JPH112100A - Up-facing ground anchor and method for its constructing and setting in place - Google Patents

Up-facing ground anchor and method for its constructing and setting in place

Info

Publication number
JPH112100A
JPH112100A JP16802097A JP16802097A JPH112100A JP H112100 A JPH112100 A JP H112100A JP 16802097 A JP16802097 A JP 16802097A JP 16802097 A JP16802097 A JP 16802097A JP H112100 A JPH112100 A JP H112100A
Authority
JP
Japan
Prior art keywords
anchor
grout
pipe
packer
mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16802097A
Other languages
Japanese (ja)
Other versions
JP3377720B2 (en
Inventor
Yutaka Hosoe
豊 細江
Norihide Saeki
憲英 佐伯
Yoshito Tauchi
義人 田内
Hiroshi Yamada
博 山田
Tomoyoshi Shikada
朋義 鹿田
Hiroshi Chikahisa
博志 近久
Kaoru Kobayashi
薫 小林
Hirotaka Nakahara
博隆 中原
Kazunobu Matsumoto
和伸 松元
Masayuki Tsutsui
雅行 筒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tobishima Corp
Original Assignee
Tobishima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tobishima Corp filed Critical Tobishima Corp
Priority to JP16802097A priority Critical patent/JP3377720B2/en
Publication of JPH112100A publication Critical patent/JPH112100A/en
Application granted granted Critical
Publication of JP3377720B2 publication Critical patent/JP3377720B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a ground anchor which can be effectively formed as facing up to the top face of an underground cavity and which will exert a satisfactory durability after execution of works. SOLUTION: An up-facing ground anchor has a packer part 20 which is located at the anchor mouth part in such a condition as inserted into an anchor hole 50 as facing up, expands around a mouth pipe 5 accommodating a PC cable 30, and is put in tight attachment to the wall of anchor hole for holding the PC cable 30 in the hole 50. The arrangement further includes a packer injection pipe 22 laid in the mouth pipe 5 for supplying a grout material to the packer part 20, an internal grout exhaust pipe 32 which is laid in a sheath pipe 11 coupled with the mouth pipe 5 and accommodating the whole PC cable 30 and which is to exhaust the surplus portion of internal grout to outside the hole, and an external grout exhaust pipe 33 which is laid in the sheath pipe 11 and is to exhaust the surplus portion of external grout to outside the hole.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は上向きグラウンドア
ンカー及びその施工方法に係り、特に各種地盤内に掘削
された地下空間の天端部分等の地盤を支保するために用
いられるグラウンドアンカー及びその施工方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an upward ground anchor and a method of constructing the same, and more particularly to a ground anchor used for supporting a ground such as a top end of an underground space excavated in various types of ground and a method of constructing the ground anchor. About.

【0002】[0002]

【従来の技術】グラウンドアンカー工法は、土木分野や
建築分野において、その構造物の地盤に接する部分と地
盤内の安定した支持部分との間を高強度のケーブル等の
鋼材で連結し、その鋼材に大きな引張力を導入して前記
構造物の地盤に対する安定を図る支保工法である。建築
分野においては、このグラウンドアンカー工法を用いた
建物の安全性の確保を確実にするために、建築物の支保
に永久アンカーとして使用する場合には法的な制約が設
けられている。すなわち、建築物の永久支保に関して
は、(社)日本建築センターの評定を得た種類の永久ア
ンカーを、その設計施工指針に従って施工することが定
められている。
2. Description of the Related Art In the field of civil engineering and construction, a ground anchor method connects a portion of a structure in contact with the ground and a stable support portion in the ground with a steel material such as a high-strength cable. This is a supporting method for introducing a large tensile force to the structure to stabilize the structure with respect to the ground. In the construction field, in order to ensure the safety of a building using the ground anchor method, there are legal restrictions when the building is used as a permanent anchor for supporting a building. That is, regarding the permanent support of a building, it is stipulated that a permanent anchor of a type that has been rated by the Japan Building Center be constructed in accordance with its design and construction guidelines.

【0003】図10は日本建築センターが評定した永久
アンカーの一種(VSLアンカー)の設置時の全体構成
を示した断面図である。岩盤内に削孔されたアンカー孔
50にはあらかじめユニット化された永久アンカーケー
ブル60(以下、アンカーユニットと記す。)が挿入さ
れている。このアンカーユニット60は合成樹脂製のコ
ルゲートシース61(以下、シース管と記す。)内に収
容されたPC鋼より線(PCケーブル)の束からなる。
このアンカーユニット60を構成するPCケーブルは長
手方向に所定間隔をあけて取り付けられたスペーサ62
を介して所定の間隔をあけてシース管61内に収容され
ている。また、アンカーユニット60の長手方向に関し
てはアンカー設計から定められた自由長部分70と定着
長部分71とが設けられている。
FIG. 10 is a cross-sectional view showing the overall configuration of a type of permanent anchor (VSL anchor) evaluated by the Building Center of Japan at the time of installation. A permanent anchor cable 60 (hereinafter, referred to as an anchor unit) unitized in advance is inserted into the anchor hole 50 drilled in the rock. The anchor unit 60 is composed of a bundle of PC steel stranded wires (PC cables) housed in a synthetic resin corrugated sheath 61 (hereinafter, referred to as a sheath tube).
The PC cable constituting the anchor unit 60 is provided with spacers 62 attached at predetermined intervals in the longitudinal direction.
Are housed in the sheath tube 61 at predetermined intervals. Further, with respect to the longitudinal direction of the anchor unit 60, a free length portion 70 and a fixing length portion 71 determined from the anchor design are provided.

【0004】シース管61は図示したように、表面にら
せん状をなす波状の凹凸面を有する合成樹脂製管あるい
はステンレススチール管からなり、その先端にはシース
管のアンカー孔内への挿入を容易にするための先端キャ
ップ63が取り付けられている。一方、シース管61の
口元部分はコンクリートベース64上に設置された支圧
板65、定着具66を介してくさび方式によって定着さ
れたケーブル端が位置している。このケーブル端はケー
ブルの耐久性を高めるためにヘッドキャップ67で覆わ
れている。さらにアンカーユニット60をアンカー孔5
0内に保持させるために、シース管61とアンカー孔壁
51との間に外部グラウト52が充填されている。さら
に、シース管61内に内部グラウト53が充填され、地
盤54に対してのアンカー効果が得られるようになって
いる。通常はシース管内を内部グラウト53としてのグ
ラウトミルクで充填し、所定のグラウト強度が得られた
後に、外部グラウト52においてアンカー体部分を形成
し、このアンカー体部分の外部グラウト52の強度が所
定の強度に達した段階でアンカー口元において緊張ジャ
ッキ(図示せず)によって所定導入量の緊張力を導入す
る。この緊張力を導入した段階でさらにアンカー自由長
部分の追加グラウトを行うようになっている。
[0004] As shown, the sheath tube 61 is made of a synthetic resin tube or a stainless steel tube having a spiral corrugated surface on its surface, and the tip of the tube is easily inserted into the anchor hole of the sheath tube. Is attached. On the other hand, at the mouth of the sheath tube 61, a cable end fixed by a wedge system via a support plate 65 mounted on a concrete base 64 and a fixing tool 66 is located. This cable end is covered with a head cap 67 to increase the durability of the cable. Further, the anchor unit 60 is connected to the anchor hole 5.
The outer grout 52 is filled between the sheath tube 61 and the anchor hole wall 51 so as to keep the inside of the sheath tube 61 at zero. Further, the inner grout 53 is filled in the sheath tube 61 so that an anchor effect on the ground 54 can be obtained. Usually, the inside of the sheath tube is filled with grout milk as the inner grout 53, and after a predetermined grout strength is obtained, an anchor body portion is formed in the outer grout 52, and the strength of the outer grout 52 of the anchor body portion is a predetermined strength. When the strength is reached, a predetermined amount of tension is introduced by a tension jack (not shown) at the anchor mouth. At the stage where this tension is introduced, additional grout of the free length portion of the anchor is further performed.

