JPS5947017A - Manufacture of metallic pipe - Google Patents

Manufacture of metallic pipe

Info

Publication number
JPS5947017A
JPS5947017A JP15862882A JP15862882A JPS5947017A JP S5947017 A JPS5947017 A JP S5947017A JP 15862882 A JP15862882 A JP 15862882A JP 15862882 A JP15862882 A JP 15862882A JP S5947017 A JPS5947017 A JP S5947017A
Authority
JP
Japan
Prior art keywords
pipe
punch
enlarged diameter
inner peripheral
peripheral surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15862882A
Other languages
Japanese (ja)
Inventor
Shiro Tanaka
四郎 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MITSUBOSHI SEISAKUSHO KK
Original Assignee
MITSUBOSHI SEISAKUSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MITSUBOSHI SEISAKUSHO KK filed Critical MITSUBOSHI SEISAKUSHO KK
Priority to JP15862882A priority Critical patent/JPS5947017A/en
Publication of JPS5947017A publication Critical patent/JPS5947017A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/30Finishing tubes, e.g. sizing, burnishing

Abstract

PURPOSE:To obtain a lightweight metallic pipe having the prescribed length and thin wall thickness, by forming one end of a short-sized metallic pipe into a radially expanded part having thick wall thickness, and stretch forming the total length of the pipe by drawing the remaining part of it. CONSTITUTION:The 1st drawing is performed by pressing a metallic pipe 7 of short-sized blank material into the 1st die hole 5 having the 1st radially expanding part at its upper opening, by a punch 8 in a cold state. Successively, a perfect radially-expanded part is formed at the upper end of the metallic pipe 7 in the 2nd drawing state. Next, the pipe is pressed into the 3rd die hole 14 of the 3rd die 15 in a cold state. The 3rd punch 16 is inserted through the inner hole of the pipe to press its inner peripheral surface, thereby the inner peripheral surface of the pipe 7C is radially expanded to form the pipe into the thin wall thickness, and the pipe is simultaneously stretched in the axial direction to form it into the prescribed length. Then a punch having its diameter slightly larger than that of the punch 16 is pressed into the pipe 7C in a cold state to uniformly press only the surface of the inner peripheral surface of the pipe 7C, thereby forming a specular surface.

Description

【発明の詳細な説明】 この発明はたとえば自動二輪車のフロントフォークに使
用されるような金属パイプの製造方法に関している。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of manufacturing a metal pipe used, for example, in the front fork of a motorcycle.

従来、上述例のような金属パイプの製造方法は、所要長
さr有する金属パイプの一端ケ加圧して拡大径部に成形
し、その拡大径部ケ他部拐との連結部として設ける一方
、内周面はビメトンを摺動自在に内蔵する構成上、その
内周面全精密な仕上面に形成していた。
Conventionally, the method for manufacturing a metal pipe as described in the above example involves pressurizing one end of a metal pipe having a required length r to form an enlarged diameter portion, and providing the enlarged diameter portion as a connecting portion with other parts. The inner circumferential surface had a completely precisely finished surface because it contained a vimeton that could be slid freely.

しかし、このような製造方法では金IA4ノくイブの全
長が強度上厚肉が要求される拡大径部と同厚さの厚肉と
なってしまい、金属パイプの刀(1乳が大きくなってい
た。
However, with this manufacturing method, the entire length of the gold IA4 pipe becomes as thick as the enlarged diameter part, which requires a thick wall for strength reasons, and the metal pipe sword (1 breast is large). Ta.

そのため、拡大径部に相当するj指状体とltv肉の金
属パイプと全溶接にて連結することも名えられるが、こ
の場合は熱歪や組付は不艮等Ii:誘発しやすいという
問題を有していた。
Therefore, it is also possible to connect the J finger-like body corresponding to the enlarged diameter part to the metal pipe of LTV flesh by full welding, but in this case, thermal distortion and assembly are likely to occur. I had a problem.

