JPS5925051B2 - Earth retaining method - Google Patents

Earth retaining method

Info

Publication number
JPS5925051B2
JPS5925051B2 JP2084480A JP2084480A JPS5925051B2 JP S5925051 B2 JPS5925051 B2 JP S5925051B2 JP 2084480 A JP2084480 A JP 2084480A JP 2084480 A JP2084480 A JP 2084480A JP S5925051 B2 JPS5925051 B2 JP S5925051B2
Authority
JP
Japan
Prior art keywords
earth
frame
earth retaining
ground
frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP2084480A
Other languages
Japanese (ja)
Other versions
JPS56119036A (en
Inventor
一彌 広田
邦光 山田
清司 内藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2084480A priority Critical patent/JPS5925051B2/en
Publication of JPS56119036A publication Critical patent/JPS56119036A/en
Publication of JPS5925051B2 publication Critical patent/JPS5925051B2/en
Expired legal-status Critical Current

Links

Description

【発明の詳細な説明】 この発明は地盤面を開削して基礎および建造物地下部分
の施工を行なう場合等の根切り工事において、地山切取
面を保護するための土留工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an earth retaining method for protecting the cut surface of the ground during root cutting work, such as when excavating the ground surface and constructing foundations and underground parts of buildings.

従来良く使用されている土留工法としては鋼矢板、コン
クリート矢板等を連続して打ち込む工法、H形鋼や■形
鋼を使用した親杭横矢板工法、また深い掘削に対しては
地中連続壁工法等がある。
Conventionally commonly used earth retaining methods include the method of continuously driving steel sheet piles and concrete sheet piles, the parent pile horizontal sheet pile method using H-shaped steel and ■-shaped steel, and underground continuous walls for deep excavations. There are construction methods etc.

しかし、いずれの工法にも安定性、強度、施工速度、資
材、設備、工費その他の面で一長一短があり、現場条件
、施工規模等に応じて使い分けられている。
However, each construction method has advantages and disadvantages in terms of stability, strength, construction speed, materials, equipment, construction costs, and other aspects, and they are used depending on site conditions, construction scale, etc.

この発明の土留工法はエキスバンドメタルフレームを使
用して比較的簡易な設備で安定性の優れた土留工を急速
施工しようとするものである。
The earth retaining method of this invention is intended to rapidly construct an earth retaining structure with excellent stability using an expanded metal frame with relatively simple equipment.

以下、この発明を図示した実施例に基づいて説明する。The present invention will be described below based on illustrated embodiments.

第1図〜第3図はこの発明の土留工法の施工手順の概略
を示したもので、まず第1図a e bに示すように根
切り位置において一段目の掘削を行ない、直ちにこの地
山切取面に断面溝状に形成したエキスバンドメタルフレ
ーム(以下フレームと略す)1aおよび1bを格子状に
配設し、格点部分をアースアンカー2で固定して、地山
切取面とフレーム1aおよび1bを密着させる。
Figures 1 to 3 schematically show the construction procedure of the earth retaining method of this invention. First, as shown in Figure 1 a e b, the first stage of excavation is carried out at the root cutting position, and the ground is immediately excavated. Extended metal frames (hereinafter referred to as frames) 1a and 1b, which are formed in a cross-sectional groove shape on the cut surfaces, are arranged in a grid pattern, and the case points are fixed with earth anchors 2, so that the cut surfaces of the earth and the frames 1a and 1b are arranged in a grid pattern. Bring 1b into close contact.

次に、第2図a、bに示すようにフレーム1aおよび1
bを所定段数固定したらモルタル吹付けを行ない、前記
地山切取面に土留梁枠4を形成させる。
Next, as shown in FIG. 2a and b, frames 1a and 1
After fixing a predetermined number of stages b, mortar is sprayed to form the retaining beam frame 4 on the cut surface of the ground.