【0005】[0005]

【発明が解決しようとする課題】ところで、上述した日
本建築センターの評定を得た永久アンカーは通常、下向
きあるいは下方への所定傾角をなして設計されている。
このため岩盤地下空間の掘削を行って地下空間の天端ア
ーチを永久支保するのに、この種のグラウンドアンカー
の施工は認められていない。すなわち、従来のグラウン
ドアンカーは下向き施工が基本的な使用態様であり、日
本建築センターの評定を受けたグラウンドアンカーも下
方に向けて施工することを念頭においているため、その
機能が適正に発揮されるかの確認がなされていないのが
実状であった。
Incidentally, the permanent anchors rated by the Japan Building Center are usually designed with a predetermined downward or downward inclination.
For this reason, this type of ground anchor is not allowed to be used for excavating a rocky underground space to permanently support the top arch of the underground space. In other words, the conventional ground anchor is basically used for downward construction, and the ground anchor rated by the Nippon Building Center is also designed to be constructed downward, so that its function is properly exhibited. It was in fact not confirmed.

【0006】この種の永久アンカーを上向きに施工する
ためには、まず重量のあるアンカーユニットをアンカー
孔内に挿入した状態でグラウト固化までそのままアンカ
ー孔内に保持させる必要がある。さらに上向きにアンカ
ー内グラウトを行う際に、グラウト材が完全にアンカー
孔先端(上端)まで確実に充填されるように充填作業を
行う必要がある。
In order to construct this kind of permanent anchor upward, it is necessary to hold a heavy anchor unit in the anchor hole as it is until the grout solidifies with the heavy anchor unit inserted into the anchor hole. Further, when grouting the inside of the anchor upward, it is necessary to perform a filling operation so that the grout material is completely filled up to the tip (upper end) of the anchor hole.

【0007】これまでにも、これらの課題を解決を図っ
た上向きアンカー技術も種々開発されている。たとえば
アンカー先端がアンカー孔の奥の壁に到達した際にアン
カーユニットの先端に装着されていた爪を内蔵バネ等の
動作で広げて、この爪をアンカー孔壁に係止させてアン
カーユニットの先端を岩盤に固定する方法や、アンカー
口元に拡大部を設け、ブロッキング保持具をホールイン
アンカーやレジンモルタルで固定してアンカー後端のブ
ロッキングパイプを口元部に固定されたブロッキングパ
イプ保持具の筒内にボルト等で固定する方法等も開発さ
れている。
[0007] Up to now, various upward anchoring techniques for solving these problems have been developed. For example, when the tip of the anchor reaches the inner wall of the anchor hole, the claw attached to the tip of the anchor unit is spread by the operation of a built-in spring or the like, and this claw is locked to the wall of the anchor hole, so that the tip of the anchor unit is Method of fixing the anchor to the bedrock, providing an enlarged portion at the anchor mouth, fixing the blocking holder with a hole-in anchor or resin mortar, and fixing the blocking pipe at the rear end of the anchor inside the cylinder of the blocking pipe holder A method of fixing to a vehicle with bolts has been developed.

【0008】しかしながら、爪を孔壁に係止させる方法
では、付加的な係止機構を必要とする上、グラウトモル
タル注入時の口元からの流出を防止することができな
い。ブロッキングパイプを用いる方法ではアンカーの口
元部分に拡大部を設ける必要があり、削孔時に拡幅用の
特殊ビットと、通常径のアンカー孔用ビットとを必要と
し、削孔作業の段取りが面倒であるという問題がある。
However, the method of locking the claw to the hole wall requires an additional locking mechanism and cannot prevent the grout mortar from flowing out from the mouth during injection. In the method using a blocking pipe, it is necessary to provide an enlarged portion at the mouth portion of the anchor, a special bit for widening at the time of drilling, and a bit for an anchor hole of a normal diameter are required, and the setup of the drilling work is troublesome. There is a problem.

【0009】また、従来のグラウンドアンカーでは、グ
ラウト注入は注入用ホースをアンカー孔の先端部分まで
引き延ばしておくことにより先端部分から順次、孔内の
グラウト充填を行うようになっている。しかしながら、
グラウンドアンカーを上向きに施工する場合には、グラ
ウトはアンカーの口元部分から上方に向かって序々に孔
内を満たしていく必要がある。このため、アンカー孔は
早い段階から口元が閉塞された状態になる。このため、
アンカー孔内の空気を抜きながらのグラウト注入作業が
必要となってくる。すなわち、グラウト充填とともに、
アンカー孔内の排気作業を行う必要がある。
In a conventional ground anchor, grouting is performed by filling the grout in the hole sequentially from the distal end portion by extending the injection hose to the distal end portion of the anchor hole. However,
When constructing the ground anchor upward, the grout must gradually fill the hole from the mouth of the anchor upward. Therefore, the mouth of the anchor hole is closed at an early stage. For this reason,
Grout injection work is required while removing air from the anchor holes. That is, along with grout filling,
It is necessary to evacuate the anchor holes.

【0010】同様に、設置されたグラウンドアンカーの
アンカーヘッド部分の耐久性を高めるために、アンカー
ヘッド部分に防錆油を充填する必要があるが、この防錆
油を確実に充填するためにもヘッドキャップ内部の排気
を行う必要もある。
Similarly, in order to increase the durability of the anchor head portion of the installed ground anchor, it is necessary to fill the anchor head portion with rust preventive oil. It is also necessary to exhaust the inside of the head cap.

【0011】そこで、本発明の目的は上述した従来の技
術が有する問題点を解消し、グラウンドアンカーを上向
きに施工する場合にも、安全な施工ができ、またグラウ
ト作業等が確実に行えるようにした上向きグラウンドア
ンカー及びその施工方法を提供することにある。
Therefore, an object of the present invention is to solve the above-mentioned problems of the prior art and to make it possible to carry out safe construction even when constructing a ground anchor upward, and to ensure that grout work and the like can be performed. An object of the present invention is to provide an upward ground anchor and a method for constructing the ground anchor.

