JPS5876700A - Method of installing penetrating pipe to shield segment under compressed air - Google Patents

Method of installing penetrating pipe to shield segment under compressed air

Info

Publication number
JPS5876700A
JPS5876700A JP56172781A JP17278181A JPS5876700A JP S5876700 A JPS5876700 A JP S5876700A JP 56172781 A JP56172781 A JP 56172781A JP 17278181 A JP17278181 A JP 17278181A JP S5876700 A JPS5876700 A JP S5876700A
Authority
JP
Japan
Prior art keywords
pipe
segment
guide
shield
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP56172781A
Other languages
Japanese (ja)
Other versions
JPH025878B2 (en
Inventor
石川 芳夫
蔵内 良明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seiken Co Ltd
Original Assignee
Seiken Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seiken Co Ltd filed Critical Seiken Co Ltd
Priority to JP56172781A priority Critical patent/JPS5876700A/en
Publication of JPS5876700A publication Critical patent/JPS5876700A/en
Publication of JPH025878B2 publication Critical patent/JPH025878B2/ja
Granted legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は王気べ劉にあるシールドtグメ/トに地上部或
は無王気状態にあるところから貫通管を設置する方法に
関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for installing a penetrating pipe in a shield site located above ground or in an empty state.

−Nにシールドトンネルを施工する場合、作業の安全件
、,確実性を期するために、シールト゜トンネルに、曲
が9のチェソクをすbための観淘用の管や、地上部との
通信,給排水等を容易にするための連絡!、二久巻コン
ク・】一トを打設するためのコンクリートε入管、或は
トンネル底部の地盤をa結工法tC:り改良するための
凍釉管を貰逼役賃する必費のある場合が多いが、上記管
を設1するにはシールドセグメントに穿孔しなければな
らず、その穿孔に際してに、ンールドトンメル円にその
外簡の享や土砂が浸入しない:うに地工しなけれぱなら
ない。
- When constructing a shield tunnel in N, in order to ensure work safety and reliability, the shield tunnel should be equipped with observation pipes for carrying out the check in song 9, and communication pipes with the above-ground part. , Contact to facilitate water supply and drainage, etc.! If there is a need to pay for concrete pipes for pouring concrete pipes, or frozen glaze pipes for improving the ground at the bottom of tunnels. However, in order to install the above-mentioned pipe, it is necessary to drill a hole in the shield segment, and when drilling the hole, the earth and sand of the outer shell should not enter into the rolled tommel circle.

そのため1従米に駕ボーり/グ隈に工り地表等から円径
が貰通管の外僅:9大僅の管を案内雷として前記セグメ
ントの表面まで穿孔し、前記セグメントの前記穿孔部に
対する個所の内側面に前記案内管の径より大きい@状の
シールケースを密着固定した後、前記案内管により前記
セグメントに穿ηしてから前記シールケース及び前記案
内管の丁周辺に止水材を注入、充填して止水し、前記案
内管に所簀の管を挿入して鉄管にょ如前記シールケース
を穿孔すると共に鉄管の適宜の個所を前記シールケース
に密着固定するととにょシ、シールドセグメントに貫通
していたく%開昭55−119891号F照)。
For this purpose, a tube with a diameter of just 90 mm outside the receiving tube is drilled from the ground surface, etc., up to the surface of the segment as a guide bolt, and After closely fixing a @-shaped seal case larger than the diameter of the guide tube to the inner surface of the segment, the guide tube perforates the segment, and then a waterproof material is applied around the seal case and the guide tube. After injecting and filling the water to stop the water, insert the appropriate pipe into the guide pipe, pierce the seal case of the iron pipe, and tightly fix the appropriate parts of the iron pipe to the seal case, and then the shield segment. (See No. 55-119891 F).

