JPS5852191A - Mounting structure of pulley for extension in expansion boom - Google Patents

Mounting structure of pulley for extension in expansion boom

Info

Publication number
JPS5852191A
JPS5852191A JP13059381A JP13059381A JPS5852191A JP S5852191 A JPS5852191 A JP S5852191A JP 13059381 A JP13059381 A JP 13059381A JP 13059381 A JP13059381 A JP 13059381A JP S5852191 A JPS5852191 A JP S5852191A
Authority
JP
Japan
Prior art keywords
boom
pulley
extension
bracket
extension pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13059381A
Other languages
Japanese (ja)
Other versions
JPS6055439B2 (en
Inventor
宮沢 洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP13059381A priority Critical patent/JPS6055439B2/en
Publication of JPS5852191A publication Critical patent/JPS5852191A/en
Publication of JPS6055439B2 publication Critical patent/JPS6055439B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 この発明は相互に伸縮自在の少なくとも三本のブームを
有し、中間のブームの先端に伸長用の滑車を取付け、骸
伸長用滑車に掛回された伸長用ワイヤループの一端を基
方のブームに固着するとともに、その他端を先方のブー
ムの基Jll!IN3位に固着して成り、基方のブーム
に対して中間ブームを伸長させるのみで先方のブームが
中間ブームに対して伸長されるよう構成した伸縮ブーム
において、前記伸長用滑車を前記中間ブームにとシっけ
るための新規な構造に関するものである。
Detailed Description of the Invention This invention has at least three booms that are mutually telescopic, an extension pulley is attached to the tip of the middle boom, and an extension wire loop is hung around the skeleton extension pulley. Attach one end to the base boom, and attach the other end to the base boom. In a telescopic boom that is fixed to the IN3 position and is configured such that the front boom is extended with respect to the intermediate boom only by extending the intermediate boom with respect to the base boom, the extension pulley is attached to the intermediate boom. It is related to a new structure for the purpose of

第1図は3段式のこの種伸縮ブームが線図的に示されて
おり、該伸縮ブームは中間のブーム(1>と該中間ブー
ム(1)を伸縮可能に支持する基方のブーム12)と、
該中間ブーム(11に伸縮可能に支持された先方のブー
ム(3)と、前記中間ブームrl)の先端に、設けられ
た伸長用滑車(4)と、紋伸長用滑車(4)に掛巻され
るとともにその一端が前記基方ブーム(2)の先端部位
(A)に固着されるほかその他端が前記先方ブーム【3
)の基端部1位(B)に固着され九伸長用ワイヤp−プ
(5)と、前記中間ブーム(1) ?前記基方ブーム(
2)に対して伸縮させる油圧シリンダ(図示せず)゛等
々とを主要構成要素として成り、中間ブーム(1)を基
方ブーム(2)に対して伸長するとワイヤロープ(5)
により先方ブーム(3)も同時に中間ブーム(1)に対
して伸長されるものであ〕、このような伸縮ブーム自体
は油圧伸縮ブームクレーンにおいて一般的に用いられて
おり既知である。
FIG. 1 diagrammatically shows a three-stage telescopic boom of this type, comprising an intermediate boom (1) and a proximal boom 12 that telescopically supports the intermediate boom (1). )and,
The intermediate boom (11 is extendably supported by the front boom (3) and the intermediate boom RL), and the extension pulley (4) and the crest extension pulley (4) are provided at the tip of the intermediate boom (11) and the intermediate boom rl. At the same time, one end thereof is fixed to the tip part (A) of the base boom (2), and the other end is fixed to the tip part (A) of the base boom (2).
) is fixed to the proximal end position 1 (B) of the nine extension wire p-pull (5), and the intermediate boom (1)? The base boom (
The main components include a hydraulic cylinder (not shown) that extends and retracts the intermediate boom (1) relative to the base boom (2), and a wire rope (5) when the intermediate boom (1) extends relative to the base boom (2).
Accordingly, the front boom (3) is also extended with respect to the intermediate boom (1) at the same time.] Such a telescoping boom itself is commonly used in hydraulic telescoping boom cranes and is well known.

ところでこの種伸縮プームにおいて伸長用ワイヤロープ
はクレーンが大型化される傾向ともあいまって大径化さ
れる傾向にあり、その際ロープ(5)の安全上、ロープ
の径(d)と滑車(4)の径(D)との比(D/d )
は一定比以上にする必要性があり、かつそれが大であれ
ばある程ロープC5)の疲労強度は太きくなシ好ましい
ものである。ここで、従前のように滑車(4)の軸芯を
中間ブーム山の主体部エフも上位に位置した構造を採用
したまま滑車(4)を大型化すると、クレーン吊作業用
のワイヤロープ(6)はそれにつれて上位へ張架する必
要性が生じ、そのこ、!:tl先方7’−ム(3)の先
端に設けられるシーブブロック(7) t−も大型、従
って大重量化する必要を招来することとなり、それは結
果として制限されたクレーンの転倒モーメントの範囲内
でクレーン(D吊能力を低下することとなり好ましいも
のでない。
By the way, in this type of telescopic pool, the wire rope for extension tends to have a larger diameter in line with the tendency for cranes to become larger. ) to the diameter (D) (D/d)
It is necessary to make the ratio greater than a certain ratio, and the larger the ratio, the greater the fatigue strength of the rope C5), which is preferable. Here, if we increase the size of the pulley (4) while adopting the structure in which the shaft center of the pulley (4) is located above the main body part F of the intermediate boom mount as before, it is possible to increase the size of the pulley (4) using the wire rope (6 ) will need to be moved to a higher level, and that's it! :The sheave block (7) t- installed at the tip of the tl forward 7'-m (3) is also large and therefore needs to be increased in weight, which is within the range of the limited overturning moment of the crane. This is not preferable as it will reduce the lifting capacity of the crane (D).

この発明は以上の背景に鑑みなされたものでるり、伸長
用滑車の軸芯を従前のように伸縮ブームの上位へ位置さ
せずその中段位に位置させて、伸長用滑車の上方への飛
び出し量を大きくならないようにしたものてあシ、この
際そのようにすると伸長用滑車の軸が先方ブームの両側
板の部分に位置することとなるわけであるが、本発明で
はこの伸長用滑車の取付構造を工夫することにょシ、先
方ブームのブーム巾すなわちその両側板間の寸法を可及
的に大きくすることを可能とし、従って先方ブームの剛
性を可及的に大きくすることを可能にしたものであ)、
この発明の取付構造は、伸縮ブームの軸芯に喬直な平面
視にて中間ブームの先端でかつ先方ブームの両@部位に
位置して各−個の伸長用滑車を配し、該両伸長用滑車の
軸芯同志はハ字状の関係にめり、該各伸長用滑車は円外
に壁板をもつU字状断面を有しかつ中゛、[間ブームに
連続する鋼板製のブラケットで後われてお)、谷伸長用
滑車は該ブラケットの円外壁板に対して外壁板側から貫
通された有頭軸にて軸支され、該有頭軸はブラケットの
白檀の内aに存するピンにて抜止めされていることを特
徴とするものである。
This invention was made in view of the above background, and the shaft center of the extension pulley is not located above the telescopic boom as in the past, but is positioned in the middle of the telescopic boom, thereby increasing the amount by which the extension pulley protrudes upward. If this is done, the axis of the extension pulley will be located on both side plates of the front boom, but in the present invention, the extension pulley is not attached. By devising the structure, it was possible to increase the boom width of the front boom, that is, the dimension between its both side plates, and thus to increase the rigidity of the front boom as much as possible. De),
In the mounting structure of the present invention, each extension pulley is arranged at the tip of the intermediate boom and at both parts of the forward boom in a plan view perpendicular to the axis of the telescopic boom, and The axes of the extension pulleys are arranged in a V-shaped relationship, and each extension pulley has a U-shaped cross section with a wall plate on the outside of the circle, and a steel plate bracket continuous to the boom in the middle. ), the valley extension pulley is pivotally supported by a headed shaft that penetrates the circular outer wall plate of the bracket from the outer wall plate side, and the headed shaft is located inside the sandalwood part of the bracket. It is characterized by being secured with a pin.

以下4段伸縮ブームに本発明を採用した例につき第2〜
4図を用いて詳説する。
Below are the second to second examples of the present invention adopted in a four-stage telescopic boom.
This will be explained in detail using Figure 4.

図中(1)、 (2)、 (3)、 (4)、 (7)
は第2図中ff号のものと対応する。而して本例では基
方のブーム(21の基方に更に油圧シリンダをもつ基本
のブーム(8)を具備して4゛段伸縮ブームを構成して
いる。又(9) tj ’シーブブロック(7)の前方
へ設けられた補巻ワイヤロープのための補巻滑車である
(1), (2), (3), (4), (7) in the figure
corresponds to No. ff in FIG. Therefore, in this example, a 4-stage telescoping boom is constructed by comprising a basic boom (8) further having a hydraulic cylinder at the base of the base boom (21).Also, (9) tj' sheave block This is an auxiliary winding pulley for the auxiliary winding wire rope provided in front of (7).

伸長用滑車の取付構造を第2図中ff−4線に沿うすな
わち伸縮ブームの軸芯に対して垂直な面に投影した第4
図を用いて説明する。図中(7)は先方ブーム(3)の
前方に設けられたシーブブロックであり、それは先方ブ
ーム(3)t−構成する両方の側板を延長して形成され
た側板(7a)(7b)  の部分から成り%該シ〜プ
ブロック【7)にはその上位に主巻用滑車01、補巻用
滑車61が又その下位には主巻用滑車群四が支持されて
お9%図示しない主巻ドラムに巻回される主巻ワイヤロ
ープ(6)は滑車QQと(2)と図示しない主巻フック
の滑車群に巻回され、又同補巻ドラムに巻回された補巻
ワイヤロープは滑車α刀。
Figure 4 shows the mounting structure of the extension pulley projected on the plane along line ff-4 in Figure 2, that is, perpendicular to the axis of the telescopic boom.
This will be explained using figures. In the figure, (7) is a sheave block installed in front of the front boom (3), and it is a sheave block formed by extending both side plates of the front boom (3) (7a) and (7b). The ship block [7] has a main hoisting pulley 01 and an auxiliary hoisting pulley 61 above it, and a main hoisting pulley group 4 below it. The main winding wire rope (6) wound around the winding drum is wound around pulleys QQ and (2) and the pulley group of the main winding hook (not shown), and the auxiliary winding wire rope (6) wound around the auxiliary winding drum is Pulley α sword.

(9)に巻回されており2以上の構成は通常のものであ
る。
(9), and the structure of two or more is normal.

第4図中(4)は伸長用滑車であシ、腰回では一個が示
されるのみであるが、該滑車(4)は先方のブーム(3
)’を間にして両側に二個一対で配置されており、その
軸芯は先方ブーム(3)の中程に位置しており1かつ両
輪芯は図示のように傾斜し相互にハキの関係にある。Q
:In中間ブニム(1)の前端に設けられたブラケット
であ夛、該ブラケット(至)は外壁板(13a)と内壁
板(13b)と天壁板(23Q)ト、$ら成る断面U字
状であり、内壁板(tab)は中間ブーム(1)の外壁
板(1a)とはソ同一平面にあり、外壁板(13a)は
第3図からも理解されるように外方へ突出している。O
eは一方に頭@(16a)を有し他方に抜止めビンのた
めのビン孔(1ob)を有する滑車のための有頭軸でア
)、該有頭軸α時をブラケット(至)の外壁板(13!
L) s滑車(4)のボス、プラケツ) Qiの内壁板
(13b)を貫通している。Q4は前記プラ冴ツ) 0
30内壁板(13b)の内側に配置された抜止めビンで
あり、該抜止めビンα4の下端社有頚軸αQのビン孔(
16b)に嵌入され、一方上端はブラケット(至)の上
方迄のびており、上端に固着されたプレートをブラケッ
トa葎の天壁板(13c)に重ね合せたままポル) (
IF5にて止着自在でめる。尚図中(11りは中間ブー
ム(1)を構成する底壁板の−Sを示し、又(Wl)は
中間ブーム(1)の両内壁板(1a)の間の巾を%(W
l)は先方ブーム(3)の外壁板の間の巾を示す。(5
)社伸縮用のワイヤロープでアに、その一端は差力ブー
ム(2)の先端外方へ張出して設けられブラケット(A
)に固着され、その他端は先方ブーム(3)の基端外方
へ突設した金具(図示せず)に固着され、中間に滑車(
4)に巻回されている。
In Fig. 4, (4) is an extension pulley. Only one pulley is shown at the waist, but this pulley (4) is connected to the boom (3) at the front.
)' are arranged in pairs on both sides with the center of the wheel located in the middle of the front boom (3), and the center of both wheels are inclined as shown in the figure, so that they are in a horizontal relationship with each other. It is in. Q
:In A bracket provided at the front end of the middle bunim (1), the bracket (to) has a U-shaped cross section consisting of the outer wall plate (13a), the inner wall plate (13b), and the ceiling wall plate (23Q). The inner wall plate (tab) is on the same plane as the outer wall plate (1a) of the intermediate boom (1), and the outer wall plate (13a) protrudes outward as can be understood from FIG. There is. O
e is a headed shaft for a pulley that has a head @ (16a) on one side and a bottle hole (1ob) for a retaining bottle on the other side; Exterior wall board (13!
L) Boss of s pulley (4), bracket) Penetrates the inner wall plate (13b) of Qi. Q4 is the above platform) 0
30 is a retaining bottle placed inside the inner wall plate (13b), and the lower end of the retaining bottle α4 has a bottle hole (
16b), while the upper end extends above the bracket (to), and the plate fixed to the upper end is overlapped with the top wall plate (13c) of bracket a).
It can be fixed freely at IF5. In the figure, (11) indicates -S of the bottom wall plate constituting the intermediate boom (1), and (Wl) indicates the width between both inner wall plates (1a) of the intermediate boom (1) in % (W
l) indicates the width between the outer wall panels of the forward boom (3). (5
) Co., Ltd. A wire rope for expansion and contraction is provided at A, one end of which extends outward from the tip of the differential boom (2), and is connected to the bracket (A).
), the other end is fixed to a metal fitting (not shown) protruding outward from the proximal end of the front boom (3), and a pulley (
4).

以上の構造におい、て差力ブーム(2)に対して中間ブ
ーム(1)を伸長すれは、先方ブーム(3)が中間ブー
ム(1)に対して伸長すること従前のものと同様でおる
In the above structure, the extension of the intermediate boom (1) with respect to the differential force boom (2) is the same as that of the conventional one, in which the front boom (3) is extended with respect to the intermediate boom (1).

板子組立ての順序を説明する。先方ブーム(370両方
の外壁板外面間の巾は(Wl)であること先述の通シで
あるが、両方壁板の基端側の外面にはその部分を中間ブ
ーム(1)の外壁板(1a)の内側面に沿って案内する
通常サイドパラ・ドともされる突起物が存在しておシ、
従って滑車(4)等を第4図々示の通シに組立てた状態
では、先方ブーム(3)を中間ブーム(1)に挿入する
ことは不可であ乏。そこでビン(141、有頭軸Qfl
抜出して滑車(4)を外しfcまま、一方先方プーム(
3)の、基端にワイヤロープ(5)の一端を固着した状
態にて先方ブーム(3)を中間ブーム(1)に挿入し、
つぎに滑車(4)を所定配置し、有頭軸0→を外方から
貫通し、ビン04を上方から挿入し、しかる後ビンa4
をボルト(至)止めし、そしてロープr5)の他端をブ
ラケット(A)に固着して組付けを完了する。
The order of assembling the board will be explained. The width between the outer surfaces of both outer wall plates of the front boom (370) is (Wl).As mentioned above, the outer wall plate of the intermediate boom (1) is 1a) There is a protrusion, also commonly referred to as a side para, that guides along the inner surface of the
Therefore, when the pulley (4) and the like are assembled in the manner shown in Figure 4, it is impossible to insert the front boom (3) into the intermediate boom (1). So Bin (141, headed axis Qfl
Pull it out, remove the pulley (4), leave it as fc, and move it to the other end of the pool (
3), insert the front boom (3) into the intermediate boom (1) with one end of the wire rope (5) fixed to the base end,
Next, the pulley (4) is placed in a predetermined position, penetrates the headed shaft 0→ from the outside, inserts the bottle 04 from above, and then the bottle a4
is bolted (to), and the other end of the rope r5) is fixed to the bracket (A) to complete the assembly.

この発明は以上の通り構成したものであるから、第一に
滑車(4)のための軸を有頭軸aQとkるとともに、そ
れを傾斜配置とする捻か1、その抜止めをピンα勾方式
としたので、滑車(4)の下端のm−を巾(Wl)内に
するとしても有頭軸aQO軸先+1!1lt−可及的外
方へ配置でき、従って先方ブーム(3)の巾(Wg)を
可及的に大きい剛性の大きいものとでき、第二にブラケ
ート0の内外壁板(13t+)(1!1m)は有頭軸(
至)の頭部(16a)とビンa4との間にあるので、全
体υ字状断面であるにもかかわらず、両壁[’ (13
a)(13b)が開いてしまうような危惧#in<、第
三に有頭軸0Qの抜止めをビン方式としたので、所謂袋
部分にもかかわらずビン0◆の装着は極めて容易でア抄
組付けが容扇である等多くの効果がある。
Since this invention is constructed as described above, firstly, the shaft for the pulley (4) is a headed shaft aQ, the screw 1 is arranged at an angle, and the pin α is used to prevent the pulley (4) from slipping out. Since it is a slope type, even if the m- of the lower end of the pulley (4) is within the width (Wl), the headed shaft aQO shaft tip +1!1lt- can be placed as far outward as possible, so that the front boom (3) The width (Wg) of the bracket can be made as large as possible and the rigidity can be made as large as possible, and secondly, the inner and outer wall plates (13t+) (1!1m) of the bracket 0 are
Since it is located between the head (16a) of
a) There is a risk that (13b) may open. Thirdly, since the head shaft 0Q is prevented from coming out using a bottle method, it is extremely easy to install the bottle 0◆ even though it is a so-called bag part. It has many effects, such as the ability to assemble the paper into a fan.

【図面の簡単な説明】[Brief explanation of drawings]

) W線に沿う縦断側面図である。 (11;中間プーム   (2);1方プームC3):
先方ブーム  C4):伸長用滑車(5):伸長用ワイ
ヤロープ (至)ニブラケット(1a&) :外壁板 
  (13k)) :内1板°α呻:有頭軸    α
4=ビン 特許出願人: 株弐会社神戸製鋼所
) It is a longitudinal side view along the W line. (11; Intermediate pool (2); One-way pool C3):
Front boom C4): Extension pulley (5): Extension wire rope (to) 2 brackets (1a&): External wall board
(13k)) :Inner 1 plate °α Groan: Headed axis α
4=Bin Patent applicant: Kobe Steel, Ltd.

Claims (1)

【特許請求の範囲】[Claims] 相互に伸縮自在の少なくとも三本のブームを有し、中間
のブームの先端に伸長用の滑車を取付け、該伸長用滑車
に掛回された伸長用ワイヤロープの一端を基方のブーム
に固着するとともに、その他端を先方のブームの基端部
位に固着して成ね、基方のブームに対して中間ブームを
伸長させるのみで先方のブームが中間ブームに対して伸
長されるよう構成した伸縮ブームにおいて、伸縮ブーム
の軸芯に垂直な平面視にて中間ブームの先端でかつ先方
ブームの両側部位に位置して各−個の伸長用滑車を配し
、該両伸長用滑車の軸芯同志扛へ字状の関係にあり、該
各伸長用滑車は内外に壁板をもつU字状断面を有しかつ
中間ブームに連続する鋼板製のブラケットで覆われてお
り%各伸長用滑車は該ブラケットの内外壁板に対して外
壁板側から貫通された有頭軸にて軸支され、該有頭軸は
ブラケットの内壁の内側に存するビンにて抜止めされて
いることを特徴とする伸縮ブームにおける伸長用滑車の
取付構造。
It has at least three mutually telescopic booms, an extension pulley is attached to the tip of the intermediate boom, and one end of an extension wire rope wrapped around the extension pulley is fixed to the base boom. In addition, the other end is fixed to the proximal end of the boom at the front, and the boom is configured such that the boom at the front can be extended relative to the intermediate boom simply by extending the intermediate boom relative to the boom at the base. , each extension pulley is arranged at the tip of the intermediate boom and on both sides of the front boom in a plan view perpendicular to the axis of the telescopic boom, and the axes of both extension pulleys are aligned. Each extension pulley has a U-shaped cross section with inner and outer wall plates, and is covered with a steel plate bracket continuous to the intermediate boom. A telescoping boom, characterized in that it is pivotally supported by a headed shaft penetrating the inner and outer wall plates of the bracket from the outer wall plate side, and the headed shaft is prevented from coming off by a bin located inside the inner wall of the bracket. Mounting structure of extension pulley in.
JP13059381A 1981-08-19 1981-08-19 Mounting structure of extension pulley on telescopic boom Expired JPS6055439B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13059381A JPS6055439B2 (en) 1981-08-19 1981-08-19 Mounting structure of extension pulley on telescopic boom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13059381A JPS6055439B2 (en) 1981-08-19 1981-08-19 Mounting structure of extension pulley on telescopic boom

Publications (2)

Publication Number Publication Date
JPS5852191A true JPS5852191A (en) 1983-03-28
JPS6055439B2 JPS6055439B2 (en) 1985-12-05

Family

ID=15037911

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13059381A Expired JPS6055439B2 (en) 1981-08-19 1981-08-19 Mounting structure of extension pulley on telescopic boom

Country Status (1)

Country Link
JP (1) JPS6055439B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63165790A (en) * 1986-12-26 1988-07-09 Hazama Gumi Ltd Sonic wave generating apparatus
JPH01500055A (en) * 1986-03-18 1989-01-12 シェブロン リサーチ カンパニー Downhole electromagnetic seismic source
US5416281A (en) * 1991-11-08 1995-05-16 Oyo Corporation Deadweight dropping type wave source

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62170195U (en) * 1986-04-19 1987-10-28
JP5766079B2 (en) * 2011-09-22 2015-08-19 日本車輌製造株式会社 Earth drill

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01500055A (en) * 1986-03-18 1989-01-12 シェブロン リサーチ カンパニー Downhole electromagnetic seismic source
JPS63165790A (en) * 1986-12-26 1988-07-09 Hazama Gumi Ltd Sonic wave generating apparatus
US5416281A (en) * 1991-11-08 1995-05-16 Oyo Corporation Deadweight dropping type wave source
US5534668A (en) * 1991-11-08 1996-07-09 Oyo Corporation Deadweight dropping type wave source

Also Published As

Publication number Publication date
JPS6055439B2 (en) 1985-12-05

Similar Documents

Publication Publication Date Title
WO2020026842A1 (en) Crane
JPS5852191A (en) Mounting structure of pulley for extension in expansion boom
US4363413A (en) Endless chain drive for telescopic jib sections
JP2005126212A (en) Crane
JP4422845B2 (en) Counterweight mounting method and frame support means
JP6985644B2 (en) hook
JP4340174B2 (en) crane
JPH09240989A (en) Auxiliary jib
JP2008007278A (en) Crane
JPH028952Y2 (en)
JPS59172383A (en) Stationary type crane
JP2579400Y2 (en) Rope guide device for crane boom
JPS6121506Y2 (en)
JPS6348798B2 (en)
JPH0344785Y2 (en)
JP6773199B2 (en) crane
JPS5980864A (en) Distributor
JPS6011919Y2 (en) hook storage device
JP3940706B2 (en) Folded bridge crane
JPS5852192A (en) Mounting structure of pulley for extension in expansion boom
JPS61206792A (en) Horizontal and derricking combination type crane with telescopic boom
JPS6335551B2 (en)
JPS59105282U (en) Swing sheave device
JPS61206793A (en) Method of erecting gantry in crane
JPS6210315Y2 (en)