【0012】[0012]

【課題を解決するための手段】前記目的を達成するため
に、本発明はアンカー孔に挿入された状態でアンカー口
元部に位置し、内部に引張部材を収容した口元管の周囲
で膨張し、アンカー孔壁と密着可能なパッカー部と、該
パッカー部にグラウト材を供給するために前記口元管内
に収容されたパッカー注入管と、前記口元管に連結され
前記引張部材全体を収容するシース管内に配管され、余
剰内部グラウト分を孔外に排出する内部グラウト排気管
と、前記シース管内に配管され、余剰外部グラウト分を
孔外に排出する外部グラウト排気管とを備えたことを特
徴とする。
In order to achieve the above object, the present invention is arranged such that it is located at an anchor mouth while being inserted into an anchor hole, and expands around a mouth tube accommodating a tension member therein, A packer portion that can be in close contact with the anchor hole wall, a packer injection tube housed in the mouth tube for supplying grout material to the packer portion, and a sheath tube that is connected to the mouth tube and houses the entire tension member. An internal grout exhaust pipe that is piped and discharges excess internal grout to the outside of the hole, and an external grout exhaust pipe that is piped inside the sheath pipe and discharges excess external grout to the outside of the hole.

【0013】また、その施工方法として、管周囲にパッ
カー部が装着された口元管を連結したシース管内に引張
部材が収容されたアンカーユニットを、地山に対して上
向きに削孔したアンカー孔に挿入し、前記口元管内に配
管されたパッカー注入管を介して前記パッカー部にグラ
ウト材を供給して前記パッカー部をアンカー孔壁に密着
させ前記アンカーユニットを前記アンカー孔内に保持さ
せた状態で、内部グラウト注入管により内部グラウトを
行うとともに、前記シース管内に配管された内部グラウ
ト排気管を介して余剰内部グラウト分をアンカー孔外に
排出させ、その後、外部グラウト注入管により前記アン
カー孔壁と前記シース管との間に外部グラウトを行うと
ともに、前記シース管内に配管された外部グラウト排気
管を介して余剰外部グラウト分をアンカー孔外に排出す
るようにし、前記内部グラウトが所定強度に達した段階
でアンカー頭部の定着を行うようにしたことを特徴とす
るものである。
[0013] As a construction method, an anchor unit in which a tension member is accommodated in a sheath tube connecting a mouth tube having a packer portion attached to the periphery of the tube is inserted into an anchor hole drilled upward with respect to the ground. In a state in which a grout material is supplied to the packer portion through a packer injection pipe provided in the mouth pipe and the packer portion is brought into close contact with an anchor hole wall and the anchor unit is held in the anchor hole. Performing internal grouting with the internal grout injection pipe, discharging excess internal grout outside the anchor hole through the internal grout exhaust pipe provided in the sheath pipe, and then using the external grout injection pipe to form the anchor hole wall. An external grout is performed between the sheath tube and the extra grout through an external grout exhaust pipe provided in the sheath tube. The grout component so as to discharge the anchor Anagai, the internal grout is characterized in that to perform the fixing of the anchor head at the stage of reaching a predetermined intensity.

【0014】このとき、前記内部グラウト排気管及び前
記外部グラウト排気管は前記引張部材に沿って前記シー
ス管先端近傍まで配管させることが好ましい。
In this case, it is preferable that the inner grout exhaust pipe and the outer grout exhaust pipe are piped to the vicinity of the sheath pipe tip along the tension member.

【0015】また、アンカー頭部の定着時に前記アンカ
ー頭部を覆うようにアンカー口元部に取り付けられるヘ
ッドキャップ内に、前記アンカー孔内と連通した防錆材
戻り管を設けることが好ましい。
It is preferable that a rust preventive return pipe communicating with the inside of the anchor hole is provided in a head cap attached to the anchor opening so as to cover the anchor head when the anchor head is fixed.

【0016】施工方法としては、前記アンカー頭部を覆
うように取り付けられるヘッドキャップ内に、前記アン
カー孔内と連通した防錆材戻り管を設け、前記ヘッドキ
ャップ内への防錆材充填時に前記防錆材戻り管からの防
錆材の戻りを確認して前記アンカー孔内への防錆材充填
状態を確認することが好ましい。
As a construction method, a rust-preventive material return pipe communicating with the inside of the anchor hole is provided in a head cap attached to cover the anchor head, and the rust-preventive material is filled into the head cap. It is preferable that the return of the rust preventive material from the rust preventive material return pipe be confirmed to check the filling state of the rust preventive material into the anchor hole.

【0017】[0017]

【発明の実施の形態】以下、本発明の上向きグラウンド
アンカー及びその施工方法の一実施の形態について、添
付図面を参照して説明する。図1は本発明の上向きグラ
ウンドアンカーの施工完了時の状態を示した断面図であ
る。図2、図3はアンカー支持パッカー部の内部構成及
びパッカー部分の膨張状態を説明するために示した部分
断面図である。図4〜図6は図1に示した各断面線位置
でのグラウンドアンカーのアンカーユニットの断面構成
を示した横断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the upward ground anchor of the present invention and a construction method thereof will be described below with reference to the accompanying drawings. FIG. 1 is a sectional view showing a state at the time of completion of the construction of the upward ground anchor of the present invention. 2 and 3 are partial cross-sectional views shown for explaining the internal configuration of the anchor support packer portion and the expanded state of the packer portion. 4 to 6 are cross-sectional views showing the cross-sectional configuration of the anchor unit of the ground anchor at each cross-sectional line position shown in FIG.

【0018】図1は、施工が完了した状態での上向きグ
ラウンドアンカーの内部構成を、長手方向の一部を省略
して示した全体断面図である。同図に示したように、上
向きグラウンドアンカー1はアンカー孔50内に挿入さ
れたアンカーユニット10とアンカー定着部40とから
構成されている。アンカーユニット10は外部グラウト
52が固化するまでアンカーユニット10全体をアンカ
ー孔50内に保持するアンカー支持パッカー部20と、
アンカー支持パッカー部20に連結され内部にPCケー
ブル30、グラウト注入管24、注入用ホース31、排
気用ホース32、33が収容された状態で先端が先端キ
ャップ63により閉塞されたシース管11とからなる。
一方、アンカー頭部40を覆うヘッドキャップ67内に
は後述する排気パイプ47が収容されている。
FIG. 1 is an overall sectional view showing the internal configuration of the upward ground anchor in a state where the construction is completed, with a part of the longitudinal direction being omitted. As shown in the figure, the upward ground anchor 1 includes an anchor unit 10 inserted into an anchor hole 50 and an anchor fixing part 40. The anchor unit 10 includes an anchor support packer portion 20 that holds the entire anchor unit 10 in the anchor hole 50 until the outer grout 52 solidifies;
The sheath tube 11 is connected to the anchor support packer unit 20 and has the PC cable 30, the grout injection tube 24, the injection hose 31, and the exhaust hoses 32 and 33 housed therein, and the distal end is closed by the distal end cap 63. Become.
On the other hand, an exhaust pipe 47 to be described later is accommodated in the head cap 67 that covers the anchor head 40.

