JPS5820866A - Reinforcing wire arranging and connecting method of vertical and horizontal reinforcing wires for wall of construction - Google Patents

Reinforcing wire arranging and connecting method of vertical and horizontal reinforcing wires for wall of construction

Info

Publication number
JPS5820866A
JPS5820866A JP11878881A JP11878881A JPS5820866A JP S5820866 A JPS5820866 A JP S5820866A JP 11878881 A JP11878881 A JP 11878881A JP 11878881 A JP11878881 A JP 11878881A JP S5820866 A JPS5820866 A JP S5820866A
Authority
JP
Japan
Prior art keywords
horizontal
vertical
bars
reinforcing
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11878881A
Other languages
Japanese (ja)
Other versions
JPH0214509B2 (en
Inventor
藤川 泰司
静観 正雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP11878881A priority Critical patent/JPS5820866A/en
Publication of JPS5820866A publication Critical patent/JPS5820866A/en
Publication of JPH0214509B2 publication Critical patent/JPH0214509B2/ja
Granted legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 本発明は、建造物壁体用縦横鉄筋の配筋接続工法に関す
る。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for arranging and connecting vertical and horizontal reinforcing bars for building walls.

鉄筋工事の工期短縮、省力化を図る丸め鉄筋のルファプ
化け、建簗構造物、土木構造物ともに適用範囲が戴大し
、将来は無人化、ロボット化へと擾る領内がある。
The scope of application of rounded reinforcing bars to shorten the construction period and labor-saving of reinforcing steel works is increasing, and the scope of application is expanding to both gable structures and civil engineering structures, and there are areas where automation and robotization will move forward in the future.

とりわけ、ネジフシ鉄筋を使った鉄筋ユニット化は原子
力発電所、LNGタンク1.橋梁等の大形構造物の壁体
として盛んに検討されている。
In particular, reinforcing steel units using threaded reinforcing bars are used in nuclear power plants and LNG tanks. It is being actively studied as a wall for large structures such as bridges.

従来、鉄筋プレファプ化の一環として、縦筋と横筋を個
別にそれぞれユニット化して縦筋と横筋の交叉部はクロ
ス・ジ冒イナーと称されるクリップで固結していえ。
Conventionally, as part of reinforcing reinforcement prefabrication, vertical and horizontal reinforcements were individually formed into units, and the intersections of the vertical and horizontal reinforcements were fixed with clips called cross reinforcements.

この従来例によるとクリップでの固結度合が強すぎるた
めに、継手接続に必要な鉄筋O軸回動〇回転及び軸方向
移動が難しく非常に手間を必要とし、工期の短縮化及び
省力化が差糧期待できないものであった。
According to this conventional example, since the degree of consolidation with the clip is too strong, it is difficult to rotate and move the reinforcing bar O-axis in the axial direction necessary for joint connection, and it requires a lot of effort, making it difficult to shorten the construction period and save labor. It was not something that could be expected to help.

特に、鉄筋としてネジフシ鉄筋を用いる場合。Especially when using threaded reinforcing bars as reinforcing bars.

該ネジ7V鉄筋の継手としてネジカプラーが用いられる
ことから、鉄筋OH2転及び軸方向出入れ害動が不可避
であり、このよりなことか′ら煩雑な手間を要している
のである。
Since a threaded coupler is used as a joint for the threaded 7V reinforcing bar, OH2 rotation of the reinforcing bar and movement in and out of the reinforcing bar in the axial direction are unavoidable, and this requires complicated labor.

本発明は上記実状に鑑み案出されたもので、縦筋と横筋
を交叉配筋して鉄筋ユニツ)を作成し、請鉄筋ユニツ)
を吊上げ建込みするとき、横筋の所■「バラク」を防止
可能でありながら、該横筋の既設横筋との接続継手にさ
いして横筋の回転。
The present invention was devised in view of the above-mentioned situation, and it creates reinforcing bars by intersecting vertical and horizontal reinforcement, and
When hoisting and erecting, it is possible to prevent "bulk" at the horizontal reinforcement, but rotation of the horizontal reinforcement at the connection joint between the horizontal reinforcement and the existing horizontal reinforcement.

