JPH1141809A - Test-managing equipment for power system monitor and controller, and recording medium with program recorded thereof - Google Patents

Test-managing equipment for power system monitor and controller, and recording medium with program recorded thereof

Info

Publication number
JPH1141809A
JPH1141809A JP9209955A JP20995597A JPH1141809A JP H1141809 A JPH1141809 A JP H1141809A JP 9209955 A JP9209955 A JP 9209955A JP 20995597 A JP20995597 A JP 20995597A JP H1141809 A JPH1141809 A JP H1141809A
Authority
JP
Japan
Prior art keywords
power system
system monitoring
control device
test management
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9209955A
Other languages
Japanese (ja)
Inventor
Noriyuki Nagamine
規之 長峯
Shunichi Habuka
俊一 羽深
Mitsukage Yamada
光影 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP9209955A priority Critical patent/JPH1141809A/en
Publication of JPH1141809A publication Critical patent/JPH1141809A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To eliminate writing of program in a medium, transportation of the medium, and installation of software from the medium, when conducting factory tests after shipment or on-site tests after a Revision (updating). SOLUTION: A network system is constituted of at least one power system monitor and a controller and which monitors and controls a power system and records and stores power information and a test managing equipment connected to the power system monitor and controller via a network. In this case, the functions of the test managing equipment 101 of a version which has been updated compared to those of the power system monitor and controller 1 (1-1,...) or functions, which are provided in the test managing equipment 101 but not in the power system monitor and controller, are transmitted from the test managing equipment 101 to the power system monitor and controller and then executed on the power system monitor and controller.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、電力系統を監視,
制御し、電力情報を記録,保存する電力系統監視制御装
置の試験管理装置とそのプログラムを記録した記録媒体
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention
The present invention relates to a test management device of a power system monitoring and control device for controlling and recording and storing power information, and a recording medium on which a program thereof is recorded.

【0002】[0002]

【従来の技術】運用中の電力系統監視制御装置を機能試
験する場合には、次に示す2種類がある。先ず、第1は
バージョンアップ時に工場等で試験をする場合と、第2
は工場等にて試験を行なった後、バージョンアップした
ものを現地にてインストールし、現地で試験をする場合
とがある。
2. Description of the Related Art There are the following two types of functional tests for an operating power system monitoring and control device. First, the first is to test at a factory or the like when upgrading, and the second is
In some cases, after a test is performed at a factory or the like, an upgraded version is installed on site and the test is performed on site.

【0003】これらは以下のように試験環境を構築す
る。 (1)バージョンアップ時に工場等で試験する場合 現地の電力系統監視制御装置にインストールされている
ソフトウェア一式を磁気テープ等の媒体に吸い上げ、こ
れを工場等に設置した試験装置にインストールして環境
を構築する。そして工場等にて構築した環境に対して変
更機能のバージョンアップを実施して、工場等での試験
装置で試験を行なう。
[0003] These construct a test environment as follows. (1) When testing at a factory or the like at the time of version upgrade Download a set of software installed on the local power system monitoring and control device onto a medium such as a magnetic tape and install it on a test device installed at a factory or the like to save the environment. To construct. Then, the version of the change function is upgraded for the environment constructed at the factory or the like, and the test is performed by the test device at the factory or the like.

【0004】(2)工場等での試験後、現地で試験する
場合 工場等でバージョンアップしたプログラムを工場等に設
置した試験装置から磁気テープ等の媒体に吸い上げ、こ
れを現地の電力系統監視制御装置にインストールして、
プログラムをコンパイル・リンケージし、電力系統監視
制御装置を再起動して試験環境が構築される。ここで構
築した電力系統監視制御装置の環境により試験を行な
う。
(2) In the case of on-site testing after a test at a factory or the like A program upgraded at the factory or the like is downloaded from a test device installed at the factory or the like to a medium such as a magnetic tape, and the program is monitored and controlled on the local power system. Install it on the device,
The test environment is established by compiling and linking the program and restarting the power system monitoring and control device. A test is performed in the environment of the power system monitoring and control device constructed here.