【0019】これらの構成のうち、まず外部グラウト注
入前にアンカーユニット10をアンカー孔50内に保持
させるアンカー支持パッカー部20の構成について図
2、図3を参照して説明する。本発明の上向きグラウン
ドアンカー1のシース管11のアンカー口元2の近傍に
はアンカー支持パッカー部20が形成されている。この
アンカー支持パッカー部20は口元管5の内部に形成さ
れた止水エリア21と、止水エリア21に配管されたパ
ッカー注入管22と、口元管5の外周部分に形成された
円筒形状のパッカー部Pとからなる。
Among these configurations, the configuration of the anchor support packer section 20 for holding the anchor unit 10 in the anchor hole 50 before injecting the external grout will be described with reference to FIGS. An anchor support packer portion 20 is formed near the anchor mouth 2 of the sheath tube 11 of the upward ground anchor 1 of the present invention. The anchor support packer section 20 includes a water stop area 21 formed inside the mouth pipe 5, a packer injection pipe 22 laid in the water stop area 21, and a cylindrical packer formed at an outer peripheral portion of the mouth pipe 5. And part P.

【0020】これらのうち、止水エリア21は、アンカ
ー口元2部分の口元管5内において、アンカー長手方向
に所定の離れを保持して平行になるように収容された2
枚の樹脂製シールディスク23に挟まれた部分に形成さ
れている。止水エリア21内のシールディスク23には
複数個の円形開口(図示せず)が設けられ、この円形開
口をスペーサとして用いることで、複数本のアンボンド
のPCケーブル30、注入ホース、排気ホース及びパッ
カー注入管22が口元管5内で位置保持される。また、
シールディスク23は止水エリア21内にジェットセメ
ントが充填される際に端部閉塞板の役割も果たしてい
る。アンカー支持パッカー部20はあらかじめPCケー
ブル30及び各注入ホースが組み立てられた時に工場内
で口元管5の所定位置に組み込まれるようになってい
る。
Of these, the water stop area 21 is accommodated in the mouth pipe 5 of the anchor mouth 2 so as to be kept parallel to the anchor at a predetermined distance in the longitudinal direction of the anchor.
It is formed at a portion sandwiched between two resin seal disks 23. A plurality of circular openings (not shown) are provided in the seal disk 23 in the water stop area 21. By using the circular openings as spacers, a plurality of unbonded PC cables 30, an injection hose, an exhaust hose, and The packer injection tube 22 is held in position in the mouth tube 5. Also,
The seal disk 23 also serves as an end closing plate when the water-stop area 21 is filled with jet cement. The anchor support packer section 20 is assembled at a predetermined position of the mouth pipe 5 in the factory when the PC cable 30 and each injection hose are assembled in advance.

【0021】止水エリア21内に配管されたパッカー注
入管22の注入出口22aは止水エリア21の中間位置
の口元管5の側面部分に位置している。このパッカー注
入管22の経路中には図示しない逆止弁バルブが取り付
けられ、グラウトの逆流を防止できるようになってい
る。シールディスク23の前方位置の口元管5の側面部
分には外部グラウト注入管24の先端出口24aが位置
している。この外部グラウト注入管24の先端位置近傍
と止水エリア21の後端部分にかけて口元管5を外周か
ら覆うように筒状のパッカーPが装着されている。この
パッカーPはシームレスの円筒形状の織布からなり、そ
の両端は熱収縮チューブ25により口元管5の外側面に
気密性を保持するように固定されている。さらに熱収縮
テープ25の外周にはスチールバンド26が巻回され、
パッカー端部が口元管5から容易に離脱しないようにな
っている。このパッカーPは厚手の合成繊維製の密な織
りの織布からなり、内部にグラウトミルク27が充填さ
れた状態でもグラウトミルク27が外部に漏れない構造
になっている。パッカー材料としては布製のほか、ポリ
ウレタン膜等のような合成樹脂製品を使用することも可
能であるが、火災等の被災時に十分な耐火性を有すると
ともに、有毒ガス等の発生がないものを選択することが
必要である。
The injection outlet 22a of the packer injection pipe 22 provided in the water stop area 21 is located at the side of the mouth pipe 5 at an intermediate position of the water stop area 21. A check valve valve (not shown) is attached in the path of the packer injection pipe 22 to prevent backflow of grout. The front end outlet 24a of the external grout injection pipe 24 is located at the side of the mouth pipe 5 at the front position of the seal disk 23. A tubular packer P is attached so as to cover the mouth pipe 5 from the outer periphery around the front end position of the external grout injection pipe 24 and the rear end portion of the water stop area 21. The packer P is made of a seamless cylindrical woven cloth, and both ends thereof are fixed to the outer surface of the mouth tube 5 by a heat-shrinkable tube 25 so as to maintain airtightness. Further, a steel band 26 is wound around the outer periphery of the heat shrink tape 25,
The end of the packer is not easily detached from the mouth tube 5. The packer P is made of a dense woven fabric made of thick synthetic fiber, and has a structure in which the grout milk 27 does not leak out even when the grout milk 27 is filled therein. As the packer material, besides cloth, it is also possible to use synthetic resin products such as polyurethane film, etc. It is necessary to.

【0022】図3はこのパッカーPにパッカー注入管2
2を介してグラウトミルク27を充填しパッカーPが膨
張した状態を示した状態説明図である。同図に示したよ
うにパッカーP内部にグラウトミルク27が充填されて
パッカー部Pが紡錘形状に膨張すると、パッカーPの膨
張部分がアンカー孔壁51に密着して孔壁51とパッカ
ーPとの間に大きな摩擦が生じる。これにより、アンカ
ーユニット10の全体重量をアンカー孔壁51に保持さ
せることができる。
FIG. 3 shows a packer injection pipe 2
FIG. 4 is a state explanatory view showing a state in which grout milk 27 is filled through the packing 2 and a packer P is expanded. As shown in the figure, when the grout milk 27 is filled in the packer P and the packer portion P expands into a spindle shape, the expanded portion of the packer P comes into close contact with the anchor hole wall 51 and the gap between the hole wall 51 and the packer P is increased. Large friction occurs between them. Thereby, the whole weight of the anchor unit 10 can be held by the anchor hole wall 51.

【0023】図4〜図6はパッカーP及びアンカーユニ
ット10の先端部分のPCケーブル30の配置及び各注
入ホース及び排気ホースの配置を示した断面図である。
図4、図5に示したように本実施の形態においては、口
元管5内のシールディスク23に保持されるように8本
のPCケーブル30が配線されている。本実施の形態で
はPCケーブル30として所定径の7本よりアンボンド
ストランドが使用されている。さらにPCケーブル30
に囲まれるように、口元管5の断面のほぼ中央位置に内
部グラウト注入ホース31、内部グラウト排気ホース3
2、外部グラウト排気ホース33が接するように略三角
形状に配管されている。また口元管5の内側側面に接す
るようにして前記3本のホースの直径より大きい直径を
有する外部グラウト注入管24も収容されている。中心
位置に配置された3本のホースは耐圧樹脂ホースからな
るが、外部グラウト注入管24とパッカー注入管22に
は電縫管が用いられている。
FIGS. 4 to 6 are sectional views showing the arrangement of the PC cable 30 at the tip of the packer P and the anchor unit 10, and the arrangement of each injection hose and exhaust hose.
As shown in FIGS. 4 and 5, in the present embodiment, eight PC cables 30 are wired so as to be held by the seal disk 23 in the mouth tube 5. In the present embodiment, seven unbonded strands having a predetermined diameter are used as the PC cables 30. Further, the PC cable 30
The inner grout injection hose 31 and the inner grout exhaust hose 3 are located at substantially the center of the cross section of the mouth pipe 5 so as to be surrounded by
2. The pipe is formed in a substantially triangular shape so that the external grout exhaust hose 33 contacts. Further, an outer grout injection pipe 24 having a diameter larger than the diameter of the three hoses is also accommodated in contact with the inner side surface of the mouth pipe 5. The three hoses arranged at the center position are made of pressure-resistant resin hoses, and the outer grout injection pipe 24 and the packer injection pipe 22 use ERW pipes.