出入れを容aK可能として鉄筋ユニット化に伴う利点を
十分に発揮せしめ、工期の大幅な短縮と省力化を図った
ものであり、従って本発明では、多数の縦筋とネジフシ
筋よ)なる多数の横筋とを縦横に交叉配筋し、横筋のネ
ジピッチよ)広い支え部を有する横筋受は具を介して縦
筋に横筋を装着して鉄筋ユニットを作成し、vI鉄筋ユ
ニツFの縦筋を吊込み治具に定着するとともに、その後
、前記吊込み治具を介して鉄筋ユニットを吊上げ運搬し
て所定の位置に建込み1次に、前記鉄筋ユニットの縦筋
を対応する既設縦iのそれぞれに接続し、その後、前記
鉄筋ユニットの横筋を対応すゐ既設横筋のそれぞれにネ
ジカプラーを介して接続することを特徴とするのである
By making it possible to put in and take out the reinforcing bars, the advantages associated with unitization of reinforcing bars can be fully demonstrated, and the construction period can be significantly shortened and labor saved. The horizontal reinforcement with a wide supporting part (the screw pitch of the horizontal reinforcement) is arranged horizontally and vertically, and the horizontal reinforcement is attached to the vertical reinforcement using a tool to create a reinforcing bar unit, and The reinforcing bar unit is fixed to the lifting jig, and then the reinforcing bar unit is hoisted and transported via the hoisting jig and erected at a predetermined position. The horizontal reinforcement of the reinforcing bar unit is then connected to each of the corresponding existing horizontal reinforcement via screw couplers.

以下、図面を参照して本発明の実施例を詳述する。Embodiments of the present invention will be described in detail below with reference to the drawings.

第1図乃至第4図は本発明実施例の工程概要を示し、第
S図は鉄筋ユニットの吊上げ運搬中の正面−例、第6図
は吊込み治具に対する縦筋の定着−例およびwc1図、
*aWJは縦筋と横筋の取合い関係をそれぞれ示してい
るが、まず1本発明にあっては第1図に示す如く地上に
おいて、多数の縦筋(1)と多数の横筋(りを縦横に交
叉配筋して鉄筋ユニット(3)が作成される。
Figures 1 to 4 show a process outline of an embodiment of the present invention, Figure S is a front view of a reinforcing bar unit during lifting and transportation - an example, Figure 6 is an example of fixing vertical bars to a lifting jig, and wc1 figure,
*aWJ indicates the relationship between vertical and horizontal strips, but first of all, in the present invention, as shown in FIG. A reinforcing bar unit (3) is created by cross-arranging the reinforcing bars.

即ち、第1図に示す鉄筋組立台(補止に本実施例ではネ
ジフシ鉄筋で示す縦筋(1)の多数を互いに平行に載置
並列するとともに、ネジフシ鉄筋よ如なる横筋(!)の
多数を互いに平行でかつ前記縦筋(1)K対して直交配
置し、縦筋(1)と横筋(幻の交叉郁を第7図、第8図
で示す横筋受は具(4)を介して連繋するのである。1
゜ 第7図、第8図に示す第1実施例による横筋受は具(4
)は1弾性材からなり主体郁が平面概ねC字形であって
、円形の縦筋嵌合部(S)の−側に差込み片(6)の一
対を縦筋(1)の直径よ)小さな間隔で対設して有し、
各差込み片(6)の延出端は互いに離°反する畜肉に傾
斜拡大して案内部(7)とされている、更に、縦筋嵌合
部(i)の胴何部、具体的には差込み片(・)と対応す
る他側に嵌合部(5)の軸方向と直交して横筋支え部(
8)が連設され、該支え部(8)の巾は横筋(!)のネ
ジピッチよ〕広い巾とされている。なお、−支え部(8
)はその延在端が縦軸(1)の軸方向−側に向って屈折
されて横筋躍り規制部(9)とされ、嵌合部偵)に対し
てリプQOで補強連結されている。更に。
That is, on the reinforcing bar assembly table shown in FIG. are arranged parallel to each other and orthogonal to the longitudinal strip (1) K, and the vertical strip (1) and the horizontal strip (the phantom crossing shown in FIGS. 7 and 8) are arranged through the tool (4). It connects.1
゜The horizontal strip receiver according to the first embodiment shown in Figs. 7 and 8 has a tool (4
) is made of 1 elastic material, the main body is approximately C-shaped in plan, and a pair of insert pieces (6) are inserted on the minus side of the circular vertical reinforcement fitting part (S) with a diameter smaller than that of the vertical reinforcement (1). They are arranged oppositely at intervals,
The extending ends of each insertion piece (6) are enlarged at an angle to the meat that moves away from each other to form a guide part (7). On the other side corresponding to the insertion piece (・), there is a transverse reinforcement support part (
8) are arranged in series, and the width of the supporting portion (8) is wider than the screw pitch of the horizontal strip (!). In addition, - support part (8
) is bent toward the negative side in the axial direction of the vertical axis (1) to form a transverse muscle jump regulating part (9), which is reinforced and connected to the fitting part (2) by a lip QO. Furthermore.