【0005】[0005]

【発明が解決しようとする課題】上記したように工場等
で試験を実施するためには、常に現地ソフトウェア一式
を媒体に吸い上げ、これを工場等に保管しておく必要が
あり、更にソフトウェアのバージョン管理を厳格に行な
う必要がある。又、現地等で機能試験を実施するために
は、工場等に設置した試験装置から媒体を介して、現地
の電力系統監視制御装置にインストールし、コンパイル
・リンケージ等の環境構築作業を行なう必要がある。
又、現地でのインストール作業においてもバージョン管
理を厳格に行なう必要があり、現地のソフトウェアと工
場等で保管するソフトウェアとの間でバージョンに不適
合(ミスマッチ)が発生すると、現地のソフトウェアに
不動作が発生する。
As described above, in order to carry out a test in a factory or the like, it is necessary to always download a set of local software to a medium and store it in the factory or the like. Management must be strict. In addition, in order to conduct a functional test on site, it is necessary to install a test device installed in a factory or the like via a medium to the local power system monitoring and control device, and perform environment construction work such as compilation and linkage. is there.
It is also necessary to strictly control the version during the installation work on site, and if there is a mismatch between the local software and the software stored at the factory, etc. (mismatch), the local software will not operate. Occur.

【0006】本発明は上記課題を解決するためになされ
たものであり、電力系統監視制御装置のバージョンアッ
プ時の工場等での試験のための現地での媒体への吸い上
げ作業と、工場等での現地ソフトウェアの管理作業と、
工場等に設置した試験装置への現地ソフトウェアのイン
ストール・環境構築作業と、現地試験のための工場等で
の媒体への吸い上げ作業と、現地電力系統監視制御装置
への工場ソフトウェアのインストール・環境構築作業を
不要にし、又、現地電力系統監視制御装置のソフトウェ
アと工場等で保管するソフトウェアとの間でバージョン
管理ミスによる不動作を回避することのできる電力系統
監視制御装置の試験管理装置とそのプログラムを記録し
た記録媒体を提供することを目的としている。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems. Local software management tasks,
Installation of local software on test equipment installed in factories, etc., environment construction work, downloading work to media in factories, etc. for on-site testing, installation of factory software on local power system monitoring and control equipment, construction of environment A test management device and a program for a power system monitoring and control device that eliminates the need for work and can avoid malfunction due to a version control error between the software of the local power system monitoring and control device and the software stored at a factory or the like. The purpose of the present invention is to provide a recording medium on which is recorded.

【0007】[0007]

【課題を解決するための手段】本発明の[請求項1]に
係る電力系統監視制御装置の試験管理装置は、電力系統
を監視制御し、電力情報を記録,保存する1つ以上の電
力系統監視制御装置と、この電力系統監視制御装置にネ
ットワークを介して接続された試験管理装置とで構成さ
れたネットワークシステムであって、電力系統監視制御
装置の機能よりもバージョンアップされた試験管理装置
の機能及び試験管理装置にはあるが当該電力系統監視制
御装置に無い機能を、試験管理装置から電力系統監視制
御装置へ転送して、当該電力系統監視制御装置上で実行
するよう構成した。
According to a first aspect of the present invention, there is provided a test management apparatus for a power system monitoring and control apparatus, wherein at least one power system monitors and controls the power system and records and saves power information. A network system comprising a monitoring control device and a test management device connected to the power system monitoring control device via a network, wherein the test management device is upgraded to have a function upgraded from the function of the power system monitoring control device. The function and the function which are present in the test management apparatus but not present in the power system monitoring and control apparatus are transferred from the test management apparatus to the power system monitoring and control apparatus and executed on the power system monitoring and control apparatus.

【0008】したがって電力系統監視制御装置の試験時
に、電力系統監視制御装置の機能よりバージョンアップ
された試験管理装置の機能及び当該電力系統監視制御装
置に無い機能を試験管理装置から当該電力系統監視制御
装置に転送して、当該電力系統監視制御装置上で実行さ
れるので、現地試験のための工場等での媒体への吸い上
げ作業と、現地電力系統監視制御装置への工場ソフトウ
ェアのインストール・環境構築作業を不要にし、又、現
地電力系統監視制御装置のソフトウェアと工場等で保管
するソフトウェアとの間で発生するバージョン管理ミス
による不動作を回避することが可能となる。
Therefore, at the time of the test of the power system monitoring and control device, the function of the test management device upgraded from the function of the power system monitoring and control device and the function that is not included in the power system monitoring and control device are transferred from the test management device to the power system monitoring and control device. Since the data is transferred to the device and executed on the power system monitoring and control device, it is downloaded to a medium at a factory or the like for on-site testing, and factory software is installed on the local power system monitoring and control device and the environment is constructed. This eliminates the need for an operation, and also avoids a malfunction due to a version control mistake that occurs between the software of the local power system monitoring and control device and the software stored in a factory or the like.

