JPS54112510A - Method of excavation presssin underground continuous concrete wall construction jointly using circulation muddy water high pressure injection compressed air
- Google Patents
Method of excavation presssin underground continuous concrete wall construction jointly using circulation muddy water high pressure injection compressed air
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to JP1816478ApriorityCriticalpatent/JPS54112510A/en
Publication of JPS54112510ApublicationCriticalpatent/JPS54112510A/en
Bulkheads Adapted To Foundation Construction
(AREA)
JP1816478A1978-02-211978-02-21Method of excavation presssin underground continuous concrete wall construction jointly using circulation muddy water high pressure injection compressed air
PendingJPS54112510A
(en)
Method of excavation presssin underground continuous concrete wall construction jointly using circulation muddy water high pressure injection compressed air
Method of excavation presssin underground continuous concrete wall construction jointly using circulation muddy water high pressure injection compressed air
Method of excavation presssin underground continuous concrete wall construction jointly using circulation muddy water high pressure injection compressed air
Method of excavation presssin underground continuous concrete wall construction jointly using circulation muddy water high pressure injection compressed air
Method of construction of circulation muddy water high pressure injection excavation deep layer foundation with compressed air floating device and circulation muddy water high pressure injection excav