この従来方法は通常のシールド工法での施工には適して
いるが、圧気下におけるシールド工法には些か不向きで
ある。その理由は、圧気下のシールドトンネル内におけ
るガスや電気の使用が安全上の髭地から制約t−受ける
ため、前記シールケースの暖附けに問題があるはが如で
なく、シールドセグメントに管を貫通した際に圧気洩れ
が生じてシールド内の圧気が急激に減圧され、切羽面の
土砂の崩壊や湧水が起り、シールド内の作業員等に多大
の影響を与えるおそれがあるからである。
This conventional method is suitable for ordinary shield construction, but is somewhat unsuitable for shield construction under pressure. The reason for this is that the use of gas and electricity in the shield tunnel under pressure is subject to safety restrictions, so there is no problem with heating the seal case, and the pipes in the shield segment are This is because when the shield penetrates, a pressure air leak occurs and the pressure inside the shield is rapidly reduced, causing the collapse of earth and sand on the face surface and water gushing, which may have a great impact on the workers inside the shield.

本発明は上記のような従来技術に鑑み、圧気下における
シールドセグメントに地上部或は無圧気状櫂にあるとこ
ろから、安全且つ確実に貫通管を設置−できる方法を提
供することを目的としてなされたもので、その構成は、
圧気下にあるシールドトンネルを構成するシールドセグ
メントに貫通管を設置するに際し、ポーリング機により
地表等から内径が前記貫通管の外径より大径の管を案内
管として前記セグメントの貫通管を設置すべき部分の表
面まで埋設し、該案内管から前記セグメントの前記部分
の周辺及び該案内管先端部の内外に止水材を注入して止
水すると共に該案内管を固定させ、該案内管に、それよ
り小径で先端部に刃を設は先端部から適宜離隔した位置
に圧気洩れ防止用兼止水用のバッキング及びそのストッ
パを増附けた管を挿入して、鉄管により前記案内管内の
止水材及び前記セグメントに穿孔すると共にその孔に前
記バッキングを密嵌させることを特徴とするものでちる
The present invention has been made in view of the above-mentioned prior art, and aims to provide a method for safely and reliably installing a through pipe into a shield segment under pressure from above the ground or from an unpressurized pneumatic paddle. Its composition is
When installing a through pipe in a shield segment constituting a shield tunnel under pressure, a poling machine is used to install the through pipe of the segment from the ground surface, etc. using a pipe whose inner diameter is larger than the outside diameter of the through pipe as a guide pipe. The guide tube is buried up to the surface of the segment, and a water stop material is injected from the guide tube into the periphery of the portion of the segment and inside and outside the tip of the guide tube to stop water and fix the guide tube. If the diameter is smaller than that and a blade is installed at the tip, insert a tube with a backing and a stopper for preventing pressure leaks and water stops at an appropriate distance from the tip, and use the iron tube to tighten the stop in the guide tube. The water material and the segment are perforated, and the backing is tightly fitted into the hole.

次に本発明の実施の一例を図に拠り説明する。Next, an example of implementation of the present invention will be explained with reference to the drawings.

1は圧気下におけるシールドトンネルを構成するシール
ドセグメント、2は該セグメントに貫通設置すべき管の
外径より大きい内径の案内管で、ホーリング機により地
表からセグメント1の表面に達するところまで埋設し、
該案内管2からセグメント1の上部及び該案内管2の下
部内外に止水剤6を注入して、貫通時の地山への圧気洩
れを防止すると共に止水する。4はセグメント1に貫通
設置すべき管で、前記案内管2の内径より小径で、先端
に案内管2内の上水材3及びセグメント1に穿孔するた
めの刃5を設け、先端から適「離隔した位置に圧気洩れ
防止用兼止水用のバッキング6及びその上にストッパ7
を定潰してあり、鉄管4を地上から案内管2に挿入し、
n5により該案内管2内の止水材6をポーリングし、且
つセグメント1に穿孔して更に下降させ、セグメント1
に穿孔した孔にバッキング6を密嵌させることによって
、セグメント1と管4との隙間を基ぐと同時に圧気洩れ
防止及び止木を行なうのである・図中、8は管4の上端
に密に増附けた送水管、9は鉄管の中途に設けた開閉弁
である。
1 is a shield segment constituting a shield tunnel under pressure; 2 is a guide pipe with an inner diameter larger than the outer diameter of the pipe to be installed through the segment; buried with a hole machine until it reaches the surface of segment 1 from the ground surface;
A water stop agent 6 is injected from the guide pipe 2 into the upper part of the segment 1 and the lower part of the guide pipe 2 inside and outside to prevent pressure air from leaking into the ground during penetration and to stop water. Reference numeral 4 denotes a pipe to be installed through the segment 1, which has a diameter smaller than the inner diameter of the guide pipe 2, and has a blade 5 at its tip for piercing the water supply material 3 in the guide pipe 2 and the segment 1, and a suitable hole is inserted from the tip. A backing 6 for preventing pressure leakage and water stopping is placed at a separate location, and a stopper 7 is placed on it.
The iron pipe 4 is inserted into the guide pipe 2 from the ground,
n5, the water stop material 6 in the guide pipe 2 is polled, and the segment 1 is perforated and further lowered to form the segment 1.
By tightly fitting the backing 6 into the hole drilled in the hole, the gap between the segment 1 and the pipe 4 is established, and at the same time, pressure leakage is prevented and the backing is stopped. The added water pipe, 9, is an on-off valve installed in the middle of the iron pipe.