この作業を所要深さまで繰り返し、第3図a s bに
示すアースアンカー2で固定された土留梁枠4を完成さ
せる。
This operation is repeated to the required depth to complete the earth retaining beam frame 4 fixed with the earth anchors 2 shown in FIG. 3A-S-B.

フレームは初?背面土圧に耐えられるよう適度な曲げ剛
性を有するものであり、エキスバンドメタルを断面溝形
に形成し、その底面を地山切取面に密着固定させる。
Is this your first frame? It has appropriate bending rigidity to withstand rear earth pressure, and the expanded metal is formed into a groove shape in cross section, and the bottom surface is tightly fixed to the cut surface of the ground.

なお、このフレームは土留梁枠4形成後は梁の補剛材と
して働き、RC梁を構成する。
Note that after the earth retaining beam frame 4 is formed, this frame acts as a stiffener for the beam and constitutes an RC beam.

また切取面に格子状の土留梁枠4を形成するため、格子
の格点間部分については切取面と垂直な方向からみて直
線状のフレーム1a、格点部分については格点を中心と
して交差する十字状のフレーム1bを使用することによ
り、施工能率を向上させることができる。
In addition, in order to form a lattice-shaped earth retaining beam frame 4 on the cut plane, the frame 1a is linear when viewed from the direction perpendicular to the cut plane for the part between the case points of the lattice, and the frame 1a is linear when viewed from the direction perpendicular to the cut plane, and the frame 1a for the case point part intersects with the case point as the center. By using the cross-shaped frame 1b, construction efficiency can be improved.

すなわち、直線上のフレームIaを下に、十字状のフレ
ーム1bを上にして重ね合わせ、格点部分において十字
状のフレーム1bをアースアンカー2で固定すれば、フ
レーム1a、1b全体を法面に固定することができる。
That is, by stacking the straight frame Ia on the bottom and the cross-shaped frame 1b on top, and fixing the cross-shaped frame 1b at the case point with the earth anchor 2, the entire frames 1a and 1b can be placed on the slope. Can be fixed.

このとき、フレーム1a、1bii’アースアンカー2
0啼付緊張により、地山切を面に押し付けられ特に初期
の地山のゆるみ発生を抑える。
At this time, frames 1a, 1bii' earth anchor 2
Due to the zero tension, the ground cutting is pressed against the surface, which suppresses the loosening of the ground, especially in the early stages.

また、フレーム1a、1bけ多少の地山変化にも追随す
ることができるため地山整形が容易である。
Furthermore, since the frames 1a and 1b can follow even slight changes in the ground, shaping the ground is easy.

第4図〜第6図はこの発明の工法における地山切取面の
横断面形状を示したもので、第4図および第5図はそれ
ぞれ第2図すのA−A断面図およびB−B断面図、第6
図は第3図すのC−C断面図である。
Figures 4 to 6 show the cross-sectional shapes of the cut surfaces of the ground in the construction method of this invention, and Figures 4 and 5 are sectional views A-A and B-B of Figure 2, respectively. Sectional view, No. 6
The figure is a sectional view taken along the line C--C in Figure 3.

図に示すように、鉛直方向の各フレーム1間はアーチ状
に掘削されているため、アーチ状の土圧が作用し、この
土のアーチ作用によって地山の抜は出しを抑えることが
できる。
As shown in the figure, since the space between each frame 1 in the vertical direction is excavated in an arch shape, arch-shaped earth pressure acts, and this arch action of the earth can suppress the extraction of the ground.

また、横方向のフレーム1はあらかじめ、このアーチ形
状に合わせて湾曲させたものを用いることにより、作業
が容易となり、無理なく地山切増面に押し付けて土圧に
対抗させることができる。
Further, by using a horizontal frame 1 that is curved in advance to match the arch shape, the work is facilitated and the frame 1 can be pressed against the ground cutting surface without difficulty and counteract the earth pressure.

さらにフレーム1間についても吹付けによって形成され
たアーチ状のモルタル375嘴面上圧に抵抗する。
Furthermore, the arch-shaped mortar 375 formed by spraying also resists pressure on the beak surface between the frames 1.

