JPS5844125A - Construction work of pile - Google Patents

Construction work of pile

Info

Publication number
JPS5844125A
JPS5844125A JP14054681A JP14054681A JPS5844125A JP S5844125 A JPS5844125 A JP S5844125A JP 14054681 A JP14054681 A JP 14054681A JP 14054681 A JP14054681 A JP 14054681A JP S5844125 A JPS5844125 A JP S5844125A
Authority
JP
Japan
Prior art keywords
pile
spacer
hammer
piles
upper pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP14054681A
Other languages
Japanese (ja)
Inventor
Seiji Saito
斉藤 征次
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeta Concrete Industry Ltd
Original Assignee
Maeta Concrete Industry Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeta Concrete Industry Ltd filed Critical Maeta Concrete Industry Ltd
Priority to JP14054681A priority Critical patent/JPS5844125A/en
Publication of JPS5844125A publication Critical patent/JPS5844125A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To absorb striking sound as well as make the confirmation of bearing force easier by giving an impaction to a spacer for upper and lower piles by a hammer provided inside the upper pile whose top is covered with a sound-proof cover. CONSTITUTION:A pit 1 is excavated in such a way that the depth H of the pit is slightly shorter than the length L of a pile to be erected. Cement milk 2 is injected into the pit 1, a lower pile 3 is inserted into the pit 1, the lower face of a spacer 4 is welded to the tip of the lower pile 1, the upside of the spacer 4 is welded to the tip of the upper pile 5, and these piles are penetrated into the pile 1. Then, a hammer 6 is hung down into the hollow of the upper pile 5 by a wire 7 and an impaction is given to the upside of spacer 4 by the hammer 6 to penetrate the tip of the lower pile 3 into the ground. The striking sound of the hammer 6 is absorbed by the upper pile 5 and the sound-proof cover 8. The bearing force of the piles is confirmed by measuring the penetration amount of the piles by giving an impaction to the spacer 4 by the hammer 6 after the cement milk hardened.

Description

【発明の詳細な説明】 本発明は騒音・振動の発生を抑えた杭の嬬込み工法に関
する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a pile insertion method that suppresses the generation of noise and vibration.

従来、この樵の工法に框オーガーマシンにより削孔を掘
削し、この削孔内にセメントバルクを注入した後、杭を
挿入し史に圧入するものかめるが、この場会、杭の支持
刃11t確−するため、−荷試験が必要でるり、仁の試
験は油圧等により杭の線部に載荷Xk与えることにより
行うのでろるが、非常に萬価でるる(例えば、500ト
ンの油圧を用いる礪酋框約i、ooo万円の経費が必要
でるる。)という欠点がめった。
Traditionally, this woodcutter construction method involved drilling a hole with a stile auger machine, injecting cement bulk into the hole, and then inserting and press-fitting the pile into the hole. In order to confirm this, a load test is necessary.The test for strength is carried out by applying a load of Xk to the line part of the pile using hydraulic pressure, etc., but it is very expensive (for example, when applying 500 tons of hydraulic pressure) The shortcoming was that it required an expense of approximately 10,000,000 yen.

