JPS58160474A JP57042078A JP4207882A JPS58160474A JP S58160474 A JPS58160474 A JP S58160474A JP 57042078 A JP57042078 A JP 57042078A JP 4207882 A JP4207882 A JP 4207882A JP S58160474 A JPS58160474 A JP S58160474A
Authority
JP
Japan
Prior art keywords
work
hoistway
members
scaffolding
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP57042078A
Other languages
Japanese (ja)
Inventor
茂樹 三宅
町野 昭二
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Elevator and Building Systems Corp
Original Assignee
Tokyo Shibaura Electric Co Ltd
Toshiba Elevator Service KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Shibaura Electric Co Ltd, Toshiba Elevator Service KK filed Critical Tokyo Shibaura Electric Co Ltd
Priority to JP57042078A priority Critical patent/JPS58160474A/en
Publication of JPS58160474A publication Critical patent/JPS58160474A/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔発明の技術分野〕 この発明は、エレベータ−の昇降路内にエレベータ−用
品を取付けるに供されるエレベータ−工事用における作
業足場装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a work scaffolding device for elevator construction, which is used for installing elevator equipment in an elevator hoistway.

〔発明の技術的背景とその問題点〕[Technical background of the invention and its problems]

一般にエレベータ−の据付工事においては、乗Qかとが
昇降する昇降路内に作業足場を構築し、この作業足場を
もとに乗りかごおよびっり1− 合いNりをガイドするガイドレール、各階の田人口用品
、さらには乗りかご、つり合い重υ等の昇降にかかわる
部品の取付ける工事が採用されている。
Generally, during elevator installation work, a work scaffold is constructed in the hoistway where the elevator cars go up and down, and based on this work scaffold, the guide rails that guide the elevator car and the elevators are installed on each floor. Work has been adopted to install parts related to lifting of equipment such as passenger cars, counterweights, etc.

従来、作業足場を構築するにあたっては、第1図で示す
ように、昇降路a内の最下端からその昇降路aの隅部に
位置して、単管・9イグを順次継ぎ合せてなる縦地部材
b(j4本立設し、この縦地部材b・・・間に一定の間
隔で支持部材としての横桁部材Cおよび足場部材として
の縦桁部材dを複数用いて井桁状に複数IN組み上げて
作業足場e・・・全構築する構造が用いられ、その作業
足場e・・・の上で据付工事を行なっている。
Conventionally, when constructing a work scaffold, as shown in Fig. 1, a vertical scaffold is constructed by sequentially joining nine single pipes located at the corner of the hoistway a from the lowest end of the hoistway a. Four base members b (j) are erected, and a plurality of horizontal girder members C as supporting members and longitudinal girder members d as scaffolding members are used to assemble multiple INs in a grid shape at regular intervals between the vertical members b... The work scaffold e... The structure to be completely constructed is used, and the installation work is being carried out on the work scaffold e...

ところで、この据付工事において、昇降路aの上部に設
けられたエレベータ−機械室(図示しない)へ昇降路a
i通して機械部品といった大きな用品を荷揚げすること
が行なわれることは知られている。
By the way, in this installation work, the elevator-machine room (not shown) provided above the hoistway a
It is known that large items such as mechanical parts are unloaded through the I-way.

ところが、昇降路a内に縦地部材b・・・を設けて作業
足場e・・・を構築する技術によると、荷揚げ路が狭く
なることから、大きな用品および部品を運び込むときに
は、縦地部材b・・・が邪魔となって縦地部材b・・・
會その都度広け、これに併せて作業足場e・・・も解体
しなければならない。
However, according to the technique of constructing the work scaffold e by installing the vertical members b in the hoistway a, the unloading path becomes narrow, so when carrying large goods and parts, ... is in the way and the vertical member b...
Each time the meeting is held, the work scaffold e... must be dismantled.

しかも、この解体および復帰には、かなりの時間と労力
を要し、据付けにかかる作業の能率化の上で支障となっ
ている。そのうえ、縦地部材b・・・が据付は作業の邪
魔をきたし、狭い昇降路a内での作業を一層不便なもの
としている。また作業足場e・・・は、最下端を支持部
とした縦地部材b・・に組み付けられているところから
安定性に劣り、据付作業などの際、横揺′nを発生しや
すく、作業に危険を伴うといった問題がある。
Moreover, this disassembly and restoration requires a considerable amount of time and effort, which is an obstacle to increasing the efficiency of installation work. Moreover, the installation of the vertical members b... obstructs the work, making work in the narrow hoistway a even more inconvenient. In addition, the work scaffold e... has poor stability because it is assembled to the vertical member b... whose lowest end is the supporting part, and it is likely to cause lateral sway during installation work, etc. There is a problem that it is dangerous.