またこの工法は必要に応じて、できる限り早期にモルタ
ル吹付けを行ないながら最下段まで掘削して行こうとす
る工法であり、フレーム1a、1bが適度な剛性を有し
ていることから、この他、■ 一段を最小限の高さに掘
削すると同時にフレームIa、1bをアースアンカー2
で固定し、直ちにモルタル吹付けを行なう方法、 ■ または、掘削と同時に全面にモルタル吹付けを行な
い、その上からフレーム1a、1bとアースアンカー2
を固定し、さらに吹付けを行なう方法、 といった方法か考えられる。
In addition, this construction method attempts to excavate to the lowest level while spraying mortar as early as possible, and since the frames 1a and 1b have appropriate rigidity, this construction method Others: ■ Excavate the first stage to the minimum height and at the same time attach the frames Ia and 1b to the earth anchors 2.
2. Or, spray mortar on the entire surface at the same time as the excavation, and then attach frames 1a, 1b and earth anchor 2 from above.
Possible methods include fixing the material and then spraying it.

なお■と方法の場合1回目のモルタル吹付けにより土留
梁枠4が形成され、同時に梁枠間もモルタル層で保護さ
れる。
In the case of method (2), the retaining beam frames 4 are formed by the first mortar spraying, and at the same time, the gaps between the beam frames are also protected by a layer of mortar.

この発明は以上の構成からなり、次のような利点、特徴
を有する。
The present invention has the above configuration and has the following advantages and features.

(1)適度な曲げ剛性を有するエキスバンドメタルフレ
ームをアースアンカーで締め付けることによって、早期
に地山の緩みを抑えることができる。
(1) By tightening an extended metal frame with appropriate bending rigidity with earth anchors, loosening of the ground can be suppressed at an early stage.

(]i)モルタルはある程度の量をまとめて吹付けるこ
とができるため地山掘削の能率が非常によくなる。
(]i) Since a certain amount of mortar can be sprayed all at once, the efficiency of earth excavation is greatly improved.

011) フレームは適度な曲げ剛性を有しているた
め地山に密着して固定することができる。
011) Since the frame has appropriate bending rigidity, it can be fixed in close contact with the ground.

4V) エキスバンドメタルフレームの中間部ハ土の
アーチ作用が働き、フレーム部分の固定により抜は出し
を防ぐことができる。
4V) The middle part of the extended metal frame has an arching effect of the soil, and by fixing the frame part, it can prevent it from coming out.

(V)吹付はモルタルによっても抜は出しを防ぐことが
でき、さらに吹付は前にアーチ状に掘削しておくことに
よって、モルタルで形成されるアーチで背面土圧に抵抗
することができる。
(V) Shotting can also be prevented from being pulled out by using mortar, and by excavating an arch in front of the shotgun, the arch formed with mortar can resist back earth pressure.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図〜第3図はこの発明の実施例における施工手順を
示したもので、第1図すは一段目掘削時の切取面正面図
、第1図aはその側面断面図、第2図すは所定段数掘削
時の切取面正面図、第2図aはその側面断面図、第3図
すは土留工完成時の正面図、第3図aはその側面断面図
、第4図は第2図すのA−A断面図、第5図は第2図す
のB−B断面図、第6図は第3図すのC−C断面図であ
る。 1.1a、1b・・・・・・エキスバンドメタルフレー
ム、2・・・・・・アースアンカー、3・・・・・・モ
ルタル、4・・・・・・土留梁枠。
Figures 1 to 3 show the construction procedure in an embodiment of the present invention, where Figure 1 is a front view of the cut surface during the first stage of excavation, Figure 1a is a side sectional view thereof, and Figure 2 Figure 2a is a front view of the cut surface when excavating a predetermined number of stages, Figure 2a is a side sectional view, Figure 3 is a front view when the earth retaining work is completed, Figure 3a is a side sectional view, and Figure 4 is a side sectional view. 2, FIG. 5 is a sectional view taken along line BB in FIG. 2, and FIG. 6 is a sectional view taken along line C-C in FIG. 3. 1.1a, 1b... Extracted metal frame, 2... Earth anchor, 3... Mortar, 4... Earth retaining beam frame.

