JPS5595712A - Shoring wall by concrete - Google Patents
Shoring wall by concreteInfo
- Publication number
- JPS5595712A JPS5595712A JP10878179A JP10878179A JPS5595712A JP S5595712 A JPS5595712 A JP S5595712A JP 10878179 A JP10878179 A JP 10878179A JP 10878179 A JP10878179 A JP 10878179A JP S5595712 A JPS5595712 A JP S5595712A
- Authority
- JP
- Japan
- Prior art keywords
- sheet piles
- concrete
- sheet
- shoring wall
- shore
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
PURPOSE: To prevent concrete and sheet piles from being in direct contact with each other and to enable pulling off of and the re-use of the sheet piles, by applying a separating member, such as cross or bituminous material, to a surface of the sheet pile, such as H-shaped steels, buried in a shoring wall.
CONSTITUTION: Concrete 2 is placed in a bored hole 1, sheet piles 3 being driven into a fresh concrete 2 to cast a concrete shore. Or the sheet piles 3 are previously set in the bored hole 1 at given intervals, the concrete 2 being deposited between the sheet piles 3 to construct said shore. A material 4, such as corss, or bituminous material, etc., is applied to a surface of the sheet piles 3 thereupon, and thereby the concrete 2 is kept from being in direct contact with the sheet piles 3. After an expected purpose of the shoring wall is achieved, the sheet piles 3 are pulled off for re-using. This permits the re-use of the sheet piles such as expensive shape steels, and thus, a construction cost can be reduced sharply.
COPYRIGHT: (C)1980,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10878179A JPS5595712A (en) | 1979-08-27 | 1979-08-27 | Shoring wall by concrete |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10878179A JPS5595712A (en) | 1979-08-27 | 1979-08-27 | Shoring wall by concrete |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1081377A Division JPS5397205A (en) | 1977-02-04 | 1977-02-04 | Method of placing dry concrete under water |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS5595712A true JPS5595712A (en) | 1980-07-21 |
Family
ID=14493307
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10878179A Pending JPS5595712A (en) | 1979-08-27 | 1979-08-27 | Shoring wall by concrete |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS5595712A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11357591B2 (en) | 2016-06-16 | 2022-06-14 | DePuy Synthes Products, Inc. | Surgical instrument delivery systems and related methods |
-
1979
- 1979-08-27 JP JP10878179A patent/JPS5595712A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11357591B2 (en) | 2016-06-16 | 2022-06-14 | DePuy Synthes Products, Inc. | Surgical instrument delivery systems and related methods |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5595712A (en) | Shoring wall by concrete | |
JPS5545960A (en) | Method of engineering embedded pile and device therefor | |
JPS55119822A (en) | Method for reinforcing bearing capacity of concrete pile and reinforcing member thereof | |
JPS5536147A (en) | Method of constructing structure on sea-surface | |
JPS55122914A (en) | Method for early improvement of soft ground | |
JPS5513338A (en) | Caison sinking method | |
JPS5552424A (en) | Method of installing underground continuous wall constructing standard pile | |
JPS5721623A (en) | Treatment work for top of pile | |
JPS5771938A (en) | Outer water-proofing work | |
JPS5677429A (en) | Basement | |
JPS5631942A (en) | Corrosion-inhibitive device for steel pile | |
JPS5646031A (en) | Constructing method for pile foundation footing with erected trunk | |
JPS55114715A (en) | Method for construction of steel pipe sheet pile well foundation | |
JPS56115426A (en) | Construction of vibration-proof foundation of building | |
JPS5532812A (en) | Huge pole foundation practice | |
JPS5622815A (en) | Construction method of continuous earth wall | |
JPS5595718A (en) | Setting method for steel wire cylinder, sheet pile etc. | |
JPS548396A (en) | Method of constructing concrete floating body | |
JPS5628930A (en) | Driving method for sheet pile | |
JPS5685029A (en) | Protection work for slope | |
JPS5751337A (en) | Construction of underground concrete shell | |
JPS56424A (en) | Reinforcing of foundation for existing building with irregular sheet pile | |
JPS5721608A (en) | Construction of vertical self-supporting wall for simple revetment | |
JPS5628943A (en) | Waterproofing method for underground structure from outside | |
JPS5639239A (en) | Hollow concrete block for afforestation |