JPS5953426B2 - Mobile formwork equipment - Google Patents

Mobile formwork equipment

Info

Publication number
JPS5953426B2
JPS5953426B2 JP11589279A JP11589279A JPS5953426B2 JP S5953426 B2 JPS5953426 B2 JP S5953426B2 JP 11589279 A JP11589279 A JP 11589279A JP 11589279 A JP11589279 A JP 11589279A JP S5953426 B2 JPS5953426 B2 JP S5953426B2
Authority
JP
Japan
Prior art keywords
girder
formwork
bottom plate
bridge
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP11589279A
Other languages
Japanese (ja)
Other versions
JPS5641969A (en
Inventor
重賢 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON KOGEN KONKURIITO KK
Original Assignee
NIPPON KOGEN KONKURIITO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON KOGEN KONKURIITO KK filed Critical NIPPON KOGEN KONKURIITO KK
Priority to JP11589279A priority Critical patent/JPS5953426B2/en
Publication of JPS5641969A publication Critical patent/JPS5641969A/en
Publication of JPS5953426B2 publication Critical patent/JPS5953426B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【発明の詳細な説明】 この発明は、型枠を移動しながら順次連続的に桁を成型
してコンクリート橋梁を造成する。
DETAILED DESCRIPTION OF THE INVENTION The present invention constructs a concrete bridge by sequentially and continuously forming girders while moving formwork.

従来のこの種の移動型枠装置としては、橋梁長手方向移
動可能な支保梁によって型枠底板を吊下げ、橋脚位置に
おいては型枠底板を左右にスライドさせるものなどがあ
ったが、一般に装置構成が複雑であった。
Conventional mobile formwork equipment of this type involves suspending the formwork bottom plate from supporting beams that can be moved in the longitudinal direction of the bridge, and sliding the formwork bottom plate left and right at the pier position; was complicated.

この発明は、このような従来の問題点を解消すべく創案
されたもので、装置構成が極めて単純な移動型枠装置を
提供することを目的とする。
The present invention was devised to solve these conventional problems, and an object of the present invention is to provide a movable formwork device with an extremely simple device configuration.

この発明に係る移動型枠装置は、橋梁幅方向に二分割さ
れた型枠底板を橋梁長手方向移動可能な可動支保梁上に
載置して、適宜橋梁長手方向に移動させこれによって連
続的に桁を形成し、打設されたコンクリートと型枠底板
とを分離させるために可動支保梁を扛上装置によって降
下させ、型枠底板を前記のとおり二分割するとともに、
各分割部分を支持する可動支保梁を、面分割部分の相互
接近、相互離間を可能にすべく、滑動体によって橋梁幅
方向移動可能にしたものである。
The movable formwork device according to the present invention places a formwork bottom plate divided into two in the bridge width direction on a movable support beam that is movable in the bridge longitudinal direction, and moves it appropriately in the bridge longitudinal direction, thereby continuously In order to form the girder and separate the poured concrete and the formwork bottom plate, the movable support beam is lowered by a lifting device, and the formwork bottom plate is divided into two as described above,
The movable support beam supporting each divided section is made movable in the width direction of the bridge by sliding bodies in order to enable the surface divided sections to approach and separate from each other.

次に、この発明に係る移動型枠装置の一実施例を図面に
基づいて説明する。
Next, an embodiment of a movable formwork apparatus according to the present invention will be described based on the drawings.

第8図において、移動型枠装置1は橋梁2の幅方向に二
分割されて分割部分3A、3Bよりなる型枠底板3を有
し、各分割部分3A、3Bそれぞれ可動支保梁4A、4
Bによって支持されている。
In FIG. 8, the movable formwork device 1 has a formwork bottom plate 3 which is divided into two parts in the width direction of the bridge 2 and consists of divided parts 3A and 3B, and each divided part 3A and 3B has a movable supporting beam 4A and 4
Supported by B.