前記差込み片(6)同士は取外し可能なボルトナツト締
着具(ロ)を介して締上げ可能とされ1本実施例では横
筋支え部(8)K横筋(2)を接蟲せしめ該支え部(8
)に形成の引掛部(8A) K横筋仮止め鋼線(至)の
眼鏡部(1−を引掛は該鋼線(2)にて横筋(りを抱込
み更に、嵌合部(i)の外周に沿わせるとともに、鋼線
(2)の他端眼鏡部(12B)を締着具(ロ)K引掛け
ている。
The insertion pieces (6) can be tightened together using removable bolt/nut fasteners (B). 8
) The hook part (8A) formed on the K transverse bar temporarily fixed steel wire (1-) is hooked on the horizontal bar (1-) with the steel wire (2), and then the fitting part (i) is hooked. Along the outer periphery, the other end of the steel wire (2) (12B) is hooked onto the fastener (B) K.

即ち、横筋受は具(4)はその案内部(7)を介して差
込み片(6)の付根部を弾性変形させつつ縦筋(1)忙
套嵌して嵌合部(21)にて縦筋(1)を弾性力で緊締
するとともに、受は具(4)の支えII (8)に横筋
(2)を接轟し、鋼線@で横筋(2)を抱込み、締着具
a珍を締め上は為ことによって縦筋(1)と横筋(2)
を仮止めする。
That is, the horizontal strip receiver (4) elastically deforms the base of the insertion piece (6) through its guide portion (7), while the vertical strip (1) is fitted into the fitting portion (21). While tightening the vertical reinforcement (1) with elastic force, the receiver connects the horizontal reinforcement (2) to the support II (8) of the tool (4), holds the horizontal reinforcement (2) with the steel wire @, and tightens the fastening tool. Tighten the top and make vertical stripes (1) and horizontal stripes (2).
Temporarily fasten.

こO縦筋(1)に対する横筋(2)の仮止めは第5図に
示す如く複数箇所、実施例では鉄筋ユニット(3)の両
側2箇所にて仮止めしている。
The horizontal reinforcements (2) are temporarily secured to the vertical reinforcements (1) at multiple locations as shown in FIG. 5, and in the embodiment, they are temporarily secured at two locations on both sides of the reinforcing bar unit (3).

鉄筋ユニット(3)の縦筋(1)Fiその一端群が吊込
み治具(至)に嵌挿されて本実施例では第6図に示す定
着ナツト鱒で縦筋(1)群が定着される。
One end group of the vertical bars (1) Fi of the reinforcing bar unit (3) is inserted into the lifting jig (to), and in this embodiment, the group of vertical bars (1) is fixed with a fixing nut shown in FIG. Ru.

なお、吊込み治具(至)はH形鋼その他の鋼材から彦)
セの長手方崗両端郁に引掛は用フッタ(2)を有し、こ
のフッタ(2)にワイヤー(2)等を掛架して図示しな
いタレーン尋によゐ吊具(ロ)を介して第5図に示す如
く既設壁体(至)及び先建込み鉄筋ユニツ)(至)の位
置まで吊上げ運搬され為のである。
In addition, the lifting jig (to) is made from H-beam steel and other steel materials)
The hook has a footer (2) on both ends of the longitudinal side of the cage, and a wire (2), etc. is hung from this footer (2) and the crane is attached to the crane (not shown) via a hanging device (b). As shown in Fig. 5, it is lifted up and transported to the position of the existing wall (to) and the previously installed reinforcing bar unit (to).