また金属パイプの内周面を精密な仕」二面に成形するた
め、フォーミング加工等の研11.v作業を必要とする
など金/i、%パイプの製作曲Vこおいては重荷■にな
るばかりか、絞シ加工に加えてフォーミング加工等r要
し、コスト高を余儀なくされていた。
In addition, in order to form the inner peripheral surface of the metal pipe into a precise finish, polishing such as forming process 11. Not only is it a heavy burden when producing gold/i,% pipes, but it also requires forming processes in addition to drawing processes, which inevitably increases costs.

そこでこの発明は、金属パイプが重荷重になることなく
、またフォーミング加工等葡要することのない金属パイ
プの製造方法の提供を目的とする。
SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a method for manufacturing a metal pipe that does not impose a heavy load on the metal pipe and does not require forming processing or the like.

そしてこの発明によれば、短尺利料の金属/くイブを用
いて所定長さの軽量の金部パイプに成形することかでき
、しかも成jシイノに要求される各部のパイプI!、!
さに対応した肉厚に1戊形できる。すなわち、4Ax尺
の金1、似パイプ葡用いて一端葡厚閑の拡大径部VC成
形したのち、残シのバイブ部分を絞シ加工してパイプ全
長音引伸し成、形すれば、所定長さ7准する薄肉の金j
高パイプが?4ノられ、全体の重量奮fM実に1111
1i化することができる。
According to this invention, it is possible to form a lightweight metal pipe of a predetermined length using a short length of metal/tube, and moreover, it is possible to form a pipe of each part required for construction. ,!
It can be shaped into a wall thickness that corresponds to the size. In other words, if you use a 4A x size metal 1 and a similar pipe to form the enlarged diameter part VC with one end thick and blank, then draw the remaining vibrator part and stretch the entire length of the pipe to form it to the specified length. 7. Thin-walled gold j
A high pipe? 4 times, the overall weight is actually 1111
1i.

このため、拐刺費のコスト低下のみならず庫体の現もi
: +li7;減化娑1ネすることかでき、極めて有益
である。
For this reason, not only will the cost of kidnapping be reduced, but the current situation of the warehouse will also be reduced.
: +li7; It can be reduced by 1, which is extremely beneficial.

−また最終1捏としてパイプの内周[(ri Vこ対し
、加工度の小さい紋9加工’x Ij(uすことにより
、金属パイプの内)iji1面k =x jnI Ij
ls形することができ、フォーミング加工鎗Jd:要す
ることなく精密仕上曲會得ることかできる。
- Also, as the final kneading, the inner periphery of the pipe [(r i V , compared to that, the pattern 9 machining with a small degree of machining'
It is possible to obtain a precision finish without the need for a forming process.

こび〕ため、フロントフォーク等の金ワロバイプはダイ
ストポンチによる一連の絞シ加工によって成;ヒするこ
とかできるばかりか、厚肉の必要な拡大径部Vこ&J、
厚肉1戎ハコすべく対応し、その他の薄肉が望ましい桟
りのパイ・プ部分には薄肉成形すべく対応し、各肉厚の
異なる部分に対応しfc製造手段となって金属パイプヲ
製作することができる。
Because of this, the gold-plated pipes for front forks, etc. can not only be made by a series of drawing processes using a die punch, but also the enlarged diameter parts, which require thick walls, can be
Metal pipes are manufactured by using fc manufacturing means to accommodate thick walls, and to form thin walls for other pipe sections where thin walls are desirable, and to accommodate sections with different wall thicknesses. be able to.

このような特徴を有するこの発明の一実施例全以下図面
に基づいて詳述する。
An embodiment of the present invention having such features will be described in detail below with reference to the drawings.

