JPH116285A - Moving scaffold for assembling floor slab reinforcement - Google Patents

Moving scaffold for assembling floor slab reinforcement

Info

Publication number
JPH116285A
JPH116285A JP17289297A JP17289297A JPH116285A JP H116285 A JPH116285 A JP H116285A JP 17289297 A JP17289297 A JP 17289297A JP 17289297 A JP17289297 A JP 17289297A JP H116285 A JPH116285 A JP H116285A
Authority
JP
Japan
Prior art keywords
floor
main girder
main
girder
supported
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP17289297A
Other languages
Japanese (ja)
Other versions
JP3197234B2 (en
Inventor
Kunio Oohi
邦夫 大樋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KAWADA KENSETSU KK
Original Assignee
KAWADA KENSETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KAWADA KENSETSU KK filed Critical KAWADA KENSETSU KK
Priority to JP17289297A priority Critical patent/JP3197234B2/en
Publication of JPH116285A publication Critical patent/JPH116285A/en
Application granted granted Critical
Publication of JP3197234B2 publication Critical patent/JP3197234B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To enable assembly of forms and that of reinforcement to be performed concurrently by eliminating the need for large hoisting equipment, and enabling a working floor for assembly of the reinforcement to be provided separately from the forms. SOLUTION: A moving scaffold has a scaffold support frame 2 movably placed on a main girder 1, an inter-main-girder working floor 3, an overhanging working floor 4, and a member moving part 6 installed on a cross girder 5. The scaffold support frame 2 has a horizontal member 10 which is supported on legs 7 and from which hanging columns 8 hang down, with lift members 9 attached to the horizontal member 10. The inter-main-girder working floor 3 is removably suspended from the lift members 9. Floor system reinforcement 17 has rigidity such that it can be supported only by the main girders 1, with truss reinforcing bars or the like used for reinforcement. During movement, the inter-main-girder working floor 3 is lowered, is put on the member moving part 6, and is towed by a pulling device, together with the scaffold support frame 2. Thereafter, floor-slab forms are installed, and floor-slab concrete is placed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、主桁に支持され
る床版の鉄筋を型枠組立前に組み立て、主桁で仮支持し
た後に床版型枠を設置し、効率よい床版構築作業を実現
する床版鉄筋組立用の移動足場に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an efficient slab erection work in which a reinforcing bar of a slab supported by a main girder is assembled before assembling a formwork, and temporarily supported by the main girder, and a slab form is installed. The present invention relates to a movable scaffold for assembling floor slabs which realizes the above.

【0002】[0002]

【従来の技術】鋼橋の床版を構築する際には、主桁及び
床版型枠上に鉄筋を組み立ててからコンクリートを打設
するが、型枠組立の完了を待って配筋作業に入る工程で
は型枠と鉄筋の組立作業を同時に進行させることができ
ず、工期が長くなる欠点があった。このため、型枠組立
と並行してブロック化した鉄筋を別の場所で組み立て、
揚重機器を用いてブロック鉄筋を型枠上に吊り上げ工期
短縮を図る工法が提案されている。この工法は、例えば
橋梁架設に当たって、当該床版下方の地上で鉄筋を組み
立て、これを吊り金具により主桁上方に吊り上げ、床版
型枠上で継手部の処理を行った後短期間でコンクリート
打設を実施するものであった。
2. Description of the Related Art When constructing a slab of a steel bridge, rebar is assembled on a main girder and a slab form, and then concrete is poured into the slab. In the entering process, the assembling work of the formwork and the rebar cannot be performed at the same time, and there is a disadvantage that the construction period becomes long. For this reason, rebars that have been blocked in parallel with the formwork assembly are assembled at another location,
There has been proposed a method of lifting a block reinforcing bar on a form using a lifting device to shorten a construction period. In this construction method, for example, when constructing a bridge, a reinforcing bar is assembled on the ground below the floor slab, lifted up above the main girder by means of a hanging metal fitting, and the joint is processed on the floor slab form, and then concrete is cast in a short period of time. Was implemented.

【0003】[0003]

【発明が解決しようとする課題】しかし、ブロック鉄筋
はかなりの重量物となる上、一般に主桁は地上から高い
位置にあるため、吊上げ用には大型の揚重機器を常備し
なければならず重機費用が増大する欠点があった。又、
床版下方の地形によっては鉄筋組立ヤードを造成するこ
とができないため、適用し得る橋梁が限定されてしまう
欠点もあった。
However, since the block reinforcing bar is quite heavy and the main girder is generally located at a high position from the ground, large lifting equipment must be provided for lifting. There was a disadvantage that the cost of heavy equipment increased. or,
There is also a drawback that applicable bridges are limited because a rebar assembly yard cannot be formed depending on the topography below the floor slab.

