JPS5841106A - Moving of platform for truss bridge inspecting work - Google Patents

Moving of platform for truss bridge inspecting work

Info

Publication number
JPS5841106A
JPS5841106A JP13978081A JP13978081A JPS5841106A JP S5841106 A JPS5841106 A JP S5841106A JP 13978081 A JP13978081 A JP 13978081A JP 13978081 A JP13978081 A JP 13978081A JP S5841106 A JPS5841106 A JP S5841106A
Authority
JP
Japan
Prior art keywords
work
hoisting
frame
rope
gantry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13978081A
Other languages
Japanese (ja)
Inventor
三輪 了
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Miike Machinery Co Ltd
Mitsui Miike Engineering Corp
Original Assignee
Mitsui Miike Machinery Co Ltd
Mitsui Miike Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Miike Machinery Co Ltd, Mitsui Miike Engineering Corp filed Critical Mitsui Miike Machinery Co Ltd
Priority to JP13978081A priority Critical patent/JPS5841106A/en
Publication of JPS5841106A publication Critical patent/JPS5841106A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 この発明は、トラス橋の点検や塗装その他の作業を行な
う場合建、資材や器具等の置場1作業区間内の通行路等
として使用する架台を、一方の作業区間から隣接する他
方の作業区間に移設する方法に関するものである。
[Detailed Description of the Invention] This invention provides a storage area for materials, equipment, etc. when performing inspection, painting, or other work on a truss bridge. This relates to a method of relocating to another adjacent work section.

大スノゼンのトラス橋の点検や塗装等の作業は5〜10
年ごとに行なう必要があり、この点検や塗装等の作業の
ためにトラス橋の床版の下部に作業用歩道を設けること
があるが、その作業用歩道を使用して点検や塗装等の作
業を行なうことができる範囲は極く一部である。またト
ラス構造の橋梁は、その形状が複雑で、あるので、トラ
ス内部の点検や塗装等の作業を行なうため・の足場とし
ては適当々ものがなく、トラス橋全長にわたって固定足
場を組立てると、美大な費用がががシ、しかもその組立
および撤去にも相当長い時間がかかるので能率的でない
Work such as inspection and painting of the truss bridge in Daisnozen takes place from 5 to 10 days.
This work must be carried out every year, and a work walkway may be provided at the bottom of the truss bridge deck for this inspection and painting work. This can only be done in a limited area. In addition, since truss structure bridges have complex shapes, there is no suitable scaffolding for inspecting the inside of the truss, painting, etc., and if fixed scaffolding is assembled along the entire length of the truss bridge, it will be beautiful It is inefficient because it costs a lot of money and also takes a considerable amount of time to assemble and dismantle.

この対策として、トラス橋におけるトラス組内の作業区
間において、桁に走行自在に架設された移動装置から巻
上様によシ昇降移動される足場を吊下げ、かつ前記移動
装置により足場を作業区間内において橋長手方向および
橋巾方向に移動して作業区間内の点検や塗装その他の作
業を行なうことが考えられ、またこの場合、資材や器具
等の置場1作業区間内の通行路等として使用する架台を
、作業区間の前後の縦補フレームにわたって架設する必
要がある。
As a countermeasure for this, in the working section of the truss assembly of a truss bridge, the scaffold that is moved up and down in a hoisting manner is suspended from a moving device that is movably installed on the girder, and the scaffold is moved by the moving device into the working section. It is conceivable that the bridge may be moved in the longitudinal direction and width direction of the bridge to perform inspections, painting, and other work within the work section, and in this case, it is also used as a storage area for materials and equipment, etc. as a passageway within the work section. It is necessary to erect a frame that spans the vertical support frames before and after the work section.

1つの作業区間における塗装を行なうには約7〜10日
間の工期を必要とし、また1つの作業区間における塗装
その他の作業を終了したのちは、架台等を他の作業区間
に移設して反復使用しないと不経済であるが、如何なる
手段によって移設するかが問題となる。
It takes about 7 to 10 days to paint in one work area, and after finishing painting and other work in one work area, the frame etc. can be moved to another work area and used repeatedly. Otherwise, it would be uneconomical, but the question is how to relocate it.

この発明は前述の問題を有利に解決したトラス橋点検作
業用架台の移設方法を提供することを目的とするもので
ある。
An object of the present invention is to provide a method for relocating a frame for truss bridge inspection work that advantageously solves the above-mentioned problems.

次にこの発明を図示の例によって詳細に説明する。Next, the present invention will be explained in detail using illustrated examples.

一般のトラス橋の場合は、床版の下部において橋長手方
向すなわち前値方向に延長する断面工:形の複数の鋼製
桁が配置され、1かつ多数の縦補剛フレーム5が前後方
向に間隔をおい7て配置されている。
In the case of a general truss bridge, a plurality of cross-sectional steel girders extending in the longitudinal direction of the bridge, that is, in the longitudinal direction, are arranged at the bottom of the deck, and one and many longitudinal stiffening frames 5 are arranged in the longitudinal direction. They are arranged at intervals of 7.

