仮床板、24は打設したコン
クリートを示すものである。
23 is a temporary floor board supported by construction beams, and 24 is concrete that has been poured.

なお、本考案を実施する場合は、受体9の取付片11の
位置を支持杆7の挿通部分より横方向に突設すると、取
付片11を第1図示の如く例えば仮側枠15に可及的に
接近して設置することができ、仮側枠15の開き止め桟
木18に固定することもできるもので、この場合に仮側
枠15の中間部に補強のために端太材が配設されていて
も工事に支障を生ずることがなく、上記中間の端太材を
支持杆で保持することもできる。
In addition, when implementing the present invention, if the position of the mounting piece 11 of the receiver 9 is provided to protrude laterally from the insertion part of the support rod 7, the mounting piece 11 can be attached to the temporary side frame 15, for example, as shown in the first figure. It can be installed as close as possible to the temporary side frame 15, and can also be fixed to the opening stopper 18 of the temporary side frame 15. In this case, a thick piece is placed in the middle of the temporary side frame 15 for reinforcement. Even if it is installed, it will not hinder the construction work, and the intermediate thick material can also be held with a support rod.

本考案は上記の如くで、梁受主部1を仮側枠15の上端
で支持すると共に、コンクリート建築物の梁部分を構戊
するための仮底板16の近傍でも支承するので、仮側枠
15の強度を大きくする必要がなく、通常の合板を用い
た仮側枠15をそのまま用いても工事をすることができ
る。
The present invention is as described above, and the main beam support part 1 is supported at the upper end of the temporary side frame 15, and also supported in the vicinity of the temporary bottom plate 16 for constructing the beam part of a concrete building. There is no need to increase the strength of the frame 15, and construction work can be carried out using the temporary side frame 15 made of ordinary plywood as it is.

そして、本考案の装置では支持杆7に複数のピン挿通孔
8が設けてあるから下部の受体9と梁受主部1との間の
距離を大きく変更することが容易で、しかも雄ネジ部材
5と雌ネジ部材6との間で上記受体9と梁受主部1との
間の距離を微調整することが容易で、全体として受体9
に対して梁受主部1との間の距離を要求されるものに極
めて迅速に、正確に設定できる。
In addition, in the device of the present invention, since a plurality of pin insertion holes 8 are provided in the support rod 7, it is easy to greatly change the distance between the lower receiver 9 and the beam receiver main part 1. It is easy to finely adjust the distance between the receiver 9 and the beam receiver main part 1 between the member 5 and the female screw member 6, and the receiver 9 as a whole can be easily adjusted.
The distance between the main beam receiving part 1 and the main beam receiving part 1 can be set extremely quickly and accurately to the required value.

