JPS589509A - Corrosion preventive control panel - Google Patents

Corrosion preventive control panel

Info

Publication number
JPS589509A
JPS589509A JP56104986A JP10498681A JPS589509A JP S589509 A JPS589509 A JP S589509A JP 56104986 A JP56104986 A JP 56104986A JP 10498681 A JP10498681 A JP 10498681A JP S589509 A JPS589509 A JP S589509A
Authority
JP
Japan
Prior art keywords
control panel
control
frame
panel
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP56104986A
Other languages
Japanese (ja)
Inventor
澁谷 豊次郎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Shibaura Electric Co Ltd filed Critical Tokyo Shibaura Electric Co Ltd
Priority to JP56104986A priority Critical patent/JPS589509A/en
Publication of JPS589509A publication Critical patent/JPS589509A/en
Pending legal-status Critical Current

Links

Landscapes

  • Patch Boards (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は設置工事を容易にすると共に、設置現場の悪環
境から制御用品の腐食を防止した、改良された防食制御
盤に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an improved anti-corrosion control panel that facilitates installation work and prevents corrosion of control equipment from the adverse environment at the installation site.

従来のビルディング建築工法は、比較的に工事期間を十
分に取シ、複そうする工事を避けていた。
Conventional building construction methods take a relatively long construction period and avoid duplication of construction.

このため、電気品を現場に据え付ける場合でも、粉塵埃
や、コンクリート湧水による湿気や、他の建築付帯工事
等も、ある程度治まった時期にされるため、電気工事に
専念することができる状態であった。
For this reason, even when electrical equipment is installed on-site, it is done at a time when dust, moisture from concrete springs, and other incidental construction work have subsided to a certain extent, allowing the user to concentrate on electrical work. there were.

例えば、電気品相互間を接続する制御ケーブル工事、こ
れは一般に数百本から数万本、巨大化すれば数十1本に
も達する芯線つなぎ込み工事、制御ケーブルの延線工事
が必要であり、1日当シで数十分程度の割で仕事が消化
されるときには、数日から数週間もその工事の作業性か
ら、制御盤の出入口もしくは表面の扉を開放したまま作
業がなされて来た。この場合、従来は、簡単なシート掛
は程度でも、比較的に降下粉塵等が少ないだめ、その環
境より保護することができていた。
For example, work on control cables that connect electrical devices requires work to connect core wires and extend control cables, which generally ranges from several hundred to tens of thousands of core wires, and can reach up to tens of thousands if the work becomes huge. When the work is completed at a rate of several tens of minutes per day, due to the workability of the work, the work may be carried out with the entrance/exit of the control panel or the front door open for several days to several weeks. Ta. In this case, in the past, it was possible to protect the device from the environment by simply hanging a sheet, since there was relatively little falling dust.

しかし、近代化の波はビルデング建設の工法を変え、工
事期間は飛躍的に短縮され、ビルディング地下階等にあ
っては、極く短詩11搬入口が開いているだけで、詰機
材や設備を搬入し、!りとは閉鎖し、地上階のコンクリ
ート打設玉串に移って行くようになってきた。
However, the wave of modernization has changed building construction methods, and the construction period has been dramatically shortened.In the basement floors of buildings, only the loading entrance is open, and packing equipment and equipment can be moved. Bring it in! The site has been closed down and moved to a concrete-cast Tamagushi site on the ground floor.