【0024】図5はパッカーP内にグラウトミルク27
が注入されて完全に膨張した状態でアンカー孔壁51に
接するようになったパッカーPの中央位置を示した断面
図である。この断面には止水エリア21内に充填された
止水材3も合わせて示されている。なお、止水材3には
本実施例ではジェットセメントが用いられているが、不
燃止水材であれば、種々のものを採用することができ
る。
FIG. 5 shows grout milk 27 in packer P.
FIG. 9 is a cross-sectional view showing a center position of the packer P that comes into contact with the anchor hole wall 51 in a state where the gas is injected and completely expanded. This cross section also shows the water stopping material 3 filled in the water stopping area 21. In this embodiment, jet cement is used as the water-stopping material 3, but various non-combustible water-stopping materials can be used.

【0025】図6はパッカーPの先端を示した断面図で
ある。口元管(図示せず)の先端部分にはシース管11
との連結のためにジョイントカラー28が設けられてお
り、このジョイントカラー28の外側にシース管11が
装着されている。外部グラウト注入管24及びパッカー
注入管22はこの部分まで延長されていないが、PCケ
ーブル30と、内部グラウト注入ホース31、内部グラ
ウト排気ホース32、外部グラウト排気ホース33とは
図示しないスペーサによってシース管11内の所定位置
で保持され、シース管11の先端まで延長されている。
FIG. 6 is a sectional view showing the tip of the packer P. A sheath tube 11 is provided at the tip of a mouth tube (not shown).
A joint collar 28 is provided for coupling with the sheath tube 11, and the sheath tube 11 is mounted outside the joint collar 28. Although the outer grout injection pipe 24 and the packer injection pipe 22 are not extended to this portion, the PC cable 30, the inner grout injection hose 31, the inner grout exhaust hose 32, and the outer grout exhaust hose 33 are sheathed by a spacer (not shown). It is held at a predetermined position inside 11 and extends to the distal end of the sheath tube 11.

【0026】次に、図7〜図9を参照して上向きアンカ
ーの施工手順について説明する。まず、図7(a)に
は、図示しない公知の削孔装置本体に装着された削孔ロ
ッド75によってアンカー孔50が削孔されている状態
が示されている。この削孔装置にはケーシングパイプを
回転させて削孔を行う公知のロータリー式削孔装置や、
ケーシングパイプを空気圧や油圧によって打撃を加えて
削孔するロータリーパーカッションタイプが用いること
ができる。削孔装置で所定のアンカー孔深さまで削孔し
たら、アンカー孔壁51を清掃し、あらかじめ組み立て
ておいたアンカーユニット10をアンカー孔50内に挿
入する。
Next, the procedure for installing the upward anchor will be described with reference to FIGS. First, FIG. 7A shows a state in which the anchor hole 50 is drilled by a drilling rod 75 mounted on a known drilling device main body (not shown). This drilling device is a known rotary drilling device that drills by rotating the casing pipe,
A rotary percussion type in which a casing pipe is drilled by applying an impact with air pressure or hydraulic pressure can be used. After drilling to a predetermined anchor hole depth by the drilling device, the anchor hole wall 51 is cleaned, and the previously assembled anchor unit 10 is inserted into the anchor hole 50.

【0027】このアンカーユニット10内のPCケーブ
ル30の先端は、図7(b)に示したように、シース管
11内の先端キャップ63付近まで配線されている。先
端はアンカー止水材72によってシース管11内に固定
されている。複数本のPCケーブル30、各注入ホー
ス、排気ホースは前述したように図示しないスペーサに
よってシース内の所定位置にで保持されている。
The distal end of the PC cable 30 in the anchor unit 10 is wired to the vicinity of the distal end cap 63 in the sheath tube 11 as shown in FIG. The distal end is fixed in the sheath tube 11 by the anchor water stopping material 72. The plurality of PC cables 30, each injection hose, and the exhaust hose are held at predetermined positions in the sheath by the spacer (not shown) as described above.

【0028】次いで、アンカーユニット10を図示しな
いアンカーユニット挿入装置によってアンカー孔50内
に完全に挿入する。そしてアンカー口元2に設置された
図示しない仮受け台に支持させた状態でパッカー注入管
22にグラウトポンプを接続し、グラウトポンプを運転
してパッカーP内にグラウトミルク27を加圧注入す
る。注入圧としては0.5〜1.0kgf/cm2が好適であ
る。パッカーP内へのグラウト完了により、アンカー孔
50の口元部分は確実に密閉される。また、パッカーP
内に注入されたグラウト強度の発現によりアンカーユニ
ット10は上向き状態でアンカー孔50内で自立できる
ようになる(図7(c)参照)。引き続き図8(d)に
示したように内部グラウト注入ホース31にグラウトポ
ンプを接続する。そしてグラウトポンプの運転によりシ
ース管11内にアンカー口元2から徐々に内部グラウト
53を行う。
Next, the anchor unit 10 is completely inserted into the anchor hole 50 by an anchor unit insertion device (not shown). Then, a grout pump is connected to the packer injection pipe 22 in a state where the grout pump is connected to the temporary receiving table (not shown) installed at the anchor mouth 2, and the grout pump is operated to pressurize the grout milk 27 into the packer P. The injection pressure is preferably 0.5 to 1.0 kgf / cm 2 . Upon completion of grouting into the packer P, the mouth portion of the anchor hole 50 is securely sealed. In addition, Packer P
Due to the development of the strength of the grout injected into the inside, the anchor unit 10 can stand up in the anchor hole 50 in an upward state (see FIG. 7C). Subsequently, a grout pump is connected to the internal grout injection hose 31 as shown in FIG. Then, the internal grout 53 is gradually performed from the anchor opening 2 into the sheath tube 11 by the operation of the grout pump.