この発明の実施例においては、前記各縦補剛フレーム5
により区画された作業区間の上部に、それぞれ橋巾方向
すなわち左右方向に延長する鋼製・可動レール13が配
置され、その可動レール16の上部には複数のトロリ1
4が左右方向に間隔をおいて配置され、そのトロリ14
のフレーム15は可動レール13に固定され、かつトロ
リ14の車輪16は前記桁2の下部7ランジ17に載置
され、前記フレーム15には車輪16を駆動する減速機
および電磁ブレーキ付き電動機からなる走行用駆動装置
18が着脱自在に固定されている。
In the embodiment of this invention, each of the vertical stiffening frames 5
At the top of the work section divided by
4 are arranged at intervals in the left and right direction, and the trolleys 14
The frame 15 of the trolley 14 is fixed to the movable rail 13, and the wheels 16 of the trolley 14 are placed on the lower 7 flange 17 of the girder 2, and the frame 15 includes a reducer and an electric motor with an electromagnetic brake for driving the wheels 16. A traveling drive device 18 is removably fixed.

可動フレーム19の上部において前後および左右方向に
間隔をおいて取付けられている4個の車輪20は可動レ
ール13の下部フランジ21に載置され、可動フレーム
19の移動方向の両側には、可動レール13の下面に対
向する下部ガイドローラ22が取付けられ、かつ可動フ
レーム19の中央部に垂直な支軸26の上部が嵌挿され
てキー24によシ固定され、前記支軸26の中間部には
横方向に延長する支持ビーム25の中央部が水平旋回自
在に嵌合され、さらに前記支軸26の下部には、ウオー
ム歯車26が回動不能に嵌合されて支軸23の下端部に
螺合したナツト27により固定されている。
Four wheels 20 are mounted on the upper part of the movable frame 19 at intervals in the longitudinal and lateral directions, and are mounted on the lower flange 21 of the movable rail 13. A lower guide roller 22 facing the lower surface of the movable frame 13 is attached, and the upper part of a vertical support shaft 26 is fitted into the center of the movable frame 19 and fixed by a key 24. The center portion of a support beam 25 extending in the lateral direction is fitted so as to be horizontally rotatable, and a worm gear 26 is fitted in a non-rotatable manner to the lower part of the support shaft 26, and the worm gear 26 is fitted to the lower end of the support shaft 23. It is fixed by a screwed nut 27.

可動レール13の一端部に減速機および電磁ブレーキ付
き電動機からなる横行用駆動装置28力;着脱自在に固
定され、その駆動装置28により回転される駆動スプロ
ケット29と可動レール16の他端部に取付けられた従
動スプロケット60とにわたって移動用チェーン31が
巻掛けられ、そのチェーン610両端部は可動フレーム
19に連結されている。
A traverse drive device 28 consisting of a speed reducer and an electric motor with an electromagnetic brake is attached to one end of the movable rail 13; a drive sprocket 29 is detachably fixed and rotated by the drive device 28 and is attached to the other end of the movable rail 16. A moving chain 31 is wound around the driven sprocket 60 , and both ends of the chain 610 are connected to the movable frame 19 .

支持ビーム25の中央下部に固定されたがツクス32に
よりウオーム66の軸34が軸受を介して回転自在に支
承され、そのウオーム33は前記ウオーム歯車26に噛
み合わされ、かつ前記軸64にはボックス62の外部に
おいて鎖車65が固定され、その鎖車65には無端状の
手動操作用チェーン66が巻掛けられ、前記ウオーム歯
車26およびウオーム36は?ツクス62内に収容され
ている。また前記走行用駆動装置18によ9前後方向に
走行移動される可動レール16と、横行用駆動装置28
により横行移動される可動フレーム19と、手動操作用
チェーン36によシ鎖車35およびウオーム歯車機構を
介して旋回される支持ビーム25とKより移動装置3A
、3Bが構成されている。
A shaft 34 of a worm 66 is rotatably supported via a bearing by a shaft 32 fixed to the lower center of the support beam 25, and the worm 33 is meshed with the worm gear 26, and a box 62 is attached to the shaft 64. A chain wheel 65 is fixed on the outside of the chain wheel 65, and an endless manual operation chain 66 is wound around the chain wheel 65. It is housed in the Tux 62. In addition, the movable rail 16 is moved by the traveling drive device 18 in the front and rear directions, and the traversing drive device 28
The movable frame 19 is moved laterally by the manual operation chain 36, and the support beams 25 and K are rotated by the chain wheel 35 and the worm gear mechanism.
, 3B are configured.

