JPS58191808A - Connecting device for marine structure and platform - Google Patents

Connecting device for marine structure and platform

Info

Publication number
JPS58191808A
JPS58191808A JP7343682A JP7343682A JPS58191808A JP S58191808 A JPS58191808 A JP S58191808A JP 7343682 A JP7343682 A JP 7343682A JP 7343682 A JP7343682 A JP 7343682A JP S58191808 A JPS58191808 A JP S58191808A
Authority
JP
Japan
Prior art keywords
platform
opening
leg
legs
guide piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7343682A
Other languages
Japanese (ja)
Inventor
Kimito Furuta
古田 公人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP7343682A priority Critical patent/JPS58191808A/en
Publication of JPS58191808A publication Critical patent/JPS58191808A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)

Abstract

PURPOSE:To easily connect the legs of a platform with the struts of a marine structure in a short time by providing a guide piece with a vertical groove on the inside of an opening and a fixing piece of a circular form to be inserted into the vertical groove. CONSTITUTION:In the strut 3 of a marine structure 1, a vertical hole 33 to be fitted with the leg 5 of a platform 4 is provided at the center, and also an opening 32 provided on the side of the vertical hole 33 is provided on the upper part. Then, a guide piece 31 with vertical grooves 34 and 34a is provided in the inside of the opening 32, and a circular fixing piece 35 to be fitted into the vertical grooves 34 and 34a is also provided in the strut 3. By this, the connection of the legs 5 of the platform 4 and the strut 3 of the marine structure 1 can be easily attained in a short time without being affected by weather and oceanic conditions.

Description

【発明の詳細な説明】 本発明は、石油の海洋掘削設備において、海底に@設し
た構造物に1掘削装置等を積載したプラットフォームを
洋上で接合してなるリグに関し。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a rig in oil offshore drilling equipment, which is formed by connecting a platform on which a drilling rig or the like is mounted to a structure installed on the seabed on the ocean.

さらに詳しくは、前記構造物とプラットフォームとの接
合装置に関するものである。
More specifically, the present invention relates to a device for joining the structure and the platform.

海洋掘削設備には、海中に築堤して島を築き、陸地と同
様に抗弁を掘削する人工島方式、海底に鋼製のジャケッ
トを杭打により固定し、これをプラットフォームにして
この上に掘削装置を設置して抗弁を掘削する固定プラッ
トフォーム方式、下面にパージを備えたプラットフォー
ム上に掘削装置を積載し、海上所定の位置まで曳航した
のちパージに海水を注入して沈降させ、海底に建設した
構造物とプラットフォームを接合してリグを構成し、抗
弁を掘削する移動ブラットフオーム方式などがある。
For offshore drilling equipment, there is an artificial island method in which an island is constructed by building an embankment in the sea, and a defense is excavated in the same way as on land.A steel jacket is fixed to the seabed by piling, and this is used as a platform on which the drilling equipment is mounted. A structure constructed on the seabed by installing a drilling rig on a platform with a purge on the bottom, towing it to a predetermined location at sea, and then injecting seawater into the purge to allow it to settle. There is a moving bratform method that connects objects and platforms to form a rig and excavates a defense.

上記のような各方式のうち、移動プラットフォーム方式
によるリグは、第1図に示すよ5に、海底に設置したベ
ース2に上端にソケットを有する支柱3ajb、3・、
34を立設して海中構造物1を建設り、/(−シロによ
り浮力が与えられたプラットフォーム−を曳航してこの
構造物1上に位置させ、パージ@に%水を注入してプラ
ットフォーム4を沈降させ、これπ設けたレグlla、
5b、5c、5d 全91l造物1の上方から支柱3&
〜3ば1合し、バージ6を離脱してプラットフォーム礁
を海面上の所定の位置まで引上げてレグ5&〜1ldK
固定し、抗弁を掘削するようにしたものである。
Among the above-mentioned methods, the mobile platform type rig has a base 2 installed on the seabed and supports 3ajb, 3, .
34 is erected to construct underwater structure 1, /(-a platform given buoyancy by Shiloh) is towed and positioned on top of this structure 1, and % water is injected into Purge@ to construct platform 4. is precipitated, and the leg lla with this π is set,
5b, 5c, 5d All 91l from above the structure 1, pillar 3&
~ 3 and 1 meet, leave barge 6, pull the platform reef to a predetermined position above the sea surface, and proceed to leg 5 & ~ 1ldK
It is fixed and the defense valve is excavated.