第1図は自動二輪車のステアリングステム全示し、両側
に平行するフロントフォーク1.1開音連結部材2で連
結し、その連結部iA’ 2の中央部に植設した連結パ
イプ3の上部および双方のフロントフォーク1.1の上
部がハンド)V部分(図外)に装着され、またこれらフ
ロントフォーク1.1の下端関口部が油圧緩街器と連結
される。
Fig. 1 shows the entire steering stem of a motorcycle, and the front forks 1. The upper part of the front fork 1.1 is attached to the hand V part (not shown), and the lower end entrance part of the front fork 1.1 is connected to a hydraulic slackener.

次に、上述のフロントフォークIK使用される金属パイ
プの製造方法について説明”Jる。
Next, a method for manufacturing the metal pipe used in the above-mentioned front fork IK will be explained.

第2図はその第1絞シ工程乞示し、」二端開171面に
第1拡大径部4′!!−備えた第1型孔5葡有する第1
ダイヌ6を設け、この第1型孔5に短尺素材としての金
k]!パイプ7を冷間で@lポンチ8にて用人し、第1
絞シが行なわれる。これにより金属パイプ7aの上端部
はなめらかに形成された第1拡大径部4VC毛った拡径
に形成されるとともに、下部は第1型孔5に毛って小径
に絞られる。
FIG. 2 shows the first drawing step, with the first enlarged diameter portion 4' on the two-end open surface 171! ! - a first mold having five holes;
A dynu 6 is provided, and gold k as a short material is placed in this first mold hole 5! Punch pipe 7 cold with @l punch 8, and
Strangulation is performed. As a result, the upper end of the metal pipe 7a is formed to have an enlarged diameter as the smoothly formed first enlarged diameter portion 4VC, and the lower part is narrowed to a small diameter by the first mold hole 5.

そして、第1絞り工程ケ終えたる≧属パイプ7aはさら
に第2絞り」1程に移って完全な拡大径111への成形
が行なわれる。
Then, the pipe 7a which has completed the first drawing step is further moved to the second drawing step 1, where it is formed into a completely enlarged diameter 111.

すなわち、9.’)3図に示すように、(″)52拡大
径1?+59を備えた第2ハ1シ孔10ケ有する第2ダ
イス11の第2型孔10に第1絞シ工程を終えたるハ・
、6パイプ7a’7冷[1)jで第2ポンチ12にてI
J−人し、8fN 2 &ジが行なわれる。これにより
、4f(1<r、+バイブ’I bの上端に完全な拡大
径部が形成2さiLる。なお、13は下部加圧部材であ
って、成形IRIVこパイプの延びおよび肉厚が変動す
るのを規1iilJする。ま7ξ、−1−述の第1、第
2ポンチ8,12は、各ダイス6.11の拡大径部4,
9に対応した形状Vこ成形されている。
That is, 9. ') As shown in Figure 3, the second mold hole 10 of the second die 11, which has 10 holes with an enlarged diameter of ('') 52 and an enlarged diameter of 1?・
, 6 pipe 7a'7 cold [1) j with second punch 12 I
J-person and 8fN 2 &ji are performed. As a result, a completely enlarged diameter portion is formed at the upper end of 4f (1<r, +vibe'I b). 13 is a lower pressure member, and the extension and wall thickness of the molded IRIV pipe are The first and second punches 8, 12 mentioned above are the enlarged diameter portions 4, 12 of each die 6.11.
It is molded into a V shape corresponding to No. 9.

そして、第4図に示すように、第3型孔14をイエする
第3ダイス15に第2絞シエ氾d k終え/こ金属パイ
プ7b?I:冷間で第3ポンチ16にて圧入し、第3絞
シが行なわれる。このとき、第3ポンチ16はパイプの
内孔r抑通してパイプの内周面を加圧するため、金j1
・4パイプ7Cは内周面が拡径で薄肉に成形されるとと
もに、パイプtよ軸線方向K iJi’定長さに引延し
成形される。
Then, as shown in FIG. 4, the third mold hole 14 is filled with the third die 15, and the second drawing die dk is finished/this metal pipe 7b? I: Cold press-fitting is performed using the third punch 16, and third drawing is performed. At this time, the third punch 16 presses the inner peripheral surface of the pipe by pressing the inner hole r of the pipe.
・The inner peripheral surface of the 4-pipe 7C is formed to have an enlarged diameter and a thin wall, and is also formed by being stretched to a constant length in the axial direction K iJi' of the pipe t.