而して、第5図で示す如く縦筋(1)の下端Ktj★ブ
ラー、本例ではネジカプラー曽を鉄筋組作業時に装着し
ておくとと亀に、横筋(りの一端には同様にネジカプラ
ー(2)を装着している。
As shown in Fig. 5, if the lower end of the vertical reinforcement (1) is fitted with a screw coupler (in this example, a screw coupler) when assembling the reinforcing bars, one end of the horizontal reinforcement (1) is similarly attached. The screw coupler (2) is attached.

第5図に示す如くクレーンによ)吊込み治具(至)を介
して吊上げ運搬するとき、縦筋(1)に横筋(2)が受
は具0)を介して装着されかつ、鋼!I(6)で仮止め
されているので、運搬中、横筋(2)の「アバレ」はな
く鉄筋ユニット(3)は既設壁体(至)及び先建込み鉄
筋ユエツ)(lの所定場所に正確、容易に建込まれ、鉄
骨材よりなる柱四間に納めつつ鉄骨材よりなる乗@に吊
込み治具(至)を仮に架設しこのような意味から吊込み
治具(至)の両端には第5図で示す如く架設切込郁(1
3a)を形成することが望しい。
As shown in Fig. 5, when the crane is used to lift and transport the vertical bars (1) through the lifting jig (2), the horizontal bars (2) are attached to the vertical bars (1) via the receivers (0), and the steel! Since it is temporarily fixed at I (6), the horizontal reinforcement (2) will not be damaged during transportation, and the reinforcing bar unit (3) will be placed in the specified location of the existing wall (toward) and the pre-built reinforcing bar (l). It is accurate and easy to erect, and the hanging jig (to) is temporarily erected on the steel frame while being placed between four pillars made of steel frame materials.For this reason, both ends of the hanging jig (to) As shown in Figure 5, the construction cut-out (1
It is desirable to form 3a).

鉄筋ユニット(3)を前述のように建込んだ後K、鉄筋
ユニット(1)の縦筋(1)を対応すb既設壁体(至)
の縦筋(1)’ K本実施例ではネジカプラー翰により
接続し1次いで、鋼線(2)を切断して横筋(!)を支
え部(8)上で支え九状態で鉄筋ユニット(8)の横筋
(2)を対応する鉄筋ユニット(2)の横筋(2)1に
ネジカプラー(2)を介して接続するのであゐ。
After erecting the reinforcing bar unit (3) as described above, install the vertical reinforcement (1) of the reinforcing bar unit (1) into the corresponding B existing wall (to)
In this example, the vertical reinforcement (1)'K is connected by a screw coupler, and then the steel wire (2) is cut and the horizontal reinforcement (!) is supported on the support part (8). ) is connected to the horizontal reinforcement (2) 1 of the corresponding reinforcing bar unit (2) via a screw coupler (2).

との横筋(2)のネジカプラー(2)忙よる接続にさい
して横筋(りはその軸回りに回転させたり軸方向に出入
れしたヤする必要があるも、各横筋(りは縦筋(1)K
対して2箇所以上の位電で受は具(4)を介して支えら
れており、その支え郁−)は横筋(2)のネジピッチよ
りも広い長さとされて−ることから、ネジカプラーIn
KよるネジII絖において横筋(幻の一転及び出入れは
支障な〈実施できるのである。  ゛第9図、第10図
で示す如く鉄筋ユニット(りを前述要領で纏込み接続し
た後、本例では鉄筋ユニット(3)を壁内外に建込ので
あり、このとき、第10図に示す如くマグネット(ロ)
とウェイト(ロ)をロープ(2)でつなhだバランサー
(財)を鉄筋ユーツ) (1) K装着し、所謂レバー
プロッタを有する筋違いワイヤーを介して鉄筋ユニット
(8)の鉛直度を修正保持せしめ、第9図に示す如く別
の鉄筋ユニット(1)を前述同様K1m込みて幅止め筋
(至)によ)両鉄筋ユニット(3)の鉛直性を保持して
移動式是場(2)等を介して縦筋(1)と横筋(2)を
締付は機−を利用して調定結束するのであり、これによ
ってひとつの壁体の鉄筋工事が完了する。
When connecting the horizontal strip (2) with the threaded coupler (2), it is necessary to rotate the horizontal strip (2) around its axis or move it in and out in the axial direction. 1) K
On the other hand, the receiver is supported by the electric potential at two or more places via the tool (4), and the length of the support member (2) is wider than the screw pitch of the horizontal strip (2), so the threaded coupler In
In the case of screws II with K threads, transverse bars (illusory turning and pulling in and out are not a hindrance, but can be implemented.) As shown in Figures 9 and 10, after connecting the reinforcing bar units (in this example) in the same manner as described above, In this case, the reinforcing bar unit (3) is installed inside and outside the wall, and at this time, the magnet (b) is installed as shown in Figure 10.
Connect the weight (b) with the rope (2) and the balancer (incorporated) with the reinforcing bar (1) Attach the K and correct the verticality of the reinforcing bar unit (8) via a bracing wire with a so-called lever plotter. As shown in Fig. 9, another reinforcing bar unit (1) was inserted into the width stop bar (to) by K1m as described above, and the verticality of both reinforcing bar units (3) was maintained, and the movable bar (2) was moved. ) etc., the vertical reinforcement (1) and the horizontal reinforcement (2) are tightened and tied together using a machine, thereby completing the reinforcing work for one wall.

