JPS52120202A - Method of unattended total cross section uppcut excavation - Google Patents
Method of unattended total cross section uppcut excavationInfo
- Publication number
- JPS52120202A JPS52120202A JP3754276A JP3754276A JPS52120202A JP S52120202 A JPS52120202 A JP S52120202A JP 3754276 A JP3754276 A JP 3754276A JP 3754276 A JP3754276 A JP 3754276A JP S52120202 A JPS52120202 A JP S52120202A
- Authority
- JP
- Japan
- Prior art keywords
- uppcut
- unattended
- excavation
- section
- total cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3754276A JPS52120202A (en) | 1976-04-03 | 1976-04-03 | Method of unattended total cross section uppcut excavation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3754276A JPS52120202A (en) | 1976-04-03 | 1976-04-03 | Method of unattended total cross section uppcut excavation |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS52120202A true JPS52120202A (en) | 1977-10-08 |
Family
ID=12500399
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3754276A Pending JPS52120202A (en) | 1976-04-03 | 1976-04-03 | Method of unattended total cross section uppcut excavation |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS52120202A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6442393U (en) * | 1987-09-09 | 1989-03-14 | ||
KR100796033B1 (en) | 2006-04-05 | 2008-01-21 | (주)성풍건설 | The measurement method for perpendicular point making use of raise climber |
-
1976
- 1976-04-03 JP JP3754276A patent/JPS52120202A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6442393U (en) * | 1987-09-09 | 1989-03-14 | ||
KR100796033B1 (en) | 2006-04-05 | 2008-01-21 | (주)성풍건설 | The measurement method for perpendicular point making use of raise climber |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS5293110A (en) | Method of improving subsoil | |
JPS52155844A (en) | Method of dredging | |
JPS5297233A (en) | Excavation method of lateral pit by means of method of shield construction | |
JPS52120202A (en) | Method of unattended total cross section uppcut excavation | |
JPS52139215A (en) | Grouting method | |
JPS5342410A (en) | Method of connecting piles underground | |
JPS52137137A (en) | Method of improving excavating land | |
JPS5361104A (en) | Method of jet excavation | |
JPS52132505A (en) | Grouting method | |
JPS5331311A (en) | Grouting method | |
JPS5348310A (en) | Method of excavating ditch | |
JPS5314933A (en) | Method of tunnel construction | |
JPS5364929A (en) | Method of excavating tunnel | |
JPS534305A (en) | Method of reinforcing subsoil | |
JPS5341008A (en) | Method of reinforcing poor subsoil | |
JPS531938A (en) | Method of muddy water backkfilling construction in method of muddy water shield construction | |
JPS5311311A (en) | Construction method of underground tanks | |
JPS52137111A (en) | Method of improving excavated soil | |
JPS5286240A (en) | Tunnel construction method | |
JPS52149813A (en) | Grouting method | |
JPS52142838A (en) | Method of tunnel excavation construction | |
JPS52132510A (en) | Method of improving subsoil | |
JPS5287808A (en) | Method of improving subsoil | |
JPS5330118A (en) | Method of improving subsoil | |
JPS5299629A (en) | Method of constructing underground dam |