JPS59187907A - Support and holding construction - Google Patents

Support and holding construction

Info

Publication number
JPS59187907A
JPS59187907A JP6273983A JP6273983A JPS59187907A JP S59187907 A JPS59187907 A JP S59187907A JP 6273983 A JP6273983 A JP 6273983A JP 6273983 A JP6273983 A JP 6273983A JP S59187907 A JPS59187907 A JP S59187907A
Authority
JP
Japan
Prior art keywords
shoring
support
stopper
hydraulic jack
underframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6273983A
Other languages
Japanese (ja)
Other versions
JPH0251002B2 (en
Inventor
岩田 三樹男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MEIDAI RIISU KK
Original Assignee
MEIDAI RIISU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MEIDAI RIISU KK filed Critical MEIDAI RIISU KK
Priority to JP6273983A priority Critical patent/JPS59187907A/en
Publication of JPS59187907A publication Critical patent/JPS59187907A/en
Publication of JPH0251002B2 publication Critical patent/JPH0251002B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は支保工に関する。[Detailed description of the invention] The present invention relates to shoring.

支保工Vユ建設工事において橋桁などの構造物を支持す
るもので、鋼材及びパイプなどを組んで構成されている
。この様な支保工を使用する橋桁゛の架設作業は、従来
から次の様にして行われている。
Shoring supports structures such as bridge girders during construction work, and is made up of steel materials, pipes, etc. Construction of bridge girders using such supports has conventionally been carried out as follows.

即ち、橋桁をクレーンで吊上けて橋脚の近傍に設置した
支保エヘ載せ、該支保工で橋桁を位置決めした後降下さ
せて橋脚上に載置同定するものである。上記クレーンで
橋桁を吊上ける作業即ち扛上作業は橋桁が大型で且つ支
保工の高さが高い程困難な作業であり、多大な危険性を
伴う。また、橋桁の降下作業は支保工上に多数の鋼材を
槓み重ね更にその鋼材の上に多数の油圧ジヤツキを設置
し、該油圧ジヤツキで橋桁を支持しながら次の様にして
行われる。
That is, the bridge girder is hoisted up by a crane and placed on a support installed near the bridge pier, and after the bridge girder is positioned using the support, it is lowered and placed on the bridge pier for identification. The work of hoisting a bridge girder with the above-mentioned crane, that is, the lifting work, is more difficult as the bridge girder is larger and the height of the support is higher, and it is accompanied by great danger. Further, the work of lowering the bridge girder is carried out in the following manner by stacking a large number of steel members on the shoring, installing a number of hydraulic jacks on top of the steel members, and supporting the bridge girder with the hydraulic jacks.

先ず、油圧ジヤツキの設置位置から外れだ箇所の鋼材を
撒去し、その鋼材が撤去きれて一段低くなった箇所に新
だな油圧ジヤツキを設置して該ジヤツキに橋桁を支持さ
せると共に、それまで橋桁を支持していた油圧ジヤツキ
を取外してその設置位置の縞材を撒去し、然る後m材を
撤去した箇所に再び油圧ジヤツキを設置するという一連
の作業を緑シ返えすことによシ、橋桁を徐々に降下させ
るものである。
First, remove the steel material from the location where the hydraulic jack was installed, install a new hydraulic jack in the lower part where the steel material has been removed, and let the jack support the bridge girder. By removing the hydraulic jacks that supported the bridge girders, scattering the striped material at the location where they were installed, and then reinstalling the hydraulic jacks at the locations where the m materials had been removed, the work was repeated. The bridge girder is gradually lowered.

ところが、この様な工程による作業では、油圧ジヤツキ
の着脱や鋼材の撤去に手間がががシ、極めて作業性が悪
くしかも安全性に問題がある。
However, in such a process, it takes time and effort to attach and detach the hydraulic jack and remove the steel material, resulting in extremely poor workability and safety issues.

一方、橋桁の架設後には支保工を撤去しなければならな
いが、支保工と架設された橋桁との間には僅かな隙間し
かおいていないため、クレーン等によって支保工を機械
的に撤去することができず、支保工を人為的に手作業で
分解して撤去してお軌極めて作業性の悪いものであった
On the other hand, the shoring must be removed after the bridge girder is erected, but since there is only a small gap between the shoring and the erected bridge girder, it is not possible to mechanically remove the shoring using a crane, etc. However, the shoring had to be manually disassembled and removed, resulting in poor workability.