このような工法においては、地下階内に設備される詰機
材、設備とも一度に搬入され、それから据え付は工事が
ほとんど同時に行なわれる。このため、電気品の据え付
は工事、制御ケーブルの布設、つなぎ込工市にあっては
、否応の別なく、建築はつり工事や室内空調工事、機械
据え付は工水建築付帯工事と同時進行となシ、従来と比
較にならない悪い環境下で制御ケーブル布設、つなぎ込
みの工事が行なわれる。そして制御盤にあっては、塵埃
の侵入、湿気の侵入による、寿命低減現象から保護しな
ければならない欠点があった。
In this construction method, the filling equipment and equipment installed in the basement are brought in at the same time, and the installation and construction work is done almost simultaneously. For this reason, the installation of electrical equipment must be carried out at the same time as construction work, control cable laying, and tethering work, and construction work must be carried out at the same time as hanging work, indoor air conditioning work, and machinery installation, as well as construction work. In Tonanashi, control cable installation and connection work will be carried out under conditions incomparably worse than in the past. The control panel also has the drawback of having to be protected from shortening of its lifespan due to the intrusion of dust and moisture.

第1図及び第2図は、従来の制御盤の断面を示すもので
あり、制御盤19体1に制御パネル2と継電器パネル3
を取付け、これに天井板5を張ったものをベース4の上
に設置する。制御り°−プル6を制御ケーブルピット9
より立ち上げて制御盤内に引き込み、制御配線用端子7
につなぎ込みをする。すでに制御盤内の配線8は、製作
工場で配線が施されている。このように制御盤を搬入し
てから、制御ケ・−プル工事の布設、引き込み、端末処
理つなぎ込み工事が長期間つづくわけである。
Figures 1 and 2 show cross sections of conventional control panels, which include 19 control panels 1, a control panel 2, and a relay panel 3.
is attached, and a ceiling plate 5 is stretched thereon, which is then installed on the base 4. Control cable pit 9
Raise it up and pull it into the control panel, and connect the control wiring terminal 7.
Connect to. The wiring 8 in the control panel has already been wired at the manufacturing factory. After the control panel was brought in, the control cable installation, lead-in, and terminal processing and connection work continued for a long time.

本発明は、現地の建設環境、工事計画に合わせて大形電
気品は先に搬入し、先行工事をし、必要な時期に小さく
区分し、搬入可能とした主要部分を極く短時間に搬入し
て、据え付は工事を行なうもので、工事環境に合わせた
、施工性を容易にした防食制御盤を提供することを目的
とする。
The present invention allows large electrical items to be brought in first in accordance with the local construction environment and construction plan, and preliminary construction work is carried out, divided into smaller pieces at the required time, and the main parts that can be brought in are brought in in an extremely short time. The installation is a construction work, and the purpose is to provide a corrosion protection control panel that is suitable for the construction environment and is easy to install.

以下、本発明を図面に示す一実施例に基づいて説明する
。第3図は制御ケーブルを下部より引き込む方式での断
面構成を示すものであり、制御盤筐体1に天井板56取
付け、制御配線用端子7を取付けたものをベース4の上
に設置する。この場合ベース12も、同時に床に固定す
る。
The present invention will be described below based on an embodiment shown in the drawings. FIG. 3 shows a cross-sectional configuration in which the control cable is led in from the bottom, and the control panel housing 1 with the ceiling plate 56 attached and the control wiring terminals 7 attached is installed on the base 4. In this case, the base 12 is also fixed to the floor at the same time.

この状態で制御ケーブル6の制御ケーブルピット9から
の布設、つなぎ込み工事を完了させてしまうわけである
。ここでしばらく様子を見て、周囲建設環境が落ついた
ときに、周辺を清掃し、制御パネル2とこれに取付けら
れた胴縁枠17a、及び継電器パネル3とこれに取付け
られた胴縁枠17bの搬入に備える。用意ができたとき
、°上記主要部の制御パネル2−胴縁枠17aと継電器
ノくネル3−胴縁枠17bを搬入し、ベース4とベース
12の上に設置し、制御盤筐体1と連結し、工場で配線
を施し、片側のみ取外してあった連絡配線13を元のと
おシに再度つなぎ込みをすればよい。
In this state, the installation and connection work of the control cable 6 from the control cable pit 9 is completed. We will observe the situation for a while, and when the surrounding construction environment has calmed down, we will clean the surrounding area and remove the control panel 2 and the rim frame 17a attached to it, and the relay panel 3 and the rim frame attached to it. Prepare for the delivery of 17b. When the preparations are complete, the main parts of the control panel 2 - the body frame 17a and the relay nozzle 3 - the body frame 17b are carried in, installed on the bases 4 and 12, and then the control panel casing 1 is installed. All you have to do is connect the connection wiring 13, which was wired at the factory, and then reconnect the connection wiring 13, which was removed on one side, to the original connection.