しかも、上述した技術によると、作業足場以外にかかる
縦地部材b・・・の施工に準じた組立て、解体、撤去に
多くの作業(時間を含めて)が要求されるといった問題
があり、作業足場に要する作業能率はあまり良くなく、
かつコスト高をきたすものでめった。
Moreover, according to the above-mentioned technology, there is a problem in that a lot of work (including time) is required for the assembly, disassembly, and removal of the vertical ground members (b) other than the work scaffolding. The work efficiency required for scaffolding is not very good,
Moreover, it was very costly.

〔発明の目的〕[Purpose of the invention]

この発明は上記事情に着目してなさnたものでその目的
とするところは、荷揚げ□路を最大限に確保するととも
に、用品および部品の据付作業を容易に、また作業足場
にかかわる作業を短時間で容易に行なうことができる安
全かつコスト的に優れるエレベータ−工事用における作
業足場装置を提供することにろる。
This invention was made in view of the above circumstances, and its purpose is to maximize the unloading route, facilitate the installation of supplies and parts, and shorten the work related to work scaffolding. It is an object of the present invention to provide a work scaffolding device for elevator construction that can be easily carried out in a short time and is safe and cost-effective.

〔発明の概要〕[Summary of the invention]

この発明は、昇降路の下段側の相対向する壁面間に取付
具を介して複数の支持部材を架設し、こ扛ら支持部材上
に足場部材を架設して作業足場を構成し、この作業足場
全順次昇降路の上階方向へ複数段配設することにより、
荷揚げ路の狭くなる要因、作業足場の組立て、解体、撤
去作業の作業性および据付作業性の低下の要因、安全性
、さらにはコスト高の要因となる縦地部材全使用するこ
となく作業足場を構築しようとするものである。
This invention constructs a work scaffold by constructing a plurality of support members via fixtures between opposing walls on the lower level side of the hoistway, and constructing a work scaffold by constructing a scaffold member on top of these support members. By arranging multiple stages of scaffolding all sequentially towards the upper floors of the hoistway,
The work scaffold can be constructed without using all the vertical members, which are factors that narrow the unloading road, reduce the workability of assembling, dismantling, and dismantling the work scaffolding, and reduce the installation workability, and increase the safety and cost. This is what we are trying to build.

〔発明の実施例〕[Embodiments of the invention]

以下、この発明を図面に示す一実施例にもとづいて説明
する。第2図中1は建築物等の内部に形成された乗りか
と(図示しない)が昇降する昇降路で、この昇降路1の
上部にはエレベータ−機械室1aが設けられている。ま
た昇降路1内には昇降方間に沿って一定の間隔で複数の
作業足場装置2・・・が設けられている。これら作業足
場装置2・・・は、いずれも同構造を呈していて、この
うちの一つについて説明すnば、図中3.3はたとえば
L字形状あるいはU字形状を呈した取付具、たとえばア
ングル材で、これらアングル材3,3は昇降路1の相対
向する壁面lb 、Ibにそれぞれアンカーポルト4.
4で対(たとえば4個)をなして固定されている。
The present invention will be described below based on an embodiment shown in the drawings. In FIG. 2, reference numeral 1 denotes a hoistway formed inside a building or the like, through which a platform (not shown) goes up and down, and an elevator-machine room 1a is provided in the upper part of this hoistway 1. Further, within the hoistway 1, a plurality of work scaffolding devices 2 are provided at regular intervals along the hoisting direction. These work scaffolding devices 2... all have the same structure, and to explain one of them, 3.3 in the figure is a mounting fixture having an L-shape or a U-shape, for example; For example, these angle members 3, 3 are anchor ports 4, 3, 3, 4, 3, 3, 4, 4, 4, 4, 4, 4, 4, 4, 4, 3, 3, 3, 3, 3, 3, 3, 3, such 3, 3, so 3, so 3, 3, 3, such 3, 3, 3, 3, such 3, 3, 3, such 4, 3, such that an anchor port 4.
4 and are fixed in pairs (for example, 4 pieces).