本発明は上記の様な技術的課題の解決を目的としてなさ
れたもので、橋桁等の構造物の扛上降下作業及び支保工
自体の撤去作業を迅速且つ安全に行えるようにした支保
工を提供するものである〇以下、本発明の実施例を図面
にょシ説明する。
The present invention was made with the aim of solving the above-mentioned technical problems, and provides a shoring system that enables quick and safe lifting and lowering of structures such as bridge girders and removal of the shoring itself. Hereinafter, embodiments of the present invention will be described with reference to the drawings.

本実施例の支保工(A)は第1図乃至第3図に示す如く
中空な4本の支柱(1)を有しだ台枠(a)と、この台
枠(a)の各支柱(1)に夫々摺動自在に嵌挿され、且
つ支柱(1)から突出する4本のスクリューロッド(2
)とを備えたもので、伸縮自在に構成されている。
The shoring (A) of this embodiment has four hollow supports (1) as shown in Figs. 1 to 3, an underframe (a), and each support ( Four screw rods (2) are slidably inserted into the support columns (1) and protrude from the support columns (1).
), and is configured to be expandable and contractible.

台枠(a>h各支柱(1)を側枠(6a) (6b)で
連結して平面矩形状の枠体とされている。支柱(1)は
第4図及び第5図に示す如く断面円形のパイプ材からな
シ、上端を閉塞して内部へ雨水等が侵入しないようにし
である。この支柱(1)においてスクリューロッド(匂
が突出する側の端部、即ち下端部外周には一対の油圧ジ
ヤツキ(8)d(軸線に沿って取付けられる。
Underframe (a>h) Each support (1) is connected by side frames (6a) (6b) to form a frame with a planar rectangular shape.The support (1) is as shown in Figures 4 and 5. It is made of pipe material with a circular cross section, and the upper end is closed to prevent rainwater from entering the interior.In this support (1), a screw rod (the end on the side where the smell protrudes, that is, the outer periphery of the lower end is A pair of hydraulic jacks (8) d (mounted along the axis).

油圧ジヤツキ(8)は支柱(1)に溶接した上下2枚の
7ランジ(7) (8)間にラム(3a)を下向きにし
て固定され、そのラム(3a)が下側の7ランジ(8)
を摺動自在に挿通し支柱(す下端より下方へ突出してい
る0これら各支柱(1)の油圧ジヤツキ(3)t;l:
夫々1台の油圧ポンプ(不図示)に接続され、夫々同調
して伸縮動作される。
The hydraulic jack (8) is fixed with the ram (3a) facing downward between two upper and lower 7 langes (7) (8) welded to the column (1), and the ram (3a) is attached to the lower 7 lange (7). 8)
The hydraulic jacks (3) of each of these columns (1) protrude downward from the lower end of the column (3) which is slidably inserted through the column (1).
Each of them is connected to one hydraulic pump (not shown), and is expanded and contracted in synchronization with each other.

前記支柱(1)に嵌挿したスクリ・、−ロツドク2)は
比較的厚肉なパイプ材外周の全長に渉ってネジを切った
もので、上端にフランジ部(2a)を備え且つ下端が台
座(9)を介して接地している。前記フランジ部(2a
)はスクリューロッド(2)を支柱(すから抜は止めす
るだめのもので、スクリュ−ロッド(2)が支柱(1)
から最も突出した際に支柱(す内部下端のガイド(1a
)に当接するようになっている。支柱(すからのスクリ
ューロッド(2)の突出部には、支柱(りとスクリュー
ロッド(2)とを係止する第1ストツパ(4)と第2ス
トツパク5)とが螺合される。第1ストツパ(4) i
i:支柱(1)の下端に係脱するもので、外周に回ルb
操作用の把手(4a)が設けられている。第2ストツパ
(5)ハ油圧ジヤツキ(3)のラム(3りに係脱するも
ので、Ml ス)ツバ(4)の下方にあって該ストッパ
(4)よシも大径とされ、且つ外周に回動操作用の把手
(5a)が設けられている。スクリューロッド(2)の
下部には、該ロッド(2)が支柱(1)から大きく突出
した状態で側枠00uυが取付けられ、との側枠0に(
ロ)で各スクリュー四ツド(2)が連結される。側枠0
1uりは前記の如くスクリューロッド(2)が突出して
支保工(A)が伸張した際にその支保工に))下部の剛
性を確保するためのもので、支保工(A)を収縮させる
1Hcii取外せるようになっている。
The screw rod 2) fitted into the support column (1) is a relatively thick pipe material with threads cut along the entire length of the outer periphery, and has a flange portion (2a) at the upper end and a flange portion (2a) at the lower end. It is grounded via the pedestal (9). The flange part (2a
) is used to hold the screw rod (2) as a support (to prevent it from being removed), and the screw rod (2) is attached to the support (1).
The lower end guide (1a
). A first stopper (4) and a second stopper (5) for locking the column and screw rod (2) are screwed into the protrusion of the column screw rod (2). 1 stoppa (4) i
i: A device that engages and disengages from the lower end of the column (1), with a rotating ring b around the outer circumference.
A handle (4a) for operation is provided. The second stopper (5) engages and disengages from the ram (3) of the hydraulic jack (3), and is located below the collar (4) and has a larger diameter than the stopper (4). A handle (5a) for rotational operation is provided on the outer periphery. A side frame 00uυ is attached to the lower part of the screw rod (2) with the rod (2) largely protruding from the column (1), and the side frame 0 (
Each screw quadruple (2) is connected at (b). side frame 0
As mentioned above, when the screw rod (2) protrudes and the shoring (A) is extended, the 1Hcii is to ensure the rigidity of the lower part of the shoring (A). It is removable.