【0004】又、床版構築の工期短縮を図るため鉄筋組
立作業の合理化を図ると共に主桁に沿って移動可能な床
版型枠を利用する場合がある。従来の移動可能な床版型
枠としては例えば特公昭50−30931号公報に記載
するように、主桁間型枠及び張出床版用型枠を各々支保
工で支持し、ブロック移動の際には各組の部材を主桁間
型枠移動部及び張出床版用型枠移動部を利用して別々に
橋軸方向に移動するものが知られていた。
[0004] Further, in order to shorten the construction period of the floor slab, there is a case where a floor slab form that can be moved along the main girder while rationalizing the rebar assembling work is used. As a conventional movable floor slab form, for example, as described in Japanese Patent Publication No. 50-30931, a main girder form form and an overhang floor form form are each supported by a shoring, and when a block is moved, It has been known that the members of each set are separately moved in the bridge axis direction by using the main girder form moving section and the overhang floor slab form moving section.

【0005】しかし、従来の床版型枠は、移動する度に
型枠やトラスを主桁から取り外して足場上に移し、その
後再度主桁に取り付ける工程をとるため、作業の効率化
が図れず、又高所での解体組立作業を繰り返し行うこと
になるので安全面でも問題があった。
[0005] However, the conventional floor slab form requires a step of removing the form and truss from the main girder, moving the form and truss onto the scaffold each time it moves, and then attaching the form and truss to the main girder again. In addition, there is a problem in terms of safety because the disassembly and assembling work at a high place is repeatedly performed.

【0006】この発明は上記課題を解決して、組立鉄筋
を吊り上げるための大型の揚重機器が不要で、床版下方
の地形によらず鉄筋組立用の作業床を型枠とは別に設け
ることができ、型枠と鉄筋の組立作業を並行して行うこ
とができ、効率よい床版構築作業を実現する床版鉄筋組
立用の移動足場を提供することを目的としている。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned problems, and eliminates the need for a large lifting device for lifting an assembled rebar, and provides a work floor for rebar assembly separately from the formwork regardless of the terrain below the floor slab. It is an object of the present invention to provide a movable scaffold for assembling a slab which can perform an assembling work of a formwork and a reinforcing bar in parallel and realize an efficient slab building operation.

【0007】又、張出床版用型枠支保工に作用する荷重
を主桁に伝達してこれを支持すると共に主桁に過大な捩
り応力を発生させない床版型枠を併設し、この床版型枠
の解体が容易で高所作業の安全性が確保でき、しかも主
桁の補強材や橋脚が介在しても鉄筋足場と床版型枠の双
方が移動可能で効率よい床版構築作業が実現できる床版
鉄筋組立用の移動足場を提供することを目的としてい
る。
Further, a load acting on the form support for the overhang floor slab is transmitted to the main girder to support the main girder, and a floor slab form is provided on the main girder so as not to generate excessive torsional stress. Easily dismantled slabs and ensure safety in work at heights.Efficient slab construction work with both rebar scaffolding and slab formwork movable even with reinforcements and bridge piers in the main girder. It is an object of the present invention to provide a movable scaffold for assembling floor slabs that can realize the above.

【0008】[0008]

【課題を解決するための手段】上記課題を解決するた
め、この発明の床版鉄筋組立用の移動足場は、主桁上面
のスタッドジベルに着脱自在に挿着して上面に移動部材
を備える台座部と、この台座部上を移動可能に立設する
脚体に支持され主桁側部の張出端部に吊下柱体を備え適
宜間隔で昇降部材を付設する横架材と、この昇降部材に
離脱可能に釣支される主桁間作業床と、主桁を連結する
横桁上に設置し昇降部材から離脱した主桁間作業床を上
載して橋軸方向に移動し得る部材移動部と、吊下柱体の
下端部に接続して張出作業床を支持する梁材と、主桁部
で支持し得るように床版鉄筋を作業床上で組立てた後、
床版型枠の設置に先行して両作業床を移動する牽引手段
を備えることを特徴としている。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, a moving scaffold for assembling a floor slab according to the present invention is provided with a pedestal having a moving member on an upper surface which is removably inserted into a stud dowel on an upper surface of a main girder. And a horizontal member that is supported by legs that are movably erected on the pedestal portion and that has a suspension column at the projecting end of the main girder and that is provided with lifting members at appropriate intervals. Member work that can be moved in the bridge axis direction by mounting the work floor between the main girders supported on the members to be detachable and the work floor between the main girders installed on the horizontal girder connecting the main girder and detached from the lifting member After assembling the floor slab reinforcement on the work floor so that it can be supported by the main girder part and the beam material connected to the lower end of the suspended pillar and supporting the overhang work floor,
It is characterized in that it is provided with traction means for moving both work floors prior to installation of the floor slab formwork.