ところで、プラットフォーム礁の下面には、前記したよ
うにバージ6がとシつけられているので、波浪等によシ
プラヅトフォーム纏が動揺し、レグ8a〜611を支柱
3a〜3dの上方からンヶッ)K嵌合する作業がきわめ
て困難である。その上レグ5a〜5dが支柱3a〜34
に衝突してレグ5畠〜5dや支柱3瓢〜3dを破損する
ことがある。このため、比較的波浪の少ない日を選んで
作業をしなければならないので工期が遅れる等、多くの
問題があった。
By the way, since the barge 6 is attached to the lower surface of the platform reef as described above, the ship platform foam may be shaken by waves etc., causing the legs 8a to 611 to be pushed from above the supports 3a to 3d. K-fitting is extremely difficult. Moreover, the legs 5a to 5d are the supports 3a to 34.
The legs 5 to 5d and the supports 3 to 3d may be damaged by the collision. This caused many problems, including delays in the construction period as the work had to be carried out on days with relatively few waves.

本発明は、上記のような問題点を解決するためになされ
たもので、その目的とするところは、気象、海象条件に
左右されることなく、プラツトフオームのレグと海中構
造物の支柱との接合を、短時間かつ容易に行なうことの
で診る接合装置を提供するKある。
The present invention was made to solve the above-mentioned problems, and its purpose is to connect platform legs and supports of underwater structures without being affected by weather or sea conditions. The present invention provides a welding device that can easily perform welding in a short period of time.

本発明に係る海中構造物とプラットフォームの接合装置
は、上記の目的を達成するため、石油掘削装置等を積載
したプラットフォームを海中構造物の上まで曳航して該
ゲラブトフオームK i& ケ1コレグを前記海中構造
物の支柱に接合してなるリグにおいて、前記海中構造物
の支柱に、中心部に前記レグが嵌装される縦穴を有し上
部には該縦穴の側面を開口する開口部を設けかつ該開口
部の内側に縦溝を設けたガイドピースと、前記レグを前
記ガイドピースの開口部から縦穴に装入したのち前記縦
溝に挿入される円弧状の固定ピースとを設けたことを特
徴とするものである。以下図面を用いて本発明を説明す
る。
In order to achieve the above-mentioned object, the device for joining an underwater structure and a platform according to the present invention tows a platform loaded with an oil drilling rig or the like to the top of the underwater structure, and connects the Gelabtoform K i & K 1 coreg to the underwater structure. In a rig connected to a support of a structure, the support of the underwater structure has a vertical hole in the center into which the leg is fitted, and an opening opening on a side surface of the vertical hole in the upper part. A guide piece having a vertical groove provided inside the opening, and an arc-shaped fixing piece that is inserted into the vertical groove after the leg is inserted into the vertical hole from the opening of the guide piece. It is something to do. The present invention will be explained below using the drawings.