そして、各壁面1b 、Jbから突出した突出部−1E
Eh =p 栖で支持座5.5を構成している。また図
中6は支持部材、たとえば単管・9イブで構成された横
桁部材で、この横桁部材6は上記取付具3,3間上に渡
って複数、たとえば2本設けられる。そして、これら横
桁部材6,6の各端部は、第3図で示すように連結具6
a・・・を介5− して上記支持座5,5にそ扛ぞれ運結さ扛、連結具6a
・・全通じて各アングル材3.3に固定ざnでいる。そ
して、これら横桁部材6.6上には、足場部材、たとえ
ば板状の縦桁部材7が2本井桁状に架設さ扛、作業足場
8全構成している。なお、9は安全ネットである。
Then, each wall surface 1b, a protruding portion -1E protruding from Jb.
Eh = p constitutes the support seat 5.5. Reference numeral 6 in the figure denotes a support member, for example, a cross beam member composed of a single tube with nine tubes, and a plurality of cross beam members 6, for example two, are provided over the space between the above-mentioned fixtures 3, 3. Each end of these crossbeam members 6, 6 is connected to a connector 6 as shown in FIG.
Connector 6a is connected to the support seats 5, 5 through a...
...It is fixed to each angle member 3.3 throughout. Scaffolding members, for example, plate-shaped longitudinal girder members 7 are installed in the form of two parallel girders on these cross beam members 6.6, thereby forming the entire work scaffold 8. Note that 9 is a safety net.

−力、図中10は安全装置で、この安全装置10は、エ
レベータ−機械室1aの床下に第4図で示すように、取
付具としてのたとえばアングル材11をアンカーポルト
12で固定し、こ礫r?、、1 のアングル材11に吊持具13を介して親脩終 14を連結するとともに、親書14全昇降路1に沿って
最下階まで吊り下げて構成され、上記作業足場8上での
作業における安全を安全ネッ橡閑 親綱′14は昇降路1の最上部から吊り下げるよ置する
ときには、まず昇降路1の下段側、すなわち最下階の相
対向する壁面1b 、7bの側部6一 にそれぞnアングル材3を2個ずつアンカーボルト4・
・・で固定する。このとき、各アングル材3・・は支持
座5・・・が水平な位置で対をなして対向していること
はいうまでもない。つぎにこれら離間対向するアングル
材3,3間に渡って横桁部材6をそnぞ扛装置し、各横
桁部材6の端部を連結具6a・・・でそれぞれアングル
材3・・・に固定し、一段の足場を構成する。その後、
横桁部材6,6上に縦桁部材7,7を井桁状に配置して
連結具(図示しない)で横桁部材6,6にそれぞれ固定
することによフ、作業足場8が構成される。そして、こ
の最下階の作業足場8上で、上段側に先程の作業手順に
ならって作業足場8を組立て、以後、この作業を昇降路
1の上階方向へ順次繰や返して行ない、作業足場8を複
数構築することにより、昇降路1内の全体に足場装置8
・・・が組立てられることになる。そし併用した安全装
置10の取付けも行なわれることになる。
10 in the figure is a safety device, and this safety device 10 is made by fixing, for example, an angle material 11 as a fixture with an anchor port 12 as shown in FIG. 4 under the floor of the elevator machine room 1a. Gravel? . , 1. The main letter 14 is connected to the angle member 11 of 1 through the hanging fixture 13, and the letter 14 is suspended along the entire hoistway 1 to the lowest floor. When installing the safety line 14 to suspend from the top of the hoistway 1, first attach it to the lower side of the hoistway 1, that is, the sides of the opposing walls 1b and 7b on the lowest floor. 6 Anchor bolts 4 and 2 N angle pieces 3 each.
Fix it with... At this time, it goes without saying that each of the angle members 3... forms a pair and faces each other with the support seat 5... in a horizontal position. Next, the cross-beam members 6 are pulled across between the spaced apart and facing angle members 3, 3, and the ends of each cross-beam member 6 are connected to the angle members 3... with the connectors 6a... to form a single stage of scaffolding. after that,
A work scaffold 8 is constructed by arranging the vertical beam members 7, 7 in a grid pattern on the horizontal beam members 6, 6 and fixing them to the horizontal beam members 6, 6 using coupling tools (not shown), respectively. . Then, on the work scaffold 8 on the lowest floor, assemble the work scaffold 8 on the upper level side according to the work procedure described earlier, and thereafter repeat this work sequentially in the direction of the upper floor of the hoistway 1. By constructing a plurality of scaffolds 8, the entire hoistway 1 is covered with a scaffolding device 8.
...will be assembled. The safety device 10 used in conjunction with this will also be installed.

かくして、作業足場8上2の施行が完成した状態では、
第5図で示すように従来、各棟問題された縦地部材を全
く使用しないで荷揚げ路を最大限に確保することができ
ることになる。
Thus, in the state where the construction of work scaffold 8-2 is completed,
As shown in FIG. 5, it is now possible to maximize the unloading path without using any of the vertical members that have conventionally been problematic for each building.