即ち、本発明は、まず、シールドセグメント1に貫通設
置すべき管4の外径よりその内径が大きい管を案内管2
として、ポーリング機により地表からセグメント1の表
面に達するところまで埋設し、次いで該案内管2からセ
グメント1の上部及び鉄管の下部内外に止水材3を注入
して、管4の貫通時に地山へ圧気が洩れるのを防止する
と共に止水した後、地上から管4を案内管2に挿入して
、送水管8から送水し乍らポーリング機にエリその先端
の刃5で案内管2内の止水材3をポーリングし、且つセ
グメント1に穿孔し終ったら開閉弁9を閉ぢて送水を停
止し管4の先端をシールドトンネル内に突出させると共
にセグメン、ト1に形成された孔にバッキング6を密嵌
させることにより、セグメント1と管4との隙間を基ぐ
と同時に圧気洩れ+177+L及び止木を行ない、更に
、前記バッキング6の密嵌後、管4とセグメント1との
隙間に急結剤等によるコーキング10を行なって圧気洩
れ及び上水の万全を期するのである。
That is, in the present invention, first, the guide tube 2 is provided with a tube whose inner diameter is larger than the outer diameter of the tube 4 to be installed through the shield segment 1.
Then, the water stop material 3 is injected from the guide pipe 2 into the upper part of the segment 1 and the lower part of the iron pipe inside and outside, so that when the pipe 4 penetrates, the ground is buried. After preventing the leakage of pressure air and stopping the water, the pipe 4 is inserted into the guide pipe 2 from the ground, and while the water is being fed from the water pipe 8, the polling machine is used to clean the inside of the guide pipe 2 with the blade 5 at the tip of the polling machine. After poling the water stop material 3 and drilling the segment 1, the on-off valve 9 is closed to stop water supply, and the tip of the pipe 4 is made to protrude into the shield tunnel, and the segment is backed into the hole formed in the segment 1. By tightly fitting the backing 6, the gap between the segment 1 and the pipe 4 is fixed, and at the same time, the pressure leak +177+L and the block are prevented. Caulking 10 with a binder or the like is performed to prevent pressure leaks and water supply.

而して、管4の先端部はねじ加工して刃5を暇附けるも
のとし、f4のW通設峻後、刃5を取外し、管4を使用
しないときはその両端に盲蓋11゜12を施して圧気部
と完全に!!断することにより作業を完了する。
Therefore, the tip of the tube 4 is threaded to provide a space for the blade 5. After the W of f4 is threaded through, the blade 5 is removed, and when the tube 4 is not in use, a blind cover 11° is installed at both ends. Apply step 12 to completely remove the pressure part! ! Complete the work by cutting.