籐2図は本発明の実施例を示すもので、fatはプラッ
トフォームとレグの要部を示す側面図、fblは海中構
造物の支柱の要部を示す斜視図である。両図において、
4はプラットフォーム、5はプラットフォーム4に上下
に移動可能に装着されたレグ、6はバージである。3は
海中構造物lの支柱で、上部にはガイドピース31が装
着されている。このガイドピース31の下部は、支柱3
と#t r同じ外径の円桂状に形成されておシ、上部は
一方に開口部32を備えたC字状に形成されて、中心部
にはレグ5を嵌入する穴おが設けられている。易はレグ
5の外径と整合する円弧状の固定ピースで、ガイドピー
ス31の上部から長さ方向に設けた溝34.aaaに嵌
合できるように構成されている。なお、ガイドピース3
1は各支柱3&〜3diC装着されておシ、各開口部3
2はいずれも同一方向に向けられている。
Figure 2 shows an embodiment of the present invention, in which fat is a side view showing the main parts of the platform and legs, and fbl is a perspective view showing the main parts of the supports of the underwater structure. In both figures,
4 is a platform, 5 is a leg attached to the platform 4 so as to be movable up and down, and 6 is a barge. 3 is a support of the underwater structure 1, and a guide piece 31 is attached to the upper part. The lower part of this guide piece 31 is connected to the support 3
The upper part is formed into a C-shape with an opening 32 on one side, and a hole into which the leg 5 is inserted is provided in the center. ing. The guide piece 34 is an arc-shaped fixing piece that matches the outer diameter of the leg 5, and has a groove 34 extending from the top of the guide piece 31 in the length direction. It is configured so that it can fit into the aaa. In addition, guide piece 3
1 is attached to each pillar 3 &~3diC, each opening 3
2 are both oriented in the same direction.

上記のよ5に#l成した支柱31〜3dとレグ5&〜1
511を接合する順序を説明すれば次の通シである。
Struts 31-3d and legs 5&-1 made from #5 as above
The order of joining 511 is as follows.

(凰)造船所で建造されたプラットフォーム感を海中構
造物1の上まで曳航し、第3図に示すように各レグ5a
−5−を各支柱3a〜3dのガイドピース31a〜31
− の開口部冨と対向する位置で停止させる。
(凰) Tow the platform built at the shipyard to the top of the underwater structure 1, and as shown in Figure 3, each leg 5a
-5- to the guide pieces 31a to 31 of each support 3a to 3d.
- Stop at a position facing the opening depth.

このとき、各レグ51〜5dは海中に所定の長さ突出し
た状態でゲラブトフオーム4に固定されている。
At this time, each of the legs 51 to 5d is fixed to the gelatin foam 4 while protruding a predetermined length into the sea.

(劾バージ−に海水を注入してプラットフォーム礁を下
降させ、レグ5&〜5dの下端がガイドピース31a〜
314の開口部32の下端より僅かに上方まで違したと
き(破線で示す)、ゲラブトフオーム4の下降を止める
(Inject seawater into the barge and lower the platform reef, so that the lower ends of legs 5 &~5d are connected to guide pieces 31a~
When the gelabut foam 4 reaches a position slightly above the lower end of the opening 32 (indicated by a broken line), the lowering of the gelabut foam 4 is stopped.

4alこの状態でプラットフォーム4を図の左方に靜か
に曳航すれば、各レグ5畠〜11dは各ガイド31轟〜
11− の開口部紹から穴33に嵌合される。このとぎ
、若しレグ11&〜5dがガイド31a〜314 K衝
突しても、智撃力はガイド31a〜31d K吸収され
、レグやガイドを損傷するおそれはない。
4al In this state, if the platform 4 is towed quietly to the left in the figure, each leg 5 ~ 11d will be moved to each guide 31 ~
11- is fitted into the hole 33 from the opening introduction. At this point, even if the legs 11&~5d collide with the guides 31a~314K, the intelligent impact force is absorbed by the guides 31a~31dK, and there is no risk of damaging the legs or guides.

