JPS58110754A - Construction of building - Google Patents

Construction of building

Info

Publication number
JPS58110754A
JPS58110754A JP56215530A JP21553081A JPS58110754A JP S58110754 A JPS58110754 A JP S58110754A JP 56215530 A JP56215530 A JP 56215530A JP 21553081 A JP21553081 A JP 21553081A JP S58110754 A JPS58110754 A JP S58110754A
Authority
JP
Japan
Prior art keywords
space
formwork
unit
forming
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP56215530A
Other languages
Japanese (ja)
Other versions
JPS6329057B2 (en
Inventor
板垣 茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Engineering Corp
Toshiba Corp
Original Assignee
Toshiba Engineering Corp
Tokyo Shibaura Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Engineering Corp, Tokyo Shibaura Electric Co Ltd filed Critical Toshiba Engineering Corp
Priority to JP56215530A priority Critical patent/JPS58110754A/en
Publication of JPS58110754A publication Critical patent/JPS58110754A/en
Publication of JPS6329057B2 publication Critical patent/JPS6329057B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 発明の技術分野 本発明は建屋の構築方法に関する。[Detailed description of the invention] Technical field of invention The present invention relates to a method of constructing a building.

発明の技術的背景 一般に原子力発電設備の建醸内には多数の配管・配線・
ケーブル等が配置されている.そして、原子力発電設備
では耐震性を向上させるため建屋躯体内にトンネル状の
空間部を設けこの空間部に配管等を設置することが行な
われている。
Technical background of the invention Generally, there are many pipes, wiring,
Cables etc. are arranged. In nuclear power generation facilities, in order to improve earthquake resistance, a tunnel-like space is provided within the building frame and piping and the like are installed in this space.

そして、従来このような原子力発電設備建屋の構築方法
はIJ41図ないし第4図に示す各行程により行なわれ
るものである.まず、@1図に示すようにコンクリート
打設用の型枠I・・・に空間形成枠2をセ・童レータ3
・・・により取付ける。
Conventionally, the construction method of such a nuclear power generation equipment building is carried out according to the steps shown in Figures IJ41 to Figure 4. First, as shown in Figure @1, space forming frame 2 is placed in formwork I for concrete pouring.
Attach by...

このとき空間修成枠2にはアンカ4・・・を取付けてお
く,次に第2図に示すようにコンクリートlを打設する
.そしてコンクリート5の養生後。
At this time, anchors 4 are attached to the space modification frame 2, and then concrete l is poured as shown in Figure 2. And after curing of concrete 5.

型枠1・・・。空間形成枠lを取外して第3図に示すよ
うな内部に空間部σを有する建履駆体1が形成される0
次に、第4図に示すように空間部−に支持体1を1y力
4・・・を介して固定する。
Formwork 1... After removing the space forming frame l, a building deck structure 1 having a space σ inside as shown in FIG. 3 is formed.
Next, as shown in FIG. 4, the support 1 is fixed in the space using a 1y force 4.

そして、この支持体Iに配管9・−等を架設する。Then, pipes 9, etc. are constructed on this support I.

岬景技術の問題点 このような従来の構築方法では打設したコンク9−)j
の養生が終り型枠1・・・、空間形成枠2を取外した後
でなければ配管t・・・等の設置工程を行なうことはで
きなかった。また、形成された空間部Cはコンクリート
5で囲められており長尺の配管9・・・等をこの空間部
6に一人するのは困難な場合があり、このような場合に
は既に完成した建屋躯体rに仮開口を設けて、仮開口か
ら配管9・・・等を搬入しなければならず、きわめて非
能率的である等の欠点があった。また。
Problems with the capescape technology: With this conventional construction method, the concreted concrete 9-)j
It was not possible to carry out the process of installing the piping t, etc. until after the curing of the molds 1, . . . and the space forming frame 2 had been removed. In addition, the formed space C is surrounded by concrete 5, and it may be difficult for one person to install long pipes 9, etc. in this space 6. It is necessary to provide a temporary opening in the building frame r and transport the pipes 9, etc. through the temporary opening, which has the disadvantage of being extremely inefficient. Also.

配tり・・・等を適中で連結する場合にも同様に作業用
の仮開口を設ける必要があり、これまた非能率的であっ
た。
Similarly, when connecting the treads, etc. in the middle, it is necessary to provide a temporary opening for the work, which is also inefficient.

発明の目的 本発明の目的は、内部に配管用の空間部を有する建屋の
建設工期を短縮するとともに、13管等の設置作業を容
易に行なうことのできる建屋の構築方法を提供すること
にある。
OBJECTS OF THE INVENTION An object of the present invention is to provide a method for constructing a building that can shorten the construction period of a building that has a space for piping inside, and also facilitate the installation work of 13 pipes, etc. .

発明の概要 本発明による建屋の構築方法は機器を収容する空間を構
成するとともに収容される機器をあらかじめ内部に据付
けた容器状の空間形成型枠ユニットを構築する工程と、
この空間形成型枠ユニットを設置箇所″に設置するとと
もにその周囲にコンクリート打設用の型枠を構築する工
程と、この型枠と上記空間形成型枠ユニットとの間にコ
ンクリートを打設する工程ととからなるものである。し
たがって、建屋を構築して空間部を形成すると同時に内
部に配管等の配役が同時になされるので構築工程がきわ
めて能率的となるものである。
Summary of the Invention The method for constructing a building according to the present invention includes the steps of constructing a container-shaped space-forming formwork unit that configures a space for accommodating equipment and in which the equipment to be accommodated is installed in advance;
A process of installing this space-forming formwork unit at the installation location and constructing a formwork for concrete pouring around it, and a process of pouring concrete between this formwork and the above-mentioned space-forming formwork unit. Therefore, the construction process becomes extremely efficient because the building is constructed to form a space and piping, etc., are installed inside the building at the same time.

発明の実施例 第5図ないし第10図にしたがって本発明の第1実施例
を説明する。まず、第5図および第6図に示す如き空間
形成型枠ユニット1−1を横棒する。この空間形成型枠
ユニットl#1は鋼板等を溶接して形成した枠体102
を有し、この枠体101は第6図に示す如く複数の分割
枠体rash、rashに分割した構造とし、これら分
割枠体taxs、iambは端部にフランジ部11←−
を有し、これらフランジ部104を衝合してest)r
as−により結合できる構造としである。そして、これ
ら分割枠体roz*、raxb内には支持体1 # #
 −・・が設けられ、この支持体10#・・・には必要
な配管11J’l・・・、ケーブル11ト・等が取付け
られでいる。また、これら配管1#r・−およびケーブ
ル101・−はこの分割枠体1011に−・の結合箇所
において継手5ee−、プネク!11#・・・によって
接続されるように構成されている。また。
Embodiment of the Invention A first embodiment of the invention will be described with reference to FIGS. 5 to 10. First, a space forming form unit 1-1 as shown in FIGS. 5 and 6 is horizontally barred. This space forming formwork unit l#1 is a frame body 102 formed by welding steel plates etc.
As shown in FIG. 6, this frame body 101 has a structure divided into a plurality of divided frame bodies rash and rash, and these divided frame bodies taxs and iamb have flange portions 11←-
est)r by abutting these flange portions 104.
This is a structure that can be bonded by as-. And, in these divided frame bodies roz* and raxb, there is a support body 1 # #
-... are provided, and necessary piping 11J'l..., cables 11T, etc. are attached to the supports 10#.... In addition, these pipes 1#r.- and cables 101.- are connected to this split frame body 1011 at the joint 5ee-, Puneku! 11#... Also.

これら分割枠体J l j a−の外面には上記支持体
1#−・・・に対応してアンカ111・−が賓役されて
おり、上記支持体11J6・・・に作用する配管101
・・・やケーブル108・−の荷重はされらアンカ11
1・−に伝達されるように構成され七いる。また1図中
112・−は七ノ臂レータである。
Anchors 111.- are attached to the outer surfaces of these divided frames Jlja- in correspondence with the supports 1#-..., and piping 101 acting on the supports 11J6...
The load of ... and the cable 108-- is carried out by the anchor 11.
1.-. Also, 112.- in Figure 1 is the seventh arm laterator.

なお、この空間形成型枠ユニツ)74)J・・・は工場
で製造され、必要に応じて分割枠体1021・・・を分
割して建設現場まで運搬される。
Note that this space forming formwork unit) 74) J... is manufactured in a factory, and the divided frame bodies 1021... are divided as necessary and transported to the construction site.

次に、第7図に示すように、コンクリート打設用の型枠
113・・・を配置し、これ゛ら型枠113・・・の内
側に予め用意された上記空間形ふ型枠ユニット1−1を
セノ!レータJ’Jj−・・によって所定位置に固定□
する。キしで、型枠111・・・と空間形成型枠ユニッ
ト1互1の枠体1111との間隙−には鉄筋114・・
・を配筋する。
Next, as shown in FIG. 7, the formwork 113 for concrete pouring is placed, and the space-shaped formwork unit 1 prepared in advance inside the formwork 113... Seno -1! Fixed in place by the rotor J'Jj-...□
do. In the gap between the formwork 111... and the frame body 1111 of the space forming formwork unit 1, reinforcing bars 114...
・Arrange reinforcement.

次に、第8図に示讐ように型枠111・・・と空間形成
型棒ユニット101の枠体101との間隙にコンクリー
ト111を打設等る。そして。
Next, as shown in FIG. 8, concrete 111 is placed in the gap between the formwork 111... and the frame 101 of the space-forming rod unit 101. and.

コンクリート111の養生後、型枠111−・・を取除
けば第9図に示すような内部に配管通路用の嫡間部11
gk有する鉄筋コンクリート製の建屋躯体111が完成
する。
After the concrete 111 is cured, if the formwork 111-- is removed, there will be a vertical section 11 for the piping passage inside as shown in Fig. 9.
A building frame 111 made of reinforced concrete with gk is completed.

外お、こあ空間形成型−ユニット101の長手方向端部
=閉塞する場合は第10図に示すように閉塞板11#を
設けそ密閉し、また開放する場合にはフランジ部119
を型枠113に衝合させておけば、この型枠111を取
外すとこの空間形成型枠ユニット101の端部は開口さ
れるものである。
Outer and inner space forming type - Longitudinal end of the unit 101 = If the unit 101 is to be closed, a closing plate 11# is provided as shown in FIG.
If the space-forming formwork unit 101 is brought into contact with the formwork 113, the ends of the space-forming formwork unit 101 will be opened when the formwork 111 is removed.

このような本発明の第1実施例では次に述べる利点を有
する。第1に、コンクリートを打設して建屋躯体111
を構築すると同時に配管J # ’I−・・等が枠体1
−1内に形成される空間内に配置されるので工期を大幅
に短縮できる。
The first embodiment of the present invention has the following advantages. First, concrete was poured to form the building frame 111.
At the same time as constructing the pipe J # 'I-... etc., frame 1
Since it is placed within the space formed within -1, the construction period can be significantly shortened.

第2に、配管J # F −・・等は空間形成型枠ユニ
ツ)J#7の製造と同時に取付けられるので従来の如(
狭い空間部内で配管I#ν・・・等の配置をおこなう必
要はなく、作業が容易になる。
Secondly, piping J#F-... etc. can be installed at the same time as the space forming formwork unit) J#7 is manufactured, so it can be installed as usual (
There is no need to arrange the pipes I#ν, etc. in a narrow space, making the work easier.

第3に、空間形成型枠工ニット101は確設現場で組立
てる必要はなく、作愈環塊のよい工場内で予め製造する
ことができるので、十分な品質管理を行なうことができ
る。
Thirdly, the space-forming formwork knit 101 does not need to be assembled at the installation site, and can be manufactured in advance in a factory with good production capacity, so that sufficient quality control can be carried out.

また1本発明の第2実施例を第119を参照して説明す
る。この第!実施例はfiyf璽等の大きな空間部11
#を形成する場合のものである。このものは分割して別
途工場生産された空間形成型枠ユニッ)JJFとして鋼
板等からなる床部材J20、壁部材121・・・、天井
部材IIIを別々に製作し、床部材120にはIフグ1
13、制御機器124等をあらかじめ据付け、また壁部
材121・・・には配管101・・・、ケーブルトレイ
125・・・等を取付けておく、また、壁部材111に
は出入口126を設けてお(。
Further, a second embodiment of the present invention will be described with reference to No. 119. This number! The example is a large space 11 such as a fiyf seal.
This is the case when forming #. This is a space-forming formwork unit that is divided and produced separately in a factory.) As JJF, the floor member J20, wall member 121, etc., ceiling member III made of steel plates etc. are manufactured separately, and the floor member 120 is made of I blowfish. 1
13. Install the control equipment 124, etc. in advance, and install the piping 101..., cable tray 125..., etc. on the wall members 121..., and provide the entrance/exit 126 on the wall member 111. (.

そして、これら床部材1211%壁部材121・・・、
天井部材122・・・を別夷に建築現場まで運搬し、こ
れらを組立てて空間形成型枠ユニツ)LLlを構成する
。そして、この空間形成型枠ユニツ)mの外側に型枠(
図示せず)を配置して建屋躯体128を構築する。なお
、建屋躯体128には壁部材121の出入口126に対
応して出入通路129を形成する。この第2実施例のも
のはポンプ室の如く大きな空間部を形成する場合に好適
するものである。
And these floor members 1211% wall members 121...
The ceiling members 122... are separately transported to the construction site and assembled to form a space forming form unit (LLl). Then, the formwork (
(not shown) to construct the building frame 128. Note that an entrance/exit passage 129 is formed in the building frame 128 in correspondence with the entrance/exit 126 of the wall member 121. This second embodiment is suitable for forming a large space such as a pump chamber.

また、第12図を参照して第3実施例を説明する。この
ものは空間形成ユニット130島。
Further, a third embodiment will be described with reference to FIG. This is a space forming unit with 130 islands.

xsobと型棒131・・eとを用いて空間部132を
形成する型枠組立体を構成し、コンクリート打設後、型
枠J 1 :1−・・を取外して空間形成ユニットtx
emm111]をこの゛空間部131内に残すものであ
る。この第3実施例は空間部132がきわめて大きな場
合に好適するものである。
xsob and the mold rods 131...e constitute a formwork assembly that forms the space 132, and after pouring concrete, the formwork J1:1... is removed and the space forming unit tx is constructed.
emm111] is left in this space 131. This third embodiment is suitable when the space 132 is extremely large.

発明の効果 本発明による建直の構築方法は、機器を収容する空間を
構成するとともに収容される機器をあらかじめ内部に書
付けた空間形成型枠ユニットを構築し、この空間形成型
枠ユニットの鳩囲値:コンクリーシを打設するので、躯
体を構築するとともに空間部を形威し、かつこの空間部
内における旧管等の配設を同時に完了できる。したがっ
て、工期が短縮できるとともに、空間部内に収容される
機器の設置を容具に行なうことができる等その効果は大
である。
Effects of the Invention The construction method for rebuilding according to the present invention constructs a space-forming formwork unit that constitutes a space for accommodating equipment, and in which the equipment to be accommodated is written inside in advance. Surrounding value: Since concrete will be poured, it is possible to construct the frame, shape the space, and complete the installation of old pipes, etc. within this space at the same time. Therefore, the construction period can be shortened and the equipment to be accommodated in the space can be installed in the container, which has great effects.

【図面の簡単な説明】[Brief explanation of drawings]

第1図ないし第4図は従来の原子力発電設備建屋の構築
方法を示す縦断面図である。第5図は本発明の第2およ
び第3実施例を説明する断面図である。 101.121゜13′01A、LLLJ!・・・空間
形成型枠ユニット、102・・・枠体、103・・・分
割枠体、lag・・・支持体、ior・・・配管、11
1・・・アンカ、112・・・セノヤレータ、11J・
・−m枠。 114・・・鉄筋% 115・・・コンクリート、11
8゜119.132・・・空間部% 11 F −・・
建屋躯体、11#・・・閉塞板。 出−人代理人  弁理士 鈴 江 武 彦第1図 第2図 第3図 第4図 第7図 第8図
1 to 4 are vertical sectional views showing a conventional method of constructing a nuclear power generation equipment building. FIG. 5 is a sectional view illustrating the second and third embodiments of the present invention. 101.121゜13'01A, LLLJ! ...Space forming formwork unit, 102...Frame body, 103...Divided frame body, lag...Support body, ior...Piping, 11
1... Anchor, 112... Senoyalator, 11J.
・-m frame. 114...Reinforcement% 115...Concrete, 11
8゜119.132... Space part % 11 F -...
Building frame, 11#...Closure plate. Representative Patent Attorney Takehiko Suzue Figure 1 Figure 2 Figure 3 Figure 4 Figure 7 Figure 8

Claims (2)

【特許請求の範囲】[Claims] (1)  機器を収容する空間を構成するとともに収容
される機器をあらかじめ内部に据付けた空間形成型枠ユ
ニットを構築する工程と、この空間形成型枠ユニットを
設置部所に設置するとともにその周囲にコンクリート打
設用の型枠を構築する工程と、この後に上記型枠と上記
空間形成型枠ユニットとの間にコンクリートを打設する
工程とからなることを特徴とする優子力11簑會建履の
構築方法。
(1) The process of constructing a space-forming formwork unit that configures a space for accommodating equipment and in which the equipment to be accommodated is installed in advance, and installing this space-forming formwork unit at the installation location and surrounding it. A Yukoriki 11-house construction system characterized by comprising a step of constructing a formwork for pouring concrete, and a step of subsequently placing concrete between the formwork and the space forming formwork unit. How to build.
(2)前記空間形成型枠ユニットの構築はこの空間形成
型枠ユニットを構成する複数の分割片に機器をあらかじ
め揚付けておき、これらの分割片をコンクリート打設現
場で組立てて空間形成型枠ユニットを構築するものであ
ることを特徴とする特許 吻潰1看番ー麗の構築方法。
(2) To construct the space-forming formwork unit, equipment is first lifted onto the plurality of divided pieces that make up this space-forming formwork unit, and these divided pieces are assembled at the concrete pouring site to form the space-forming formwork. A method of constructing a patented Nosobusu 1 Kenban-Rei, which is characterized in that it is a method for constructing a unit.
JP56215530A 1981-12-24 1981-12-24 Construction of building Granted JPS58110754A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP56215530A JPS58110754A (en) 1981-12-24 1981-12-24 Construction of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP56215530A JPS58110754A (en) 1981-12-24 1981-12-24 Construction of building

Publications (2)

Publication Number Publication Date
JPS58110754A true JPS58110754A (en) 1983-07-01
JPS6329057B2 JPS6329057B2 (en) 1988-06-10

Family

ID=16673947

Family Applications (1)

Application Number Title Priority Date Filing Date
JP56215530A Granted JPS58110754A (en) 1981-12-24 1981-12-24 Construction of building

Country Status (1)

Country Link
JP (1) JPS58110754A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0450363U (en) * 1990-09-04 1992-04-28

Also Published As

Publication number Publication date
JPS6329057B2 (en) 1988-06-10

Similar Documents

Publication Publication Date Title
US5997792A (en) Apparatus and process for casting large concrete boxes
CN212358846U (en) Assembled concrete composite beam
KR20140110490A (en) Half precast concrete column manufacturing method using prefabricated PC panels and constructing method using the same
JPS58110754A (en) Construction of building
CN111809796A (en) Assembled concrete composite beam and construction method thereof
CN218766269U (en) Telescopic shield segment mold capable of being recycled
JPH09203060A (en) Last joint execution method of immersed tunnel
JP3015415B2 (en) Nuclear power plant construction method
JP2915135B2 (en) Caisson and its manufacturing method
CA1115072A (en) Method of manufacturing building elements and building
JP3308761B2 (en) Reactor containment vessel construction method
JPH0694863A (en) Construction method of radiation shielding wall
CN219404689U (en) Grouting sleeve slurry inlet and outlet hole fixing die for vertical die production and die combination structure
CN115139407B (en) Method for manufacturing assembled combined formwork beam component
JPS6055175A (en) Construction of composite structural storage tank
JPS62121237A (en) Constructing method for apparatus foundation
JP3011080B2 (en) How to make a caisson skeleton
JPS62293188A (en) Structure of nuclear-reactor container wall
CN115045440A (en) Prefabricated column component with steel pipe joints at two ends and construction method thereof
JPH041832B2 (en)
JPS6228389A (en) Precast heat accumulating tank made of concrete
JP3011081B2 (en) Caisson skeleton
JP2556952B2 (en) Manufacturing method for tubular concrete products
JPS5833155B2 (en) How to build offshore structures
JPH0553601B2 (en)