尚、管4によりセグメント1に穿孔し、それを貫通して
から、セグメント1の孔にバッキング6が密嵌されるま
での間に圧気洩れが起るが、との圧気洩れが不都合な場
合は、これを防止するため、地上部において、案内管2
と管4との間に漏気防IE用のバンカーPを設ければよ
い。
Incidentally, pressure air leakage occurs between the time when the segment 1 is perforated by the pipe 4 and the backing 6 is tightly fitted into the hole of the segment 1. , In order to prevent this, the guide pipe 2 is
A bunker P for air leak prevention IE may be provided between the pipe 4 and the pipe 4.

また、上記実施例においては、地上から圧気状態にある
シールドセグメントに貫通管を設置する例について述べ
たが、本発明はこれに限られず、他の無圧気状轢のとこ
ろから前記セグメントに貫通管を設置する場合にも適用
できる。
Further, in the above embodiment, an example was described in which a through pipe is installed in a shield segment in a pressurized state from the ground, but the present invention is not limited to this. It can also be applied when installing.

本発明は上述の通りであるから、圧気状態にあるシール
ドトンネルを構成するシールドセグメントに一通管を設
置する方法として好適である。
Since the present invention is as described above, it is suitable as a method for installing a one-way pipe in a shield segment constituting a shield tunnel under pressure.

【図面の簡単な説明】[Brief explanation of drawings]

図は本発明の実施の一例を示すもので、第1図は地上か
ら案内管を埋設し、市水材をセグメントの表面周辺及び
案内管の先喘部内外周に注入し、一通管となるべき管を
案内管に挿入して核管の先端部に設けた刃によシ案内管
内の止水材注入部をポーリングしている状態の要部の断
面図、第2図は管の刃によりセグメントに穿孔し、該孔
にバンキングを密嵌した状態の断面図、第3図は第2図
の状態で前記管とセグメントの隙間にコーキングを施し
、且つ前記管の両端に14を施した状態の断面図である
。 1・・・・・・シールドセグメント、2・・・・・・案
内管、6・・・・・・止水材、4・・・・・・貫通管と
なるべ@管、5・・・・・・刃、6・・・・・・バッキ
ング、7・・・・・・ストッパ、10・・・・・・コー
キング、11.12・・・・・・1着¥ 3 囚
The figure shows an example of the implementation of the present invention. Figure 1 shows a guide pipe buried from the ground, and municipal water material is injected around the surface of the segment and the inner and outer periphery of the front part of the guide pipe, forming a one-way pipe. Figure 2 is a cross-sectional view of the main part of the tube inserted into the guide tube and the blade provided at the tip of the core tube poling the water stop material injection part in the guide tube. A cross-sectional view of a segment with a hole drilled and a banking tightly fitted into the hole, Figure 3 shows the state shown in Figure 2 with caulking applied to the gap between the tube and the segment and No. 14 applied to both ends of the tube. FIG. 1...Shield segment, 2...Guide pipe, 6...Water stop material, 4...Pipe that becomes a through pipe, 5... ...Blade, 6...Backing, 7...Stopper, 10...Caulking, 11.12...1 piece ¥3 Prisoner

Claims (1)

【特許請求の範囲】 1 圧気下にあるシールドトンネルを構成するシールド
セグメントに貫通管を設置するに際し、ポーリング機に
より地表等から内径が前記貫通管の外径より大径の管を
案内管として前配セグメントの貫通管を設置すべき部分
の表面まで埋設し、該案内管から前記セグメントの前紀
部分の周辺及び該案内管先端部の内外に止水材を注入し
て止水すると共に該案円管を固足させ、該案内管に、そ
れより小径で先端部に刃を設け先端部から適宜離隔した
位置に圧気洩れ防止用兼止水用のパッキング及びそのス
トツパを取付けた管を押入して、該管により前記案内管
内の止水材及ひ前記セグメントに穿孔すると共にその孔
に前記パッキングを密嵌させることを特徴とする圧気下
におけるシールドセグメントに貫通管を設置する方法。 2 案内管と管との間に漏気防止用のパッカーを設ける
特許請求の範囲第1項に記載の方法。
[Scope of Claims] 1. When installing a through pipe in a shield segment constituting a shield tunnel under pressure, a polling machine is used to insert a pipe whose inner diameter is larger than the outer diameter of the through pipe from the ground surface etc. as a guide pipe. The penetration pipe of the distribution segment is buried up to the surface of the part where it is to be installed, and a water stop material is injected from the guide pipe into the vicinity of the pre-formed part of the segment and inside and outside the tip of the guide pipe to stop the water, and A circular pipe is fixed, and a pipe with a smaller diameter and a blade at the tip and a packing and a stopper for preventing pressure leaks and water stops is inserted into the guide tube at an appropriate distance from the tip. A method for installing a penetrating pipe in a shield segment under pressure, characterized in that the pipe is used to make a hole in the water stop material in the guide pipe and the segment, and the packing is tightly fitted into the hole. 2. The method according to claim 1, wherein a packer for preventing air leakage is provided between the guide pipe and the pipe.
JP56172781A 1981-10-30 1981-10-30 Method of installing penetrating pipe to shield segment under compressed air Granted JPS5876700A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP56172781A JPS5876700A (en) 1981-10-30 1981-10-30 Method of installing penetrating pipe to shield segment under compressed air