なお、第3図で、10は運搬時の損傷防止用のボス、l
laは制御パネル2内の内部配線を中継する端子台11
bは継電器パネルの内部配線を中継する端子台である。
In addition, in Fig. 3, 10 is a boss for preventing damage during transportation, l.
la is a terminal block 11 that relays internal wiring in the control panel 2;
b is a terminal block that relays the internal wiring of the relay panel.

近代ビルディング建築工法においては、地下階や、地上
階への大形機材、設備の搬入には、搬入用大口径ノ・ツ
チを用意して、一度に大量の必要品を搬入する。このだ
め、−気品側で一体構成の大形電気品が建築工程に合わ
せて、まだ建築の完了していない極悪の建設環境の中に
収納されることになっていた。これは、ノ・ツチが閉ま
ってからの大物の搬入は困るという、建築側の理由であ
った。
In modern building construction methods, when transporting large equipment and equipment to the basement or ground floor, a large-diameter transport tool is used to transport a large amount of necessary items at once. In order to accommodate the construction process, a large, elegantly constructed electrical appliance was to be housed in an extremely poor construction environment that had not yet been completed. The reason given by the architect was that it would be difficult to bring in large items after No-Tsuchi had closed.

本発明は、建設環境に耐えない主要部分は小形に分割し
、搬入をずらし、設置環境が安定したシ、少なくとも長
期の工事期間を必要とする制御ケーブルの布設、つなぎ
込み工事が終了してから搬入すれば、据え付は後の養生
も十分性なえたうえ、(5) 極悪な建設環境に曝さなくて済むことに着目したもので
ある。
The present invention divides the main parts that cannot withstand the construction environment into smaller pieces and staggers the delivery, so that the installation environment can be stabilized, or at least after the installation and connection of control cables, which require a long construction period, have been completed. The idea was to focus on the fact that once the equipment is delivered, the installation and subsequent curing are not only sufficient, but also (5) there is no need to expose it to the harsh construction environment.

この工法を、第4図〜vJ6図によ、り説明する。This construction method will be further explained with reference to FIGS. 4 to 6.

第4図は、先送シされたベース4とベース12を。Figure 4 shows the postponed base 4 and base 12.

床上に据え付けたところへ、制御盤筐体1を搬入し、制
御ケーブル6を制御配線用端子7へつなぎ込んだ状態を
示しておシ、あとは簡単なシート掛けで、制御パネル2
−胴縁枠17aと継電器パネル3−胴縁枠17bの搬入
を待つ。
The figure shows the state in which the control panel casing 1 is carried in to a place where it is installed on the floor, and the control cable 6 is connected to the control wiring terminal 7.Then the control panel 2 is simply hung on a sheet.
- Arming frame 17a and relay panel 3 - Waiting for the arming frame 17b to be delivered.

従来は、制御盤筐体1と制御、パネル2と継電器パネル
3は輸送、搬入、据え付は時には分割不可分であるとい
う観念であったが、これでは、電子部品化されつつある
電気品を寿命短縮よシ救えないので、環境が良くなるが
、養生によシ許容できる状態が得られる目途がつくまで
、制御パネル2と継電器パネル3の搬入を遅らせること
である。
In the past, the concept was that the control panel housing 1 and the control panel 2 and the relay panel 3 were inseparable during transportation, delivery, and installation, but this did not mean that electrical components, which are becoming more and more electronic components, would have a limited lifespan. Since we cannot save by shortening the time, we will delay bringing in the control panel 2 and the relay panel 3 until we have a prospect of achieving an acceptable condition through curing, although this will improve the environment.