1だ、セメントバルク等を注入した掘削孔内に杭を挿入
し、杭の踵部にハンマーによる打−を与え、杭の先熾部
のみt支持基盤に買入させるもの%るるか、この場曾、
瀘鯖のハンマーによる打一時の打−音がかなり大きくな
つ1し筐う欠点がめった6 本発明ば、上記に鑑み、載荷試験を行う必要がなく、従
91大幅な経費の削減を図ることができ、しかも騒音・
振動を惚力抑えたtのt提供せんとしてなされたもので
め9、そのI!旨は削孔tこれに仲人する杭の長さより
やや浅めに掘削し、該削孔内にセメントばルクを注入し
た後、上杭と上杭tスペーサ塾介し1連鮎し1挿入し、
上杭の内部において該スペーサに打mt与えることによ
り上杭先趨を地盤に貫入させるようにしたこと【特徴と
する杭の嬉込み工法にりる〇 以下、図示の夫り例に蕪づい1、不発#Uts細に説明
すると、第1図は、h工職序tボす似要図で、先ず、同
図(IL)で示すようにオーガーマシン(図示せず)の
スクリューへの先端を机上に正確にm”を込み、掘削を
開始し、ntl孔lの閑さH=iここに建1込む杭の長
さしよりやや浅めに達するまで掘進する0 そし1、スクリューAの先端よりセメントミルク21i
約2〜3m注入し、次にスクリューAt逆回転させなが
ら引揚げる。
1. Insert the pile into the excavated hole into which cement bulk, etc. has been injected, hammer the heel of the pile, and force only the leading part of the pile into the support base. Great,
In view of the above, with the present invention, there is no need to conduct a loading test, and it is possible to significantly reduce costs. possible, and with less noise
This was done in order to provide a product that suppresses vibrations. The purpose is to drill a hole slightly shallower than the length of the intermediary pile, and after injecting cement bulk into the hole, insert one continuous hole through the upper pile and the upper pile spacer,
By driving mt into the spacer inside the upper pile, the leading edge of the upper pile penetrates into the ground. To explain in detail, Figure 1 is a diagram similar to the construction order. First, as shown in the same figure (IL), the tip of the auger machine (not shown) to the screw is Insert m" accurately on the desk, start drilling, and drill until it reaches a depth slightly shallower than the length of the pile to be erected here. cement milk 21i
Inject about 2 to 3 m and then pull up while rotating the screw At in the opposite direction.

次に上杭3を吊り上げ1削孔l内に挿入し、この頭部に
スペーサ4に#l接により接合する。
Next, the upper pile 3 is lifted up and inserted into the drilled hole 1, and the head of the upper pile 3 is joined to the spacer 4 by #l contact.

このスペーサ4は、第2図で示すように円筒管4a内に
放射状のりププレー) 41) 、 4b・・働を配設
して補強し、円筒管4aの土面にはjf4Ckllil
付けて閉塞させることにより、後述のように、これにハ
ン−#−6による打−を与えた際、この打−力が一面に
拡がるようになされている。
This spacer 4 is reinforced by arranging radial glue plates (41), 4b, etc. in the cylindrical pipe 4a as shown in Fig.
By attaching and closing the hole, as will be described later, when a blow is applied to this by hand #6, the force of the blow is spread over the entire surface.

そして、上杭5を吊り上げこの先端と上記スペーサ4の
上面とrlll!接により襞脅し、下VT、3と上杭5
とrスペーサ4に介して連結して削孔1内に仲人し、杭
の建込みに行うのでりるが、この時第1図に)で示すよ
うに削孔1の深さHに杭の長さし、すなわち上杭3、ス
ペーサ4及び上杭5の長さの和よりも浅いため、上杭5
の一部は地上に露出し、また削孔1円に圧入したセメン
トミルク2は杭の0真により上方に押され、削孔1の掘
削面と上杭3、スペーサ4及び上杭5の外周面との間に
充満することになる。
Then, lift up the upper stake 5 and connect this tip to the upper surface of the spacer 4! Threatening folds by contact, lower VT, 3 and upper pile 5
The piles are connected to each other through the spacer 4 and installed in the drilled hole 1, and the pile is erected.At this time, as shown in Fig. Because the length is shallower than the sum of the lengths of the upper pile 3, spacer 4, and upper pile 5, the upper pile 5
A part of it is exposed above the ground, and the cement milk 2 that has been press-fitted into the drilled hole is pushed upward by the zero thread of the pile, and the cement milk 2 is pushed upward by the zero thread of the pile, and is exposed to the excavated surface of the drilled hole 1 and the outer periphery of the upper pile 3, spacer 4, and upper pile 5. It will fill up between the surface and the surface.