支保梁4A、4Bの底部には、複数のジヤツキ5よりな
る扛上装置6および一対の車輪7,7よりなる滑動体8
が橋梁2の長手方向に並列して設けられ、扛上装置6お
よび滑動体8は支保梁4A、4Bの全幅に渡って延在し
ている。
At the bottom of the support beams 4A, 4B, a lifting device 6 consisting of a plurality of jacks 5 and a sliding body 8 consisting of a pair of wheels 7, 7 are provided.
are provided in parallel in the longitudinal direction of the bridge 2, and the lifting device 6 and sliding body 8 extend over the entire width of the support beams 4A and 4B.

従って支保梁4A、4Bは扛上装置6または滑動体8に
よって固定支保工9上において安定に支持されている。
Therefore, the support beams 4A, 4B are stably supported on the fixed support 9 by the hoisting device 6 or the sliding body 8.

ここに移動型枠装置1を前進させるときには、移動型枠
装置1の下方にコロ11 (第5図、第6図参照)を導
入して移動型枠装置1に走行性を与える。
When moving the movable formwork apparatus 1 forward, rollers 11 (see FIGS. 5 and 6) are introduced below the movable formwork apparatus 1 to give the movable formwork apparatus 1 running properties.

このコロ11の導入に際しては、支保梁4A、4Bおよ
び型枠底板3を扛上6によって扛上する。
When introducing this roller 11, the supporting beams 4A, 4B and the formwork bottom plate 3 are lifted up by the lifting 6.

一方、滑動体8は固定支保工9上に橋梁2の幅方向に敷
設されたレール12によって支持案内されて橋梁2の幅
方向に滑動し、支保梁4A、4Bおよび型枠底板3を橋
梁2の幅方向に移動させ得る。
On the other hand, the sliding body 8 is supported and guided by rails 12 laid on the fixed support 9 in the width direction of the bridge 2, and slides in the width direction of the bridge 2, and moves the support beams 4A, 4B and the formwork bottom plate 3 to the bridge 2. can be moved in the width direction.

支保梁4A、4Bには橋梁2の幅方向に伸縮し得るスク
リュージヤツキ13が内蔵され、このスクリュージヤツ
キ13の進退ロッド14は先端において橋脚15に固着
されている。
The supporting beams 4A and 4B have built-in screw jacks 13 that can expand and contract in the width direction of the bridge 2, and the advancing/retracting rods 14 of the screw jacks 13 are fixed to the piers 15 at their tips.

従って、スクリュージヤツキ]3によって進退ロッド1
4を進退させると支保梁4A、4Bおよび型枠底板3が
橋梁幅方向に進退する。
Therefore, the advance/retreat rod 1 is moved by the screw jack] 3.
4 moves back and forth, the supporting beams 4A, 4B and the formwork bottom plate 3 move back and forth in the bridge width direction.

支保梁4A、4Bの幅方向外側端部には、長手方向に延
在するレール16が敷設され、このレ−ル16.16上
には門形クレーン17が橋梁長1方向走行可能に載置さ
れている。
Rails 16 extending in the longitudinal direction are laid at the outer ends of the support beams 4A and 4B in the width direction, and a portal crane 17 is placed on the rails 16.16 so as to be able to travel in one direction along the bridge length. has been done.

この門形クレーン17は移動型枠装置1上の作業に有効
である。
This portal crane 17 is effective for working on the mobile formwork apparatus 1.

桁10の成型に際しては、桁10内に空洞Hを形成して
桁10を軽量化するが、この空洞形成は型枠底板3によ
って支持された中型18によって行う。
When molding the girder 10, a cavity H is formed in the girder 10 to reduce the weight of the girder 10, and this cavity formation is performed by a medium die 18 supported by the formwork bottom plate 3.

移動型枠装置1は、橋梁2の投技方向に移動して順次連
続的に桁10を成型する。
The movable formwork device 1 moves in the throwing direction of the bridge 2 and sequentially and continuously forms the girders 10.

第8図の左半部には型枠底板3による桁10の打設を行
う状態が示されているが、この状態では支保梁4A、4
Bおよび型枠底板3は橋脚15に突き当ってしまうので
、橋脚15の位置を通過できない。
The left half of FIG. 8 shows the state in which the girder 10 is being cast using the formwork bottom plate 3. In this state, the supporting beams 4A, 4
Since B and the formwork bottom plate 3 collide with the pier 15, they cannot pass through the pier 15.