これを工作上から可能とするため、本発明は制御パネル
2及び継電器パネル3に胴縁枠17a、17bをそれぞ
れ取付け、制御用品が全て制御パネル2及び継電器パネ
ル3と胴縁枠17a1.17b内に納まる6(6) ようにしたものである。
In order to make this possible from a construction standpoint, the present invention attaches the control panel 2 and the relay panel 3 to the control panel 2 and the relay panel 3 with the frame frames 17a and 17b, respectively, so that all the control supplies are inside the control panel 2, the relay panel 3, and the frame frames 17a1 and 17b. 6 (6).

第5図及び第6図は、制御パネル2−胴縁枠17aと継
電器パネル3−胴縁枠17bの輸送、搬入の方法を示す
ものである。す々わち、輸送枠15に制御パネル2−胴
縁枠17aと、継電器パネル3−胴縁枠17bを積載し
、輸送蓋14で密封し、ボス10で落ちつかせたまま固
定して、一括輸送する。荷おろし時は、キャスタ16に
より最寄りのところまで移動すればよく、あとは人手に
より、それぞれの制御パネル−胴縁枠17a及び継電器
パネル3−胴縁枠17bを積持ちし、蓋14を取去って
第3図のように組立てる。
FIGS. 5 and 6 show a method of transporting and carrying in the control panel 2--flank frame 17a and the relay panel 3--flank frame 17b. In short, the control panel 2 - body frame 17a and the relay panel 3 - body frame 17b are loaded on the transport frame 15, sealed with the transport lid 14, fixed with the boss 10 while remaining stable, and transported all at once. transport. When unloading, all that is needed is to move it to the nearest location using the casters 16, and then manually load the respective control panel-frame frame 17a and relay panel 3-frame frame 17b, and remove the lid 14. and assemble as shown in Figure 3.

継電器パネル3は、従来の構造のままでよく、胴縁17
bと組合わせることによシ、目的が達せられる。これに
より、品質の保証できる環境に制御盤として据え付は工
事を完了することができる。
The relay panel 3 may remain in the conventional structure, and the body rim 17
By combining with b, the objective can be achieved. This allows the installation work to be completed as a control panel in an environment where quality can be guaranteed.

なお、上記実施例においては、制御ケーブル6を筐体の
下部から引き込む場合について説明したが、上方から制
御ケーブル6を引き込む場合についても同様である。
In the above embodiment, a case has been described in which the control cable 6 is drawn in from the bottom of the housing, but the same applies to a case in which the control cable 6 is drawn in from above.

以上、説明したように本発明によれば、設置工事を容易
にすると共に、雰囲気の悪いM トQから制御用品の腐
食を防止した、効果的な防食制御盤が提供できる。
As described above, according to the present invention, it is possible to provide an effective anti-corrosion control panel that facilitates installation work and prevents corrosion of control equipment from the presence of a poor atmosphere.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図及び第2図は従来の制御盤の断面図、第3図は本
発明の一実施例を示す防食制御盤の断面図、第4図は据
付は工事の説明図、第5図及び第6図は制御パネル、継
電器パネルの輸送及び搬入方法の説明図である。 1・・・・・・制御盤筐体、   2・・制御パネル、
3・・・・・・m=aパ:*ル、4.12・・・・・ベ
ース、5・・・・天井板、     6・・・・制御り
゛−プル、7.11a、11b・・・・・端子台、  
8・・・・・内部配線、9・・・・・・ 制御ケーブル
ピット、  10・・・・ ボス、13・・・・連絡線
、    14  ・ 輸送蓋、15・・・・・・輸送
e 、     16・・・・・キャスタ、17a、 
17b・・・・・・胴縁枠。 (7317)  代理人 弁理士 則 近 憲 佑 (
ほか1名)第1図 一タ 第2図
Figures 1 and 2 are sectional views of a conventional control panel, Figure 3 is a sectional view of a corrosion protection control panel showing an embodiment of the present invention, Figure 4 is an explanatory diagram of installation work, and Figures 5 and 2 are sectional views of a conventional control panel. FIG. 6 is an explanatory diagram of a method of transporting and bringing in a control panel and a relay panel. 1... Control panel housing, 2... Control panel,
3... m=a panel: *le, 4.12... base, 5... ceiling board, 6... control lever, 7.11a, 11b... ····Terminal block,
8...Internal wiring, 9...Control cable pit, 10...Boss, 13...Connection line, 14・Transportation lid, 15...Transportation e, 16... Caster, 17a,
17b...Front frame. (7317) Agent: Patent Attorney Noriyuki Chika (
(and 1 other person) Figure 1 Itta Figure 2