次に、上杭5の中空孔5a内によ−をワイヤー7で吊し
てハンマー6を挿入し、スペーサ4の土面にこのハンマ
ー6にょる打l11t−与えて上杭3の先41i−地盤
に買入させ、上杭5のよi!m#it地表面と同一半面
となるようにするのでめるが、この時、ハンマー6によ
る打−は上杭5内で行われるため、ここで発生する打−
曽は上杭5に吸収されるばかりでなく、上杭5に沿つ1
土万に同は伝達されるので、4万に拡がることが阻害さ
れ、外部におい又は非常に小さくなり、また、振動も、
七の伝播面積が上杭3の元端の買入部のみとなるため狭
く、かつ発生位置が医(なるため、非常に少なくなる0 なお、第1図(ホ)で示すように、上杭5の頭部にVj
fカバー8t−鉄層すれば打−會r史に小さくすること
ができる。
Next, the hollow hole 5a of the upper pile 5 is suspended with a wire 7, a hammer 6 is inserted, and the hammer 6 is applied to the soil surface of the spacer 4 to give a hammering l11t- to the tip 41i- of the upper pile 3. Buy it into the ground and put it on top pile 5! This is done so that it is on the same level as the ground surface, but at this time, the hammer 6 is hammered inside the upper pile 5, so the hammer that occurs here.
Zeng is not only absorbed by the upper stake 5, but also 1 along the upper stake 5.
Since the same is transmitted to the earth, it is prevented from spreading to the earth, and the vibration becomes very small.
Since the area of propagation is limited to the purchase part at the base end of the upper pile 3, it is narrow, and the location of occurrence is very small, so it is very small. Vj on the head of 5
If the f cover has an 8t iron layer, it can be made smaller in size.

そし1、杭の支持力の確認は、セメントミルクが固まっ
た恢、上記とtir+様に上杭5の中!孔りa内にハン
マー6t−挿入し、このノ〜ンマー6でスペーサ4に数
打−を与え買入盪を測定し、動力学的支持力公式に1.
すなわち従来の打−工法と同様にし1行うのでめる0 1だ、オーガマシン電流計、スクリューへの先gs酩に
残る土質並びに破終打止時の一打によりて41支持力の
−agt−行うこともできる。
1. To check the support capacity of the pile, check that the cement milk has hardened, and as above and tir+, it is inside the upper pile 5! Insert the hammer 6t into the hole a, give several blows to the spacer 4 with the hammer 6, measure the force, and use the dynamic support force formula as 1.
In other words, it is done in the same way as the conventional hammering method, and the auger machine ammeter, the soil remaining at the tip of the screw, and the one stroke at the end of the screw give a bearing capacity of 41. You can also do it.

本発明は、上記のように削孔1tこれに仲人する杭の長
さLjりやや浅めに掘削し、この削孔1円にセメントミ
ルクを注入した後、上@3と上杭5tスペーサ4倉介し
1連結し1神人し、上杭5の内部におい1スベーt4に
ff1lt4.することにより上杭3の先121It−
地盤に買入させるようにしたので、以下の様な幼米がゐ
る〇■Nkfは小さく、また打−は上杭5の内部で村わ
れるため、この時の打mf%小さくなり、振動の発生も
少ない。
In the present invention, as described above, a 1 ton hole is drilled to a slightly shallower depth than the length Lj of the pile to be intermediary, and after pouring cement milk into this 1 yen hole, the upper @ 3 and upper pile 5 t spacers are drilled into 4 holes. Connect 1 through 1, connect 1 god, and connect 1 subt4 to ff1lt4 inside the upper stake 5. By doing this, the tip of the upper pile 3 121It-
Since the rice is purchased into the ground, the following young rice is produced.〇■Nkf is small, and since the driving is done inside the upper pile 5, the driving mf% at this time is small, which causes vibration. There are also few.

■杭の支持力に従来の打−工法と同等の支持力が得られ
る0 ■削孔1内に杭を吊り込むので、杭は泰直に施工するこ
とができ、セメントシルク硬化恢は杭が傾斜することd
ない。
■The bearing capacity of the piles is equivalent to that of the conventional driving method.■Since the piles are suspended in the drilled hole 1, the piles can be installed steadily. to tilt d
do not have.

■支持力の確認が4易で、高価な載荷試験を行う必要が
ない。
■Confirming the bearing capacity is easy and there is no need to conduct expensive loading tests.