【0009】本発明の[請求項2]に係る記録媒体は、
電力系統を監視制御し、電力情報を記録,保存する1つ
以上の電力系統監視制御装置と、この電力系統監視制御
装置にネットワークを介して接続された試験管理装置と
で構成されたネットワークシステムであって、電力系統
監視制御装置の機能よりもバージョンアップされた試験
管理装置の機能及び試験管理装置にはあるが当該電力系
統監視制御装置に無い機能を、試験管理装置から電力系
統監視制御装置へ転送して、当該電力系統監視制御装置
上で実行する監視制御プログラムを記録したものであ
る。
[0009] The recording medium according to claim 2 of the present invention comprises:
A network system comprising one or more power system monitoring and control devices that monitor and control the power system and record and store power information, and a test management device connected to the power system monitoring and control device via a network. Then, the functions of the test management device upgraded from the functions of the power system monitoring and control device and the functions that are present in the test management device but not in the power system monitoring and control device are transferred from the test management device to the power system monitoring and control device. The monitoring and control program to be transferred and executed on the power system monitoring and control device is recorded.

【0010】本発明の[請求項3]に係る電力系統監視
制御装置の試験管理装置は、電力系統を監視制御し、電
力情報を記録,保存する1つ以上の電力系統監視制御装
置と、この電力系統監視制御装置にネットワークを介し
て接続され前記電力系統監視制御装置と同一構成を有す
る試験管理装置とで構成されたネットワークシステムで
あって、試験管理装置の機能よりもバージョンアップさ
れた電力系統監視制御装置の機能及び電力系統監視制御
装置にはあるが試験管理装置に無い機能を、電力系統監
視制御装置から試験管理装置へ転送して、試験管理装置
上で実行するよう構成した。
According to a third aspect of the present invention, there is provided a test management apparatus for a power system monitoring and control apparatus, wherein at least one power system monitoring and control apparatus monitors and controls a power system and records and stores power information. What is claimed is: 1. A network system comprising a test management device connected to a power system monitoring and control device via a network and having the same configuration as the power system monitoring and control device, wherein the power system is upgraded to a version higher than the function of the test management device. The function of the supervisory control device and the function of the power system supervisory control device but not of the test management device are transferred from the power system supervisory control device to the test management device and executed on the test management device.

【0011】本発明の[請求項4]に係る記録媒体は、
電力系統を監視制御し、電力情報を記録,保存する1つ
以上の電力系統監視制御装置と、この電力系統監視制御
装置にネットワークを介して接続され前記電力系統監視
制御装置と同一構成を有する試験管理装置とで構成され
たネットワークシステムであって、試験管理装置の機能
よりもバージョンアップされた電力系統監視制御装置の
機能及び電力系統監視制御装置にはあるが試験管理装置
に無い機能を、電力系統監視制御装置から試験管理装置
へ転送して、試験管理装置上で実行する監視制御プログ
ラムを記録したものである。
The recording medium according to claim 4 of the present invention is:
One or more power system monitoring and control devices that monitor and control the power system and record and store power information, and a test that is connected to the power system monitoring and control device via a network and has the same configuration as the power system monitoring and control device. A network system configured with a management device, the functions of the power system monitoring and control device upgraded from the functions of the test management device and the functions that are present in the power system monitoring and control device but are not included in the test management device. This is a recording of a monitoring control program transferred from the system monitoring control device to the test management device and executed on the test management device.

【0012】本発明の[請求項5]に係る電力系統監視
制御装置の試験管理装置は、請求項1又は請求項3にお
いて、電力系統監視制御装置を複数用意し、それら電力
系統監視制御装置の機能を全電力系統監視制御装置共通
の標準機能と各電力系統監視制御装置固有のオプション
機能とに分け、電力系統監視制御装置の機能メンテナン
ス又は試験時に、ネットワークを介して全電力系統監視
制御装置共通の標準機能の内、当該電力系統監視制御装
置の機能よりもバージョンアップした試験管理装置の機
能を、試験管理装置から電力系統監視制御装置に転送し
て、電力系統監視制御装置上で実行するよう構成した。
According to a fifth aspect of the present invention, there is provided a test management device for a power system monitoring and control device according to claim 1 or 3, wherein a plurality of power system monitoring and control devices are prepared, and The functions are divided into standard functions common to all power system monitoring and control devices and optional functions unique to each power system monitoring and control device, and common to all power system monitoring and control devices via a network during function maintenance or testing of power system monitoring and control devices. Among the standard functions, the functions of the test management device upgraded from the functions of the power system monitoring and control device are transferred from the test management device to the power system monitoring and control device, and executed on the power system monitoring and control device. Configured.