長方形箱形の足場4における長辺の側板37に、その側
板67の両端部から中央側に少し離れた位置において、
2台の巻上様38が固定され、その巻上様68は、基台
39とこれに固定された減速機40と電動機41および
巻胴56とを有し、各巻上様68の巻胴56にはそれぞ
れローf7の中間部が多数回巻付けられ、かつ各ロープ
7の上端部は前記支持ビーム25の両端部に連結され、
さらに各ローグアの垂下端部には重錘42が連結され、
また各ローf7の中間部は、前記基台39の上部に着脱
自在に取付けられた側部滑車45と、足場4の巾方向の
中央に設けられた中央滑車44とに巻掛けられ、その中
央滑車44は足場4に対し逆V字状の連結部材45を介
して取付けられている。
On the side plate 37 of the long side of the rectangular box-shaped scaffold 4, at a position slightly away from both ends of the side plate 67 toward the center,
Two hoisting units 38 are fixed, and each hoisting unit 68 has a base 39, a reducer 40 fixed to this, an electric motor 41, and a winding drum 56. The middle part of the rope f7 is wound a large number of times on each rope, and the upper end of each rope 7 is connected to both ends of the support beam 25,
Furthermore, a weight 42 is connected to the hanging end of each Roguea,
Further, the middle part of each row f7 is wound around a side pulley 45 detachably attached to the upper part of the base 39 and a central pulley 44 provided at the center of the scaffold 4 in the width direction. The pulley 44 is attached to the scaffold 4 via an inverted V-shaped connecting member 45.

連結部材45として曲げ剛性の大きいものを使用し、そ
の連結部材45の下端部を足場4に対し剛性状態で固定
する場合は、支持ビーム25に対する2本のロープ7の
連結点間隔をか中央滑車44の間隔よりも大きく設定し
、また曲げ剛性の小さい連結部材45を使用した′場合
は、支持ビーム25に対する2本のローノアの連結点間
隔を各側部滑車46の間隔よシも大きく設定する。
When using a member with high bending rigidity as the connecting member 45 and fixing the lower end of the connecting member 45 to the scaffold 4 in a rigid state, the distance between the connecting points of the two ropes 7 to the support beam 25 is determined by the central pulley. 44, and if a connecting member 45 with low bending rigidity is used, the distance between the connecting points of the two rowers with respect to the support beam 25 is set to be larger than the distance between each side pulley 46. .

前記走行用駆動装置18および横行用駆動装置28の運
転および停止の制御は、足場4上に設けられた制御装置
(図示を省略した)によりケーブルを介して行なわれる
か、あるいは足場4上で無線による遠隔操作によって行
なわれ、走行用駆動装置18を運転すると可動レール1
3が前後方向に走行し、横行用駆動装置28を運転する
と可動フレーム19が左右方向に走行し、さらにチェー
ン36を引張って鎖車65を回転させると、ウオーム歯
車26に噛み合っているウオーム33が回転されるので
、ウォ7ム66はウオーム歯車26の周シに水平旋回し
、がつウオーム33を支持しているボックス62を固定
した支持ビーム25も水平旋回される。また足場4に固
定されている各巻上機8を同調して巻上または巻下方向
に運転すると、足場4が水平状態を保って上昇または下
降移動される。
The running and stopping of the traveling drive device 18 and the traversing drive device 28 are controlled by a control device (not shown) provided on the scaffold 4 via a cable, or by wireless control on the scaffold 4. When the travel drive device 18 is operated, the movable rail 1
3 travels in the front-rear direction, and when the traverse drive device 28 is operated, the movable frame 19 travels in the left-right direction, and when the chain 36 is further pulled and the chain wheel 65 is rotated, the worm 33 meshing with the worm gear 26 is moved. Since it is rotated, the worm 76 turns horizontally around the worm gear 26, and the support beam 25 to which the box 62 supporting the worm 33 is fixed is also turned horizontally. Furthermore, when the hoisting machines 8 fixed to the scaffolding 4 are operated in the hoisting or hoisting direction in synchronization, the scaffolding 4 is moved upward or downward while maintaining a horizontal state.

隣り合う縦補剛フレーム5にわたって架設される移設用
架台6t/−1、広巾中間部46とその前端部および後
端部に連設された狭巾前部47および狭巾後部48とに
より構成されると共に隣シ合う縦補剛フレーム5の外側
間隔よシも適当長さ例えば約2mだけ長く作られ、かつ
架台6の前後両端部には下向きに突出する外れ止め用ス
トッパ49゜50が固定され、さらに架台乙の周囲には
手摺51が固定され、また狭巾前部49の左右両側には
前部巻上機11が固定され、その前部巻上機11は、基
台52とこれに固定された減速機56と電動機54およ
び巻胴12とを有している。
It is composed of a relocation frame 6t/-1 constructed over adjacent vertical stiffening frames 5, a wide intermediate section 46, and a narrow front section 47 and a narrow rear section 48 connected to the front and rear ends thereof. At the same time, the outer spacing between adjacent vertical stiffening frames 5 is made longer by an appropriate length, for example, about 2 m, and stoppers 49 and 50 are fixed to the front and rear ends of the pedestal 6 to prevent them from coming off and projecting downward. Furthermore, a handrail 51 is fixed around the mount B, and a front hoist 11 is fixed on both left and right sides of the narrow front section 49, and the front hoist 11 is connected to a base 52 and to this. It has a fixed speed reducer 56, an electric motor 54, and a winding drum 12.

架台6の狭巾後部48の左右両側に後部巻上機8が固定
され、その後部巻上機8は、基台57とこれに固定され
た減速機58と電動機59および巻胴9とを有し、また
前記広巾中間部46の前端側の左右両側に前進用滑車5
5が取付けられ、第8図に示すように前部のストツノJ
?49が縦補剛フレーム5の前面に接触または近接して
いるとき。
A rear hoisting machine 8 is fixed to both left and right sides of the narrow rear part 48 of the frame 6, and the rear hoisting machine 8 includes a base 57, a reducer 58 fixed to this, an electric motor 59, and a winding drum 9. Further, forward pulleys 5 are provided on both left and right sides of the front end side of the wide intermediate portion 46.
5 is attached, and the front strut horn J is installed as shown in Figure 8.
? 49 is in contact with or close to the front surface of the vertical stiffening frame 5.

前記広巾中間部46の前端面とこれに対向する縦補剛フ
レーム5の後面との間隔をSとすると、前記巻胴12と
前進用滑車55との間隔は2Sになるように設定される
If the distance between the front end surface of the wide intermediate portion 46 and the rear surface of the vertical stiffening frame 5 opposing thereto is S, then the distance between the winding drum 12 and the advance pulley 55 is set to be 2S.

1つの作業区間の点検その他の作業を行なう場合、その
作業区間の前後両側の縦補剛フレーム5にわたって架台
6が架設され、かつ後部のストッパ50がこれに対向す
る縦補剛フレーム5の後面に接触または近接するように
架台6が前方にずらして配置され、その架台6は資材や
機械器具類の置場および作業区間内の通行路としても利
用される。
When performing inspection or other work on one work section, a pedestal 6 is installed across the vertical stiffening frame 5 on both the front and rear sides of the working section, and a rear stopper 50 is installed on the rear surface of the vertical stiffening frame 5 opposite to this. A pedestal 6 is shifted forward so as to be in contact with or in close proximity to each other, and the pedestal 6 is also used as a storage area for materials and machinery and as a passageway within the work zone.

1つの作業区間におけるトラス組の点検や塗装その他の
作業を終了して、足場4および架台6を隣シの作業区間
に前進移設する場合は、まず第9図に示すように、足場
4を前後方向に延長する向きにして架台6の中央部に下
ろし、かつ移設すべき作業区間すなわち前部の作業区間
1Bに設けられている移動装置3Bの支持ビーム25を
左右方向に延長するように配置した状態で、移動装置6
Bを後端位置付近に配置し、さらにその移動装置3BK
おける支持ビーム25の両端部から垂下している重錘4
2付きのロープ10の中間部を、架台乙の前部の左右両
側に固定されている巻上機11の巻胴12に多数回巻付
ける。
When inspecting the truss assembly, painting, and other work in one work zone and moving the scaffolding 4 and pedestal 6 forward to the adjacent work zone, first move the scaffolding 4 forward and backward as shown in Figure 9. The supporting beam 25 of the moving device 3B provided in the working section to be relocated, that is, the front working section 1B, is arranged so as to extend in the left-right direction. In the state, the mobile device 6
B is placed near the rear end position, and its moving device 3BK
A weight 4 hanging from both ends of the support beam 25
The middle part of the rope 10 with 2 is wound many times around the winding drum 12 of a hoist 11 fixed on both left and right sides of the front part of the gantry B.

また第10図に示すように、点検や塗装その他の作業を
終了した作業区間すなわち後部の作業区間1Aにある移
動装置3Aの支持ビーム2゛5の両端部から垂下してい
るロープ7を巻上機68の巻胴56から外し、かつ移動
装置3Aの支持ビーム25を約90°水平旋回して左右
方向に延長する向きにしたのち、後部の作業区間1Aに
ある移動装置6Aを後端位置付近まで後退移動し、かつ
その移動装置3Aの支持ビーム25の両端部から垂下し
ているロープ7を、架台6の後部の左右両側に固定され
ている巻上機80巻胴9に多数回巻付ける。
In addition, as shown in FIG. 10, the ropes 7 hanging down from both ends of the support beam 25 of the moving device 3A in the rear work zone 1A, where inspection, painting, and other work have been completed, are hoisted up. After removing it from the winding drum 56 of the machine 68 and horizontally turning the support beam 25 of the moving device 3A by about 90 degrees to make it extend horizontally, move the moving device 6A in the rear working section 1A near the rear end position. The rope 7, which is moved backward until the end of the moving device 3A and is hanging down from both ends of the support beam 25 of the moving device 3A, is wrapped many times around the hoisting machine 80 and the winding drum 9 fixed to both left and right sides of the rear part of the gantry 6. .

次に第11図に示すように、各巻上機8.11を巻上方
向に運転して、足場4と共に架台6を吊上げたのち、各
作業区間IA、IBの移動装置3A、3Bを前端位置付
近まで前進移動させ、次いで各巻上機8,11を巻下方
向に運転して、架台6を前部の作業区間1Bの前後両側
の縦補剛フレーム5に下ろす。
Next, as shown in FIG. 11, each hoisting machine 8.11 is operated in the hoisting direction to lift the platform 6 together with the scaffolding 4, and then the moving devices 3A and 3B of each work section IA and IB are moved to the front end position. The hoisting machines 8 and 11 are moved forward to a nearby location, and then the hoisting machines 8 and 11 are operated in the lowering direction to lower the gantry 6 onto the vertical stiffening frames 5 on both front and rear sides of the front work section 1B.

次に第12図に示すように、前部巻上機11のロープ1
0を弛緩して前進用滑車55にも巻掛けたのち、各巻上
機8,11を巻上方向に運転して架台6を吊上げると、
第13図に示すように、架台6が前記間隔Sだけ自動的
に前進移動し、後部のストッパ50がこれに対向す縦補
剛フレーム5の後端面に接触または近接する状態になる
Next, as shown in FIG. 12, the rope 1 of the front hoist 11 is
0 is loosened and wound around the forward pulley 55, and each hoisting machine 8, 11 is operated in the hoisting direction to lift the pedestal 6.
As shown in FIG. 13, the pedestal 6 automatically moves forward by the distance S, and the rear stopper 50 comes into contact with or approaches the rear end surface of the vertical stiffening frame 5 facing it.

次に各巻上機8,11を巻下方向に運転して、第14図
に示すように架台6を前部の作業区間1Bにおける前後
両側の縦補剛フレーム5に下ろしたのち、架台6の後部
の左右両側に取付けられている巻上機8の巻胴9から後
部の作業区間1Aのローグアを外し、かつ前部の作業区
間1Bにある移動装置6Bを足場4の上方まで後退移動
すると共に、その移動装置6Bの支持ビーム25を約9
00水平旋回して前後方向に延長するように配置し、そ
の支持ビーム25の両端部から垂下しているロープ10
の中間部を足場4に固定されている各巻上機38の含胴
56に多数回巻付けたのち、各巻上機38を巻上方向に
運転して足場4を架台6から吊上げる。
Next, each hoisting machine 8, 11 is operated in the lowering direction to lower the gantry 6 onto the vertical stiffening frames 5 on both front and rear sides of the front working section 1B, as shown in FIG. Remove the lower gear in the rear working section 1A from the winding drum 9 of the hoisting machine 8 attached to both left and right sides of the rear, and move the moving device 6B in the front working section 1B backward to above the scaffolding 4. , the support beam 25 of the moving device 6B is about 9
00 The rope 10 is arranged to horizontally rotate and extend in the front-rear direction, and is suspended from both ends of the support beam 25.
After wrapping the middle part of the scaffold 4 many times around the barrel 56 of each hoist 38 fixed to the scaffold 4, each hoist 38 is operated in the hoisting direction to lift the scaffold 4 from the pedestal 6.

作業区間1Bにおけるトラス組の点検や塗装その他の作
業を終了して、足場4および架台を隣シの作業区間1C
に移設する場合は、作業区間I B。
After completing the inspection, painting, and other work on the truss assembly in work zone 1B, the scaffolding 4 and trestle were moved to the adjacent work zone 1C.
If relocating to , work section IB.

1Cに設けられている移動装置3B 、3Cを使用し、
前述の場合と同様の動作順序で移設作業を行なう。以下
同様にして、作業区間の点検や塗装その他の作業と足場
および架台の移動とを必要回数だけ交互に反復して行な
う。
Using the moving devices 3B and 3C provided in 1C,
Perform the relocation work in the same order of operation as in the previous case. Thereafter, in the same manner, inspection of the work zone, painting and other work, and movement of the scaffolding and pedestal are alternately repeated as many times as necessary.

前記実施例においては、支持ビーム25を水平旋回させ
るための旋回駆動装置として、手動操作用チェーン66
により鎖車65を介してウオーム63を回転させる手動
式旋回駆動装置を使用しているが、前記ウオーム63を
減速機付き電動機によ多回転するように構成してもよい
。また前記各作業区間において桁に架設する移動装置と
しては、支持ビーム25を前後および左右方向に移動で
きるものであれば、図示以外の任意構造のものを使用し
てもよい。さらにまた、平面円形または矩形の足場を使
用する場合は、支持ビームの旋回手段を省略し、支持ビ
ームを可動フレームに固定してもよい。
In the embodiment described above, the manual operation chain 66 is used as a swing drive device for horizontally swinging the support beam 25.
Although a manual swing drive device is used in which the worm 63 is rotated via the chain wheel 65, the worm 63 may be rotated multiple times by an electric motor with a speed reducer. Further, as the moving device installed on the girder in each of the work sections, any structure other than that shown in the drawings may be used as long as it can move the support beam 25 in the front-rear and left-right directions. Furthermore, when using a planar circular or rectangular scaffold, the pivoting means for the support beam may be omitted and the support beam may be fixed to the movable frame.

前記実施例のように、支持ビーム25に対す、る2本の
ローグア、10の連結点間隔を、各中央滑車440間隔
または各側部滑車43の間隔よシも大きく設定しておけ
ば、足場長手方向の足場4の揺れを少なくすることがで
きる。また巻上機38を足場の端部から成る距離だけ中
央寄シの位置に取付けておけば、足場4の端部を架台6
の下方に位置させることができるので、縦補剛フレーム
5における架台の下側部分の点検や塗装その他の作業を
も容易に行なうことができる。
As in the above embodiment, if the distance between the connecting points of the two row pulleys 10 to the support beam 25 is set larger than the distance between each central pulley 440 or the distance between each side pulley 43, the scaffolding The shaking of the scaffold 4 in the longitudinal direction can be reduced. In addition, if the hoisting machine 38 is installed at a position near the center by a distance corresponding to the distance from the end of the scaffolding, the end of the scaffolding 4 can be connected to the frame 6.
Since it can be positioned below, the lower part of the pedestal in the vertical stiffening frame 5 can be inspected, painted, and other operations can be easily performed.

前記各巻上機8.11.38としてロープ押えローラを
有するものを使用してもよく、あるいは平行に配置され
た2つの巻胴を有する巻上様を使用し、各巻胴に対しロ
ープの中間部を交互に巻付けてもよい。また重錘42を
省略して、ロープの端部を巻胴に対し着脱自在に固定ま
たは係止してもよい。
Each hoisting machine 8.11.38 may have a rope holding roller, or a hoisting machine having two winding drums arranged in parallel may be used, with each winding drum having an intermediate portion of the rope. may be wound alternately. Alternatively, the weight 42 may be omitted and the end of the rope may be detachably fixed or locked to the winding drum.

前記トロリ14としては、桁2の下部フランジ、17の
側面に対向するサイドローラおよびその下部7ランジ1
7の下面に対向する下部ガイドローラを有するものを使
用するのが好ましい。また前記可動フレーム19に、可
動レール16の下部フランジ210両側面に対向するサ
イドローラを取付けてもよい。
The trolley 14 includes a lower flange of the girder 2, a side roller facing the side surface of the girder 17, and a lower 7 flange 1 of the trolley 14.
It is preferable to use one having a lower guide roller facing the lower surface of 7. Furthermore, side rollers may be attached to the movable frame 19 to face both sides of the lower flange 210 of the movable rail 16.

この発明によれば、トラス橋におけるトラス脂肉の各作
業区間に設けられた移動装置を、トラス橋の桁2を利用
して支持すると共にその桁2をガイドレールとして利用
して橋長手方向に移動することができ、かつ作業区間の
前後両側の縦補剛フレーム5にわたって架設した架台6
を資材や器具類の置場9作業区間内の通行路等として使
用して、前記作業区間の点検、塗装その他の作業を終了
したのちは、その作業を終了した作業区間・に設けられ
ている移動装置から垂下しているロープを、架台6の後
部に取付けられている後部巻上機8の巻胴9に巻付け、
かつ作業を終了、した区間の前方に隣接する作業区間に
設けられている移動装置から垂下しているロープを、架
台乙の前部に取付けられている前部巻上機11の巻胴1
2に巻付け、次いで各巻上機8,11による架台乙の吊
上げと、各移動装置による架台6の前進移送と、各巻上
機8.11による架台の吊下げとを順次行なうことによ
り、架台6を簡単な手段によって各作業区間に順次移設
して反復使用することができ、さらに1つの架台6を多
数の作業区間に兼用できるので経済的である等の効果が
得られる。
According to this invention, the moving device provided in each work section of the truss fat in a truss bridge is supported using the girder 2 of the truss bridge, and the girder 2 is used as a guide rail to move the moving device in the longitudinal direction of the bridge. A frame 6 that is movable and is constructed across the vertical stiffening frame 5 on both front and rear sides of the work section.
After completing inspection, painting, and other work in the work zone by using the storage area for materials and equipment as a passageway within the work zone, move the area provided in the work zone where the work was completed. Wrap the rope hanging from the device around the winding drum 9 of the rear winding machine 8 attached to the rear of the pedestal 6,
And when the work is completed, the rope hanging from the moving device installed in the work section adjacent to the front of the section is transferred to the winding drum 1 of the front hoist 11 attached to the front of the gantry B.
2, and then each hoisting machine 8, 11 lifts the pedestal 6, each moving device moves the pedestal 6 forward, and each hoisting machine 8.11 suspends the pedestal. can be sequentially moved to each work section by simple means and used repeatedly, and one frame 6 can be used for multiple work sections, resulting in economical effects.

【図面の簡単な説明】[Brief explanation of drawings]

図面はこの発明の一実施例を示すものであって、第1図
はトラス橋に移動足場および架台を設置した状態を示す
縦断正面図、第2図はその一部の拡大縦断正面図、第6
図は移動足場および架台設置部の拡大縦断側面図、第4
図は足場移動装置の一部縦断正面図、第5図はその一部
縦断側面図、第6図は足場の吊下部を示す斜視図、第7
図は巻上機を取付けた架台を示す斜視図、第8図は架台
を吊上げにより自動前進させるときの架台前部の巻上機
のロープ巻掛状態を示す斜視図、第9図ないし第14図
は足場および架台の移設順序を示す概略側面図である。 図において、1A〜1Cは作業区間、2は桁、6A〜6
Cは移動装置、4は足場、5は縦補剛フレーム、6は架
台、7はロープ、8は後部巻上機、9は巻胴、10はロ
ープ、11は前部巻上機、12は巻胴、13は鋼製可動
レール、14はトロリ、18は走行用駆動装置、19は
可動フレーム、20は車転、22は下部ガイドレール、
23は支軸、24はキー、25は支持ビーム、26はウ
オーム歯車、28は横行用駆動装置、29は駆動スゲロ
ケット、60は従動スゲロケット、31は移動用チェー
ン、33はウオーム、35は鎖車、66は手動操作用チ
ェーン、68は巻上機、42は重錘、46は側部滑車、
44は中央滑車、49および50は外れ止め用ストッパ
、55は前進用滑車、56は巻胴である。
The drawings show one embodiment of the present invention, in which Fig. 1 is a longitudinal sectional front view showing a state in which a movable scaffold and a frame are installed on a truss bridge, Fig. 2 is an enlarged longitudinal sectional front view of a part thereof, and Fig. 6
The figure is an enlarged longitudinal cross-sectional side view of the movable scaffold and pedestal installation part.
The figure is a partially longitudinal front view of the scaffold moving device, Fig. 5 is a partially longitudinal side view thereof, Fig. 6 is a perspective view showing the suspended part of the scaffold, and Fig. 7
The figure is a perspective view showing the pedestal to which the hoist is attached, FIG. 8 is a perspective view showing the rope winding state of the hoist at the front of the pedestal when the pedestal is automatically advanced by lifting, and FIGS. 9 to 14 The figure is a schematic side view showing the order in which the scaffolding and the pedestal are relocated. In the figure, 1A to 1C are work sections, 2 is a girder, and 6A to 6
C is a moving device, 4 is a scaffold, 5 is a vertical stiffening frame, 6 is a pedestal, 7 is a rope, 8 is a rear hoisting machine, 9 is a winding drum, 10 is a rope, 11 is a front hoisting machine, 12 is a A winding drum, 13 a steel movable rail, 14 a trolley, 18 a traveling drive device, 19 a movable frame, 20 a rolling stock, 22 a lower guide rail,
23 is a support shaft, 24 is a key, 25 is a support beam, 26 is a worm gear, 28 is a traverse drive device, 29 is a driving Sugerocket, 60 is a driven Sugerocket, 31 is a moving chain, 33 is a worm, 35 is a Chain wheel, 66 is a chain for manual operation, 68 is a hoist, 42 is a weight, 46 is a side pulley,
44 is a central pulley, 49 and 50 are stoppers for preventing removal, 55 is a forward pulley, and 56 is a winding drum.

Claims (1)

【特許請求の範囲】[Claims] トラス橋におけるトラス脂肉の1つの作業区間1Aにお
いて桁2に走行自をに架設された移動装置6Aから吊下
げられているロープ7を、その作業区間1Aの前後両側
の縦補剛フレーム5にわたって架設された架台乙の後部
に取付けられている後部巻上機8の巻胴9に巻付け、か
つ前記作業区間1Aの前方に隣接する作業区間1Bにお
いて桁2に走行自在に架設された移動装置6Bから吊下
げられているロープ10を、前記架台乙の前部に取付け
られている前部巻上機11の巻胴12に巻付け、次に各
巻上機8.11を巻上方向に運転して架台6を吊上げた
のち、各移動装置3A 、 3Bを前進走行させて架台
6を前進移送し1次いで各巻上機8,11を巻下方向に
運転して架台6を前部の作業区間1Bの前後両側の縦補
剛フレーム5にわたって載架することを特徴とするトラ
ス橋点検作業用架台の移設方法。
In one working section 1A of the truss fat in a truss bridge, the rope 7 suspended from the moving device 6A installed on the girder 2 is extended across the longitudinal stiffening frame 5 on both front and rear sides of the working section 1A. A moving device is wound around the hoisting drum 9 of the rear hoisting machine 8 attached to the rear of the erected frame B, and is movably installed on the girder 2 in the working section 1B adjacent to the front of the working section 1A. The rope 10 suspended from 6B is wound around the winding drum 12 of the front hoist 11 attached to the front part of the gantry B, and then each hoist 8.11 is operated in the hoisting direction. After hoisting the gantry 6, each of the moving devices 3A and 3B is moved forward to move the gantry 6 forward, and then each hoisting machine 8, 11 is operated in the lowering direction to move the gantry 6 to the front work section. A method for relocating a frame for truss bridge inspection work, which is characterized in that it is mounted across vertical stiffening frames 5 on both the front and rear sides of 1B.
JP13978081A 1981-09-07 1981-09-07 Moving of platform for truss bridge inspecting work Pending JPS5841106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13978081A JPS5841106A (en) 1981-09-07 1981-09-07 Moving of platform for truss bridge inspecting work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13978081A JPS5841106A (en) 1981-09-07 1981-09-07 Moving of platform for truss bridge inspecting work

Publications (1)

Publication Number Publication Date
JPS5841106A true JPS5841106A (en) 1983-03-10

Family

ID=15253242

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13978081A Pending JPS5841106A (en) 1981-09-07 1981-09-07 Moving of platform for truss bridge inspecting work

Country Status (1)

Country Link
JP (1) JPS5841106A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103342318A (en) * 2013-07-19 2013-10-09 株洲时代新材料科技股份有限公司 Lifting device for steel truss inspection trolley working platform and installation method thereof
CN106522111A (en) * 2016-12-30 2017-03-22 中交路桥华南工程有限公司 Auxiliary construction platform for truss girder bridge
CN113668389A (en) * 2021-07-17 2021-11-19 江苏镇江路桥工程有限公司 Self-walking auxiliary construction platform for steel truss girder bridge construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103342318A (en) * 2013-07-19 2013-10-09 株洲时代新材料科技股份有限公司 Lifting device for steel truss inspection trolley working platform and installation method thereof
CN106522111A (en) * 2016-12-30 2017-03-22 中交路桥华南工程有限公司 Auxiliary construction platform for truss girder bridge
CN113668389A (en) * 2021-07-17 2021-11-19 江苏镇江路桥工程有限公司 Self-walking auxiliary construction platform for steel truss girder bridge construction
CN113668389B (en) * 2021-07-17 2023-03-14 江苏镇江路桥工程有限公司 Self-walking auxiliary construction platform for steel truss girder bridge construction

Similar Documents

Publication Publication Date Title
JPH0230851A (en) Device for work at structure's wall surface
JPH09165106A (en) Freight putting in and out device for automatic warehouse
JP7144978B2 (en) Floor slab erection machine
JPH01223204A (en) Bridge girder replacement method and device thereof
CN116788984A (en) Rail mounted container portal crane
JPS5841106A (en) Moving of platform for truss bridge inspecting work
JP5027015B2 (en) Cable conveyor
KR100722652B1 (en) Automatic Painting System for Ship's Outside Hull
JPS5837208A (en) Moving scaffold for truss bridge inspecting work
JP7127993B2 (en) portal crane
JPH07292964A (en) Device for construction work of building wall surface
JP6688760B2 (en) Mechanical parking device replacement method and replacement type mechanical parking device
CN219690327U (en) Bridge side construction equipment platform
JPS5910604A (en) Movable scaffold for truss bridge inspecting work
JPH02182604A (en) Travelling crane for storage and shipping
JPH08215112A (en) Wall surface cleaning device in building
CN221778961U (en) Automatic building system of building machine
KR0139129B1 (en) Lifting device and method in carrage
JP3034465U (en) Simple cargo handling equipment installed on a truck bed
JP2001080869A (en) Crane for maintenance and detection of moving sidewalk
JPH06219248A (en) Vehicle transferring traverser
JPS61145098A (en) Cargo gear in hold
JPS638560Y2 (en)
JPH0363304A (en) Device for installing cable band
JPH0415845B2 (en)