【0009】台座部は、スタッドジベルに載置する脚部
と、その頂部に固着する板材を備え、横架材を支持する
脚体の下端には移動部材に載置する縦梁を設け、台座部
の脚部は打設後の床版コンクリートから離脱可能な構成
とする。板材上に設ける移動部材には転動材あるいは滑
り材を適用して縦梁を移動可能に支持する。又、横桁上
に設置する部材移動部にも転動材、あるいは滑り材を設
ける。
The pedestal includes a leg mounted on the stud dowel, and a plate fixed to the top of the pedestal. A vertical beam mounted on the moving member is provided at a lower end of the leg supporting the horizontal member. The legs of the section are to be detachable from the concrete floor slab after casting. A rolling member or a sliding member is applied to the moving member provided on the plate member to movably support the vertical beam. Further, a rolling member or a sliding member is provided also in a member moving portion provided on the cross beam.

【0010】張出作業床を支持する梁材は、吊下柱体の
下端部より跳出す片持梁であってもよいし、吊下柱体に
ヒンジ結合し、先端部を昇降部材で離脱可能に釣支する
構成でも良い。
The beam supporting the overhanging work floor may be a cantilever projecting from the lower end of the suspended column, or may be hinged to the suspended column, and the tip may be detached by a lifting member. A configuration that supports as much as possible may be used.

【0011】主桁間作業床及び張出作業床上で組立てる
床版鉄筋はトラス鉄筋等で補強を行うので主桁部のみで
支持することができる。このため、作業床を降下した場
合にも大きく撓まないので、組立てた床版鉄筋の下部に
床版型枠を設置することができる。
The floor slabs assembled on the main girder work floor and the overhang work floor are reinforced by truss reinforcements or the like, so that they can be supported only by the main girder portions. For this reason, since it does not bend greatly even when the work floor is lowered, the floor slab formwork can be installed under the assembled floor slab.

【0012】又床版型枠は、前記部材移動部を利用して
橋軸方向に移動し所定位置で固定する主桁間型枠と、前
記台座部上を移動可能に立設する脚体に支持され端部に
L字状吊下部材を備える架台と、このL字状吊下部材の
上面に設置する支保工に支持される張出床版用型枠と、
L字状吊下部材の内端部と主桁上端部を離脱可能に連結
する鉛直荷重支持部材と、L字状吊下部材より突設し主
桁ウエブに当接する横振れ防止材と、主桁間型枠に吊下
げられ主桁下端部に当接する圧縮部材を備える構成が望
ましい。
In addition, the floor slab form is provided with a main girder form form that moves in the bridge axis direction and is fixed at a predetermined position by using the member moving section, and a leg that is movably erected on the pedestal section. A gantry that is supported and has an L-shaped suspension member at an end, and a formwork for an overhanging floor slab that is supported by a shoring installed on the upper surface of the L-shaped suspension member;
A vertical load supporting member for detachably connecting an inner end of the L-shaped hanging member and an upper end of the main girder; a lateral vibration preventing member protruding from the L-shaped hanging member and abutting on the main girder web; It is desirable to provide a configuration in which a compression member is suspended from the formwork between the girders and abuts against the lower end of the main girder.

【0013】架台を支持する脚体の下端にも移動部材に
載置する縦梁を設ける。鉛直荷重支持部材は、例えばレ
バーブロック等長さ調整可能な治具をできるだけ鉛直方
向に配設する。このため張出床版用型枠及び支保工の打
設時荷重は、L字状吊下部材と鉛直荷重支持部材で大部
分が支持されることになり、横振れ防止材の存在により
L字状吊下部材の水平移動も抑止される。
[0013] A vertical beam to be placed on the moving member is also provided at the lower end of the leg supporting the gantry. For the vertical load supporting member, a jig whose length can be adjusted, such as a lever block, is disposed in the vertical direction as much as possible. For this reason, the load at the time of placing of the formwork for the overhanging slab and the shoring work is largely supported by the L-shaped suspension member and the vertical load supporting member, and the presence of the anti-lateral shake member.
Horizontal movement of the L-shaped suspension member is also suppressed.

【0014】圧縮部材は、主桁間に配置する型鋼と、こ
れに付設する長さ調整部材からなり、主桁間型枠に連結
して橋軸方向に移動し得る構成とし、移動時には主桁か
ら離隔する。横振れ防止材を介して主桁に作用する捩り
応力が過大とならないよう下フランジ間に型鋼を押圧係
止する。
[0014] The compression member is composed of a steel die placed between the main girders and a length adjusting member attached thereto, and is configured to be connected to the form between the main girders and move in the bridge axis direction. Keep away from The shape steel is pressed and locked between the lower flanges so that the torsional stress acting on the main girder via the anti-lateral vibration member is not excessive.

【0015】[0015]

【発明の実施の形態】次にこの発明の実施の形態を添付
図面に基づき詳細に説明する。図1は床版鉄筋組立用の
移動足場の正面図、図2は同側面図、図3は張出部の拡
大正面図、図4は図3のIV−IV断面を示す断面図であ
る。床版鉄筋組立用の移動足場は、主桁1上に移動可能
に載置する足場支持架台2と、主桁間作業床3及び張出
作業床4と、横桁5上に設置する部材移動部6を有す
る。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, embodiments of the present invention will be described in detail with reference to the accompanying drawings. 1 is a front view of a movable scaffold for assembling a floor slab, FIG. 2 is a side view of the same, FIG. 3 is an enlarged front view of an overhang portion, and FIG. 4 is a cross-sectional view showing a cross section taken along line IV-IV of FIG. A movable scaffold for assembling the floor slab includes a scaffold support 2 movably mounted on the main girder 1, a work floor 3 between main girder and an overhanging work floor 4, and a member mounted on the cross girder 5. It has a part 6.

