JPS5847691A - Method of constructing heavy floating structure - Google Patents

Method of constructing heavy floating structure

Info

Publication number
JPS5847691A
JPS5847691A JP56146840A JP14684081A JPS5847691A JP S5847691 A JPS5847691 A JP S5847691A JP 56146840 A JP56146840 A JP 56146840A JP 14684081 A JP14684081 A JP 14684081A JP S5847691 A JPS5847691 A JP S5847691A
Authority
JP
Japan
Prior art keywords
trunk
contact
floating
floating bodies
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP56146840A
Other languages
Japanese (ja)
Other versions
JPS6148469B2 (en
Inventor
Norihiko Sakata
坂田 則彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Zosen Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP56146840A priority Critical patent/JPS5847691A/en
Publication of JPS5847691A publication Critical patent/JPS5847691A/en
Publication of JPS6148469B2 publication Critical patent/JPS6148469B2/ja
Granted legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Revetment (AREA)

Abstract

PURPOSE:To shorten a horizontal trunk and reduce its cost by forming a required number of wells at the contact area of a number of floating bodies that are to be adjacent to one another and sequentially joining the contact area of both floating bodies partially using these wells. CONSTITUTION:Wells 26 to 31 are formed at the contact areas of a number of floating bodies 2 that are adjacent to one another. Each of the floating bodies 2 is floated on the water level, pulled nearer, and is brought in contact with each other. When the contact areas are joined, a horizontal trunk 34 whose upper surface is opened and in which the sealing section is fit is brought in contact with the lower surface of each of the floating bodies 2 and a vertical trunk 43 with the same structure that is opened at the contact position of each of the floating bodies 2 is brought in contact with the inside of the wells 26 to 31. Then both trunks 34 and 43 are connected and fixed to each other. Mutually butting bottom plates and lateral bulkheads are welded after displacing water from both trunks.

Description

【発明の詳細な説明】 本発明は大型浮体構造物の建造方法に関する。[Detailed description of the invention] The present invention relates to a method of constructing a large floating structure.

ドックでm4できないような大型浮体構造物を鋪道する
場合には、一般に、まず複数の浮体奪建造し、その各浮
体を水面上で接当させた一1接合するζ4軒考えられる
めζこむで量線となるのは、水面下における両浮体の接
合である。そこで従来ではその水面下の接当部のナベて
を覆うトランクを設番フること軒考え外れているが、 
ca?構成ではトランクが壷わめて長尺(たとえば1@
Qjll〜16Qjll)なものとなって、高−となり
、また長尺であるから取扱いもやうかいであり、さら−
ζ万が−、トランク内で事故が生じたとhに、作業員が
逃げにくいという間層がある。5 そこで本発明はかかる間一点をjIi11sシた大型浮
体構造物の建造方法を提來するものである。
When roading a large floating structure that cannot be built at a dock, it is generally possible to first construct multiple floating structures, and connect each floating structure to 11 points on the water surface. The dose line is the connection between the two floating bodies below the water surface. Therefore, in the past, it was unthinkable to install a trunk to cover the pan of the abutting part under the water.
ca? In the configuration, the trunk is very long (for example, 1@
Qjll ~ 16Qjll), which makes it expensive, and because it is long, it is difficult to handle.
If an accident occurs in the trunk, there is a possibility that it will be difficult for the worker to escape. 5. Therefore, the present invention proposes a method of constructing a large floating structure that eliminates this problem at one point.