Claims (1)

【特許請求の範囲】 別々に輸送される制御パネル及び制御盤筐体と。 この制御パネル及び制御盤筐体間に介在して両者を連結
する胴縁枠とからなシ、前記制御パネルに胴縁枠を取付
けてパネル折込み厚を深く形成し制御用品一式をこの内
に収納し、前記制御盤筐体は骨組と付属品のみで構成し
現地に先送りされケーブル布設つなぎ込み終了後、前記
制御パネルを搬入し組み立てることを特徴とする防食制
御盤。
[Claims] A control panel and a control panel housing that are transported separately. The control panel and the control panel are interposed between a frame and a frame that connects the two, the control panel is attached to the frame, the panel is folded deeply, and a set of control supplies is stored within the frame. The anti-corrosion control panel is characterized in that the control panel casing is made up of only a frame and accessories, and the control panel is transported to the site and assembled after the cables are laid and connected.
JP56104986A 1981-07-07 1981-07-07 Corrosion preventive control panel Pending JPS589509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP56104986A JPS589509A (en) 1981-07-07 1981-07-07 Corrosion preventive control panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP56104986A JPS589509A (en) 1981-07-07 1981-07-07 Corrosion preventive control panel

Publications (1)

Publication Number Publication Date
JPS589509A true JPS589509A (en) 1983-01-19

Family

ID=14395407

Family Applications (1)

Application Number Title Priority Date Filing Date
JP56104986A Pending JPS589509A (en) 1981-07-07 1981-07-07 Corrosion preventive control panel

Country Status (1)

Country Link
JP (1) JPS589509A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61104941U (en) * 1984-12-17 1986-07-03

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61104941U (en) * 1984-12-17 1986-07-03
JPH0236197Y2 (en) * 1984-12-17 1990-10-02

Similar Documents

Publication Publication Date Title
GB1010814A (en) Improvements in or relating to prefabricated buildings
US3862534A (en) Method of constructing a dwelling
US6349510B1 (en) Equipment shelter facilities
JPS589509A (en) Corrosion preventive control panel
JP2001141263A (en) Outdoor machine unit and method of constructing outdoor machine unit
JPS589508A (en) Corrosion preventive control panel
JPH03122334A (en) Work execution method for entrance unit in unit house
JP3029175B2 (en) Method of assembling high-voltage power equipment and working device used for the same
US3157730A (en) Ventilated protective enclosure for surface mounted transformers
JPH03144037A (en) Unit connecting device
JPH084322A (en) Apartment house
JPS586015A (en) Control board
JPH0363716B2 (en)
CN113187270A (en) Movable cultural relic repair cabin
JPH11200498A (en) Method for constructing multiple dwelling house and room unit for use therein
JPS586197A (en) Control board
JPH0289790A (en) Housing installation having home elevator
JPS6124885B2 (en)
JPH02291404A (en) Nuclear power plant
JP2003092811A (en) High voltage receiving and transforming facility
Reich East Area Installation Meeting No. 23
JPS62160369A (en) Gathering building for venture business
JPH02275232A (en) Two-room switching device of separate type air conditioner
JP2000096849A (en) Building with elevator
GB728372A (en) Improvements in underground motor vehicle garages