【0016】足場支持架台2は、脚体7に支持され主桁
側部の張出端部に吊下柱体8を垂下し適宜間隔で昇降部
材9を付設する横架材10を有し、脚体7の下端には縦
梁11を固着する。この縦梁11を支持する台座部12
は、スタッドジベル13に載置する脚部14と、その頂
部に固着する板材15を備え、板材15の上面には移動
部材16を設ける。移動部材16には、転動材、例えば
チルタンクやローラ等を用いたり、あるいはテフロン等
の滑り材を利用する。又、横桁5上の部材移動部6にも
同様な転動材、滑り材を設ける。
The scaffolding support base 2 has a horizontal member 10 which is supported by the legs 7 and has hanging columns 8 suspended from the projecting ends on the side of the main girder and provided with elevating members 9 at appropriate intervals. A vertical beam 11 is fixed to the lower end of the leg 7. A pedestal portion 12 for supporting the vertical beam 11
Is provided with a leg portion 14 placed on the stud dowel 13 and a plate 15 fixed to the top thereof, and a moving member 16 provided on the upper surface of the plate 15. For the moving member 16, a rolling material such as a chill tank or a roller is used, or a sliding material such as Teflon is used. Further, a similar rolling member and sliding member are provided on the member moving portion 6 on the cross beam 5.

【0017】脚部14はスタッドジベル13を挿入する
管体14aと、スタッドジベル頭部に当接して荷重を支
持する棒体14bを備え、打設後の床版コンクリートか
ら離脱可能な構成とする。
The leg portion 14 has a tube 14a into which the stud dowel 13 is inserted, and a rod 14b which abuts on the head of the stud dove and supports the load, and is configured to be detachable from the concrete slab after casting. .

【0018】主桁間作業床3は、チェーンブロック等の
昇降部材9に離脱可能に釣支される構成であって、チェ
ーン等の吊材9aで支持する縦梁3aと、その上面に適
宜間隔に配設する大引材3bと、床版下面の形状に適合
する作業床3cを有し、部材移動部6に上載して橋軸方
向前方にセットしたウインチ等の引張装置により牽引す
る。
The work floor 3 between the main girders is supported by a lifting member 9 such as a chain block so as to be detachable, and has a vertical beam 3a supported by a hanging material 9a such as a chain, and a space between the vertical beam 3a and the upper surface thereof. And a work floor 3c adapted to the shape of the lower surface of the floor slab, and is towed by a tension device such as a winch mounted on the member moving section 6 and set forward in the bridge axis direction.

【0019】一方張出作業床4は、吊下柱体8の下端部
に接続する梁材4aと、その上面に配設する大引材4b
及び作業床4cを有し、梁材4aはレバーブロック等の
昇降部材9により吊材9aで支持されている。又図2に
示すように隣接する吊下柱体8は、ブレース8aにより
連結されている。
On the other hand, the overhanging work floor 4 includes a beam 4a connected to the lower end of the suspended pillar 8, and a large pulling member 4b disposed on the upper surface thereof.
And a work floor 4c, and the beam 4a is supported by a lifting member 9a such as a lever block by a lifting member 9a. Further, as shown in FIG. 2, the adjacent suspension columns 8 are connected by braces 8a.

【0020】これら両作業床3,4で組立てる床版鉄筋
17はトラス鉄筋等で補強を行い、主桁1のみで支持す
ることが可能な剛性を備える。従って作業床を降下させ
た場合にも大きく撓むことはない。
The slab reinforcing bar 17 assembled by the working floors 3 and 4 is reinforced by a truss reinforcing bar or the like, and has a rigidity that can be supported only by the main girder 1. Therefore, even when the work floor is lowered, it does not bend significantly.

【0021】張出作業床4は、鉄筋組立完了後に吊下柱
体8との接続部にあるボルトナット4dを緩め、昇降部
材9を利用して足場を開いていく。この時吊材9aはス
タッドジベル13に掛けられたリング9b内を通過して
いく(図4参照)ので鉄筋と干渉する恐れはない。梁材
4aが吊下柱体8と平行になる位置まで開いたら吊材9
aの接続を外し、足場支持架台2の移動を行う。なお、
次のブロックに移動して鉄筋足場を組立てる場合には上
記手順を逆に辿って行う。
After the rebar assembly is completed, the overhanging work floor 4 loosens the bolts and nuts 4 d at the connection with the suspension column 8, and uses the lifting member 9 to open the scaffold. At this time, since the hanging member 9a passes through the ring 9b hung on the stud dowel 13 (see FIG. 4), there is no possibility of interference with the rebar. When the beam 4a is opened to a position parallel to the suspension column 8, the suspension 9
The connection of a is disconnected, and the scaffold support base 2 is moved. In addition,
When moving to the next block and assembling the rebar scaffold, the above procedure is performed in reverse.