【0013】本発明の[請求項6]に係る記録媒体は、
請求項2又は請求項4において、電力系統監視制御装置
を複数用意し、それら電力系統監視制御装置の機能を全
電力系統監視制御装置共通の標準機能と各電力系統監視
制御装置固有のオプション機能とに分け、電力系統監視
制御装置の機能メンテナンス又は試験時に、ネットワー
クを介して全電力系統監視制御装置共通の標準機能の
内、当該電力系統監視制御装置の機能よりもバージョン
アップした試験管理装置の機能を、試験管理装置から電
力系統監視制御装置に転送して、電力系統監視制御装置
上で実行する監視制御プログラムを記録したものであ
る。
[0013] The recording medium according to claim 6 of the present invention comprises:
Claim 2 or Claim 4, wherein a plurality of power system monitoring and control devices are prepared, and the functions of the power system monitoring and control devices are defined as standard functions common to all power system monitoring and control devices and optional functions unique to each power system monitoring and control device. The functions of the test management device that are upgraded from the functions of the power system monitoring and control device among the standard functions common to all power system monitoring and control devices via the network during the maintenance or testing of the function of the power system monitoring and control device Is transferred from the test management device to the power system monitoring and control device, and a monitoring control program to be executed on the power system monitoring and control device is recorded.

【0014】本発明の[請求項7]に係る電力系統監視
制御装置の試験管理装置は、請求項3において、電力系
統監視制御装置を複数用意し、それら電力系統監視制御
装置の機能を全電力系統監視制御装置共通の標準機能と
各電力系統監視制御装置固有のオプション機能とに分
け、ネットワークを介して試験管理装置に無い各電力系
統監視制御装置固有のオプション機能を、当該電力系統
監視制御装置から試験管理装置へ転送して、試験管理装
置上で実行するよう構成した。
According to a seventh aspect of the present invention, in the test management apparatus for a power system monitoring and control device according to the third aspect, a plurality of power system monitoring and control devices are prepared, and the function of the power system monitoring and control device is set to a total power. The standard functions common to the power system monitoring and control device and the optional functions specific to each power system monitoring and control device are divided into optional functions unique to each power system monitoring and control device that are not in the test management device via the network. And transferred to the test management device, and executed on the test management device.

【0015】本発明の[請求項8]に係る記録媒体は、
請求項4において、電力系統監視制御装置を複数用意
し、それら電力系統監視制御装置の機能を全電力系統監
視制御装置共通の標準機能と各電力系統監視制御装置固
有のオプション機能とに分け、ネットワークを介して試
験管理装置に無い各電力系統監視制御装置固有のオプシ
ョン機能を、当該電力系統監視制御装置から試験管理装
置へ転送して、試験管理装置上で実行する監視制御プロ
グラムを記録したしたものである。
The recording medium according to claim 8 of the present invention is:
5. The network according to claim 4, wherein a plurality of power system monitoring control devices are prepared, and the functions of the power system monitoring control devices are divided into a standard function common to all power system monitoring control devices and an optional function unique to each power system monitoring control device. An optional function that is unique to each power system monitoring and control device that is not present in the test management device is transferred from the power system monitoring and control device to the test management device via the test management device, and a monitoring control program to be executed on the test management device is recorded. It is.

【0016】本発明の[請求項9]に係る電力系統監視
制御装置の試験管理装置は、請求項1又は請求項3又は
請求項5又は請求項7において、転送する機能をシステ
ムMMI装置の入出力装置から指定して転送し、転送先
の装置上で実行可能としたものである。
According to a ninth aspect of the present invention, there is provided a test management device for a power system monitoring and control device according to the first or third or fifth or fifth or seventh aspect, wherein a transfer function is provided by a system MMI device. The data is specified and transferred from the output device, and can be executed on the transfer destination device.

【0017】本発明の[請求項10]に係る記録媒体
は、請求項2又は請求項4又は請求項6又は請求項8に
おいて、転送する機能システムMMI装置の入出力装置
から指示して転送し、転送先装置上で実行可能とする監
視制御プログラムを記録したものである。
According to claim 10 of the present invention, the recording medium according to claim 2 or claim 4 or claim 6 or claim 8 is transferred from the input / output device of the function system MMI device to be transferred. And a monitoring control program that can be executed on the transfer destination device.

