JPS5612436A - Protecting method of underwater h-steel pile and protection cover thereof - Google Patents

Protecting method of underwater h-steel pile and protection cover thereof

Info

Publication number
JPS5612436A
JPS5612436A JP8968779A JP8968779A JPS5612436A JP S5612436 A JPS5612436 A JP S5612436A JP 8968779 A JP8968779 A JP 8968779A JP 8968779 A JP8968779 A JP 8968779A JP S5612436 A JPS5612436 A JP S5612436A
Authority
JP
Japan
Prior art keywords
half body
steel pile
pile
semitubular
solidified
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8968779A
Other languages
Japanese (ja)
Inventor
Akihito Jinno
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NITSUSEN KAGAKU KOGYO KK
Nippon Sheet Glass Co Ltd
Nissan Chemical Corp
Original Assignee
NITSUSEN KAGAKU KOGYO KK
Nippon Sheet Glass Co Ltd
Nissan Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NITSUSEN KAGAKU KOGYO KK, Nippon Sheet Glass Co Ltd, Nissan Chemical Corp filed Critical NITSUSEN KAGAKU KOGYO KK
Priority to JP8968779A priority Critical patent/JPS5612436A/en
Publication of JPS5612436A publication Critical patent/JPS5612436A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

PURPOSE: To effectively protect the underwater structure of an H-steel pile from impact and corrosion by a method wherein the inside of hollow chamber which is composed of a pair of internally-flat semitubular bodies consisted of glass fiber reinforced cement and butt-fixed around the H-steel pile, is filled and solidified.
CONSTITUTION: After sticking each half body 11, 11' of the anchoring members of framework to the lower appropriate position of the H-steel pile 7, the inward flanges 4, 4' of the lower end of semitubular bodies 1, 1' of said semitublar protective cover are fitted in the grooves 18, 18 carved in each skin of each half body 16, 16' of the packing 16 to be fixed. Next the flanges 2, 2' of both covers 1, 1' are placed on spacing each other so that each bottom of each packing half body 16, 16' may touch the top of each half body 11, 11' are both covers are closely jointed through belt- shaped packings 6, 6. Next motar or concrete 10 is injected into an empty chamber 9 between the inside wall of the cover 1 and outside wall of the pile 7 to be solidified. And finally said injected part top surface is sealed with water proof mortar or coking agent.
COPYRIGHT: (C)1981,JPO&Japio
JP8968779A 1979-07-13 1979-07-13 Protecting method of underwater h-steel pile and protection cover thereof Pending JPS5612436A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8968779A JPS5612436A (en) 1979-07-13 1979-07-13 Protecting method of underwater h-steel pile and protection cover thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8968779A JPS5612436A (en) 1979-07-13 1979-07-13 Protecting method of underwater h-steel pile and protection cover thereof

Publications (1)

Publication Number Publication Date
JPS5612436A true JPS5612436A (en) 1981-02-06

Family

ID=13977668

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8968779A Pending JPS5612436A (en) 1979-07-13 1979-07-13 Protecting method of underwater h-steel pile and protection cover thereof

Country Status (1)

Country Link
JP (1) JPS5612436A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114453450A (en) * 2022-02-28 2022-05-10 洛阳汇成钢结构有限公司 Steel constructs uses H shaped steel

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS532180B2 (en) * 1973-06-20 1978-01-26

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS532180B2 (en) * 1973-06-20 1978-01-26

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114453450A (en) * 2022-02-28 2022-05-10 洛阳汇成钢结构有限公司 Steel constructs uses H shaped steel

Similar Documents

Publication Publication Date Title
SE7904515L (en) GUARD PROTECTION FOR ROR
JPS5612436A (en) Protecting method of underwater h-steel pile and protection cover thereof
GB2062052B (en) Forms of coping blocks for use in forming the top courses of a masonry wall
JPS52137120A (en) Assembly framework method of precast concrete earthquake resistant wall
JPS5652209A (en) Constructing material for shore protection
JPS55136367A (en) Method of breaking reinforced concrete slab* wall or like
JPS5631942A (en) Corrosion-inhibitive device for steel pile
JPS54150548A (en) Construction for fixing substance
IT1108027B (en) DEVICE FOR THE PROGERSSIVE ERECTION OF REINFORCED CONCRETE STRUCTURES WITH HORIZONTAL AND VERTICAL CURVATURE
SE7605241L (en) PROTECTIVE WALL FOR A STORAGE TANK CONTAINING THE ENVIRONMENT HAZARDOUS VETS
JPS5766216A (en) Artificial islet and its construction work
JPS576194A (en) Outer shell wall of semiunderground tank
JPS57184108A (en) Caisson work with raised bottom
JPS559911A (en) Joint work process for continuous underground wall by use of interlocking pipe and backing material container bag
SU1025803A1 (en) Retaining wall
AU5329786A (en) Formwork for use with concrete and/or rammed earth walls
JPS5437131A (en) Preventives against crack etc* of reinforced concrete building structure
JPS57161232A (en) Protection wall against earthquake
JPS5751331A (en) Construction of continuous underground wall
RUNDMUND SUBSEQUENT SEALING BY INJECTION INTO THE CLADDING
JPS56156328A (en) Construction of underground storage tank
JPS5532812A (en) Huge pole foundation practice
JPS5633327A (en) Method of preventing from spontaneous firing of stored object
JPS54112510A (en) Method of excavation presssin underground continuous concrete wall construction jointly using circulation muddy water high pressure injection compressed air
JPS5390633A (en) Tower construction subject to internal pressure