(4)次に各ガイド31&〜314の開口部に設けた溝
34゜3aa K固定ピース蕊を嵌合すれば、各レグ5
a〜5dはガイド31a〜mldの穴お内に収容される
。このとぎの状態を第4図に示す。なお、必要に応じて
レグ5&〜5魂を下降させ、ガイド31a〜31dとの
嵌合をよシ確実にする。
(4) Next, by fitting the grooves 34°3aa K fixed piece holes provided in the openings of each guide 31 &~314, each leg 5
a to 5d are accommodated in the holes of guides 31a to mld. This cutting state is shown in FIG. Note that the legs 5 and 5 are lowered as necessary to ensure more secure fitting with the guides 31a to 31d.

+6ルダ5m−84と支柱3a〜3dとの接合が終った
とぎは、レグとプラットフォーム礁との固定を解除し、
バージ6内の海水を排出してプラットフォーム礁を海面
上の所定高さまで上昇させ、再びゲラ、トフォーム礁を
レグ5.−Isシに固定し、必要に応じてバージ−を撤
去する。なお、プラットフォーム4の上昇は、プラット
フォーム4が有する昇降手段によってもよい。
After the connection between the +6 Ruda 5m-84 and the supports 3a to 3d is completed, the legs are unfastened from the platform reef,
The seawater in barge 6 is discharged and the platform reef is raised to a predetermined height above the sea surface, and the galley and toform reef are raised again on leg 5. -Secure the barge to the ship and remove the barge if necessary. Note that the platform 4 may be raised by a lifting means included in the platform 4.

上記の説明では、海中構造物とレグとの接合順序の一例
を示したが、本発明はこれに限定するものではなく、状
況に応じて適宜変更しうろことは云う迄もない、ま1こ
、ガイドピースや固定ピースの構造も実施例に限定する
ものではなく、本発明の要旨を逸脱しない範囲で適宜変
更することができる。
In the above explanation, an example of the joining order of the underwater structure and the legs is shown, but it goes without saying that the present invention is not limited to this and may be changed as appropriate depending on the situation. Also, the structures of the guide piece and the fixed piece are not limited to the embodiments, and can be modified as appropriate without departing from the gist of the present invention.

以上の説明から明らかなように、本発明Kjれば、気象
、海象条件に左右されることなく、ブラ、トフォームの
レグと、海中構造物の支柱とを短時間かつ容易に接合し
てリグを構成することができ、しかもこれらを損傷する
おそれもないので、実施による効果大である。
As is clear from the above description, the present invention allows the rig to be assembled by easily joining the legs of the bra and toform to the supports of the underwater structure in a short time and without being affected by weather or sea conditions. Since it is possible to configure the structure, and there is no risk of damaging them, it is highly effective when implemented.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明を説明するためのリグの一例を示す斜視
図、菖2図は本発明の実施例で、111はプラy)フオ
ームとレグの要部を示す側面図、伽)は海中構造物の支
柱の要部を示す斜視図、第3図は海中構造物とプラツト
フォームとの接合前の状態を示す正面図、第4図はガイ
ドピースとレグの接合状態を示す断面図である。 1:海中構造物、3:支柱、31ニガイドピース、32
:開口部、33:穴、34.34a  :縦溝、35:
固定ヒース、4ニブラツトフオーム、5;レグ、6;バ
ージ。 代理人弁理土木村三朗
Figure 1 is a perspective view showing an example of a rig for explaining the present invention, Figure 2 is an embodiment of the present invention, 111 is a side view showing the main parts of the plyform and leg, and Figure 1) is underwater. Figure 3 is a perspective view showing the main parts of the support of the structure, Figure 3 is a front view showing the state before the underwater structure and platform are connected, and Figure 4 is a cross-sectional view showing the state where the guide piece and leg are connected. be. 1: Undersea structure, 3: Strut, 31 guide piece, 32
: opening, 33: hole, 34.34a : vertical groove, 35:
Fixed heath, 4 nibratuforms, 5; leg, 6; barge. Agent Patent Attorney Saburo Dokimura

Claims (1)