【0029】図8(d)はシース管11内に内部グラウ
ト53が半ば充填された状態を示している。この内部グ
ラウト53の上面が内部グラウト排気ホース32の先端
に達したら、内部グラウト53の一部はこの排気ホース
32を伝わってシース管11の外部に排出される。この
ようにしてグラウトポンプの圧力計の圧力値及び排気ホ
ース32からのリターンを確認することにより、シース
管11内に内部グラウトが確実に行われたかどうかを確
認することができる。2次注入としての加圧注入を引き
続き行う。内部グラウト53の注入が完了したら、外部
グラウト注入管24から外部グラウト注入を行う。外部
グラウト52のグラウト面は注入に伴って、図8(e)
に示したように、孔壁51に沿って上昇し、孔壁51面
にある割れ目部分にもその一部が浸透する。そして完全
にアンカー孔50の上端まで注入が完了すると、先端キ
ャップ63に設けられていた連通孔63aを介してその
グラウトの一部はシース管11内に流れ込む。そしてシ
ース管11内に取り付けられていた外部グラウト排気ホ
ース33を通じてグラウトの一部はリターンとしてアン
カー孔外に排出される。この状態を確認して排気ホース
33を密栓し、所定のグラウト圧で加圧注入(2次注
入:注入圧1.0〜2.0kgf/cm2)を継続する。これ
により、岩盤の割れ目部分にもグラウトが確実に充填さ
れるようになる。
FIG. 8D shows a state in which the inner grout 53 is partially filled in the sheath tube 11. When the upper surface of the internal grout 53 reaches the tip of the internal grout exhaust hose 32, a part of the internal grout 53 is discharged to the outside of the sheath tube 11 through the exhaust hose 32. By confirming the pressure value of the pressure gauge of the grout pump and the return from the exhaust hose 32 in this way, it is possible to confirm whether or not the internal grout has been reliably performed in the sheath tube 11. The pressure injection as the secondary injection is continuously performed. When the injection of the internal grout 53 is completed, the external grout is injected from the external grout injection pipe 24. As the grout surface of the outer grout 52 is injected, as shown in FIG.
As shown in (2), it rises along the hole wall 51, and part of the crack penetrates into the crack on the surface of the hole wall 51. When the injection is completely completed to the upper end of the anchor hole 50, a part of the grout flows into the sheath tube 11 through the communication hole 63a provided in the tip cap 63. Then, a part of the grout is discharged out of the anchor hole as a return through the external grout exhaust hose 33 attached in the sheath tube 11. After confirming this state, the exhaust hose 33 is sealed, and pressurized injection (secondary injection: injection pressure of 1.0 to 2.0 kgf / cm 2 ) is continued at a predetermined grout pressure. As a result, the cracks in the rock are surely filled with grout.

【0030】次に、アンカー頭部40の定着作業につい
て説明する。アンカー口元2のホースの整理を行った上
で、アンカー口元2に支圧板41及び定着板42を取り
付ける。この支圧板41及び定着板42は口元部分に取
り付けられた仮受け台(図示せず)によって保持されて
いる。内部グラウトが所定の強度に達した段階で緊張ジ
ャッキ45を定着板42部分の各PCケーブル30に装
着する(図9(g)参照)。そして図示しない油圧ポン
プの作動によりこのセンターホール型の緊張ジャッキ4
5を駆動させ、PCケーブル30に所定の緊張力を導入
する。所定の緊張力が導入された状態でウェッジ(くさ
び)を効かせて定着板42部分にPCケーブル30を確
実に定着させる。
Next, the fixing operation of the anchor head 40 will be described. After organizing the hose of the anchor mouth 2, the supporting plate 41 and the fixing plate 42 are attached to the anchor mouth 2. The support plate 41 and the fixing plate 42 are held by a temporary support table (not shown) attached to a mouth portion. When the internal grout reaches a predetermined strength, the tension jack 45 is attached to each PC cable 30 of the fixing plate 42 (see FIG. 9G). The center hole type tension jack 4 is operated by the operation of a hydraulic pump (not shown).
5 is driven to apply a predetermined tension to the PC cable 30. In a state where a predetermined tension is applied, a wedge (wedge) is applied to securely fix the PC cable 30 to the fixing plate 42 portion.

【0031】PCケーブル30の緊張定着が完了した
ら、図1、図9(h)に示したように、PCケーブル3
0の定着端全体を覆うようにヘッドキャップ67を取り
付ける。このヘッドキャップ67には定着板42を貫通
し、アンカー孔に連通するように配管されたエア抜きを
兼ねた防錆材戻り管としての排気パイプ47が取り付け
られている。また、ヘッドキャップ67の側面にはグリ
ースニップル48が設けられており、グリースニップル
48にグリースポンプ49からのグリース供給ホース4
6を連結する。そして所定の圧力をかけてヘッドキャッ
プ67内に防錆材としてのグリースGを充填する。この
ヘッドキャップ67内にグリースGが十分充填される
と、定着板42に形成されている貫通孔42aを通じて
グリースGの一部がシース管11の口元部分にも浸入す
る。そしてシース管11の口元管間での間の空隙にグリ
ースGが充填される。このとき排気パイプ47から内部
エアが抜けるようになっている。その後、口元部分にグ
リースGが完全に充填されると、排気パイプ47からそ
の一部がリターンとして得られる。このリターンを確認
した段階で排気パイプ47を閉塞ボルトBで閉塞し、ヘ
ッドキャップ67及びアンカー口元2全体をグリースG
で覆う(図9(i)参照)。これにより、アンカーヘッ
ド42の錆止め防止を図ることができる。このようにし
て、本発明の上向きアンカーを用いることによりアンカ
ーユニット10をグラウト注入前に、確実にアンカー孔
50内に保持させることができ、また上向き状態に設置
された状態においてもヘッドキャップ67を利用したグ
リース注入を確実に行うことができ、アンカー頭部及び
アンカー孔口元2の密封を図ることができる。また、高
い耐久性を確保することができる。
When the tension fixing of the PC cable 30 is completed, as shown in FIG. 1 and FIG.
The head cap 67 is attached so as to cover the entire fixing end of the “0”. The head cap 67 is provided with an exhaust pipe 47 that penetrates through the fixing plate 42 and communicates with the anchor hole and serves as a rust preventive return pipe that also serves as an air vent. A grease nipple 48 is provided on a side surface of the head cap 67, and a grease supply hose 4 from a grease pump 49 is attached to the grease nipple 48.
6 are connected. Then, grease G as a rust preventive is filled in the head cap 67 by applying a predetermined pressure. When the head cap 67 is sufficiently filled with the grease G, a part of the grease G also penetrates into the mouth portion of the sheath tube 11 through the through hole 42a formed in the fixing plate 42. Grease G is filled into the gap between the mouth tubes of the sheath tube 11. At this time, the internal air escapes from the exhaust pipe 47. Thereafter, when the grease G is completely filled in the mouth portion, a part of the grease G is obtained from the exhaust pipe 47 as a return. When this return is confirmed, the exhaust pipe 47 is closed with the closing bolt B, and the head cap 67 and the entire anchor opening 2 are greased.
(See FIG. 9 (i)). Thereby, rust prevention of the anchor head 42 can be achieved. In this way, by using the upward anchor of the present invention, the anchor unit 10 can be securely held in the anchor hole 50 before grouting, and the head cap 67 can be held even in the state where it is installed upward. The used grease can be reliably injected, and the anchor head and the anchor hole opening 2 can be sealed. In addition, high durability can be ensured.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による上向きグラウンドアンカーの一実
施の態様による全体断面図。
FIG. 1 is an overall cross-sectional view of an embodiment of an upward ground anchor according to the present invention.