【0022】又足場支持架台2の移動時には、主桁間作
業床3を昇降部材9により降下させて部材移動部6に上
載し、吊材9aとの係合を解き、足場支持架台2と主桁
間作業床3を併せて図示しない引張装置で牽引する。床
版鉄筋17の外部までこれらを移動した後、床版型枠を
設置し、床版コンクリートの打設を行う。
When the scaffolding support base 2 is moved, the work floor 3 between the main girders is lowered by the elevating member 9 to be mounted on the member moving part 6, and disengaged from the hanging member 9a. The inter-girder work floor 3 is also pulled by a tension device (not shown). After moving these to the outside of the slab reinforcing bar 17, the slab formwork is installed, and the slab concrete is cast.

【0023】なお張出作業床を支持する梁材は、図5に
示すように吊下柱体58の下端部より跳出す片持梁54
aであってもよい。この場合の張出作業床54は、ジャ
ッキ等の高さ調整部材54b上に作業床54cを構築す
るものであり、移動時には作業床54cを降下させる。
As shown in FIG. 5, the beam supporting the overhang work floor is a cantilever 54 projecting from the lower end of the suspension column 58.
a. In this case, the overhang work floor 54 constructs a work floor 54c on a height adjusting member 54b such as a jack, and lowers the work floor 54c when moving.

【0024】次に床版型枠を図6及び図7に基づき説明
する。図6は床版型枠移動装置の正面図、図7は同側面
図である。床版型枠には、主桁間型枠18と張出床版用
型枠19とがあり、主桁間型枠18は前記部材移動部6
を利用して橋軸方向に移動し所定位置で固定するもので
ある。又、張出床版用型枠19は型枠架台20のL字状
吊下部材21の上面に設置する支保工に支持されるもの
で、型枠架台20は前記台座部12上を移動可能に立設
する脚体22に支持されている。
Next, the floor slab formwork will be described with reference to FIGS. FIG. 6 is a front view of the floor slab form moving device, and FIG. 7 is a side view of the same. The floor slab form includes a main girder form 18 and an overhanging floor slab form 19.
Is used to move in the bridge axis direction and fix at a predetermined position. Also, the formwork 19 for the overhanging floor slab is supported by a shoring installed on the upper surface of the L-shaped suspension member 21 of the formwork base 20, and the formwork base 20 can move on the pedestal portion 12. Are supported by legs 22 standing upright.

【0025】L字状吊下部材21の内端部と主桁1の上
端部は、レバーブロック等長さ調整可能な治具を有する
鉛直荷重支持部材23により離脱可能に連結されてい
る。又L字状吊下部材21には横振れ防止材24が突設
し、主桁ウエブ1aに当接している。又、主桁間型枠1
8には圧縮部材25が吊下げられ、主桁下端のフランジ
1bに当接している。鉛直荷重支持部材23は、できる
だけ鉛直方向に配設して打設時の水平力が小さくなるよ
う考慮する。
The inner end of the L-shaped suspension member 21 and the upper end of the main girder 1 are detachably connected by a vertical load supporting member 23 having a jig whose length can be adjusted such as a lever block. The L-shaped suspension member 21 is provided with an anti-sway member 24 protruding therefrom, and is in contact with the main girder web 1a. Also, formwork 1 between main girder
A compression member 25 is suspended from 8, and is in contact with the flange 1b at the lower end of the main girder. The vertical load supporting member 23 is arranged in the vertical direction as much as possible so that the horizontal force at the time of driving is reduced.

【0026】圧縮部材25は、主桁1間に配置する型鋼
25aと、これに付設するジャッキ等の長さ調整部材2
5bからなり、橋軸方向に並列配置して、主桁間型枠1
8の縦梁18aから吊材26で吊支する布材27に固定
されている。このため主桁間型枠18と同時に橋軸方向
に移動し得る構成である。この圧縮部材25は横振れ防
止材24を介して主桁1に作用する捩り応力が過大とな
らないよう押圧係止するものである。
The compression member 25 includes a mold steel 25a disposed between the main girders 1 and a length adjusting member 2 such as a jack attached thereto.
5b, which are arranged side by side in the bridge axis direction to form
8 is fixed to a cloth material 27 suspended from a vertical beam 18a by a suspension member 26. For this reason, it is a structure which can move in the bridge axis direction simultaneously with the main girder formwork 18. The compression member 25 is pressed and locked so that the torsional stress acting on the main girder 1 via the anti-lateral vibration member 24 is not excessive.