以上の様な本実施例の支保工(A)は橋桁(B)等の構
造物を支持しそれを扛上降下させるが、その使用態様は
次の三通シある。
The shoring (A) of this embodiment as described above supports structures such as bridge girders (B) and lifts and lowers them, and there are three usage modes as follows.

第1は支保工(〜を単体で使用する場合で、この場合支
保工(A)は台枠(a)の上面に橋桁(B)を直接支持
する0 第2は1り乃至は複数の支保工(A)を従来の支保工と
一緒に槓み重ね互いに連結して使用する場合で、この場
合支保工(A)は最上部、中間部、最下部の何れに設置
してもよく、橋桁ψ)を直接又り間接的に支持する。
The first is when shoring (~ is used alone, in which case the shoring (A) directly supports the bridge girder (B) on the top surface of the underframe (a). The second is when one or more shoring is used. In this case, the shoring (A) is stacked together with the conventional shoring and connected to each other. In this case, the shoring (A) may be installed at the top, middle, or bottom of the bridge. ψ) directly or indirectly.

第8は本実施例の様に複数例えば2つの支保工(4)を
檀み重ね互いに連結して使用する場合で、この場合各文
保工(A)が夫々伸縮するので橋桁(B)を最も大きく
打上降下させることができる。
The eighth case is when a plurality of supports (4), for example, two supports (4), are stacked and connected to each other as in this embodiment. In this case, each support support (A) expands and contracts individually, so the bridge girder (B) It can be launched and descended significantly.

尚、前記8つの使用態様において支保工(A)を上下逆
向きにして使用できることは勿論である。
In addition, it goes without saying that in the above eight usage modes, the shoring (A) can be used upside down.

しかして、橋桁(B)を扛上降下させる場合は各支保工
(ト)が同時に又は各別に伸縮されるが、その作業は同
じであるので一方の支保工(Nの伸縮作業についてのみ
説明する。
Therefore, when lifting and lowering the bridge girder (B), each support (G) is expanded and contracted at the same time or separately, but since the work is the same, only the expansion and contraction work of one support (N) will be explained. .

支保工に)を伸縮させる作業は、支保工(Nが最も収縮
した状態から第4図、第6図、第7図に示した様にして
行われる。
The work of expanding and contracting the shoring (N) is carried out as shown in FIGS. 4, 6, and 7 from the most contracted state of the shoring (N).

支保工(A)が最も収縮した状態では、第4図に示す如
く第1ストツパ(4)と第2ストツパ(5)とが上下に
降接し、その第1ストツパ(4)が支柱(1)下端に係
合し、第2ストツパ(5)が台座(9)に当接した状態
で油圧ジヤツキ(8)のラム(3a)に係合している。
When the shoring (A) is in the most contracted state, the first stopper (4) and the second stopper (5) descend vertically as shown in Fig. 4, and the first stopper (4) The second stopper (5) is engaged with the ram (3a) of the hydraulic jack (8) in a state where it is in contact with the base (9).

