JPS58173220A
JPS58173220A JP5510982A JP5510982A JPS58173220A JP S58173220 A JPS58173220 A JP S58173220A JP 5510982 A JP5510982 A JP 5510982A JP 5510982 A JP5510982 A JP 5510982A JP S58173220 A JPS58173220 A JP S58173220A
Authority
JP
Japan
Prior art keywords
casing
inner tube
concrete
erected
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP5510982A
Other languages
Japanese (ja)
Inventor
Hidenori Namura
名村 英紀
Ryoichi Iida
飯田 良一
Takaaki Kimura
木村 孝昭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP5510982A priority Critical patent/JPS58173220A/en
Publication of JPS58173220A publication Critical patent/JPS58173220A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

PURPOSE:To exactly form a friction cut part by a method in which iron bars and a thin inner tube are erected in a casing set underground and then concrete is placed into the inner tube to construct the upper part of a pile. CONSTITUTION:After or while excavating a shaft A in the ground, a casing 1 is erected in the ground, and an iron bar cage 2 is inserted into the casing 1. Then, a inner tube 4 with a thin wall of a corrugated pipe, etc., whose tip part is wound with a strap packing 3 of an expanded synthetic resin, e.g., urethane form, is erected on the inside of the casing 1 and on the outside of the iron bar cage 2. Then, ready-mixed concrete 5 is placed into the shaft A until it reaches the bottom of the casing 1 and then the casing 1 is slightly pulled up in such a way as to prevent the extension of the concrete 5 to the outside of the inner tube 4.

Description

【発明の詳細な説明】 この発明は現場打ち基礎杭の構築法に関するものであ〕
、現場打ち杭O載荷試験の九め杭上部と土との摩擦力を
生ぜしめないようにすることを目的とする。
[Detailed Description of the Invention] This invention relates to a method for constructing cast-in-place foundation piles.
The purpose is to prevent the generation of frictional force between the upper part of the pile and the soil in the O-loading test of cast-in-place piles.

基礎杭は打ち込まれた所要のものを載荷試験して支持力
を測足するが、杭上部は、杭頂部の高さ揃えある匹Fi
地下階の施工の丸め地盤掘削後カットされるので机上1
1には摩擦力が作用しない状態で載荷試験しうるように
基礎杭を構築することが要望される。
The bearing capacity of foundation piles is measured by carrying out a loading test on the required piles driven in.
1 on the desk because it will be cut after rounding the ground excavation for basement floor construction.
1 requires that the foundation pile be constructed so that a loading test can be carried out without any frictional force acting on it.

この発明は前記要望に対処すべく、かつ経済的に実施し
うる方法を開発したもので、以下その詳S+を図示し九
実施例によって説明する。
In order to meet the above-mentioned needs, the present invention has developed a method that can be implemented economically.The details of the S+ will be explained below with reference to the drawings and nine embodiments.

先ず地盤に整孔ムを掘M後あるいは掘削しなカラ少なく
とも7リクシii7カツトが必要な深さまでケーシング
1を地盤中に嬬込む。次いで゛このクー7ング1内に鉄
筋篭2を挿入する。なおその際鉄筋計のキャップタイヤ
および先端。
First, after drilling a hole in the ground, or without digging, the casing 1 is pushed into the ground to a required depth of at least 7 holes. Next, the reinforcing bar cage 2 is inserted into the cooling cage 1. In addition, the cap tire and tip of the rebar gauge.

中間沈下針は全て鉄筋篭2の内側に取付けておく(図示
せず)0次いで先端外周に発泡ウレタン等発泡合成樹脂
の帯状バンキング3を巻き付は九コルゲートパイプ等か
らなる薄肉の内管4をケーシング1の内側で、鉄筋I1
2の外肯に建込む。
All the intermediate sinking needles are attached inside the reinforcing bar cage 2 (not shown).Next, a belt-shaped banking 3 made of foamed synthetic resin such as foamed urethane is wrapped around the outer circumference of the tip, and a thin inner pipe 4 made of corrugated pipe or the like is wrapped around the tip. Inside casing 1, reinforcing bar I1
Built on the outer meaning of 2.

次しで整孔ム内に生コンクリート5を打設し。Next, pour fresh concrete 5 into the hole adjustment chamber.

ケーシング1の下部まで生コンクリート5が打設してく
るとケーシング1を略1111@f引上げてバッキング
5の位置をケーシング1が通過するとバッキング5が拡
が〕、生コンクリートが内管4の外11に回るのを止め
る・続いて内管4内に生コンクリートを天端!で打設す
る◎その際内管4とケーシング1との関に生コンクリー
トが落ち込まないようにバッキング6を上部にも設ける
When the ready-mixed concrete 5 is poured to the bottom of the casing 1, the casing 1 is pulled up approximately 1111@f, and when the casing 1 passes the position of the backing 5, the backing 5 expands], and the ready-mixed concrete reaches the outside 11 of the inner pipe 4.・Next, pour fresh concrete into the inner pipe 4 at the top! ◎ At that time, a backing 6 is also provided at the top to prevent fresh concrete from falling into the junction between the inner pipe 4 and the casing 1.