【0027】主桁間型枠18は、横桁5上の部材移動部
6に縦梁18aを載置し、高さ調整用のジャッキ18
b、大引材18c及び床版型枠18dを備える。同様に
張出床版用型枠19もL字状吊下部材21の上面に縦梁
19a、ジャッキ19b、大引材19c及び床版型枠1
9dを備える。
The main girder form 18 has a vertical beam 18a placed on the member moving section 6 on the horizontal girder 5, and a jack 18 for height adjustment.
b, large drawing material 18c and floor slab formwork 18d. Similarly, the formwork 19 for the overhang floor slab is also provided on the upper surface of the L-shaped suspension member 21 with the vertical beam 19a, the jack 19b, the large pulling member 19c, and the floor slab form 1
9d.

【0028】なお、型枠架台20の脚体22の下端には
縦梁28を固着し、頂部には横架材29を架け渡し、更
にその上部には柱材30を立設し、これに屋根31を取
り付けることで雨天時にも作業可能なスペースを構築す
る。
A vertical beam 28 is fixed to the lower end of the leg 22 of the form stand 20, a horizontal member 29 is bridged on the top, and a column member 30 is erected on the top. By attaching the roof 31, a workable space is constructed even in rainy weather.

【0029】これら床版型枠移動装置のブロック移動の
際にも引張装置を用いて橋軸方向に移動するが、移動時
には型枠支保工の各ジャッキを縮め、鉛直荷重支持部材
23、横振れ防止材24及び圧縮部材25のそれぞれを
主桁1から離隔する。
[0029] When the blocks of the floor slab form moving device are moved, they are also moved in the bridge axis direction by using a tension device. At the time of movement, the jacks of the form support are contracted, and the vertical load supporting member 23, the lateral run-out is moved. Each of the prevention member 24 and the compression member 25 is separated from the main girder 1.

【0030】なお床版型枠は以上説明したスライド移動
型の型枠以外であっても本発明の床版鉄筋組立用の移動
足場は適用可能である。
The movable slab for assembling the slab of the present invention can be applied even if the slab form is other than the slide movable form described above.

【0031】[0031]

【発明の効果】以上説明したように、この発明の床版鉄
筋組立用の移動足場は、主桁間作業床を横桁上に設置す
る部材移動部で、張出作業床を主桁上面にある横架材に
連結して夫々移動し、更に床版鉄筋を主桁部で支持し得
る構成としたので、床版型枠の設置に先行して両作業床
を移動することができ、型枠と鉄筋の組立作業を並行し
て行うことができるので大幅な工期短縮が図れる。しか
も、作業床を主桁に沿って設けるので床版設置箇所の条
件によらず専用の鉄筋組立ヤードを独立して設けること
ができる。従って組立鉄筋を吊り上げるための大型の揚
重機器は不要となりコスト低減にも寄与する。
As described above, the moving scaffold for assembling floor slabs according to the present invention is a member moving section for installing a work floor between main girders on a horizontal girder, and an overhang work floor on the main girder upper surface. Since it was connected to a certain horizontal member and moved individually, and the floor slab reinforcement was supported by the main girder part, both work floors could be moved prior to installation of the floor slab formwork, Since the work of assembling the frame and the rebar can be performed in parallel, the construction period can be significantly reduced. In addition, since the working floor is provided along the main girder, a dedicated reinforcing bar assembly yard can be provided independently irrespective of the conditions of the floor slab installation location. Therefore, a large lifting device for lifting the assembled rebar is not required, which contributes to cost reduction.

【0032】又スタッドジベルに着脱自在に挿着する台
座部を設けるので、床版鉄筋を組立てた後にも鉄筋上を
通過して横架材を移動することができる。
Further, since the pedestal portion is provided so as to be removably inserted into the stud dowel, the horizontal member can be moved over the reinforcing bar after the floor slab reinforcing bar is assembled.

【0033】又、請求項2記載の床版鉄筋組立用の移動
足場は、スライド移動型の床版型枠を設けるので鉄筋組
立後に直ちに型枠を設置することができコンクリート打
設サイクルをより短縮することができる。しかも張出床
版用型枠をL字状吊下部材と鉛直荷重支持部材とで支持
する構成としたので打設時に発生する水平荷重が小さく
なる。又、水平反力は横振れ防止材と圧縮部材により負
担するので主桁に過大な捩り応力は発生しない。
In the moving scaffold for assembling the slab reinforcing bar according to the second aspect of the present invention, since the sliding slab type formwork is provided, the formwork can be installed immediately after assembling the reinforcing bar, thereby further shortening the concrete casting cycle. can do. In addition, since the formwork for the overhanging floor slab is configured to be supported by the L-shaped suspension member and the vertical load supporting member, the horizontal load generated at the time of driving is reduced. Further, since the horizontal reaction force is borne by the anti-lateral vibration member and the compression member, no excessive torsional stress is generated in the main girder.