Claims (1)

【特許請求の範囲】[Claims] 1 根切り地盤面を掘削し、この掘削した地山切取面に
断面溝型に形成した補強用のエキスバンドメタルフレー
ムを格子状に配設し、この格子の格点部分をアースアン
カーで固定して前記切取面とエキスバンドメタルフレー
ムとを密着させた後、モルタル吹付けを行なって土留梁
枠を形成して行く土留工法であり、かつ前記切取面は横
断面において各フレーム間が地山側へ凸となるようアー
チ状に形成しであることを特徴とする土留工法。
1. Excavate the ground surface of the excavated ground, place reinforcing expanded metal frames with a groove-shaped cross section on the excavated ground surface in a lattice pattern, and fix the points of this lattice with earth anchors. This is an earth retaining method in which the cut plane and the extended metal frame are brought into close contact with each other, and then mortar is sprayed to form the earth retaining beam frame. An earth retaining method that is characterized by being formed into a convex arch shape.
JP2084480A 1980-02-21 1980-02-21 Earth retaining method Expired JPS5925051B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2084480A JPS5925051B2 (en) 1980-02-21 1980-02-21 Earth retaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2084480A JPS5925051B2 (en) 1980-02-21 1980-02-21 Earth retaining method

Publications (2)

Publication Number Publication Date
JPS56119036A JPS56119036A (en) 1981-09-18
JPS5925051B2 true JPS5925051B2 (en) 1984-06-14

Family

ID=12038378

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2084480A Expired JPS5925051B2 (en) 1980-02-21 1980-02-21 Earth retaining method

Country Status (1)

Country Link
JP (1) JPS5925051B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0361252U (en) * 1989-10-17 1991-06-17

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1986004103A1 (en) * 1985-01-04 1986-07-17 Gearhart Australia Limited Stabilization of excavations

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0361252U (en) * 1989-10-17 1991-06-17

Also Published As

Publication number Publication date
JPS56119036A (en) 1981-09-18

Similar Documents

Publication Publication Date Title
KR100969996B1 (en) Soil retaining method for two rows pile using earth anchor
CN110106919A (en) A kind of lid digs the building enclosure and its construction method at station
CN109881683A (en) A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique
JPS5925051B2 (en) Earth retaining method
JP2001303883A (en) Excavation method using earth retaining structure composed of ring beam, inverted lining wall and rock bolt
JP2868651B2 (en) Earth retaining method above existing underground structure
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
KR102194381B1 (en) Pile for Earth self-retaining wall using double I beam
JP3072403B2 (en) Buttress type retaining digging method
JP2003268770A (en) Earth retaining construction method and reinforcing structure of sheet pile used for this construction method
JPH1181317A (en) Self-standing landslide-protection wall by soil stabilization method
JPH04115024A (en) Sheathing method
KR100479500B1 (en) The slope tree-planting structure using socket type steel pipe, and his construction method
KR100948492B1 (en) Constructing Method of Top-down type Retaining Wall
JPH08134913A (en) Earth retaining construction method
JPH0481004B2 (en)
JPH059930A (en) Self-erecting type landslide protection wall construction
JPS5844119A (en) Stabilization work for sheathing wall
JPH07127388A (en) Face shuttering method in tunnel excavation and bolts
JPH03107015A (en) Landslide protection construction
JP2003090043A (en) Construction method for earth retaining
JP3613618B2 (en) Construction method of leaning type retaining wall consisting of foundation bottom plate of horizontal pile.
JP2881001B1 (en) Earth retaining wall construction method for cutting land mountain
JPS5930857B2 (en) How to install earth retaining fence