したがって、昇降路1を通して機械室1aに大きな用品
(図示しない)を荷揚げするような場合、作業足場8・
・・を修正(解体)して広げるといった手間のかかる作
業は不要で、能率の良い荷揚げ作業を行なうことができ
るようになる。
Therefore, when unloading large items (not shown) into the machine room 1a through the hoistway 1, the work scaffold 8
There is no need for the time-consuming work of modifying (dismantling) and expanding the ..., making it possible to carry out cargo unloading operations more efficiently.

そのうえ、荷揚げした用品を据付ける作業においても作
業の邪魔となる縦地部材がないため、昇降路1の全問を
最大限に利用した作業が行なわれることから、作業は行
ないやすく狭い昇降路内での作業性(能率を含めて)の
向上を図ることができる。また作業足場8はそ扛ぞれ独
立して昇降路1内に固定されるところから、横揺れのな
い安定感に優れるものが構築されることになり、作業足
場8・・・上での据付作業は安全で、安全性にも優れる
。さらに、縦地部材を削減した分、作業足場装置2の施
行にかかわる組立て、解体、撤去作業は、作業工数およ
びそれに伴う時間の削減によシ、容易かつ短時間でよく
なり、施工の能率化(省力化を含む)を図ることができ
るとともに、部材の削減と併せてコストの低減を図るこ
とができる効果を奏する。
Furthermore, since there are no vertical members that obstruct the work when installing the unloaded equipment, the work can be carried out by maximizing the use of all sections of hoistway 1, making it easier to carry out work within the narrow hoistway. It is possible to improve workability (including efficiency) at In addition, since the work scaffolds 8 are each independently fixed in the hoistway 1, a structure with excellent stability without lateral sway can be constructed, and the installation on the work scaffolds 8... The work is safe and the safety is excellent. Furthermore, since the number of vertical members is reduced, the assembly, disassembly, and removal work involved in implementing the work scaffolding device 2 becomes easier and faster due to the reduction in work man-hours and associated time, increasing the efficiency of construction. (including labor saving), and also has the effect of reducing costs as well as reducing the number of members.

なお、上述した実施例以外のエレベータ−のタイ!全機
種にもこの発明を適用できることはもちろんである。
In addition, elevator ties other than the above-mentioned embodiments! Of course, this invention can be applied to all models.

〔発明の効果」 以上説明したようにこの発明によれば、昇降路内に独立
して作業足場を複数段構築する構造としたから、荷揚げ
路を最大限に確保することができるとともに、施工作業
並びに据付作業の能率化、安全化を図ることができる。
[Effects of the Invention] As explained above, according to the present invention, since the structure is such that multiple stages of work scaffolding are constructed independently within the hoistway, it is possible to secure the unloading path to the maximum extent possible, and also to reduce the construction work. In addition, installation work can be made more efficient and safer.

しかも、構造が従来のものに比べきわめて簡易で、コス
トの低減化にも優れる利点がある。
In addition, the structure is extremely simple compared to conventional ones, and there are advantages in reducing costs.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の作業足場装置を示す斜視図、第2図はこ
の発明の一実施例の作業足場装置を示す側面図、第3図
はその取付具および支持部材の取付構造を示す側面図、
第4図はその安全装置の取付構造を示す側面図、第5図
は施工を終えた状態の作業足場装置金示す斜視図である
。 1・・・昇降路、3・・・取付具、6・・・横桁部材(
支持部材)、7・・・縦桁部材(足場部材9.8・・・
作業足場。 出願人代理人  弁理士 鈴 江 武 彦特開昭58−
160474 (4)
FIG. 1 is a perspective view showing a conventional work scaffolding device, FIG. 2 is a side view showing a work scaffolding device according to an embodiment of the present invention, and FIG. 3 is a side view showing the mounting structure of its fixture and support member. ,
FIG. 4 is a side view showing the mounting structure of the safety device, and FIG. 5 is a perspective view showing the work scaffolding device after construction. 1... Hoistway, 3... Fixture, 6... Cross beam member (
supporting member), 7... longitudinal girder member (scaffolding member 9.8...
work scaffolding. Applicant's agent Patent attorney Suzue Takehiko Japanese Patent Application Publication No. 1983-
160474 (4)

Claims (1)

【特許請求の範囲】[Claims] 乗りかごが昇降する昇降路の下膜側の相対向する壁面に
それぞn取付具を取付け、これら取付具にその取付具間
に渡って複数の支持部材を固定し、これら支持部材上に
足場部材を架設して作業足場を構成し、この作業足場を
昇降路の上階方向へ複数段配設してなることを特徴とす
るエレベータ−工事用における作業足場装置。
Attach fittings to opposing walls on the lower membrane side of the hoistway where the car goes up and down, fix a plurality of supporting members to these fittings across between the fittings, and install scaffolding onto these supporting members. A work scaffolding device for elevator construction, characterized in that a work scaffold is constructed by constructing members, and the work scaffold is arranged in multiple stages toward the upper floors of a hoistway.
JP57042078A 1982-03-17 1982-03-17 Working scaffold apparatus in elevator construction Pending JPS58160474A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP57042078A JPS58160474A (en) 1982-03-17 1982-03-17 Working scaffold apparatus in elevator construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP57042078A JPS58160474A (en) 1982-03-17 1982-03-17 Working scaffold apparatus in elevator construction

Publications (1)

Publication Number Publication Date
JPS58160474A true JPS58160474A (en) 1983-09-22

Family

ID=12626017

Family Applications (1)

Application Number Title Priority Date Filing Date
JP57042078A Pending JPS58160474A (en) 1982-03-17 1982-03-17 Working scaffold apparatus in elevator construction

Country Status (1)

Country Link
JP (1) JPS58160474A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169011A (en) * 2005-12-22 2007-07-05 Matsushita Home Elevator Kk Main rope holding structure in elevator installation work
JP2007290832A (en) * 2006-04-26 2007-11-08 Hitachi Building Systems Co Ltd Elevator installation method and installation device
JP2011201613A (en) * 2010-03-24 2011-10-13 Taisei Corp Asbestos removing method
NL2005188C2 (en) * 2010-08-02 2012-02-06 Kennett Gmbh RAIL PROTECTION FOR AN OPENING.
CN104176582A (en) * 2014-08-12 2014-12-03 苏州台菱电梯有限公司 Elevator anti-falling device and application method thereof
DE102017123014A1 (en) * 2017-10-04 2019-04-04 Zaugg Construction GmbH Hammock Safety System
JP2019183405A (en) * 2018-04-03 2019-10-24 大成建設株式会社 Construction method of fireproof wall

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169011A (en) * 2005-12-22 2007-07-05 Matsushita Home Elevator Kk Main rope holding structure in elevator installation work
JP2007290832A (en) * 2006-04-26 2007-11-08 Hitachi Building Systems Co Ltd Elevator installation method and installation device
JP2011201613A (en) * 2010-03-24 2011-10-13 Taisei Corp Asbestos removing method
NL2005188C2 (en) * 2010-08-02 2012-02-06 Kennett Gmbh RAIL PROTECTION FOR AN OPENING.
CN104176582A (en) * 2014-08-12 2014-12-03 苏州台菱电梯有限公司 Elevator anti-falling device and application method thereof
DE102017123014A1 (en) * 2017-10-04 2019-04-04 Zaugg Construction GmbH Hammock Safety System
JP2019183405A (en) * 2018-04-03 2019-10-24 大成建設株式会社 Construction method of fireproof wall

Similar Documents

Publication Publication Date Title
JP2010065378A (en) Hanging scaffold and method for erecting the same
CN108560895B (en) Adjustable elevator shaft operation platform and erection method thereof
JPS58160474A (en) Working scaffold apparatus in elevator construction
JP2007218029A (en) Girder lifting erection method and girder erection joint structure
JPH0220354Y2 (en)
JPH05178561A (en) Installation method for guide rail for elevator
CN113152658B (en) Large-span corridor with comprehensive curtain wall at bottom and construction method
JPS5975980A (en) Movable foothold for construction of coke oven
KR102373661B1 (en) Scaffolding device for maintaining of elevator
CN115637810A (en) Large-space special-shaped honeycomb aluminum plate ceiling structure and construction method
JP6525198B2 (en) Seismic reinforcement method and reinforcement system for existing buildings
JP2008280165A (en) Lifting structure of heavy article
JP2007009633A (en) Tool for suspending cable
CN204002841U (en) A kind of outrigger formula mobile formwork for support of tunnel wall pouring construction
CN210713763U (en) Construction platform device
JPH10121713A (en) Load receiving stage and mounting method thereof
CN110965808A (en) Construction method of externally hung stair and packway of fabricated building
CN220267177U (en) Elevator well operation platform
WO2018011955A1 (en) Elevator and method for renewing elevator
JPH1072939A (en) Main rope support and main rope erection method in construction of prestressed concrete building using main rope support
CN216186805U (en) Large-scale assembled PC component transportation frame
JP6925707B2 (en) Basement attic structure and basement construction method using the basement attic structure
JP3100574B2 (en) Suspended scaffold and its erection method
JP3798966B2 (en) Lifting mast and lifting platform connection method and suspension scaffold device
JPS59170308A (en) Assembling of suspended scaffold