ついで、第51=41 VC示すように、第4型孔17
盆有する第4ダイヌ18に第3絞シ工程ケ終えた全屈パ
イプ7c’2冷間で第3ボンナ16よルわずが大径の第
4ポンチ19にて圧入し、第4絞シが行なわれる。この
とき、第4ポンチ19はパイプの内周面を軽加圧した状
態で挿31”iするため、パイプの内周面は表面のみが
均一に加圧さtして紅色面成形される。
Then, as shown in the 51st = 41 VC, the fourth mold hole 17
After completing the third drawing process, the fully bent pipe 7c'2 having a tray is press-fitted with the fourth punch 19, which has a larger diameter than the third boner 16, and the fourth drawing process is completed. It is done. At this time, the fourth punch 19 is inserted 31''i with the inner circumferential surface of the pipe lightly pressurized, so that only the surface of the inner circumferential surface of the pipe is uniformly pressurized and a red-colored surface is formed.

このように第1〜第4の一連の絞υ工程?I:経て所定
の金属パイプ7dが成形される。
Like this, the first to fourth series of drawing steps? I: A predetermined metal pipe 7d is then formed.

上述の金属パイプは、フロントフ刃−り等の軸に適した
鋼、アルミニウム合金等のt、+ 1.31j 全使用
する。
The above-mentioned metal pipe is made of steel, aluminum alloy, etc., which is suitable for the shaft of the front flap, etc.

また、金属パイプの素材厚さおよび素利長さは、拡大径
部の成形厚さと同厚さに設け、また成形後に引延ばされ
るパイプ長さt予め考JAe t、た長さに設定する。
Further, the material thickness and raw length of the metal pipe are set to be the same as the molding thickness of the enlarged diameter portion, and are set to a length determined in advance by the length t of the pipe to be stretched after molding.

なお、上述の一実施例においてrj’第1.第2紋シ工
程缶経て金属パイプ葡成形するもの忙示したが、これに
限らず第1、第2紋り工程を1工程にて紋り成形可能で
あれば、l工程にて1曳形するように工程の簡11各化
を図ってもよい。
Note that in the above-mentioned embodiment, rj' first . The second pattern forming process is followed by metal pipe molding, but this is not the only option.If the first and second patterning processes can be formed in one process, one pattern can be formed in the first process. It is also possible to simplify the process in various ways.

【図面の簡単な説明】[Brief explanation of the drawing]

図rl′liはこの発り」の−実施例全示し、第1ン1
は自ii、J二輪車に使用されるヌテアリングステム7
示す斜視図。 第2図はそのステアリングステムのフロントフォークに
相当する金属パイプの製造方法4示し1こ第1絞シ工程
の縦断面U′−51゜ 第3図はその第2紋り工程忙示す縦iノ1曲図。 第4図はその第3絞り工程を示すkit断面図。 第5図はその第4絞り工程忙示す級断向図である。 4.9・・・拡大径111ニ 5.10,14.17・・・型孔 6.11,15.18・・・ダイア、 7.7a、7b、7c、7d・−・金ス仁i、i バイ
ア”8.12,16.19・・・ポンチ 第1図 第3図
Figure rl'li shows all examples of this origin, 1st page 1
Nutearing stem 7 used in J2 and J motorcycles
FIG. Fig. 2 shows a manufacturing method 4 of a metal pipe corresponding to the front fork of the steering stem. 1 song diagram. FIG. 4 is a sectional view of the kit showing the third drawing process. FIG. 5 is a cross-sectional view showing the fourth drawing process in progress. 4.9... Expanded diameter 111 5.10, 14.17... Mold hole 6.11, 15.18... Dia, 7.7a, 7b, 7c, 7d -- Gold strip i ,i Bahia"8.12,16.19...Ponchi Figure 1 Figure 3