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP56172781A JPS5876700A (en) 1981-10-30 1981-10-30 Method of installing penetrating pipe to shield segment under compressed air

Publications (2)

Publication Number Publication Date
JPS5876700A true JPS5876700A (en) 1983-05-09
JPH025878B2 JPH025878B2 (en) 1990-02-06

Family

ID=15948226

Family Applications (1)

Application Number Title Priority Date Filing Date
JP56172781A Granted JPS5876700A (en) 1981-10-30 1981-10-30 Method of installing penetrating pipe to shield segment under compressed air

Country Status (1)

Country Link
JP (1) JPS5876700A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017122354A (en) * 2016-01-08 2017-07-13 鹿島建設株式会社 Construction method of freezing pipe

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0553126U (en) * 1991-12-21 1993-07-13 古河電池株式会社 Non-aqueous electrolyte battery

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017122354A (en) * 2016-01-08 2017-07-13 鹿島建設株式会社 Construction method of freezing pipe

Also Published As

Publication number Publication date
JPH025878B2 (en) 1990-02-06

Similar Documents

Publication Publication Date Title
JPS6286226A (en) Method and apparatus for arranging assembling member in ground receiving water pressure through sheet pile
JPH0630750B2 (en) Device for protecting garbage dumps against stray leakage water and method of using the same
JPS5876700A (en) Method of installing penetrating pipe to shield segment under compressed air
JP2867204B2 (en) Construction method of outer pipe for injection under pressurized water
CN210947732U (en) Waterproof structure of rear wall bushing of basement concrete outer wall
JPH112100A (en) Up-facing ground anchor and method for its constructing and setting in place
JPH01131715A (en) Ground improving work by horizontal injection of chemical grout
CN214660174U (en) Advanced water blocking construction device for underground tunnel in water-rich area
CN219472133U (en) Grouting pipe or hollow grouting anchor cable and anchor rod tail end plugging device
JPH0814105B2 (en) Horizontal sleeve injection method
CN215949527U (en) Hole sealing, grouting and water plugging reinforcing device for anchor cable holes in roadway water sprinkling area
JP3744396B2 (en) Construction method of steel sheet pile impervious wall and its joint structure
KR950014993B1 (en) Water proof process for filling cracks
NL2031423B1 (en) Plugging method
CN114370286A (en) Shield tunneling machine safe hole entering method for open caisson structure
JPH074600U (en) Injection fixing type support member
JPH0433926B2 (en)
JPH09316986A (en) Construction method for joining mounting pipe with buried sewage main pipe using double sheath pipe
CN112695784A (en) Punching and grouting type leaking stoppage method for underground station open cut interval foundation pit support structure
CN110529065A (en) A kind of coal mine down-hole drilling sealing of hole structures and construction method
JPH037799B2 (en)
JPS598828A (en) Anchor work
JPS5927830B2 (en) Tunnel excavation method in soft ground
JPS6249408B2 (en)
CN117090593A (en) Construction method for ultra-long distance curve jacking pipe