【図2】アンカー支持パッカー部を示した部分断面図
(アンカー孔挿入時)。
FIG. 2 is a partial cross-sectional view showing an anchor supporter (when an anchor hole is inserted).

【図3】アンカー支持パッカー部を示した部分断面図
(パッカー膨張時)。
FIG. 3 is a partial cross-sectional view showing the anchor supporting packer portion (when the packer is expanded).

【図4】図3のIV-IV断面線に沿って示したグラウンド
アンカーの横断面図。
FIG. 4 is a cross-sectional view of the ground anchor taken along the line IV-IV in FIG. 3;

【図5】図3のV-V断面線に沿って示したグラウンドア
ンカーの横断面図。
FIG. 5 is a cross-sectional view of the ground anchor shown along the line VV in FIG. 3;

【図6】図3のVI-VI断面線に沿って示したグラウンド
アンカーの横断面図。
6 is a cross-sectional view of the ground anchor shown along the line VI-VI of FIG. 3;

【図7】上向きグラウンドアンカーの施工順序を示した
施工状態図(その1)。
FIG. 7 is a construction state diagram (part 1) illustrating the construction order of upward ground anchors.

【図8】上向きグラウンドアンカーの施工順序を示した
施工状態図(その2)。
FIG. 8 is a construction state diagram (part 2) showing the construction order of the upward ground anchors.

【図9】上向きグラウンドアンカーの施工順序を示した
施工状態図(その3)。
FIG. 9 is a construction state diagram (part 3) showing the construction order of upward ground anchors.

【図10】従来の永久アンカーの構成の一例を示した全
体断面図。
FIG. 10 is an overall sectional view showing an example of a configuration of a conventional permanent anchor.

【符号の説明】[Explanation of symbols]

1 上向きグラウンドアンカー 5 口元管 10 アンカーユニット 11 シース管 20 アンカー支持パッカー部 22 パッカー注入管 24 外部グラウト注入管 30 PCケーブル 31 内部グラウト注入ホース 32 内部グラウト排気ホース 33 外部グラウト排気ホース 40 アンカー頭部 DESCRIPTION OF SYMBOLS 1 Upward ground anchor 5 Mouth pipe 10 Anchor unit 11 Sheath pipe 20 Anchor support packer part 22 Packer injection pipe 24 External grout injection pipe 30 PC cable 31 Internal grout injection hose 32 Internal grout exhaust hose 33 External grout exhaust hose 40 Anchor head

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山田 博 東京都千代田区三番町2番地 飛島建設株 式会社内 (72)発明者 鹿田 朋義 東京都千代田区三番町2番地 飛島建設株 式会社内 (72)発明者 近久 博志 東京都千代田区三番町2番地 飛島建設株 式会社内 (72)発明者 小林 薫 東京都千代田区三番町2番地 飛島建設株 式会社内 (72)発明者 中原 博隆 東京都千代田区三番町2番地 飛島建設株 式会社内 (72)発明者 松元 和伸 東京都千代田区三番町2番地 飛島建設株 式会社内 (72)発明者 筒井 雅行 東京都千代田区三番町2番地 飛島建設株 式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hiroshi Yamada 2 Tobanshima Construction Co., Ltd., Sanbancho, Chiyoda-ku, Tokyo (72) Inventor Tomoyoshi Shibata 2 Tobanjima Construction, Sanbancho, Chiyoda-ku, Tokyo (72) Inventor Hiroshi Kaku 2 Tobanjima Construction Co., Ltd., Sanbancho, Chiyoda-ku, Tokyo (72) Inventor Kaoru Kobayashi 2 Tobanjima Construction Co., Ltd., Sanbancho, Chiyoda-ku, Tokyo (72) Invention Person Hirotaka Nakahara 2 Sanbancho, Chiyoda-ku, Tokyo Tobishima Construction Co., Ltd. (72) Inventor Kazunobu Matsumoto 2nd Sanbancho, Chiyoda-ku, Tokyo Tobishima Construction Co., Ltd. (72) Inventor Masayuki Tsutsui Chiyoda, Tokyo No. 2, Sanbancho, Ward Tobishima Construction Co., Ltd.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】アンカー孔に挿入された状態でアンカー口
元部に位置し、内部に引張部材を収容した口元管の周囲
で膨張し、アンカー孔壁と密着可能なパッカー部と、該
パッカー部にグラウト材を供給するために前記口元管内
に配管されたパッカー注入管と、前記口元管に連結され
前記引張部材全体を収容するシース管内に配管され、余
剰内部グラウト分を孔外に排出する内部グラウト排気管
と、前記シース管内に配管され、余剰外部グラウト分を
孔外に排出する外部グラウト排気管とを備えたことを特
徴とする上向きグラウンドアンカー。
1. A packer portion which is located at an anchor mouth portion in a state inserted into an anchor hole, expands around a mouth tube accommodating a tension member therein, and can be brought into close contact with an anchor hole wall. A packer injection pipe that is piped into the mouth pipe to supply grout material, and an internal grout that is connected to the mouth pipe and is piped into a sheath pipe that houses the entire tension member, and that discharges excess internal grout outside the hole. An upward ground anchor comprising: an exhaust pipe; and an external grout exhaust pipe that is provided in the sheath pipe and that discharges excess external grout outside the hole.
【請求項2】管周囲にパッカー部が装着された口元管を
連結したシース管内に引張部材が収容されたアンカーユ
ニットを、地山に対して上向きに削孔したアンカー孔に
挿入し、前記口元管内に配管されたパッカー注入管を介
して前記パッカー部にグラウト材を供給して前記パッカ
ー部をアンカー孔壁に密着させ前記アンカーユニットを
前記アンカー孔内に保持させた状態で、内部グラウト注
入管により内部グラウトを行うとともに、前記シース管
内に配管された内部グラウト排気管を介して余剰内部グ
ラウト分をアンカー孔外に排出させ、その後、外部グラ
ウト注入管により前記アンカー孔壁と前記シース管との
間に外部グラウトを行うとともに、前記シース管内に配
管された外部グラウト排気管を介して余剰外部グラウト
分をアンカー孔外に排出するようにし、前記内部グラウ
トが所定強度に達した段階でアンカー頭部の定着を行う
ようにしたことを特徴とする上向きグラウンドアンカー
の施工方法。
2. An anchor unit in which a tension member is accommodated in a sheath tube connecting a mouth tube with a packer mounted around the tube is inserted into an anchor hole drilled upward with respect to the ground. A grout material is supplied to the packer part via a packer injection pipe provided in the pipe, the packer part is brought into close contact with the anchor hole wall, and the anchor unit is held in the anchor hole. While performing the internal grout, the excess internal grout is discharged out of the anchor hole through the internal grout exhaust pipe provided in the sheath pipe, and then, the outer grout injection pipe is used to separate the anchor hole wall and the sheath pipe. An external grout is performed in the meantime, and an excess external grout is removed from the anchor hole through an external grout exhaust pipe provided in the sheath pipe. So as to discharge, the construction method of the upward ground anchors the internal grout, characterized in that to perform the fixing of the anchor head at the stage of reaching a predetermined intensity.
【請求項3】前記内部グラウト排気管及び前記外部グラ
ウト排気管は前記引張部材に沿って前記シース管先端近
傍まで配管されたことを特徴とする請求項1記載の上向
きグラウンドアンカー。
3. The upward ground anchor according to claim 1, wherein the inner grout exhaust pipe and the outer grout exhaust pipe are piped along the tension member to near the distal end of the sheath pipe.
【請求項4】前記アンカー頭部を覆うようにアンカー口
元部に取り付けられるヘッドキャップ内に、前記アンカ
ー孔内と連通した防錆材戻り管を設けるようにしたこと
を特徴とする請求項1記載の上向きグラウンドアンカ
ー。
4. A rust-preventive material return pipe communicating with the inside of the anchor hole is provided in a head cap attached to an anchor mouth so as to cover the anchor head. Upward ground anchor.
【請求項5】前記アンカー頭部を覆うように取り付けら
れるヘッドキャップ内に、前記アンカー孔内と連通した
防錆材戻り管を設け、前記ヘッドキャップ内への防錆材
充填時に前記防錆材戻り管からの防錆材の戻りを確認し
て前記アンカー孔内への防錆材充填状態を確認するよう
にしたことを特徴とする請求項2記載の上向きグラウン
ドアンカーの施工方法。
5. A rust-preventive material return pipe communicating with the inside of the anchor hole is provided in a head cap attached so as to cover the anchor head, and the rust-preventive material is filled when the rust-preventive material is filled in the head cap. 3. The method according to claim 2, wherein the return of the rust preventive material from the return pipe is confirmed to check the filling state of the rust preventive material in the anchor hole.
JP16802097A 1997-06-10 1997-06-10 Upward ground anchor and construction method Expired - Fee Related JP3377720B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16802097A JP3377720B2 (en) 1997-06-10 1997-06-10 Upward ground anchor and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16802097A JP3377720B2 (en) 1997-06-10 1997-06-10 Upward ground anchor and construction method