【図面の簡単な説明】[Brief explanation of the drawing]

図面に本発明0一実施例を示し、第1図に厖工順序を示
す概略図、第2図にスペーサを示す分w4斜視図でりる
O 1・・・削孔、 2・・・セメントミルク、 311・・上杭、 4・・・スペーサ、 4a・・・円筒賃、 4b  ・  −・  リ プ、 4C・・・蓋、 5・拳・上杭、 6・1ハンマゝ、 8−  ・  ・ 防 tl カ ノ’%    a第
1 (、() 囚 λ)          (ニ) 第1図 (ホ)         (へ) 第2図
The drawings show an embodiment of the present invention, FIG. 1 is a schematic diagram showing the drilling order, and FIG. 2 is a perspective view showing the spacer. 1...Drilling, 2...Cement Milk, 311...Top stake, 4...Spacer, 4a...Cylinder part, 4b・-・Rip, 4C...Lid, 5・Fist・Upper stake, 6・1 Hammer, 8-・・Defense tl Kano'% a1st (, () Prison λ) (d) Fig. 1 (e) (e) Fig. 2

Claims (3)

【特許請求の範囲】[Claims] (1)削孔1ctLvc挿入する杭の長さよりやや浅め
に掘削し、&[#d孔内にセメントミルクを注入した後
、上杭と上杭【スペーサを介し1述鮎し1伸入し、上杭
の内部におi1級スペーサに打mt−与えることにより
下杭先4に一地盤に買入させるようにしたことに特徴と
する杭の蝿込み工法0
(1) Drill a hole 1 ctLvc slightly shallower than the length of the pile to be inserted, and after injecting cement milk into the hole, insert the upper pile and the upper pile through a spacer, Pile fly penetration construction method 0 characterized in that the lower pile point 4 is forced into the ground by driving an I1 class spacer inside the upper pile.
(2)  上杭の線部に防tカバーを鉄層したことt待
機とする籍ffIt#氷の範囲第1項記載の杭の嵯込み
工法。
(2) The method of embedding piles as described in paragraph 1 above, where an iron layer of anti-t cover is placed on the line of the upper pile.
(3)  円筒管内にリプを配設すると共に、該円藺管
上端にI11′tl:取付け1スペーサを構成した仁と
′gt特値とする特ff縛求の範囲第1項又は第2項記
載の杭の−込み工法。
(3) In addition to arranging the lip in the cylindrical tube, the upper end of the circular tube is attached with the spacer forming the I11'tl: 1 spacer and the range of the special ff restriction specified in item 1 or 2 as the special value. The pile insertion method described.
JP14054681A 1981-09-07 1981-09-07 Construction work of pile Pending JPS5844125A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14054681A JPS5844125A (en) 1981-09-07 1981-09-07 Construction work of pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14054681A JPS5844125A (en) 1981-09-07 1981-09-07 Construction work of pile

Publications (1)

Publication Number Publication Date
JPS5844125A true JPS5844125A (en) 1983-03-15

Family

ID=15271184

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14054681A Pending JPS5844125A (en) 1981-09-07 1981-09-07 Construction work of pile

Country Status (1)

Country Link
JP (1) JPS5844125A (en)

Similar Documents

Publication Publication Date Title
Whitaker The design of piled foundations: structures and solid body mechanics
US6942429B1 (en) Post-stressed pile
JPH1171752A (en) Casing of improved micropile and construction method thereof
JPH11107273A (en) Construction method of cast-in-place pile
Singh et al. A laboratory study of efficiency of sand drains in relation to methods of installation and spacing
JPS5844125A (en) Construction work of pile
GB1603637A (en) Supporting building structures
US3423944A (en) Method for forming end bearing concrete piles
JPH07317052A (en) Method of dynamic injection construction for foundation improvement
KR101072215B1 (en) pile constructing method for reinforcing ends and the pile constructed by this
JPH10121489A (en) Building structure utilizing pile as pillar
Mallard et al. The behaviour of piles in Upper Chalk at Littlebrook D power station
JPH10140583A (en) Aseismatic reinforcing method of existing structure foundation by micropile
JPS6044450B2 (en) Deep compaction method
SU1548340A1 (en) Method of installing anchor inventory pile
US3395543A (en) Method for driving thin wall pipe piles
JPH0328416A (en) Construction method to build up pile
JPS6299510A (en) Construction of in-situ pile
JP3834575B2 (en) Steel pipe pile driving method
JP2729237B2 (en) Ground compaction method
JPS6351518A (en) Construction of foundation pile
JPH1193161A (en) C-shaped pile and its driving method
Brusey Post-Grouted Test Shafts at JFK International Airport
JPS6319325A (en) Pile construction in soft ground and parts therefor
Ervin et al. Deep footing solution for Eureka Tower Project, Melbourne, Australia