そして、この状態から第6図に示す如く油圧ジヤツキ(
3)を伸張動作させることによシ、その伸張ストローク
分だけ支柱(すがスクリ=、−ロッド(2)に沿って上
方へスライドし、台枠(a)が上昇して橋桁(B)を扛
上させる。油圧ジヤツキ(3)の伸張動作が停止した後
は第7図に示す如く第1ストツパ(4)を回動させて上
方へ移動し、該ストッパ(4)に支柱(1)下端を係止
させて台枠(−)の下降を阻止する。そして、油圧ジヤ
ツキ(3)を収縮動作させた後第2ストツパ(5)を回
動させて上方へ移動し、収縮した油圧ジヤツキ(3)の
ラム(3a)に第2ストツパ(5)を係合させる。
From this state, the hydraulic jack (
3), it slides upward along the rod (2) by the length of the extension stroke, causing the underframe (a) to rise and lift the bridge girder (B). After the hydraulic jack (3) stops extending, the first stopper (4) is rotated and moved upward as shown in Fig. 7. is locked to prevent the lowering of the underframe (-). Then, after the hydraulic jack (3) is retracted, the second stopper (5) is rotated to move upward, and the retracted hydraulic jack ( 3) engage the second stopper (5) with the ram (3a).

以上の様な作業を繰シ返えし行うことによシ、スクリコ
ーロッド斡)上端の7ラング部(2a)がガイド(la
)に当接するまで台枠(a)が間欠的に上昇して支保工
(A)が伸張し、橋桁(B)を所定高さ位置まで扛上さ
せる。
By repeating the above operations, the 7 rungs (2a) at the upper end of the screw rod
), the underframe (a) intermittently rises, the shoring (A) extends, and the bridge girder (B) is raised to a predetermined height position.

一方、支保工に)の収縮作業は、支保工に)が最も伸張
した状態から第8図乃至第10図に示した様にして行わ
れる。支保工に)が最も伸張した状態では、第8図に示
す如く支柱(1)下端に第1ストツパ(4)が係合し、
且つ油圧ジヤツキ(8)のラム(3a)に第2ストツパ
(5)が係合している。そして、この状態から第9図に
示す如く第2ストツパ(5)を回動させて油圧ジヤツキ
(3)の伸張ストローク分だけ下方へ移動し、然る後油
圧ジヤツキ(3)を伸張させてそのラム(3a)を第2
ストツパ(5)に当接させ、油圧ジヤツキ(3)で台枠
(−)及び橋桁(B)を支持する。次いで、第1ストツ
パ(4)を回動して油圧ジヤツキ(3)の収縮ストロー
ク分だけ下方へ移動させた後、第1θ図に示す如く油圧
ジヤツキ(3)を収縮させることによシ、その収縮ス)
1−−り分即ち支柱(りが下方へスライドして第1スト
ツパ(4)に係止されるまで台枠(a)が下降し、橋桁
(B)を降下させる。
On the other hand, the shrinking work of the shoring is performed from the most extended state of the shoring as shown in FIGS. 8 to 10. When the support (to the support) is fully extended, the first stopper (4) engages with the lower end of the support (1) as shown in Figure 8.
Moreover, the second stopper (5) is engaged with the ram (3a) of the hydraulic jack (8). From this state, as shown in Figure 9, the second stopper (5) is rotated to move downward by the extension stroke of the hydraulic jack (3), and then the hydraulic jack (3) is extended and the 2nd ram (3a)
The underframe (-) and the bridge girder (B) are supported by the hydraulic jack (3) by bringing it into contact with the stopper (5). Next, after rotating the first stopper (4) and moving it downward by the contraction stroke of the hydraulic jack (3), the hydraulic jack (3) is contracted as shown in Fig. 1θ. contraction)
The underframe (a) is lowered until the first stopper (4) slides downward and the bridge girder (B) is lowered.

以上の様々作業を繰シ返えし行うことによシ、台枠0が
間欠的に下降して支保工(A)が収縮し、橋桁(B)を
橋脚(C)上まで降下させる。橋桁(B)が橋脚(0)
まで降下した後支保工■は、下部の側枠Q01〕を取外
すことによシ第2ストッパ(5)がスクリ・、−ロメド
(2)下端の台座(9)に当接するまで収縮し、橋桁(
B)から下方へ離間されて上側のものから順に不図示の
クレーン等によって撤去される。
By repeating the above various operations, the underframe 0 is intermittently lowered, the shoring (A) contracts, and the bridge girder (B) is lowered onto the pier (C). Bridge girder (B) is pier (0)
After the shoring ■ has been lowered, by removing the lower side frame Q01, the shoring ■ will contract until the second stopper (5) comes into contact with the pedestal (9) at the lower end of the screwdriver (2), and the bridge girder will be (
They are separated downward from B) and removed in order from the top by a crane or the like (not shown).

