JPS5641908A - Method for transfer of trestle girder and crane for installation for dam construction - Google Patents

Method for transfer of trestle girder and crane for installation for dam construction

Info

Publication number
JPS5641908A
JPS5641908A JP11752979A JP11752979A JPS5641908A JP S5641908 A JPS5641908 A JP S5641908A JP 11752979 A JP11752979 A JP 11752979A JP 11752979 A JP11752979 A JP 11752979A JP S5641908 A JPS5641908 A JP S5641908A
Authority
JP
Japan
Prior art keywords
level
crane
pillar
trestle
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11752979A
Other languages
Japanese (ja)
Other versions
JPS6122084B2 (en
Inventor
Shigeo Mogi
Michio Enoki
Gunji Yoshihara
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanadevia Corp
Original Assignee
Hitachi Zosen Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Zosen Corp filed Critical Hitachi Zosen Corp
Priority to JP11752979A priority Critical patent/JPS5641908A/en
Publication of JPS5641908A publication Critical patent/JPS5641908A/en
Publication of JPS6122084B2 publication Critical patent/JPS6122084B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

PURPOSE:To transfer and install the trestle girder and crane most efficiently by providing a structure consisting of plural lower-level pillars and the trestle grider at a dam construction site and repeating concrete placing work using the crane on the girder. CONSTITUTION:The lower-level pillar 11 is erected on pillar foundation 5A-5J at a section corresponding to the dam construction site and the trestle girder 9 is installed across the upper ends of lower-level pillar 5. This erection and bridging work are repeated, completing the lower-level structure, on which the jib cranes 10, 12 are assembled. This lower-level structure will be provided at two positions, backward and forward. On the backward structure, the jib crane 17 is mounted and then concrete for a lower dam body is placed. After this process, an upper-level pillar 23 is erected on the lower-level pillar 11 and the trestle girder 9 is lifted by means of a hydraulic cylinder along the upper-level pillar 23, thus forming a structure. On thus structure, the jib crane is mounted. By this sequence, a dam is constructed.
JP11752979A 1979-09-12 1979-09-12 Method for transfer of trestle girder and crane for installation for dam construction Granted JPS5641908A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11752979A JPS5641908A (en) 1979-09-12 1979-09-12 Method for transfer of trestle girder and crane for installation for dam construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11752979A JPS5641908A (en) 1979-09-12 1979-09-12 Method for transfer of trestle girder and crane for installation for dam construction

Publications (2)

Publication Number Publication Date
JPS5641908A true JPS5641908A (en) 1981-04-18
JPS6122084B2 JPS6122084B2 (en) 1986-05-30

Family

ID=14714037

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11752979A Granted JPS5641908A (en) 1979-09-12 1979-09-12 Method for transfer of trestle girder and crane for installation for dam construction

Country Status (1)

Country Link
JP (1) JPS5641908A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213561A (en) * 2014-08-29 2014-12-17 中国长江三峡集团公司 Concrete casting construction method for large dam with high casting strength

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213561A (en) * 2014-08-29 2014-12-17 中国长江三峡集团公司 Concrete casting construction method for large dam with high casting strength

Also Published As

Publication number Publication date
JPS6122084B2 (en) 1986-05-30

Similar Documents

Publication Publication Date Title
ES338731A1 (en) Arrangement and method for constructing multispan bridges or the like
CA999115A (en) Braced girder for steel-reinforced concrete construction, a method of and apparatus for producing such girders
CN109056534B (en) A mobile bored pile construction platform and method
JPS5641908A (en) Method for transfer of trestle girder and crane for installation for dam construction
CN110820569B (en) A hoistable suspension platform device for mold-turning construction and its working method
GB877022A (en) Improvements in and relating to the construction of piles piers, jetties, bridges and the like
JP2845060B2 (en) Construction method of underground construction by fully automatic building construction system
CN218712247U (en) A bridge erecting machine for pier-beam integrated construction
GB1441953A (en) Metal girders
CN206205457U (en) A kind of steel reinforcement cage aids in colligation frame
SU617516A1 (en) Method of constructing hollow structures and structure erected by this method
CN207194414U (en) A kind of foundation-free steel platform for temporary support
JPS6466331A (en) Method of executing arched large space roof
SU783456A1 (en) Power transmission line mast
SU142212A1 (en) The method of construction of offshore platforms
SU698909A1 (en) Tower totally slewing crane
KR200375169Y1 (en) Apparatus of constructing temporary bridge
GB1042337A (en) Improvements in or relating to methods of erecting multi-storey buildings
SU1206436A1 (en) Arrangement for pressing into soil sinkable pile
CN203755180U (en) Transport device for preparation component of assembling prestressed concrete box girder
SU881269A1 (en) Form for erecting the blocks of massive concrete structures
SU649866A1 (en) Method of erecting artificial supports
FR2256894A1 (en) Building site tower crane - has tower of open sided sections forming lift shaft on completion
JPS57116835A (en) Construction of structure with basement
SU889796A1 (en) Apparatus for constructing micro-pile foundations