以下、本発明の一実11iNを#11−〜編9囚に基づ
いて説明する。この実施例は8つの浮体(支)(2)を
接合して大型浮体構造−を建造する方法に関し、両浮体
(1)(2)は、この実施例では、8つの横縞!11(
2)に)と画浮体(υ(2)の接当部(&)の近傍に設
けられた縦111m !i@ m(f)とで形成された
4つのディープバラストタンク(〜〜@1(6)〜(至
)を有している。また両浮体0)(2)のライトシップ
状態において吃水の上に二重底のタンクトップ01(ロ
)が位置するように構成しである。さらに両浮体(1)
(至)の接当部(j)には、各横縞!i! 48(4)
と縦隔壁(li) (7)とで4つのボイドスペース曽
〜輪、四〜(2)が形成されている。@〜@1@〜(至
)はボイドスペース(至)〜(2)、(2)〜に)を利
用して仕切板−により各横闇壁(り (4)に沿って形
成されたウェルであって、浮体(1)(2)の天板(I
AXSIA)と底板(IB)(IB)とを貫通している
。に)は一方の浮体(1)の天板(IA)上に配設され
た一対の位置決め用雌金具、@は他方の浮体(2)の天
板(2人)上に雌金具(2)に対向して配設された一対
の位置決め用雄金具である。−は水平トランクであって
、断dIJU字形のトランク本体(84ム)と、該本体
(14A)の114端部に設けられ天板(14c)とを
有し、該天板(84C)の中央部にはトランク本体(8
4A)に沿って長尺の切欠日(2)を形成しである。9
4は天板(84c)とトランク本体(84A)との間の
内部に設けられた一対のバラストタンク。
Hereinafter, one example of the present invention, 11iN, will be explained based on #11--Episode 9. This example relates to a method of constructing a large floating structure by joining eight floating bodies (supports) (2).Both floating bodies (1) and (2) have eight horizontal stripes! 11(
Four deep ballast tanks (~~@1 6) to (to).Also, in the lightship state of both floating bodies 0) and (2), the double-bottomed tank top 01 (b) is located above the water.Furthermore, Both floating bodies (1)
There are horizontal stripes on the contact part (j) of (to)! i! 48(4)
and the vertical partition wall (li) (7) form four void spaces (2). @~@@@~ (to) is a well formed along each horizontal dark wall (ri (4)) by using the void space (to) to (2), (2) to). The top plate (I) of the floating body (1) (2)
AXSIA) and the bottom plate (IB) (IB). ) is a pair of positioning female metal fittings placed on the top plate (IA) of one floating body (1), @ is a female metal fitting (2) placed on the top plate (2 people) of the other floating body (2) A pair of positioning male metal fittings arranged to face each other. - is a horizontal trunk, which has a truncated dIJU-shaped trunk body (84 mm) and a top plate (14c) provided at the 114 end of the main body (14A), and the center of the top plate (84C). The trunk body (8
A long notch (2) is formed along 4A). 9
4 is a pair of ballast tanks provided inside between the top plate (84c) and the trunk body (84A).

鋤は両バラストタンクfi t4に適当間隔ごとに配設
された複数の支持杆、(至)はトランク本体(J14A
)の底部に配設された足場、−は天板(口C)の両細縁
にこの、天板(84C)の全長にわたって配設された一
対の水wI保持用−ソフトパッキン、−は天板(!14
c)の該縦ソフトパツキン鴫より内側に配設された一対
の関虜保持用縦ハードパツキン、(財)は天板(8釦)
の両端部の両線ソフトパツキンー間に配設された一対の
水密保持用横ソフトパツキン、輪は天板(畠4C)の該
砿ソフトパツキン−より内−に配設された一対の間−保
持用横へ一ドパツキンである。
The plow is a plurality of support rods arranged at appropriate intervals on both ballast tanks fit4, and (to) the trunk body (J14A
Scaffolding placed at the bottom of the top plate (84C); Board (!14
c) A pair of vertical hard gaskets for holding captives arranged inside the vertical soft gaskets, the foundation is a top plate (8 buttons)
A pair of horizontal soft gaskets for watertight maintenance placed between both wire soft gaskets at both ends of the , and a ring for holding between a pair of horizontal soft gaskets placed inside of the soft gaskets on the top plate (Hata 4C). It's a quick move to the side.