【0034】又、床版型枠は主桁に沿って移動可能に係
止されているので、張出床版用型枠支保工の解体をせず
に移動することができ高所作業の安全性を確保できる。
又、主桁上方に配置する架台を用いて張出床版用型枠を
移動するため、主桁下方にある橋脚が移動の障害となる
恐れはなく、各型枠は主桁から離隔可能であるので、ス
チフナー等の主桁補強材が介在しても移動可能である。
Further, since the floor slab form is locked so as to be movable along the main girder, the form slab can be moved without dismantling the form support for the overhang floor slab, and the work at a high place can be performed safely. Nature can be secured.
In addition, since the formwork for the overhang floor slab is moved using the gantry arranged above the main girder, there is no risk that the pier below the main girder will hinder movement, and each formwork can be separated from the main girder. Therefore, even if a main girder reinforcing material such as a stiffener is interposed, it can be moved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】床版鉄筋組立用の移動足場の正面図である。FIG. 1 is a front view of a movable scaffold for assembling a floor slab.

【図2】床版鉄筋組立用の移動足場の側面図である。FIG. 2 is a side view of a moving scaffold for assembling a floor slab.

【図3】移動足場張出部の拡大正面図である。FIG. 3 is an enlarged front view of a movable scaffold overhang.

【図4】図3のIV−IV断面を示す断面図である。FIG. 4 is a sectional view showing a section taken along line IV-IV of FIG. 3;

【図5】他の実施形態における移動足場張出部の正面図
である。
FIG. 5 is a front view of a moving scaffold overhang according to another embodiment.

【図6】床版型枠移動装置の正面図である。FIG. 6 is a front view of the floor slab form moving device.

【図7】床版型枠移動装置の側面図である。FIG. 7 is a side view of the floor slab form moving device.

【符号の説明】[Explanation of symbols]

1 主桁 2 足場支持架台 3 主桁間作業床 4 張出作業床 4a 梁材 5 横桁 6 部材移動部 7 脚体 8 吊下柱体 9 昇降部材 10 横架材 11 縦梁 12 台座部 13 スタッドジベル 16 移動部材 17 床版鉄筋 DESCRIPTION OF SYMBOLS 1 Main girder 2 Scaffolding support stand 3 Main girder work floor 4 Overhang work floor 4a Beam 5 Cross beam 6 Member moving part 7 Leg 8 Suspended pillar 9 Elevating member 10 Horizontal bridge 11 Vertical beam 12 Base 13 Stud dowel 16 Moving member 17 Floor slab

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 主桁上面のスタッドジベルに着脱自在に
挿着して上面に移動部材を備える台座部と、この台座部
上を移動可能に立設する脚体に支持され主桁側部の張出
端部に吊下柱体を備え適宜間隔で昇降部材を付設する横
架材と、この昇降部材に離脱可能に釣支される主桁間作
業床と、主桁を連結する横桁上に設置し昇降部材から離
脱した主桁間作業床を上載して橋軸方向に移動し得る部
材移動部と、吊下柱体の下端部に接続して張出作業床を
支持する梁材と、主桁部で支持し得るように床版鉄筋を
作業床上で組立てた後、床版型枠の設置に先行して両作
業床を移動する牽引手段を備えることを特徴とする床版
鉄筋組立用の移動足場。
1. A pedestal portion which is detachably inserted into a stud dowel on an upper surface of a main girder and has a moving member on an upper surface, and a leg supported by a leg standing upright on the pedestal portion so as to be movable. A horizontal member having a suspension pillar at the overhanging end and having a lifting member attached at appropriate intervals, a work floor between main girders detachably supported by the lifting member, and a horizontal girder connecting the main girder. A member moving part that can be mounted on the main girder work floor detached from the elevating member and move in the bridge axis direction, and a beam material that is connected to the lower end of the suspended pillar and supports the overhang work floor A floor slab assembler, characterized in that the slab reinforcement is assembled on a work floor so that it can be supported by a main girder, and then traction means for moving both work floors prior to installation of the floor slab formwork is provided. For moving scaffold.
【請求項2】 前記床版型枠は、前記部材移動部を利用
して橋軸方向に移動し所定位置で固定する主桁間型枠
と、前記台座部上を移動可能に立設する脚体に支持され
端部にL字状吊下部材を備える架台と、このL字状吊下
部材の上面に設置する支保工に支持される張出床版用型
枠と、L字状吊下部材の内端部と主桁上端部を離脱可能
に連結する鉛直荷重支持部材と、L字状吊下部材より突
設し主桁ウエブに当接する横振れ防止材と、主桁間型枠
に吊下げられ主桁下端部に当接する圧縮部材を備えるこ
とを特徴とする請求項1記載の床版鉄筋組立用の移動足
場。
2. A formwork between main girders which moves in the bridge axis direction and is fixed at a predetermined position by using the member moving portion, and a leg which is movably mounted on the pedestal portion. A base supported by the body and having an L-shaped suspension member at an end, a formwork for an overhanging floor slab supported by a support installed on the upper surface of the L-shaped suspension member, and an L-shaped suspension A vertical load support member that removably connects the inner end of the member and the upper end of the main girder, an anti-sway member that protrudes from the L-shaped suspension member and contacts the main girder web, The movable scaffold for assembling floor slabs according to claim 1, further comprising a compression member that is suspended and abuts on a lower end of the main girder.
JP17289297A 1997-06-13 1997-06-13 Moving scaffold for floor slab assembly Expired - Fee Related JP3197234B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17289297A JP3197234B2 (en) 1997-06-13 1997-06-13 Moving scaffold for floor slab assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17289297A JP3197234B2 (en) 1997-06-13 1997-06-13 Moving scaffold for floor slab assembly