そこで、移動型枠装置1は分割部分3A、支保工4Aと
分割部分3B、支保工4Bとを相互接近、相互離間させ
て、橋脚15の位置において第8図の右半部に示すよう
に、分割部分3A、3B、支保梁4A、4Bを橋脚15
の両側に迂回させる。
Therefore, the movable formwork device 1 moves the divided portion 3A and shoring 4A and the divided portion 3B and shoring 4B toward and away from each other, and at the position of the pier 15, as shown in the right half of FIG. Split parts 3A, 3B, supporting beams 4A, 4B are connected to piers 15
detour to both sides.

第1図、第3図、第5図、第7図は型枠底板3を省略し
て図示しているが、これらの図面において明らかなよう
に、支保工4A、4Bは内側ガーダ19、中央ガーダ2
0、外側ガーダ21とよりなり、内側ガーダ19は橋脚
15のスパンよりやや短く形成されて橋脚15間に挿入
されて型枠底板3の充分内側の部分まで支持し得る。
Although the formwork bottom plate 3 is omitted in FIGS. 1, 3, 5, and 7, as is clear in these drawings, the shoring structures 4A and 4B are connected to the inner girder 19, the center Guarda 2
The inner girder 19 is formed to be slightly shorter than the span of the piers 15, is inserted between the piers 15, and can support a sufficiently inner part of the formwork bottom plate 3.

また、外側ガーダ21は、内側ガーダ19を橋脚15間
に挿入した状態で、後端が既に打設された桁10の長手
方向中央まで至るように形成され、門型クレーン17を
後方の桁10にまで案内し得る。
In addition, the outer girder 21 is formed so that its rear end reaches the center in the longitudinal direction of the girder 10 that has already been cast when the inner girder 19 is inserted between the piers 15. We can guide you up to.

そして、外側ガーダ21の先端は内側ガーダ19の先端
と並列する。
The tip of the outer girder 21 is parallel to the tip of the inner girder 19.

中央ガーダ20は後端が外側ガーダ21の後端と並列し
、かつ先端が内側ガーダ19の先端より前方にまで突出
して、外側ガーダ21を補強するとともに支保工4A、
4Bの前後方向の釣合を保っている。
The rear end of the central girder 20 is parallel to the rear end of the outer girder 21, and its tip protrudes forward from the tip of the inner girder 19, reinforcing the outer girder 21 and supporting the shoring 4A,
It maintains balance in the front and back direction of 4B.

次に、第1図〜第7図によってこの実施例による桁10
の連続的成型工程を説明する。
Next, referring to FIGS. 1 to 7, the girder 10 according to this embodiment will be explained.
The continuous molding process will be explained.

i 桁10の打設(第1図、第2図) 第8図左半部のように内側ガーダ19を橋脚15間(第
1図、第2図では橋脚に符号15A、15Bを付して示
す。
i Casting of the girder 10 (Figures 1 and 2) As shown in the left half of Figure 8, the inner girder 19 is placed between the piers 15 (in Figures 1 and 2, the piers are designated with symbols 15A and 15B). show.

)に挿入した状態で、扛上装置6によって型枠底板3お
よび支保工4A、4Bを扛上し、かつ分割部分3A、3
Bを相互に封水的に結合して桁10の打設を行う。
), the formwork bottom plate 3 and the supports 4A, 4B are lifted up by the lifting device 6, and the divided parts 3A, 3
B are connected to each other in a water-tight manner, and the girder 10 is poured.

ii 移動型枠装置1の前進準備(第3図、第4図) 桁10のコンクリート硬化後に打上装置6のジヤツキ5
を短縮させて桁10がら型枠底板3を抜き、滑動体8を
レール12上に乗せる。
ii Preparation for advance of mobile formwork device 1 (Figures 3 and 4) After concrete hardening of girder 10, jacking 5 of launching device 6
is shortened, the form bottom plate 3 is removed from the girder 10, and the sliding body 8 is placed on the rail 12.

ここで、スクリュージヤツキ13によって支保梁4A、
4Bを相互離間させて、内側ガーダ19を橋脚15A、
15B間から抜き出す。
Here, the supporting beam 4A,
4B are spaced apart from each other, and the inner girder 19 is connected to the piers 15A,
Pull it out from between 15B.

この支保梁4A、4Bの相互離間に先立ってクレーン1
7を後方の桁10上(第3図、第4図では後方の桁10
を符号10Bで示す。
Before the support beams 4A and 4B are separated from each other, the crane 1
7 on the rear girder 10 (in Figures 3 and 4, the rear girder 10
is indicated by reference numeral 10B.

)に移動し、クレーン17に梁23を差し渡すとともに
この梁23を下側に車輪24を装着し、がっ桁10A、
IOB上にレール25をその長手方向に敷設してジヤツ
キ5の短縮に際してレール25上に車輪24を乗せる。
), pass the beam 23 to the crane 17, attach the wheels 24 to the lower side of the beam 23, and move the beam 23 to the crane 17.
A rail 25 is laid on the IOB in its longitudinal direction, and wheels 24 are placed on the rail 25 when the jack 5 is shortened.

これによって、クレーン17は桁10Aによって支持さ
れるとともに、適宜術10B上まで移動し得る。
As a result, the crane 17 is supported by the girder 10A and can be moved as needed above the girder 10B.

なお、移動型枠装置1は橋脚15A、15B間の桁10
のみを成型し、橋脚15上では別途の型枠(図示省略)
によって桁10を延長する。
In addition, the movable formwork device 1 supports the girder 10 between the piers 15A and 15B.
A separate formwork (not shown) is molded on the pier 15.
Extend digit 10 by .

なお、図面では単純桁の成型が示されているが、連続桁
あるいはラーメン構造を形成するように桁10を延長し
てもよい。
Although the drawings show the molding of a simple girder, the girder 10 may be extended to form a continuous girder or a rigid frame structure.

iii 移動型枠装置1の前進(第5図、第6図)再
び打上装置6によって支保梁4A、4Bおよび型枠底板
3を扛上し、中央ガーダ20の下方において固定支保工
9上にコロ11を設置し、ここでジヤツキ5を短縮させ
てコロ11上に支保梁4A、4Bを載置する。
iii Advancement of the movable formwork device 1 (FIGS. 5 and 6) The supporting beams 4A, 4B and the formwork bottom plate 3 are lifted up again by the launching device 6, and the rollers are placed on the fixed support 9 below the central girder 20. 11 is installed, and here the jacks 5 are shortened and the support beams 4A and 4B are placed on the rollers 11.

ここで、クレーン17を桁10上に残したまま、支保梁
4A、4Bおよび型枠底板3をコロ11で案内しつつ前
進させ、次の橋脚15B、15C間に内側ガーダ19を
挿入し得る状態にする。
Here, while the crane 17 remains on the girder 10, the support beams 4A, 4B and the formwork bottom plate 3 are moved forward while being guided by the rollers 11, and the inner girder 19 can be inserted between the next piers 15B and 15C. Make it.

V 次の桁の打設準備(第7図) 扛上装置6によって一且支保梁4A、4Bを扛上してお
いてコロ11を撤去し、次いでジヤツキ5を短縮させて
滑動体8をレール12上に乗せる。
V Preparation for pouring the next girder (Fig. 7) Lift up one support beam 4A, 4B with the lifting device 6, remove the rollers 11, then shorten the jacks 5 and move the sliding body 8 to the rail. Put it on top of 12.

ここで、支保梁4A、4Bを相互接近させて内側ガーダ
19を橋脚15B、15C間に挿入し、クレーン17を
レール25によって案内しつつ前進させてレール16上
(図中想像線で示す。
Here, the supporting beams 4A and 4B are brought close to each other, the inner girder 19 is inserted between the piers 15B and 15C, and the crane 17 is moved forward while being guided by the rail 25 onto the rail 16 (as shown by the imaginary line in the figure).

)に移載する。さらに、扛上装置6によって型枠底板3
および支保工4A、4Bを扛上して橋脚15B、15C
間の桁打設準備が完了する。
). Furthermore, the formwork bottom plate 3 is lifted by the lifting device 6.
and by lifting up the supports 4A and 4B and piers 15B and 15C.
Preparation for pouring the girders between them is completed.

この発明に係る移動型枠装置は橋梁幅方向に二分割され
た型枠底板を橋梁長手方向移動可能な可動支保梁上に載
置して適宜橋梁長手方向に移動させ、これによって連続
的に桁を形成し、打設されたコンクリート型枠底板とを
分離させるために、可動支保梁を扛上装置によって降下
させ、型枠底板が橋脚の位置を通過し得るように、型枠
底板を前記のとおり二分割するとともに、各分割部分を
支持する可動支保梁を、両分側部分の相互接近、相互離
間を可能にすべく、滑動体によって橋梁幅方向移動可能
としたので、装置構成が極めて単純でかつ高能率で桁を
成型し得るという優れた効果を有する。
The movable formwork device according to the present invention places a formwork bottom plate divided into two in the bridge width direction on a movable support beam that is movable in the longitudinal direction of the bridge and moves it appropriately in the longitudinal direction of the bridge. The movable support beam is lowered by a hoisting device in order to separate it from the cast concrete formwork bottom plate, and the formwork bottom plate is moved as described above so that the formwork bottom plate can pass through the position of the pier. The structure of the device is extremely simple, as the bridge is divided into two parts, and the movable support beams that support each divided part are made movable in the width direction of the bridge by means of sliding bodies in order to allow the two halves to approach and separate from each other. It has the excellent effect of being able to mold girders with high efficiency.

【図面の簡単な説明】[Brief explanation of the drawing]

図面はこの発明に係る移動型枠装置の一実施例を示すも
ので、第1図は桁打設状態を示す平面図、第2図は第1
図の正面図、第3図は前進準備状態を示す平面図、第4
図は第3図の正面図、第5図は前進状態を示す平面図、
第6図は第5図の正面図、第7図は桁打設準備状態を示
す平面図、第8図は左半部で桁打設状態を右半部で前進
準備状態を示す同実施例の横断面図である。 なお、第1図、第3図、第5図、第7図では型枠底板を
省略して示しである。 1・・・移動型枠装置、2・・・橋梁、3・・・型枠底
板、3A、3B・・・分割部分、4A、4B・・・可動
支保梁、5・・・ジヤツキ、6・・・扛上装置、7・・
・車輪、8・・・滑動体、9・・・固定支保工、10.
IOA、10B・・・桁、11・・・コロ、12・・・
レール、13・・・スクリュージヤツキ、14・・・進
退ロッド、15,15A、15B、15C・・・橋脚、
16・・・レール、17・・・門形クレーン、18・・
・中型、19・・・内側ガーダ、20・・・中央ガーダ
、21・・・外側ガーダ、23・・・梁、24・・・車
輪、25・・・レール。
The drawings show an embodiment of the movable formwork apparatus according to the present invention, and FIG. 1 is a plan view showing the girder casting state, and FIG.
Figure 3 is a front view, Figure 3 is a plan view showing the forward preparation state, and Figure 4 is a front view.
The figure is a front view of Fig. 3, and Fig. 5 is a plan view showing the forward state.
Fig. 6 is a front view of Fig. 5, Fig. 7 is a plan view showing the girder driving preparation state, and Fig. 8 shows the left half of the embodiment in the girder casting state and the right half showing the forward preparation state. FIG. Note that the bottom plate of the formwork is omitted in FIGS. 1, 3, 5, and 7. DESCRIPTION OF SYMBOLS 1... Mobile formwork device, 2... Bridge, 3... Formwork bottom plate, 3A, 3B... Divided part, 4A, 4B... Movable support beam, 5... Jacket, 6... ... Lifting device, 7...
・Wheel, 8...Sliding body, 9...Fixed support, 10.
IOA, 10B...digit, 11...coro, 12...
Rail, 13...Screw jack, 14...Advancing/retracting rod, 15, 15A, 15B, 15C... Pier,
16...Rail, 17...Portal crane, 18...
・Medium size, 19...Inner girder, 20...Central girder, 21...Outer girder, 23...Beam, 24...Wheel, 25...Rail.