引 なお1以上の実施例にかやで、吊込み治具(至)はこ、
れを梁材としてその11利用することが可能であり、こ
のときは吊込与治具(2)の両端切込部(15A)を*
@に締結、#1着等して固着すればよい、又、吊込み治
具Qlはこれを仮設用とするときKFi前述の鉄筋工事
中に、定着ナラ)(14を弛め縦筋(1)よ)吊込皐治
具(2)を取外し、クレーン等で運搬することが可能で
ある。
In addition, in one or more embodiments, the hanging jig (to) is here,
It is possible to use this as a beam material, and in this case, cut the notches (15A) at both ends of the hanging jig (2) *
When using the hanging jig Ql for temporary installation, loosen the vertical reinforcement (14) during the above-mentioned reinforcing work. ) It is possible to remove the lifting jig (2) and transport it using a crane, etc.

更に、横筋受は具(4) titこれを鉄筋ユニット(
3)とともにコンクリート壁体に埋設して−よいが、該
受は具(4)を再度使用するには前述の鉄筋工事中にお
いて横筋(り (り’をネジカプラー■で接続して後に
Furthermore, attach the horizontal bar support tool (4) tit to the reinforcing bar unit (
3) can be buried in the concrete wall, but if you want to use the holder (4) again, connect the horizontal reinforcements (ri') with screw couplers during the reinforcing work mentioned above.

仮止め鋼線(至)を切断するか又は締着具Qηを弛めて
横筋(りの抱束を解き受は具(4)を取外せばよく、こ
のように受は具(4)を壁体KIIji設するか再使用
するかは受は真(4)の単価によって左右されるのであ
る。
All you have to do is cut the temporarily fixed steel wire (to) or loosen the fastener Qη to untie the horizontal wire and remove the receiver (4). Whether to install or reuse the wall body depends on the unit price of the holder (4).

、 第11図乃至第1!$図は本発明の他のいくつかの
実施例であり基本工種は先と同じであるも、横筋受は具
(4)の構成が相違する。
, Figure 11 to 1st! Figures 1 and 2 show some other embodiments of the present invention, and although the basic work is the same as the previous one, the structure of the horizontal reinforcement support (4) is different.

第11図、第12図は受は具(4)として嵌合部(5)
を所謂半割要素(SAXSA)の分割型となし、その対
向フランジ(51M5m)を締着具(11ム)で締め上
げ可能としたもめで、縦筋(1)を所謂ねじ締め上げで
゛緊締する点では第7図、@Saの実施例と共通す為。
Figures 11 and 12 show the fitting part (5) as the receiver (4).
is a split type of so-called half-split element (SAXSA), and its opposing flange (51M5m) can be tightened with a fastener (11mm), and the vertical reinforcement (1) is tightened with so-called screw tightening. This is because it is similar to the embodiment shown in Fig. 7, @Sa in that it does so.