Publications (2)

Publication Number Publication Date
JPH116285A true JPH116285A (en) 1999-01-12
JP3197234B2 JP3197234B2 (en) 2001-08-13

Family

ID=15950273

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17289297A Expired - Fee Related JP3197234B2 (en) 1997-06-13 1997-06-13 Moving scaffold for floor slab assembly

Country Status (1)

Country Link
JP (1) JP3197234B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100429270B1 (en) * 2001-07-05 2004-05-04 (주)청호종합기술단 Movable scaffolding of operation concrete slab of bridge
CN103850435A (en) * 2012-12-01 2014-06-11 陈永生 Hoisting framework device capable of replacing support framework and used for frame construction building concrete floor
CN105755958A (en) * 2016-03-03 2016-07-13 中铁二十局集团第四工程有限公司 Special bracket for construction of whole bilateral post-poured flange plate and application method thereof
CN107761571A (en) * 2017-10-30 2018-03-06 中铁二十四局集团安徽工程有限公司 Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system and its application
CN109468955A (en) * 2018-11-12 2019-03-15 湖南金海钢结构有限公司 A kind of large size truss dismounting tooling
CN109573875A (en) * 2019-01-18 2019-04-05 中国建筑第二工程局有限公司 A kind of anti-collision wall template hoisting device and anti-collision wall Formwork Installation Method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100429270B1 (en) * 2001-07-05 2004-05-04 (주)청호종합기술단 Movable scaffolding of operation concrete slab of bridge
CN103850435A (en) * 2012-12-01 2014-06-11 陈永生 Hoisting framework device capable of replacing support framework and used for frame construction building concrete floor
CN105755958A (en) * 2016-03-03 2016-07-13 中铁二十局集团第四工程有限公司 Special bracket for construction of whole bilateral post-poured flange plate and application method thereof
CN107761571A (en) * 2017-10-30 2018-03-06 中铁二十四局集团安徽工程有限公司 Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system and its application
CN109468955A (en) * 2018-11-12 2019-03-15 湖南金海钢结构有限公司 A kind of large size truss dismounting tooling
CN109468955B (en) * 2018-11-12 2021-06-01 湖南金海钢结构有限公司 Large-scale truss demolishs frock
CN109573875A (en) * 2019-01-18 2019-04-05 中国建筑第二工程局有限公司 A kind of anti-collision wall template hoisting device and anti-collision wall Formwork Installation Method

Also Published As

Publication number Publication date
JP3197234B2 (en) 2001-08-13

Similar Documents

Publication Publication Date Title
JP5059491B2 (en) Assembly method of mobile suspension support
KR20030093680A (en) The construction method of double-t girder bridge by underslung movable scaffolding system
JP4748420B2 (en) Construction method of corrugated steel web bridge using girder for erection work
JPS59501465A (en) Split casting equipment for prestressed concrete bridges using cantilever construction method
JP3177904B2 (en) Mobile work vehicle for PC cable-stayed bridge
JP3197234B2 (en) Moving scaffold for floor slab assembly
JP4329535B2 (en) Mobile work vehicle for overhanging slabs
EP1111135A2 (en) Method of building viaducts
JP3110985B2 (en) Construction method of column capital of overhang girder bridge
JP3125652B2 (en) Bridge girder erection equipment
JP3065916B2 (en) Equipment for moving formwork for floor concrete
JP2000087316A (en) Method and device for construction of floor slab
JP3125653B2 (en) Bridge girder construction method
JP3032477B2 (en) Moving scaffold for floor slab assembly
JP3049402B2 (en) Supporting type scaffold form lifting device and concrete skeleton construction method
JPH0739644B2 (en) Construction method of superstructure in elevated structure
JP4080070B2 (en) Floor slab construction method and apparatus
JP3032476B2 (en) Moving device for floor slab formwork
JP5437876B2 (en) Method of dismantling and removing support members in the construction process of RC RC ramen structure viaduct
JP2992882B2 (en) Beam formwork device
JP2001098559A (en) Total lift-up form device
JP2000087314A (en) Method and device for construction of floor slab
JPH05195513A (en) Lining work car for arch bridge
JP3412505B2 (en) Slip form method
JPH10219626A (en) Movable form timbering device to install bridge and moving execution method thereof

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees