JPS58110732A - Installation of pipe culvert - Google Patents
Installation of pipe culvertInfo
- Publication number
- JPS58110732A JPS58110732A JP56125803A JP12580381A JPS58110732A JP S58110732 A JPS58110732 A JP S58110732A JP 56125803 A JP56125803 A JP 56125803A JP 12580381 A JP12580381 A JP 12580381A JP S58110732 A JPS58110732 A JP S58110732A
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- steel rod
- pipe culvert
- sand
- mound
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Sewage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
この発明はボックスカルバート等の管渠設置工法に関す
る。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for installing pipes such as box culverts.
従来オーブンカットされた溝底に管渠を設置する場合地
盤上に栗石、砂を布設し、その上に空練りモルタル、あ
るいは捨コンを打設して基礎工を造成している。ところ
で前記従来方法では基礎工のレベル出しに手間が掛り、
また捨コンを使用する場合所要の耐力が出るまでに養生
時間が必要となり施工の迅速化が困難である。さらに溝
の掘削に推進山留機を使用する場合、油圧ジヤツキによ
る推進反力を設置した管渠にとるが、基礎工の上面精度
が完全でないと油圧ジヤツキで押すと管渠が浮上したり
、片押しになることが屡々ある。Conventionally, when installing a pipe in the bottom of an oven-cut trench, the foundation is created by laying chestnut stone or sand on the ground, and pouring dry mortar or waste concrete on top of it. However, with the conventional method, it takes time to level the foundation work,
Furthermore, when waste concrete is used, curing time is required before the required strength is achieved, making it difficult to speed up construction. Furthermore, when using a propulsion retainer for trench excavation, the propulsion reaction force by a hydraulic jack is applied to the installed pipe, but if the top surface accuracy of the foundation work is not perfect, the pipe may float up when pushed by the hydraulic jack. It is often pushed to one side.
この発明は前記従来の問題点を解消すべく開発された工
法で、以下その詳細を図示した実施例によって説明する
。This invention is a construction method developed to solve the above-mentioned conventional problems, and its details will be explained below with reference to illustrated embodiments.
先ずこの工法に使用される管渠1、すなわちボックスカ
ルバートの底部周縁の両側および先端側の僅か肉寄りに
スカート部2,3が形成され、底面に凹部4が形成され
、また先端側スカート部6の外側にも小凹部5が形成さ
れている。またこの管渠1の躯体の一部、特に4隅部に
は接続方向の鋼棒挿通孔6が貫通、して設けてあり、か
つ鋼棒挿通孔6と交叉する方向に鋼棒締付凹溝7が設け
である。また底板にはグラウト注入孔8が設けである。First, skirt parts 2 and 3 are formed on both sides of the bottom peripheral edge of the pipe culvert used in this construction method, that is, a box culvert, and slightly closer to the tip side, a recess 4 is formed in the bottom surface, and a skirt part 6 on the tip side is formed. A small recess 5 is also formed on the outside. In addition, a steel rod insertion hole 6 in the connection direction is provided in a part of the body of the pipe 1, particularly in the four corners, and a steel rod tightening recess is provided in a direction intersecting with the steel rod insertion hole 6. A groove 7 is provided. Further, a grout injection hole 8 is provided in the bottom plate.
施工に際しては推進山留機A間をバンクフォー等によっ
て掘削し、その掘削溝底に砂類を布設してマウンド9を
形成し、次いで管渠1をマウンド9上に吊り下げたまま
で鋼棒10の先端部を先に設置定着した管渠1の鋼棒挿
入孔6にセットし、吊り下げたその管渠1をジヤツキB
で押すことによってマウンド9には荷重をかけず先に設
置定着した管渠1に田接し、管渠1の鋼棒挿通孔6内に
収納しである鋼棒10を接続する管渠1,1間に跨るよ
う位置させ、鋼棒締付凹溝7内においてナツトにより緊
締し、接続される管渠1を片持梁上に連結支持させる。During construction, excavate between the propulsion retainers A using a bank four or the like, lay sand at the bottom of the excavation groove to form a mound 9, and then attach the steel rod 10 with the pipe 1 suspended above the mound 9. Set the tip of the pipe into the steel rod insertion hole 6 of the pipe culvert 1 that was installed and fixed first, and then jack the suspended pipe culvert B.
By pressing the mound 9, the pipe culvert 1 is connected to the pipe culvert 1 that has been installed and fixed first without applying any load, and the steel rod 10, which is housed in the steel rod insertion hole 6 of the pipe culvert 1, is connected to the pipe culverts 1, 1. The steel rods are positioned so as to straddle the steel rods, and are tightened with nuts in the steel rod tightening grooves 7 to connect and support the connected pipe 1 on the cantilever beam.
なお管渠の先端側の小凹部5に対応してマウンド9上の
所要位置にグラウト田に耐える量の砂91を盛上げて管
渠1,1間の接続部からグラウト材の流出を防止するよ
うにする。また砂9′を盛上げる際は管渠1,1間目地
部にもグラウト材がグラウトされる様に砂91を盛上げ
ると、管渠1,1間目地部の止水構造となる。また推進
山留機Aが推進する際、管渠1の側部には埋戻しまたは
砂等吹込み充填する。In addition, an amount of sand 91 that can withstand the grout field is piled up at a predetermined position on the mound 9 corresponding to the small recess 5 on the tip side of the pipe culvert to prevent the grout material from flowing out from the connection between the pipe culverts 1 and 1. Make it. When sand 9' is piled up, the sand 91 is piled up so that the grout material is also applied to the joint between the pipes 1 and 1, thereby creating a water-stop structure at the joint between the pipes 1 and 1. Further, when the propulsion retainer A is propelled, the side of the pipe culvert 1 is backfilled or filled with sand or the like.
以上のようにして周囲が密閉状態となった管渠1の底面
の凹部4内にグラウト用ポンプ11を通じてセメントモ
ルタル等のグラウト材12を注入し硬化させる。なおこ
のグラウト材の注入作業は複数の管渠1について同時的
に実施してもよい。なお凹部4には必要に応じて、適当
な位置に空気抜き孔を取り付けてもよい。A grouting material 12 such as cement mortar is injected into the recess 4 on the bottom surface of the pipe 1, which has been sealed in the manner described above, through the grouting pump 11 and hardened. Note that this grout injection work may be performed simultaneously for a plurality of pipes 1. Note that an air vent hole may be attached to the recess 4 at an appropriate position, if necessary.
以上の施工を推進山留機Aの推進に伴って繰返し、また
管渠1の上方には適宜土砂を埋戻して施工を完了する。The above construction is repeated with the propulsion of the propulsion retainer A, and the upper part of the pipe culvert 1 is appropriately backfilled with earth and sand to complete the construction.
この発明は以上の構成からなり掘削溝底は砂類を布設し
てマウンドを形成し直ちに管渠を搬入でき、しかも鋼棒
で連結することにより、順次設置でき、また推進ジヤツ
キの反力をとることができる。This invention has the above-mentioned structure. Sand is laid at the bottom of the excavation trench to form a mound, and pipes can be brought in immediately. Furthermore, by connecting them with steel rods, they can be installed one after another, and the reaction force of the propulsion jack is taken care of. be able to.
グラウト作業は後で適宜で施工でき、全体として施工を
容易とするとともに迅速な施工を可能ならしめることが
できる。The grouting work can be carried out later as appropriate, making the overall construction easier and faster.
第1図、第2図および第3図は管渠の正面図とI−1、
II−II断面図、第4図、第5図および第6図は施工
過程の概要を示した断面図、第7図は施工過程の詳細断
面図、第8図、第9図は鋼棒による接合部断面図である
。
1・・管渠、2,3・・スカート部、4・・凹部、5・
・小凹部、6・・鋼棒挿通孔、7・・凹溝、8・・グチ
ウド注入孔、9・・マウンド、91#・砂、10・・鋼
棒、11・・ポンプ、12・・グラウト材、A・・推進
山留機、B・・ジヤツキ。
第1図 第2図
第3図
第4図Figures 1, 2 and 3 are front views of the pipe and I-1,
II-II cross-sectional view, Figures 4, 5, and 6 are cross-sectional views showing an overview of the construction process, Figure 7 is a detailed cross-sectional view of the construction process, and Figures 8 and 9 are steel rod cross-sectional views. It is a sectional view of a joint part. 1. Pipe culvert, 2, 3. Skirt portion, 4. Concave portion, 5.
・Small recess, 6. Steel rod insertion hole, 7. Groove, 8. Grout injection hole, 9. Mound, 91#. Sand, 10. Steel rod, 11. Pump, 12. Grout. Material, A...propulsion mountain retainer, B...jacket. Figure 1 Figure 2 Figure 3 Figure 4
Claims (1)
部周縁にスカート部を形成し、底面に凹部の形成された
管渠を前記々ランド上に設置し、その管渠を先に設置定
着した管渠と鋼棒によって連結支持させ、次いで周囲が
密閉状態とたった前記凹部にグラウト注入し、次いで前
記工程を順次繰返すことを特徴とする管渠設置工法。Sand is laid at the bottom of the excavation trench to form a mound, then a skirt is formed around the bottom, a pipe with a recessed bottom is installed on each land, and the pipe is installed first. A pipe culvert installation method characterized by connecting and supporting a fixed pipe and a steel rod, then injecting grout into the recess whose surroundings are in a sealed state, and then sequentially repeating the above steps.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP56125803A JPS58110732A (en) | 1981-08-11 | 1981-08-11 | Installation of pipe culvert |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP56125803A JPS58110732A (en) | 1981-08-11 | 1981-08-11 | Installation of pipe culvert |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS58110732A true JPS58110732A (en) | 1983-07-01 |
JPS6331623B2 JPS6331623B2 (en) | 1988-06-24 |
Family
ID=14919285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP56125803A Granted JPS58110732A (en) | 1981-08-11 | 1981-08-11 | Installation of pipe culvert |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS58110732A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7032737B2 (en) * | 2018-06-23 | 2022-03-09 | 株式会社奥村組 | How to install FC plate fixing member and box structure |
JP7032736B2 (en) * | 2018-06-23 | 2022-03-09 | 株式会社奥村組 | How to install FC plate fixing member and box structure |
-
1981
- 1981-08-11 JP JP56125803A patent/JPS58110732A/en active Granted
Also Published As
Publication number | Publication date |
---|---|
JPS6331623B2 (en) | 1988-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105756091B (en) | A kind of Metro station excavation construction method of control adjacent building composition deformation | |
US4453366A (en) | Process of forming a continuous wall in the ground | |
CN1072746C (en) | Head and side grouting method for cast-in-situ pile | |
CN105484270A (en) | Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit | |
JPS58110732A (en) | Installation of pipe culvert | |
JPS63233120A (en) | Foundation work for wooden building | |
JPS6117696A (en) | Construction of underground head | |
JPH0953237A (en) | Pit and constructing method of basement utilizing the pit | |
JPH0249896A (en) | Open shield method and machine thereof | |
JPH07300845A (en) | Preventive method against liquefaction of underground linear structure | |
JP2000240075A (en) | Penetration type retaining wall | |
JPS6124624Y2 (en) | ||
JPH057357Y2 (en) | ||
JPS6124625Y2 (en) | ||
JP2541845Y2 (en) | Concrete box for underground structure | |
JPH02232414A (en) | Protecting method for underground utilities or the like | |
JPS63304821A (en) | Construction work of underground continuous cut-off wall | |
JPS6033941B2 (en) | Method and device for creating a pole foundation | |
JPS6124626Y2 (en) | ||
JP4344069B2 (en) | Reinforced concrete L-type retaining wall | |
JP2003027885A (en) | Construction method for underground tunnel and underground tunnel | |
JPS6192235A (en) | Fixing of embedded pipe | |
JP2832284B2 (en) | Open shield method | |
JPH0553890B2 (en) | ||
JPS6245368B2 (en) |