また、上記支保工(A)は橋邦間にコンクリートスラブ
(床版)の施行をする場合において、そのコンクリート
を打つだめの型材を支持する手段としても使用できる。
Further, the above-mentioned shoring (A) can also be used as a means for supporting the form material for pouring concrete when constructing a concrete slab (floor slab) between bridge spaces.

この場合、支保工(A)はコンクリートスラブが固まっ
た後前記と同様にして収縮させることにょシ、コンクリ
ートスラブから太きく離間させてクレーン等で簡単に撤
去できるっ 本発明社以上説明した様に、中空な複数本の支柱を有し
だ台枠と、この台枠の各支柱に摺動自在に嵌押され且つ
支柱から突出するスクリューロンドとを備え、前記台枠
の各支柱においてスクリーーロンドが突出する側の端部
外周には一対の油圧ジャ、・キを夫々軸線に沿わせて取
付け、支柱からのスクリーーロッドの突出部には支柱の
端部に係脱する第1ストツパと、油圧ジヤツキのラムに
係脱する第2ストツパとを支柱側から順次螺合させたか
ら、次の様な作用効果を奏する。
In this case, the shoring (A) should be shrunk in the same manner as described above after the concrete slab has hardened, and it can be left at a wide distance from the concrete slab and easily removed using a crane, etc. As explained above by the present inventor. , an underframe having a plurality of hollow pillars, and a screw rond slidably fitted into each of the pillars of the underframe and protruding from the pillars; A pair of hydraulic jacks are attached to the outer periphery of the end of the protruding side, respectively, along the axis, and the protruding portion of the scree rod from the column is provided with a first stopper that engages and disengages from the end of the column; Since the second stopper that engages and disengages from the ram of the hydraulic jack is sequentially screwed together from the column side, the following effects are achieved.

■ 第1ストツパと第2ストッパとを回動させて上下に
移動し、これら両ストッパで交互に支柱とスクリーーロ
ッドとを係止しながら油圧ジヤツキを伸縮動作させるこ
とによシ、支保工自体が間欠的に伸縮して構造物の扛上
降下作業を迅速且つ安全に行なうことができ、作業性を
向上させることができる。
■ The first stopper and the second stopper are rotated to move up and down, and the hydraulic jack is extended and retracted while alternately locking the column and the scree rod with these two stoppers. By intermittently expanding and contracting, the work of raising and lowering the structure can be carried out quickly and safely, and workability can be improved.

■ 構造物を扛上させて所定の場所へ設置した後支保工
を収縮させて構造物から下方へ大きく離間し、支保工を
クレーン等で迅速に撤去できる。
■ After the structure is hoisted up and installed in a predetermined location, the shoring is shrunk and separated from the structure by a large distance downwards, allowing the shoring to be quickly removed using a crane or the like.

■ 第1ストツパ及び第2ストツパの両者が夫々隣接し
て配置されているので、それら両ストッパを作業者が大
きな姿勢の変化を伴わずに操作でき、作業性に優れてい
る。
(2) Since both the first stopper and the second stopper are arranged adjacent to each other, the operator can operate both stoppers without making a large change in posture, resulting in excellent workability.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明支保工の使用状態を示す正面図、第2図
は支保工の拡大正面図、第8図は同側面図、第4図は要
部を拡大して示す一部切欠正面図、第6図は第4図の(
V) −(V)線拡大断面図、第6図乃至第10図は支
保工の伸縮動作説明図である。 尚図中 (ト) ・・・支保工     (a)  ・一台 枠
(1)  ・−・支柱(2)  ・・−スクリューロッ
ド(3)  ・・−油圧ジヤツキ  (4)  ・・・
第1ストツパ(5)  ・・・第2ストツパ  (3a
)・・・油圧ジヤツキのジム特許出願人   合資会社
 名大リース−’!”、   3 18コ 第2図 袷7図
Fig. 1 is a front view showing the shoring of the present invention in use, Fig. 2 is an enlarged front view of the shoring, Fig. 8 is a side view of the same, and Fig. 4 is a partially cutaway front view showing an enlarged view of the main parts. Figure 6 is the same as Figure 4 (
V) - (V) line enlarged sectional view and FIGS. 6 to 10 are explanatory views of the expansion and contraction operations of the shoring. In addition, in the figure (g)... Shoring (a) - One frame (1) - Support (2) - Screw rod (3) - Hydraulic jack (4)...
1st stopper (5) ... 2nd stopper (3a
)...Hydraulic jack gym patent applicant Meidai Lease Limited Partnership Company -'! ”, 3 18 pieces, figure 2, figure 7