そして、本考案の装置は繰返してこれを用いることがで
きるので長期間の使用によって工事費のコストの引下げ
にも役立つものである。
Furthermore, since the device of the present invention can be used repeatedly, it is useful for reducing construction costs by using it for a long period of time.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は実施例で、第1図は本考案の梁受装置を用いてコ
ンクリート建築工事を行なっている場合の縦断面図、第
2図は梁受装置の分解状態における斜視図、第3図は分
解状態の側面図である。 1・・・・・・梁受主部、2・・・・・・結合部、3・
・・・・・楔、4・・・・・・受部、5・・・・・・雄
ネジ部材、6・・・・・・雌ネジ部材、7・・・・・・
支持杆、8・・・・・・ピン挿通部、9・・・・・・受
体、10・・・・・・ピンの支承部、11・・・・・・
取付片、12・・・・・・釘挿通孔、13・・・・・・
ネジ孔、14・・・・・・環状溝、15・・・・・・仮
側枠、16・・・・・・仮底板、17・・・・・・大引
、18・・・・・・桟木、19・・・・・・端太材、2
0・・・・・・サポート、21・・・・・・桟木、22
・・・・・・工事用梁、23・・・・・・仮床板、24
・・・・・・打設コンクリート。
The drawings are examples: Fig. 1 is a longitudinal cross-sectional view of concrete construction work using the beam support device of the present invention, Fig. 2 is a perspective view of the beam support device in an exploded state, and Fig. 3 is a cross-sectional view of the beam support device of the present invention in an exploded state. FIG. 3 is a side view in an exploded state. 1...Beam receiver main part, 2...Connection part, 3.
...Wedge, 4...Receptacle, 5...Male thread member, 6...Female thread member, 7...
Support rod, 8...pin insertion part, 9...receptor, 10...pin support part, 11...
Mounting piece, 12... Nail insertion hole, 13...
Screw hole, 14... Annular groove, 15... Temporary side frame, 16... Temporary bottom plate, 17... Large pull, 18...・Structure wood, 19... Thick timber, 2
0...Support, 21...Piece, 22
...Beam for construction, 23 ...Temporary floor board, 24
・・・・・・Poured concrete.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] コンクリート建築物の梁部分を構戊するための仮側枠の
上部に結合する結合部と、工事用梁の受部を有する梁受
主部の下に雄ネジ部材をその中心軸線方向が縦となるよ
うにして固着し、上記雄ネジ部材を螺合する雌ネジ部材
を頂部に回転自在に取付けた支持杆に上下に間隙をおい
て複数のピン挿通部を設け、コンクリート建築物の梁部
分を構或するための仮底板あるいは仮底板近傍部分に固
定する受体にピンの支承部を設けてなるコンクリート建
築工事用梁の受装置。
A male screw member is installed under the main part of the beam support, which has a connecting part that joins to the upper part of the temporary side frame for constructing the beam part of a concrete building and a receiving part for the construction beam, and its center axis is vertical. The support rod has a female screw member rotatably attached to the top to which the male screw member is screwed, and a plurality of pin insertion portions are provided with gaps above and below, and a beam portion of a concrete building is fixed. A support device for a beam for concrete construction work, which comprises a support for a pin on a receiver fixed to a temporary bottom plate for construction or a part near the temporary bottom plate.
JP15833979U 1979-11-15 1979-11-15 Beam receiving device for concrete construction work Expired JPS597962Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15833979U JPS597962Y2 (en) 1979-11-15 1979-11-15 Beam receiving device for concrete construction work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15833979U JPS597962Y2 (en) 1979-11-15 1979-11-15 Beam receiving device for concrete construction work

Publications (2)

Publication Number Publication Date
JPS5675257U JPS5675257U (en) 1981-06-19
JPS597962Y2 true JPS597962Y2 (en) 1984-03-12

Family

ID=29669587

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15833979U Expired JPS597962Y2 (en) 1979-11-15 1979-11-15 Beam receiving device for concrete construction work

Country Status (1)

Country Link
JP (1) JPS597962Y2 (en)

Also Published As

Publication number Publication date
JPS5675257U (en) 1981-06-19

Similar Documents

Publication Publication Date Title
JPS597962Y2 (en) Beam receiving device for concrete construction work
JPS5920506Y2 (en) Beam receiving device for concrete construction work
US3703792A (en) Wall structure
JPS597963Y2 (en) Beam receiving device for concrete construction work
JP2515383Y2 (en) Beam support bracket for construction
US3317173A (en) Shore adapter
JPH02300450A (en) Fitting structure of wall panel
JPH0334980Y2 (en)
JPS5853841Y2 (en) Balcony handrail mounting device
JPS6212028Y2 (en)
JPH0139327Y2 (en)
JPH0714483Y2 (en) Connection structure of support beams for outdoor structures
JPH076296Y2 (en) Outdoor stair structure
JPH021366Y2 (en)
JPH0514992Y2 (en)
JPS623489Y2 (en)
JPS6240002Y2 (en)
JP2763058B2 (en) Railing wall support structure
JPH0410614U (en)
JP3106270B2 (en) Pillars for lifting and joining structures and methods for lifting structures
JPH07268953A (en) Structure for terrace, balcony, etc.
JPH0119682Y2 (en)
JPS636321Y2 (en)
JPS6231559Y2 (en)
JPH0756433Y2 (en) Floor panel equipment