−は一対の撫直トランクであって、十手形トランク本体
(41A)と、該本体(48A)の下端に固璽された成
板(411B)と1本体(4!IA)の両鋸縁に固着さ
れた一対の側板(4IC)とを有する。上記底板(48
B)には多数の長孔−を形成しである。なお前記天板(
S4C)の各長孔−に対向する箇所にはナツト−を固着
しである。−は上記両側板(48C)の外側縁にこの両
側& (48C)の全長にわたって配設された一対の水
ms持出用ソフトパツキン(ロ)ハ両側板(4E)の咳
ソフトパツキン−より内側に配設された一対の関M保持
用へ−ドパツキンである。
- is a pair of straight trunks, with a ten-shaped trunk body (41A), a plate (411B) sealed at the lower end of the body (48A), and a sawed edge on both sides of the body (4!IA). It has a pair of side plates (4IC) fixed to each other. The above bottom plate (48
B) has a large number of long holes formed therein. Note that the above-mentioned top plate (
A nut is fixed to the part facing each long hole of S4C). - is a pair of soft gaskets for taking out water ms placed on the outer edges of the both side plates (48C) along the entire length of both sides & (48C). This is a pair of seals for holding the seals M, which are arranged in the holder.

上記構成に基づいて大形浮体構造物の建造方法を説明す
る。まずドックで両浮体(1) (りを建造し。
A method of constructing a large floating structure will be explained based on the above configuration. First, build both floating bodies (1) at the dock.

その両浮体(υ(2)を水面上に浮かばせる1次にli
1図および411図に示すごと(一方の浮体(1)を第
1のウィンチt4により岸壁@に引き嵜せる0次に上記
一方の浮体(υ上の@2のウィンチAにより他方の浮体
(至)を引き寄せ、第8図に示すごとく各雄金具に)と
各雌金具(至)とを互いに嵌合させて!4′#体(υ(
2)を互いに位置決めして接当させる。次に第4図に示
すごとく、バラストタンク(至)円に適当に水を入れて
水中を浮h&せず、沈みもしないようにした水平トラン
ク(2)を浮体(υ(2)上の@8のウィンチ−により
引っ張り、この水平トランク−′に第4図左端のボイド
スペースQll曽の下方にもたらし1両浮体(υ(2)
の接当m(5)に対向させて底板(IB)(2B)に接
当させる1次にバラストタンク員円の水を抜(。
The first-order li that makes both floating bodies (υ(2) float on the water surface)
As shown in Figures 1 and 411 (one floating body (1) is pulled to the quay @ by the first winch t4), the other floating body (1) is pulled to the quay @2 by winch A on υ. ) and fit each male metal fitting () and each female metal fitting (to) together as shown in Figure 8.4'# body (υ(
2) are positioned and brought into contact with each other. Next, as shown in Figure 4, the horizontal trunk (2), which is filled with water appropriately in the ballast tank (to) so that it does not float or sink in the water, is placed on the floating body (υ (2)). 8 winch and brought it to this horizontal trunk ′ below the void space Qllseng at the left end of Figure 4.
Drain the water from the primary ballast tank (1), which is brought into contact with the bottom plate (IB) (2B) facing the abutment m (5) of the ballast tank (2B).