Publications (2)

Publication Number Publication Date
JPH112100A true JPH112100A (en) 1999-01-06
JP3377720B2 JP3377720B2 (en) 2003-02-17

Family

ID=15860327

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16802097A Expired - Fee Related JP3377720B2 (en) 1997-06-10 1997-06-10 Upward ground anchor and construction method

Country Status (1)

Country Link
JP (1) JP3377720B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003184499A (en) * 2001-12-21 2003-07-03 Onoda Chemico Co Ltd Large diameter lock bolt anchor for natural ground reinforcement
KR100493927B1 (en) * 2001-07-10 2005-06-10 주식회사 도담이앤씨 Movable foaming-urethane packer and pressure soil-nailing construction method using the packer
KR100773920B1 (en) 2007-05-03 2007-11-07 주식회사 도담이앤씨 Pre-tention soil nailing system and method for reinforcing inclined earth using the same
KR100777966B1 (en) 2006-04-26 2007-11-22 명보산업개발 주식회사 Innovation one shot grouting prefabricated steel pipe installation and using reinforcing tunnelling method
KR100779988B1 (en) 2006-05-11 2007-11-27 주식회사 쏘일텍 Method for constructing micropile
WO2012103561A3 (en) * 2011-01-31 2013-03-21 Atlas Copco Mai Gmbh Protective device for (rock) bolts and friction bolts
CN103670469A (en) * 2013-12-12 2014-03-26 辽宁工程技术大学 Expansion grouting anchor rod
EP2195510A4 (en) * 2007-09-25 2015-07-29 Hilti Ag Method for fixing a cable or tendon

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100493927B1 (en) * 2001-07-10 2005-06-10 주식회사 도담이앤씨 Movable foaming-urethane packer and pressure soil-nailing construction method using the packer
JP2003184499A (en) * 2001-12-21 2003-07-03 Onoda Chemico Co Ltd Large diameter lock bolt anchor for natural ground reinforcement
KR100777966B1 (en) 2006-04-26 2007-11-22 명보산업개발 주식회사 Innovation one shot grouting prefabricated steel pipe installation and using reinforcing tunnelling method
KR100779988B1 (en) 2006-05-11 2007-11-27 주식회사 쏘일텍 Method for constructing micropile
KR100773920B1 (en) 2007-05-03 2007-11-07 주식회사 도담이앤씨 Pre-tention soil nailing system and method for reinforcing inclined earth using the same
EP2195510A4 (en) * 2007-09-25 2015-07-29 Hilti Ag Method for fixing a cable or tendon
WO2012103561A3 (en) * 2011-01-31 2013-03-21 Atlas Copco Mai Gmbh Protective device for (rock) bolts and friction bolts
CN103670469A (en) * 2013-12-12 2014-03-26 辽宁工程技术大学 Expansion grouting anchor rod
CN103670469B (en) * 2013-12-12 2016-08-17 辽宁工程技术大学 A kind of expansion slip casting anchor stock

Also Published As

Publication number Publication date
JP3377720B2 (en) 2003-02-17

Similar Documents

Publication Publication Date Title
JPH112100A (en) Up-facing ground anchor and method for its constructing and setting in place
JPS6286226A (en) Method and apparatus for arranging assembling member in ground receiving water pressure through sheet pile
JPH06102955B2 (en) Intermediate lining structure of the tunnel
JP3974090B2 (en) Long face bolt construction method
KR102598805B1 (en) Construction method of tunnel lining back grouting of grouting tube recovery
CN111911171B (en) Tunnel portal sealing device and method for shield launching
EP0584183A1 (en) A rock or concrete injection method and a device for performing the method
JPH0468109A (en) Injection method with horizontal sleeve
JPH0343408B2 (en)
JP3594054B2 (en) Ground anchor and its construction method
JPS598828A (en) Anchor work
JP2887170B2 (en) Combined backfill injection water stop method
CN216198196U (en) Anchor cable slurry leakage prevention mechanism and self-hole-sealing type grouting anchor cable
JP2824566B2 (en) Construction method of ground anchor
CN216043775U (en) Air bag type water stop sealing device for shield tunnel portal
CN216275751U (en) A anchor rope structure for excavation supporting
JPH08277526A (en) Ground anchor and application thereof and excavating work of ground by use thereof
JP3561824B2 (en) Ground anchor and its construction method
JP2023008489A (en) Linear body installation method
JP2865571B2 (en) Anchor construction equipment under pressurized water
CN117722214A (en) Integrated anchor cable for soft disintegrating rock mass and construction method
JPH06158980A (en) Method and device for starting shield machine and arriving method and device for the same
JP3284387B2 (en) Underground water tank and its construction method
CN105908746A (en) Pile body concrete drilled core grout recharging device and method
JPH0514835B2 (en)

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081206

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091206

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091206

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101206

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101206

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111206

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121206

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131206

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131206

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141206

Year of fee payment: 12

LAPS Cancellation because of no payment of annual fees