Claims (1)

【特許請求の範囲】 1、一端に拡大径部を備えた型孔2有するダイヌの型孔
に金属パイプを圧入してそのパイプの一旬1.1に拡大
径部を形成し、。 他のパイプ部分全次工程で絞9加工してパイプ全長r 
VOW肉に引延し成形し、ついでそのパイプ内1ii’
ii面に対し、加工度の小さいj& D加工ケ施してパ
イプ内11″d面會鏡而成形することケ特徴とする金1
116パイプの製造方法。
[Claims] 1. A metal pipe is press-fitted into a mold hole of a die having a mold hole 2 having an enlarged diameter portion at one end, and an enlarged diameter portion is formed at one end of the pipe. All other pipe parts are subjected to drawing 9 in the next process, and the total length of the pipe is r.
Stretched and formed into VOW meat, then inside the pipe 1ii'
Gold 1 is characterized by applying J & D processing with a small degree of processing to the ii side and forming the 11" d side inside the pipe with a mirror.
116 Method of manufacturing pipe.
JP15862882A 1982-09-11 1982-09-11 Manufacture of metallic pipe Pending JPS5947017A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15862882A JPS5947017A (en) 1982-09-11 1982-09-11 Manufacture of metallic pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15862882A JPS5947017A (en) 1982-09-11 1982-09-11 Manufacture of metallic pipe

Publications (1)

Publication Number Publication Date
JPS5947017A true JPS5947017A (en) 1984-03-16

Family

ID=15675857

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15862882A Pending JPS5947017A (en) 1982-09-11 1982-09-11 Manufacture of metallic pipe

Country Status (1)

Country Link
JP (1) JPS5947017A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105458030A (en) * 2014-09-30 2016-04-06 友信工业株式会社 Method of manufacturing filter pipe for vehicle and filter pipe for vehicle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105458030A (en) * 2014-09-30 2016-04-06 友信工业株式会社 Method of manufacturing filter pipe for vehicle and filter pipe for vehicle
CN105458030B (en) * 2014-09-30 2017-09-01 友信工业株式会社 The manufacture method of automobile screen pipe and the automobile screen pipe being produced from it

Similar Documents

Publication Publication Date Title
US4078415A (en) Process of manufacturing shaped bodies by cold shaping
JPS6061131A (en) Plastic working method of metallic product
JPS5947017A (en) Manufacture of metallic pipe
JP2000202552A (en) Manufacture of high pressure gas container liner
US7140226B2 (en) Methods for making a bicycle frame part having a disproportionally enlarged end section
JP3738402B2 (en) Pipe connecting end forming apparatus and pipe connecting end forming method
JPH0890135A (en) Joint metal tool and manufacture of this half-made product
JPH02120536A (en) Piston for disc brake and manufacture thereof
JPS62286842A (en) Manufacture of change lever and structure thereof
JP3229365B2 (en) Pipe end molding method
JPS5886938A (en) Manufacture of steering stem
JPH0316206B2 (en)
JP4461454B2 (en) Cold reduction press forming method of metal tube and metal tube formed thereby
JPS5921429A (en) Manufacture of thin cylinder having plural step difference on inside face
US7431317B2 (en) Bicycle frame part having a disproportionally enlarged end section and process for making the same
JPS59120329A (en) Forming method of stepped pipe
JP3921772B2 (en) Method for manufacturing shell of negative pressure booster
JPH04135029A (en) Method for cold forming short tube with intermediate flange
JPH0262100B2 (en)
JPS58142026A (en) Manufacture of outer wheel in unispeed universal joint
JPH02165811A (en) Method for extrusive forming duplex tube
JPH02112845A (en) Working method for axis-like projection formed by press forming
JPS6137336A (en) Working method of pipe roll
JP2944465B2 (en) Method for manufacturing component having fine shaft portion
JPS60158942A (en) Device for forming spiral parts