又、第15図、第14図の受は具(4)は第11図、第
12図で示しえ受叶具(4)において仮止め用鋼纏鱒を
止着している締結具(11M)を1814図に示す如く
縦筋(1)の径方向に長い長孔(11e) K嵌合せし
め、この締結具(11m)と縦筋(1)との聞に検体■
を打設してII!作用で鋼線(2)を締め上げることk
よって縦筋(1)K対する横筋(2)の受は具(4)を
介してのバラク乃至アバレを防止しえものである。なお
、検体−は縦筋(1) 0軸方向に沿って打込まれ J
lll側筋弧状の讐轟都労ム)を有する金属製、木製等
よ都なる。
In addition, the receiver (4) shown in FIGS. 15 and 14 is the fastener (11M) shown in FIGS. ) into the long hole (11e) K in the radial direction of the vertical strip (1) as shown in Fig. 1814, and insert the sample ■
II! Tighten the steel wire (2) by action k
Therefore, the support of the horizontal stripes (2) relative to the vertical strips (1) K can prevent the tool (4) from coming loose or flattening. In addition, the specimen - is a vertical strip (1) that is driven along the 0-axis direction.
It is suitable for metal, wooden, etc. having side arc-shaped curves.

第15図に承す例は仮止め鋼III(至)の掛架他側を
示し、1本の鋼線からなってか伽、その一端眼鏡都(1
2A)を締着具(11m)K嵌め入れ、横筋(!)を上
部より抱込みて支え部(8)下面に係合させ、更に横筋
(りを上部よ勤抱込みて他端の眼鏡IIK(12B)を
締着具(11m)に嵌め入れたものである。
The example shown in Fig. 15 shows the other side of the temporary fixing steel III (to), and is made of one steel wire.
2A) into the fastener (11m) K, hold the horizontal line (!) from the top and engage the lower surface of the support part (8), then hold the horizontal line (!) from the top and attach the other end of the glasses IIK. (12B) is fitted into the fastener (11m).

なお、以上の実施例において、縦筋(1)はこれをネジ
7v鉄筋に限定されるものではなく、それ以外の異形鉄
筋は勿−のこと九鉄筋であって4よ−0また、カプラー
gOIlは第5図に示す建込み後に装着してもよい。
In addition, in the above embodiment, the vertical reinforcement (1) is not limited to the threaded 7v reinforcing bar, and other deformed reinforcing bars are, of course, 9 reinforcing bars, 4 to 0, and the coupler gOIl. may be installed after the erection shown in FIG.

以上要するに本実明和よれば、多数の縦筋を吊込み治具
に装着列設し、該縦筋に交叉して配筋の横筋が縦筋に取
付けられている受は具を介して装着されて鉄筋ユニツF
が作成され、鉄筋ユニットO横筋がそのネジピッチよ)
広い支え部を有する受は真によって支えられてiるので
、当該鉄筋ユ=ツ)を吊上げ運搬すゐときに横筋の所謂
「アバレ」はなく縦横に正しく整合したもとでの運、1
と−込みが可能となりこれは大幅な施工速度を向上する
ととになる。
In summary, according to Honjitsu Meiwa, a large number of vertical reinforcements are installed in a row on a hanging jig, and a support in which the horizontal reinforcements of the reinforcement are attached to the vertical reinforcements by intersecting the vertical reinforcements is installed via the tool. Rebar Units F
is created, and the reinforcing bar unit O transverse bar has the same thread pitch)
Since a bridge with a wide support part is supported by the stems, when lifting and transporting the reinforcing bar, there is no so-called "abare" of the horizontal bars, and the horizontal and vertical alignment is correct.
This will greatly improve construction speed.