Claims (1)

【特許請求の範囲】[Claims] 中空な複数本の支柱を有した台枠と、との台枠の各支柱
に摺動自在に嵌挿され且つ支柱から突出するスクリーー
ロッドとを備え、前記台枠の各支柱においてスクリーー
ロッドが突出する側の端部外周には一対の油圧ジヤツキ
を夫々軸線に沿わせて取付け、支柱からのスクIJ、−
ロンドの突出部には支柱の端部に係脱する第1ストツパ
と、油圧ジヤツキのラムに係脱する第2ストツパとを支
柱側から順次螺合させてなる支保工。
an underframe having a plurality of hollow supports; and a scree rod that is slidably inserted into each support of the underframe and protrudes from the support; A pair of hydraulic jacks are attached to the outer periphery of the protruding end, respectively, along the axis line, and the screws from the column are fixed.
A shoring structure in which a first stopper that engages and disengages from the end of a support column and a second stopper that engages and disengages from a ram of a hydraulic jack are screwed into the protruding portion of the rond in sequence from the support side.
JP6273983A 1983-04-08 1983-04-08 Support and holding construction Granted JPS59187907A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6273983A JPS59187907A (en) 1983-04-08 1983-04-08 Support and holding construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6273983A JPS59187907A (en) 1983-04-08 1983-04-08 Support and holding construction

Publications (2)

Publication Number Publication Date
JPS59187907A true JPS59187907A (en) 1984-10-25
JPH0251002B2 JPH0251002B2 (en) 1990-11-06

Family

ID=13209053

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6273983A Granted JPS59187907A (en) 1983-04-08 1983-04-08 Support and holding construction

Country Status (1)

Country Link
JP (1) JPS59187907A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0343904U (en) * 1989-09-05 1991-04-24
JP2013019110A (en) * 2011-07-07 2013-01-31 Ihi Corp Assembly method of steel frame main column of tower boiler building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0343904U (en) * 1989-09-05 1991-04-24
JP2013019110A (en) * 2011-07-07 2013-01-31 Ihi Corp Assembly method of steel frame main column of tower boiler building

Also Published As

Publication number Publication date
JPH0251002B2 (en) 1990-11-06

Similar Documents

Publication Publication Date Title
JPS59187907A (en) Support and holding construction
US3998029A (en) Tower crane climbing
JP4623570B2 (en) Construction method of jack base and formwork support
JP3732586B2 (en) Method and apparatus for constructing steel structure
JP2957328B2 (en) Peripheral holding self-elevating construction method
JPH0525933A (en) Strut type scaffold form lifting device and concrete building frame construction method
JP3425352B2 (en) Self-elevating formwork device
JPH04161566A (en) Constructing apparatus for large space building
JP2618171B2 (en) Telescopic strut
JPH0932120A (en) Method of construction of structure
US4272465A (en) Method for multi-storied concrete construction and apparatus therefor
JPH0782799A (en) Method and apparatus for erecting towerlike structure
JPS6049724B2 (en) Shoring of structures in construction work
JPH05263531A (en) Automatic construction method and lifting-up device of structure
JP7339477B2 (en) Concrete column formwork construction device and concrete column formwork construction method using the same
JPH0533628Y2 (en)
JP2914162B2 (en) How to dismantle a water gas tank
JPH05311870A (en) Concrete mold device
JPS61270432A (en) Construction of building
JP2751988B2 (en) Building construction equipment
JP2696486B2 (en) Building construction method
JPH07158320A (en) Method of installation construction of tower-shaped structure
JPS59187908A (en) Support and holding construction
JP2653630B2 (en) How to raise the temporary roof
JPH0452802B2 (en)