コンクリートの硬化vk載荷試験するがその際ケーシン
グ1はそのままの状態としてフリクションカットをする
。試験後はケーシング1を引抜いて再使用する。
The concrete is subjected to a hardening vk loading test, and at that time, the casing 1 is left as it is and friction cut is performed. After the test, casing 1 is pulled out and reused.

この発IjlIFi以上の構成からな)、基礎杭上部に
ケーシングと円管を使用して7シツクシ曹ン力ツト部分
を確実に施工できる・しかも土庄を受けるケーシングは
引抜きが可能であp、内管は薄肉Oものでよ−ので紗済
的に実施できる。
With this construction, the casing and circular pipe are used on the top of the foundation pile to ensure the construction of the 7-socket support section.Furthermore, the casing that receives the foundation pile can be pulled out, and the inner pipe Since it is thin-walled, it can be carried out easily.

【図面の簡単な説明】[Brief explanation of drawings]

第1図、第2図、第Aml、 第4WJ>ヨヒ11Bg
lは施工過程を示し九秦断面図、第4図、第7図は横断
面図である・ ム・・整孔、1・・ケーシング、2・−鉄筋Ill、 
J・・バッキング、4・・内管、5・φコンクリート、
6・拳バッキング。 第2図 第1凶 第3図      第4図
Figures 1, 2, Aml, 4th WJ> Yohi 11Bg
l shows the construction process, and Figures 4 and 7 are cross-sectional views.
J...Backing, 4.Inner pipe, 5.φ concrete,
6. Fist backing. Figure 2 Figure 1 Figure 3 Figure 4

Claims (1)

【特許請求の範囲】 (リ 地盤に整孔を掘削するとともにケーシングを地盤
中Kll込み1次いてケーシング内に鉄筋および薄肉の
内管を建込み1次いで内管内にコンクリートを打設して
杭上部を造成することを特徴とする基礎杭の構築法。 (2)  載荷試験後ケーシングを撤去する特許請求の
範囲第1Jjl記噴の基礎杭の構築法。
[Scope of Claims] (Li) A hole is drilled in the ground, the casing is inserted into the ground, reinforcing bars and a thin-walled inner pipe are built into the casing, concrete is poured into the inner pipe, and the upper part of the pile is placed. (2) A method for constructing a foundation pile, characterized in that the casing is removed after a loading test.
JP5510982A 1982-04-02 1982-04-02 Construction of foundation pile Pending JPS58173220A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5510982A JPS58173220A (en) 1982-04-02 1982-04-02 Construction of foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5510982A JPS58173220A (en) 1982-04-02 1982-04-02 Construction of foundation pile

Publications (1)

Publication Number Publication Date
JPS58173220A true JPS58173220A (en) 1983-10-12

Family

ID=12989579

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5510982A Pending JPS58173220A (en) 1982-04-02 1982-04-02 Construction of foundation pile

Country Status (1)

Country Link
JP (1) JPS58173220A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268610A (en) * 2017-06-19 2017-10-20 中铁大桥局第七工程有限公司 A kind of local antifriction resistance piling strtucture and its construction method
WO2022160379A1 (en) * 2021-01-28 2022-08-04 江苏东合南岩土科技股份有限公司 Large-diameter cast-in-situ thin-walled prestressed concrete steel pipe pile and construction method therefor

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268610A (en) * 2017-06-19 2017-10-20 中铁大桥局第七工程有限公司 A kind of local antifriction resistance piling strtucture and its construction method
WO2022160379A1 (en) * 2021-01-28 2022-08-04 江苏东合南岩土科技股份有限公司 Large-diameter cast-in-situ thin-walled prestressed concrete steel pipe pile and construction method therefor

Similar Documents

Publication Publication Date Title
KR100618597B1 (en) Cast in place concrete pile using vibro magnetic shovel hammer, and the construction method of this
US3559412A (en) Method of forming enlarged base encased concrete piles
JPS58173220A (en) Construction of foundation pile
JP2884452B2 (en) Shaft construction method using segments
JPS61109822A (en) Construction work of pile
JPS6160928B2 (en)
JPS58189414A (en) Construction of sheathing wall
KR200375610Y1 (en) Cast in place concrete pile using vibro magnetic shovel hammer
JPS5810532B2 (en) Concrete structure destruction method
JP7007691B1 (en) Casting method for spring spacers, reinforcing bar cages and underground piles
JPS6128774B2 (en)
JP2881501B2 (en) Construction method for high strength cast-in-place concrete piles
JPS5873619A (en) Construction work of bulb pile and tremie tube
JPS63223213A (en) In-situ piling work using woven fabric formwork
JPH01102125A (en) Placement of concrete pile at site
US918100A (en) Method of underpinning and supporting walls.
JPS5915087A (en) Underground type storage tank and its constructing method
JP2675858B2 (en) Vertical shaft excavation method
US1686660A (en) Construction of concrete piles
JP2881502B2 (en) Construction method for high strength cast-in-place concrete piles
JP2003082657A (en) Construction method of reverse pile and pile head widening reverse pile
SU1021715A1 (en) Foundation erection method
JPS6319325A (en) Pile construction in soft ground and parts therefor
JPH03140594A (en) Construction work of water-stopping shaft
JP3179243B2 (en) Concrete placement method for deep foundation work