Claims (1)

【特許請求の範囲】 1 橋梁幅方向に二分割された型枠底板の各分割部分を
可動支保梁によってそれぞれ支持し、この可動支保梁に
は、この可動支保梁を昇降させ得る扛上装置および可動
支保梁を相互接近、相互離間させ得る滑動体を設けてあ
り、かつ可動支保梁は別途の滑動体によって橋梁長手方
向移動可能とさ。 れである移動型枠装置。
[Scope of Claims] 1. Each divided portion of the form bottom plate divided into two in the bridge width direction is supported by a movable support beam, and the movable support beam is equipped with a lifting device and a lifting device capable of raising and lowering the movable support beam. A sliding body is provided that can move the movable support beams toward and away from each other, and the movable support beams can be moved in the longitudinal direction of the bridge by a separate sliding body. Mobile formwork equipment.
JP11589279A 1979-09-10 1979-09-10 Mobile formwork equipment Expired JPS5953426B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11589279A JPS5953426B2 (en) 1979-09-10 1979-09-10 Mobile formwork equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11589279A JPS5953426B2 (en) 1979-09-10 1979-09-10 Mobile formwork equipment

Publications (2)

Publication Number Publication Date
JPS5641969A JPS5641969A (en) 1981-04-18
JPS5953426B2 true JPS5953426B2 (en) 1984-12-25

Family

ID=14673772

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11589279A Expired JPS5953426B2 (en) 1979-09-10 1979-09-10 Mobile formwork equipment

Country Status (1)

Country Link
JP (1) JPS5953426B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63192643U (en) * 1987-05-30 1988-12-12
JPH0534034Y2 (en) * 1986-11-27 1993-08-30

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0534034Y2 (en) * 1986-11-27 1993-08-30
JPS63192643U (en) * 1987-05-30 1988-12-12

Also Published As

Publication number Publication date
JPS5641969A (en) 1981-04-18

Similar Documents

Publication Publication Date Title
CN105649654A (en) Automatic hydraulic inverted arch trestle trolley and construction method thereof
CN205370595U (en) Automatic hydraulic pressure inverted arch landing stage platform truck
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN111022079A (en) Trestle type full-section inverted arch two-lining trolley equipment and construction method thereof
CN102660925B (en) Moveable formwork for variable-width curved bridge
CN111809536A (en) Integrally-moving box culvert template and construction method thereof
CN106593469A (en) Trolley for construction of inverted arch
CN109139050B (en) Self-propelled integrated tunnel inverted arch device
CN211342938U (en) Trestle type full-section inverted arch two-lining trolley equipment
CN111042835B (en) Tunnel cable ditch and ditch construction trolley and construction method thereof
CN110894792A (en) Trestle type lower opening full-section synchronous construction equipment and construction method thereof
JPS5953426B2 (en) Mobile formwork equipment
CN212294398U (en) Integrally-moving type box culvert template
CN202073045U (en) Hanging basket inner mould sliding apparatus
CN212716661U (en) External contraction type tunnel center ditch post forming template of slide rail
CN211081965U (en) Self-walking hydraulic trestle
CN207453986U (en) A kind of mobile jumbo device of underground pipe gallery construction
JPH0332677Y2 (en)
CN221736528U (en) Movable water ditch template
CN211342936U (en) Landing stage formula upper shed full section construction equipment that synchronizes
CN205605224U (en) Tunnel invert moving die carrier that is under construction
CN211342939U (en) Landing stage formula under shed full section construction equipment in step
JPS5953427B2 (en) Mobile formwork equipment
CN212927871U (en) Box culvert construction equipment in shield tunnel
JP7373773B2 (en) Formwork installation device and formwork installation method using the same