又、既設部に吊込み建込まれた鉄筋ユニツFの横筋は縦
筋に取付けた受は具の支え部で受止められており、ネジ
フシ筋よ)なる横筋のネジピッチよ)支え部の巾が広く
されていることから、横筋を持上げたり9回転したり1
.出入れするには支障#′iなく、これにより既設横筋
に対するネジカプラーによる接続が容易正確で、迅速に
実施できるのであ参、縦筋と横筋を予じめ組立てて鉄筋
二二ッン等の使用111fは少なくできて省力化に寄与
す為とと4に精度の高い信頼性ある鉄筋工事ができてこ
こに特に大形構造物の壁体用鉄筋工法として実益大であ
る。
In addition, the horizontal reinforcement of the reinforcing bar unit F suspended in the existing part is received by the support part of the tool, and the width of the support part is Because it is wide, it is possible to lift the transverse muscles and make 9 rotations.
.. There is no problem in putting in and taking out reinforcing bars, and as a result, connecting the existing horizontal bars with screw couplers is easy, accurate, and can be done quickly. This method is particularly useful as a reinforcing method for the walls of large structures because it can reduce the amount of 111f used, contributing to labor savings, and 4. allows for highly accurate and reliable reinforcing steel work.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の実施例を示し、第1図から第4図は各工
S*で、tIg1図は鉄筋組立作業図、11g2図は鉄
筋ユニット吊上げ状態図、1g3図は鉄筋ユニット建込
み状態図、第4WAは接続完了図、wi5図は鉄筋ユニ
ット吊上げ運搬中の正面図、第411は縦筋定着部−例
の詳細図、第7図は縦筋と横筋の装着部(取合い部)の
詳細平断面図、1g8図は第7図の立面図、第9図と1
1110図は鉄筋ユニツシ建込み接続作業等の各要領図
、第11図乃至第1s図は横筋受は真による縦筋と横筋
の取合い舊他例で第11図は第2実施例の平面図、第1
2図は第11図の立面図、第13図は第3実施例の平面
図、第14図は第13図の立面図、第15図はtIgA
賽・施例の平面図である。 、 CI)−・・縦筋、(2)・・・横筋、(3)−鉄
筋ユニツ) 、 (4)−・横筋受は真、(8)−・支
え部、n−・・仮止め鋼線、(至)・−・既設壁、II
IJ(2)・・・ネジカプラー。 特許出願人  株式会社神戸製鋼所
The drawings show an embodiment of the present invention, and Figures 1 to 4 are each work S*, Figure tIg1 is a diagram of the reinforcing bar assembly work, Figure 11g2 is a diagram of the reinforcing bar unit being lifted, and Figure 1g3 is a diagram of the reinforcing bar unit being erected. , 4th WA is a diagram of the completed connection, wi5 is a front view of the reinforcing bar unit being lifted and transported, 411 is a detailed view of the vertical reinforcement anchorage part - example, and Figure 7 is the details of the attachment part (joining part) of the vertical reinforcement and horizontal reinforcement. Plan sectional view, 1g8 is an elevational view of Fig. 7, Fig. 9 and 1
Figure 1110 is a diagram showing various procedures for reinforcing bar unit installation and connection work, etc. Figures 11 to 1s are other examples of horizontal reinforcement bridges connecting vertical and horizontal reinforcements by means of stems, and Figure 11 is a plan view of the second embodiment. 1st
Figure 2 is an elevation view of Figure 11, Figure 13 is a plan view of the third embodiment, Figure 14 is an elevation view of Figure 13, and Figure 15 is a tIgA
It is a top view of a die and an example. , CI) - Vertical bar, (2) - Horizontal bar, (3) - Rebar unit), (4) - Horizontal bar support is true, (8) - Support part, n - Temporarily fixed steel Line, (to) --- Existing wall, II
IJ (2)...Screw coupler. Patent applicant Kobe Steel, Ltd.

Claims (1)

【特許請求の範囲】 1、ネジフシ鉄筋よりなる多数の縦筋とネジフシ筋よ動
電る多数O横筋とを縦横に交叉配筋し。 横筋のネジピッチより広い支え部を有する横筋受は真を
介して縦筋に横筋を装着して鉄筋ユニットを作成し、t
l鉄筋ユニットの縦筋を吊込み治具に定着するとともに
、その後、前記吊込み治具を介して鉄筋ユエツFを帛上
げ運搬して所tFD位置に建込み1次に、前記鉄筋ユニ
ットの縦筋を対応する既設縦筋のそれぞれ忙接続し、そ
の後、前記鉄筋ユニットの、横筋を対応すゐ既設横筋の
それぞれにネジカプラーを介して接続することを特徴と
する建造物壁体用縦横鉄筋の配筋接続工法。
[Scope of Claims] 1. A large number of vertical reinforcements made of threaded reinforcement bars and a large number of O horizontal reinforcements electrodynamically moved by the threaded reinforcement bars are cross-arranged vertically and horizontally. For horizontal bar supports that have supporting parts wider than the screw pitch of the horizontal bars, horizontal bars are attached to the vertical bars through the stems to create a reinforcing bar unit, and
1 The vertical bars of the reinforcing bar unit are fixed to the lifting jig, and then the reinforcing bar F is hoisted up and transported to the tFD position via the lifting jig. The vertical and horizontal reinforcing bars for building walls are characterized in that the reinforcing bars are connected to the corresponding existing vertical bars, and then the horizontal bars of the reinforcing bar unit are connected to the corresponding existing horizontal bars via screw couplers. Reinforcement connection method.
JP11878881A 1981-07-28 1981-07-28 Reinforcing wire arranging and connecting method of vertical and horizontal reinforcing wires for wall of construction Granted JPS5820866A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11878881A JPS5820866A (en) 1981-07-28 1981-07-28 Reinforcing wire arranging and connecting method of vertical and horizontal reinforcing wires for wall of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11878881A JPS5820866A (en) 1981-07-28 1981-07-28 Reinforcing wire arranging and connecting method of vertical and horizontal reinforcing wires for wall of construction