すると、ハードパツキン−およびソフトパツキンf11
h@が底板(IBX!B)iζ圧接させられる(@8図
状ml)、次に第6図に示すごとく、浮体(υ(2)上
の第4のウィンチ−により一方の重置トランク輪を吊慟
下げシこのトランク−をウェル榊四円に挿入し、水平ト
ランク軸の一端上に載置する。次にボルト闘を各長孔−
を介してナツト軸にねじ込み、この一方の垂直トランク
−を水平トランク−に固着する(鴫6図、第7図および
第9図状−)0次6ζ浮体(υ(2)上の鴫iのウィン
チ−により他方の垂直トランク−を吊伽下げ、Cのトラ
ンク−を#体(1)(2))の外板(ICX!ICX沿
つて降下させ、水平トランク−の他端上に載置する0次
にボルドーを各長孔−を介してナツト軸にねじ込み、こ
の一方の垂直トランク−を水平トランク軸にFIA着す
る8次に両垂直トランク−および水平トランク−内の水
を排出する。すると1両重直トランクーのソフトパフキ
ン一およびハードパツキン−が横隔i! (り (4)
と外板(lc)(lc)にEE綴し、水密が保持され、
ボイドスペース−(2)内の水も抜かれる。にでもしも
水−れがあれば、ダイパーが水中から縛い水目シートか
ゴム粘土をその水−れ箇所にあてがって塞げばよい0次
にトランク(至)部内にドライエアを供給して乾燥する
8次に作業員がトランク@−内に入って互いにつき合わ
された底板(tB)(!B)どうし、横−1! (1(
4)どうしを溶接すればよい。
Then, hard packing and soft packing f11
h@ is brought into pressure contact with the bottom plate (IBX! Insert this trunk into the four circles of the well Sakaki and place it on one end of the horizontal trunk shaft.Next, insert the bolts into each long hole.
is screwed onto the nut shaft through the nut shaft, and this one vertical trunk is fixed to the horizontal trunk (Figures 6, 7, and 9). Hang the other vertical trunk with a winch, lower the trunk of C along the outer plate (ICX!ICX) of body # (1) (2), and place it on the other end of the horizontal trunk. Next, screw the Bordeaux onto the nut shaft through each elongated hole, and attach one of the vertical trunks to the horizontal trunk shaft using the FIA.8 Next, drain the water in both vertical trunks and the horizontal trunk. The soft puffkin and hard puffkin of the 1-car trunk are diaphragm i! (ri (4)
and EE binding on the outer panel (LC) (LC) to maintain watertightness,
The water in the void space-(2) is also drained. If there is any water leakage, the diaper will tie it up from the water and cover it with a wet sheet or rubber clay.Next, supply dry air into the trunk to dry it. 8 Next, the worker enters the trunk @- and the bottom plates (tB) (!B) are pressed against each other, horizontally -1! (1(
4) Just weld them together.

以上の作業が終了ルたならば、トランクー−円に水を入
れ、両鳳直トランク−と水平トランク御とを分−し、該
水平トランク員を第4図の左端から霊番目のポ゛イドス
ペース@(2)の下方にもたらし、上記と同じ作業をお
仁なって、このボイドスペース韓働部分の扉接をおζな
えばよい、同様にして。
When the above work is completed, fill the trunk circle with water, separate the two straight trunks from the horizontal trunk, and place the horizontal trunk member at the point number from the left end of Figure 4. Bring it to the bottom of space @ (2), do the same work as above, and then close the door of this void space Korean work part, in the same way.

次々と溶接し、*終的に両浮体(υ(2)の接当部係)
の水面下の部分をナベてIII接する。なおウェル−〜
(2)はそのまま繊しており、このウェル−〜−を利用
して排水や給水をおこなうようにする。
Welded one after another, *Finally both floating bodies (the contact part of υ (2))
Turn the part below the water surface into contact with the water. In addition, well~
(2) is left as is, and these wells are used for drainage and water supply.

上記実施例では、一方の浮体(1)を岸壁−に係留した
が、これに限定されるわけではなく、第1咽に示すごと
く、アンカー−により係留するようにしてもよい。
In the above embodiment, one of the floating bodies (1) is moored to the quay, but the present invention is not limited to this, and the floating body (1) may be moored by an anchor as shown in the first pier.

以上述べたごとく本発明の大型浮体−遺物の濾過方法に
よれば、互いに接当すべ―複数の浮体の接当m所に適当
数のウェルを形成し、このウェルを利用して両浮体の接
当部を部分的に順番に接合するものであるから、水平ト
ランクが短かくてよい、したがって安価となり%取扱い
も容易である。
As described above, according to the method for filtering large floating objects and artifacts of the present invention, an appropriate number of wells are formed at m points where a plurality of floating objects come into contact with each other, and these wells are used to make contact between both floating objects. Since the parts are joined in sequence, the horizontal trunk can be short, making it inexpensive and easy to handle.

さらに万が−、トランク内で事故が生じても1作業員が
ただちに逃げることがで着るものである。
Furthermore, in the unlikely event that an accident occurs in the trunk, one worker will be able to escape immediately.

【図面の簡単な説明】[Brief explanation of the drawing]

gil囚〜鴫5ailは本発明の一実施例を示し、第1
図は画浮体を互いに引き寄せている状態の一路平繭図、
第意図は同状總の概略at向図、第8図は両浮体接当状
雇の概略平向図、tB4図は水平トランク取付は拭總の
概・略正函図、f4h図は重置トランク取付は吠−のI
Ia#j&正面図、ル6融は要部の縦断両図、第7図は
wi6図の■−■矢視図、第8図は錫@図の璽−1矢a
!図、鴫9図は第6凶の腹−鳳矢視図である。m1mは
本発明の他の実施例を示す概IIl傭面−である。 (1)(2)−浮体、(5)−・接当部、轡〜−一・ボ
イドスペース、−〜−−ウェル%−−−水平トランク、
両−切欠口−maw−ソフト/櫂ツキン、−−に)・・
・Iλ−ドパフキン、匈−d@−−・ウィンチ、−一ボ
ルト代理人 森本義弘 第1図 第21図。 θt←lθ −、第3図 第4図
gil prison ~ 紫5ail shows one embodiment of the present invention, and the first
The figure is a drawing of a cocoon drawn by Ichirohira, in which the floating bodies are drawn together.
The 1st intention is a schematic AT view of the same structure, 8th figure is a schematic plan view of both floating bodies, tB4 figure is a schematic and approximate normal box view of the horizontal trunk installation, and F4H figure is a superposition. Trunk installation is done by Ho-no I
Ia #j & front view, 6th fused is both longitudinal cross-sectional view of the main part, Figure 7 is the ■-■ arrow view of wi6 figure, Figure 8 is the tin @ figure -1 arrow a
! Figure 9 is a belly-to-arrow view of the 6th sword. m1m is a general surface showing another embodiment of the present invention. (1)(2)-Floating body, (5)--Contact part, 轡〜-1-Void space, ---Well%---Horizontal trunk,
Both notches - maw - soft/paddle, --)...
・Iλ-Dopavkin, 匈-d@--・Winch, -One Volt Agent Yoshihiro Morimoto Figure 1 Figure 21. θt←lθ −, Fig. 3, Fig. 4

Claims (1)

【特許請求の範囲】[Claims] L 互いに接合すべき複数の浮体の響当箇所に適当数の
つニルを形成し、上記各浮体を水面上に浮かばせ、各浮
体を相対的に引き寄せて接当部せ、各浮体の接当部の下
′1IiiK接当部対向面が開放された水平トランクを
接当させると共に該・水平トランクの一端をウェルに対
向させかつ水平トランクの一端をウェルに対向させるか
または浮体の一方に位置させ、ウェルを過って水平トラ
ンクの一端に接当部対向面が開放8れた一方の垂直トラ
ンクを連結すると共にこの一方の垂直トランクを浮体に
接当させ、ウェルを瀘ってまたは浮体外板に沿わせて上
記水平トランクの他端に接当部対向面が開放された他方
の!直トランクを連結すると共にこの他方の垂直トラン
クな浮体に接当させ1両垂直トランク内および水平トラ
ンク円の水を排出し、その−垂直トランク内および水平
トランク内から両浮体の接当部を接合することを特徴と
する大型浮体構造物のJIl造°方法、      。
L Form an appropriate number of bridges at the contact points of multiple floating bodies to be joined to each other, float each of the floating bodies above the water surface, pull each floating body relatively to the contact part, and connect each floating body to each other. The lower part'1IiiiK of the abutting part is brought into contact with the open horizontal trunk, and one end of the horizontal trunk is made to face the well, and one end of the horizontal trunk is made to face the well or is located on one side of the floating body. , connect one vertical trunk with an open surface facing the contact part to one end of the horizontal trunk past the well, and bring this one vertical trunk into contact with the floating body, filtering the well or attaching the floating body outer plate. The other end of the horizontal trunk has an open surface facing the abutment part along with the other end of the horizontal trunk. Connect the direct trunks and bring them into contact with the other vertical trunk floating body, drain the water in the vertical trunk of both cars and the horizontal trunk circle, and connect the abutting parts of both floating bodies from inside the vertical trunk and horizontal trunk. A JIl construction method for a large floating structure, characterized by:
JP56146840A 1981-09-16 1981-09-16 Method of constructing heavy floating structure Granted JPS5847691A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP56146840A JPS5847691A (en) 1981-09-16 1981-09-16 Method of constructing heavy floating structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP56146840A JPS5847691A (en) 1981-09-16 1981-09-16 Method of constructing heavy floating structure

Publications (2)

Publication Number Publication Date
JPS5847691A true JPS5847691A (en) 1983-03-19
JPS6148469B2 JPS6148469B2 (en) 1986-10-24

Family

ID=15416714

Family Applications (1)

Application Number Title Priority Date Filing Date
JP56146840A Granted JPS5847691A (en) 1981-09-16 1981-09-16 Method of constructing heavy floating structure

Country Status (1)

Country Link
JP (1) JPS5847691A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140088724A (en) * 2013-01-03 2014-07-11 대우조선해양 주식회사 Level check system for floating marine structure
KR20140089637A (en) * 2013-01-03 2014-07-16 대우조선해양 주식회사 Joint setting apparatus for floating marine structure
KR20140089636A (en) * 2013-01-03 2014-07-16 대우조선해양 주식회사 Transverse connection method for floating marine structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140088724A (en) * 2013-01-03 2014-07-11 대우조선해양 주식회사 Level check system for floating marine structure
KR20140089637A (en) * 2013-01-03 2014-07-16 대우조선해양 주식회사 Joint setting apparatus for floating marine structure
KR20140089636A (en) * 2013-01-03 2014-07-16 대우조선해양 주식회사 Transverse connection method for floating marine structure

Also Published As

Publication number Publication date
JPS6148469B2 (en) 1986-10-24

Similar Documents

Publication Publication Date Title
CN107524174B (en) Continuous wall I-shaped steel joint with water swelling water stop strip
CN110761322A (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN209837324U (en) Tooth-groove type waterproof connecting structure for prefabricated wallboard of prefabricated building by vertical joint grouting method
JPS5847691A (en) Method of constructing heavy floating structure
CN217998618U (en) Novel slurry leakage prevention superposed secondary beam suitable for assembly type frame concrete building
CN107675606A (en) A kind of simple plastic cement rescue pontoon bridge
EP0218702A1 (en) Improvements relating to construction of submerged roadways and other structures
CN112982476B (en) Method for quickly building underwater shallow-buried open-cut large channel without dry dock
CN215253033U (en) Stagnant water subassembly and have subsiding crack of this stagnant water subassembly
CN212896179U (en) Drainage stopping structure for transverse joint between adjacent seepage-proof panels on near-water surface of concrete gravity dam
RU2388647C2 (en) Floating structure consisting of several assembled floating elements and method to assemble said structure
JP2008018933A (en) Pontoon construction method
CN210658405U (en) Wall-separated drainage structure
JP2817466B2 (en) Work box
CN107859076B (en) Flexible waterproof device for joint of anchor rod and bottom plate and construction method thereof
CN214659211U (en) Seepage-proofing structure of reinforced concrete square pool
JP4158298B2 (en) Water stop panel method for the final joint of the submerged box
CN215483095U (en) Underground combined structure
CN211285857U (en) Prefabricated plate combines assembled support frame to seal heavy van-type bathroom structure
CN212223928U (en) Cabin sealing bottom plate structure for floating transportation of open caisson
CN220889010U (en) Post-cast strip concrete cover plate
CN211420752U (en) Road prefabricated slab
CN213805510U (en) Anti structure of floating that underground continuous wall and roof combine
CN217567567U (en) Partition plate structure and sedimentation and cleaning superposed pool comprising same
CN202644548U (en) Double-wall bulkhead type cofferdam