【特許請求の範囲】 石油掘削装置等を積載したプラットフォームを海中構造
物の上まで曳航して該プラットフォームに設けたレグを
前記海中構造物の支柱に接合してなるリグにおいて、 前記海中構造物の支柱に、中心部に前記レグが嵌装され
る縦穴を有し上部には該縦穴の側面を開口する開口部を
設けかつ該開口部の内側に縦溝を設けたガイドピースと
、前記レグを前記ガイドピースの開口部から縦穴に装入
したのち前記縦溝に挿入される円弧状の固定ピースとを
設けたことを特徴とする海中構造物とゲラブトフオーム
の接合装置。
[Scope of Claims] A rig comprising a platform loaded with an oil drilling rig, etc., towed to the top of an underwater structure, and a leg provided on the platform is connected to a support of the underwater structure, comprising: A guide piece in which the post has a vertical hole in the center into which the leg is fitted, an opening opening the side surface of the vertical hole in the upper part, and a vertical groove inside the opening, and a guide piece in which the leg is fitted. A device for joining an underwater structure and a gelabut foam, characterized in that an arc-shaped fixing piece is provided which is inserted into the vertical groove after being inserted into the vertical hole through the opening of the guide piece.
JP7343682A 1982-05-04 1982-05-04 Connecting device for marine structure and platform Pending JPS58191808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7343682A JPS58191808A (en) 1982-05-04 1982-05-04 Connecting device for marine structure and platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7343682A JPS58191808A (en) 1982-05-04 1982-05-04 Connecting device for marine structure and platform

Publications (1)

Publication Number Publication Date
JPS58191808A true JPS58191808A (en) 1983-11-09

Family

ID=13518185

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7343682A Pending JPS58191808A (en) 1982-05-04 1982-05-04 Connecting device for marine structure and platform

Country Status (1)

Country Link
JP (1) JPS58191808A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4734298A (en) * 1985-07-18 1988-03-29 Yoshida Kogyo K.K. Method of providing marks on surface-type fasteners

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4734298A (en) * 1985-07-18 1988-03-29 Yoshida Kogyo K.K. Method of providing marks on surface-type fasteners

Similar Documents

Publication Publication Date Title
KR102252116B1 (en) Subsea support unit and method of providing shallow water drilling terminal
EP2905217B1 (en) Vessel for transporting and installing a floating platform and method for transporting and installing such a platform
US2699321A (en) Deepwater oil drilling and storage craft
US5092711A (en) Diverless installation of riser clamps onto fixed or compliant offshore platforms
US3946684A (en) Semi-submersible jackup apparatus
AU740127B2 (en) Method of and apparatus for anchor installation
EP2243695A2 (en) Mating of buoyant hull structure with truss structure
US3390531A (en) Offshore drilling platform
JPS58191808A (en) Connecting device for marine structure and platform
US3948056A (en) Modular offshore structure system
US2877629A (en) Method and apparatus for erecting a deep water offshore platform
US3974657A (en) Modular offshore structure system
EP0020321A1 (en) A system for depositing sediment and/or protecting an installation on the floor of a body of water
US4824291A (en) Offshore tower structures
US4027493A (en) Method and apparatus for connecting two or more components of an offshore platform
US4973199A (en) Offshore platform and method of assembling
AU646319B2 (en) Procedure for installation of a device for protection against swell and device resulting from the implementation of this procedure
US3517516A (en) Folding support structure for offshore drilling platforms
US4165706A (en) Submersible vehicle deployment and recovery system for rough water
FR2416306A2 (en) Offshore platform in several sections - floats fully equipped and is lowered on to just-submerged support structure
KR200327394Y1 (en) Wire cylinder hanger used to levee mattress work process
KR102465952B1 (en) Stability support spreader for sunken ship
KR102070843B1 (en) Floating structure and mooring method for floating structure
KR100556131B1 (en) Levee mattress work process
JPS5894511A (en) Assembling method of leg for marine structure