Publications (2)

Publication Number Publication Date
JPS5820866A true JPS5820866A (en) 1983-02-07
JPH0214509B2 JPH0214509B2 (en) 1990-04-09

Family

ID=14745098

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11878881A Granted JPS5820866A (en) 1981-07-28 1981-07-28 Reinforcing wire arranging and connecting method of vertical and horizontal reinforcing wires for wall of construction

Country Status (1)

Country Link
JP (1) JPS5820866A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5844157A (en) * 1981-09-09 1983-03-15 清水建設株式会社 Assembling method of reinforcing iron wire
JPS6225652A (en) * 1985-07-24 1987-02-03 大成建設株式会社 Joint of steel bar unit
JPS63304847A (en) * 1987-06-01 1988-12-13 株式会社竹中工務店 Pre-assembled reinforcing bar hanging construction method utilizing false constructed reinforcing bar beam
JP2015098691A (en) * 2013-11-19 2015-05-28 前田建設工業株式会社 Horizontal steel holder

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5844157A (en) * 1981-09-09 1983-03-15 清水建設株式会社 Assembling method of reinforcing iron wire
JPS614467B2 (en) * 1981-09-09 1986-02-10 Shimizu Construction Co Ltd
JPS6225652A (en) * 1985-07-24 1987-02-03 大成建設株式会社 Joint of steel bar unit
JPS63304847A (en) * 1987-06-01 1988-12-13 株式会社竹中工務店 Pre-assembled reinforcing bar hanging construction method utilizing false constructed reinforcing bar beam
JPH0522023B2 (en) * 1987-06-01 1993-03-26 Takenaka Komuten Co
JP2015098691A (en) * 2013-11-19 2015-05-28 前田建設工業株式会社 Horizontal steel holder

Also Published As

Publication number Publication date
JPH0214509B2 (en) 1990-04-09

Similar Documents

Publication Publication Date Title
CN111395754B (en) Method for implementing formwork supporting system
JPS5820866A (en) Reinforcing wire arranging and connecting method of vertical and horizontal reinforcing wires for wall of construction
JP5325709B2 (en) Method of constructing steel exposed column base structure
JPS6346571Y2 (en)
JPH05214813A (en) Suspension jig for reinforcing cage
JPH0115774Y2 (en)
JPH01290853A (en) Composite floor board using deck plate
JP2005256424A (en) Steel frame exposed type column base structure
JP2694431B2 (en) Construction method of anchor bolt
CN213806532U (en) Wall connecting support and scaffold wall connecting device
CN212336729U (en) Formwork supporting system
JPH09296457A (en) Anchorage structure of anchoring material in steel frame column base
JPH0115799Y2 (en)
JPH11193572A (en) Joint fixing for wooden building
JPH06272378A (en) Supporting structure for precast concrete form
JP2005220712A (en) Exposed steel type pedestal structure
JPS6343281Y2 (en)
JPH0115800Y2 (en)
JPS6133174Y2 (en)
JPS6044473B2 (en) Connection method of main beam reinforcement for extension
JPH01322044A (en) Joint structure of closed type sectional stay and beam main reinforcement
JPS6133173Y2 (en)
JPS638260B2 (en)
JPH04120809U (en) Shear wall reinforcing bar mounting bracket
JPS60242256A (en) Support apparatus for supporting loads of mold frame and suspension scaffold