【0018】[0018]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

(第1の実施の形態)(請求項1,2に対応) 図1は本発明の第1の実施の形態の電力系統監視制御装
置の試験管理装置の全体システム構成図、図2は本発明
の第1の実施の形態の監視制御CPU3-1 と試験管理C
PU103 の機能ブロック図である。
(First Embodiment) (Corresponding to Claims 1 and 2) FIG. 1 is an overall system configuration diagram of a test management device of a power system monitoring and control device according to a first embodiment of the present invention, and FIG. Monitoring control CPU 3-1 and test management C of the first embodiment
It is a functional block diagram of PU103.

【0019】図1において、1-1 は電力系統監視制御装
置であり、ソフトウェア保存部2-1と、監視制御CPU3
-1 と、システムMMI装置4-1 と、周辺装置5-1 とか
らなるもので、複数個(n)用意されているが説明の便
宜上1個のみ示している。前記周辺装置5-1 は電力系統
の運用状態を監視するための系統監視盤等である。6-1
〜6-n は前記電力系統監視制御装置夫々に接続されたW
AN通信装置であり、WAN7に接続され前記WAN7
経由の通信を行なう。図1において、100番台の符号
は試験管理装置に関するものであり、即ち、101 は試験
管理装置、102はソフトウェア保存部、103 は試験管理
CPU、104 はシステムMMI装置、105 は周辺装置で
ある。
In FIG. 1, reference numeral 1-1 denotes a power system monitoring and control device, which includes a software storage unit 2-1 and a monitoring control CPU 3;
-1, the system MMI device 4-1 and the peripheral device 5-1. A plurality (n) are prepared, but only one is shown for convenience of explanation. The peripheral device 5-1 is a system monitoring panel or the like for monitoring the operation state of the power system. 6-1
6-n are W connected to the respective power system monitoring and control devices.
An AN communication device connected to the WAN 7
Communication via the Internet. In FIG. 1, reference numerals in the 100s relate to a test management apparatus, that is, 101 is a test management apparatus, 102 is a software storage unit, 103 is a test management CPU, 104 is a system MMI apparatus, and 105 is a peripheral device.

【0020】図2において、31はWAN通信I/F手段
で、前記WAN通信装置6-1 〜6-nへ通信を要求し、W
AN経由通信されるデータを送受信する。32はバージョ
ン保存部で、監視制御CPU3-1 で実行される全ソフト
ウェアの現在のバージョン情報が記憶されている。
In FIG. 2, reference numeral 31 denotes a WAN communication I / F means for requesting communication from the WAN communication devices 6-1 to 6-n.
Transmits and receives data communicated via the AN. Reference numeral 32 denotes a version storage unit which stores current version information of all software executed by the monitoring control CPU 3-1.

【0021】33はバージョン管理手段で、前記バージョ
ン保存部32に記憶するバージョン情報を管理している。
34はバージョン転送要求手段で、前記バージョン保存部
32のバージョン情報を前記WAN通信I/F手段31に送
信要求すると共に、このWAN通信I/F手段31からバ
ージョン情報を受信する。
Reference numeral 33 denotes version management means for managing version information stored in the version storage unit 32.
34 is a version transfer request means, which is the version storage unit.
A request for transmission of the version information of 32 to the WAN communication I / F means 31 is received, and version information is received from the WAN communication I / F means 31.

【0022】35(1) ,35(2) ,…は現在のバージョンの
実行ソフトウェア全体の実体である。36はソフトウェア
転送要求手段で、前記WAN通信I/F手段31に対して
ソフトウェアを送信要求すると共に、このWAN通信I
/F手段31からソフトウェアを受信する。
.., 35 (1), 35 (2),... Are the entities of the entire execution software of the current version. Numeral 36 denotes a software transfer requesting unit for requesting the WAN communication I / F unit 31 to transmit software,
The software is received from the / F means 31.

【0023】37はソフトウェア起動・停止手段で、前記
複数の実行ソフトウェア35(1) ,35(2) ,…の中から、
該当する実行ソフトウェアを停止及び起動又は実行ロー
ドモジュールにする。38は試験要求受付手段で、前記シ
ステムMMI装置4から入力された試験実施要求を前記
バージョン転送要求手段34に通知する。図2において、
100番台の符号は試験管理装置に管理するものであ
り、その番号は上記した監視制御CPU3-1 側のそれに
対応している。
Reference numeral 37 denotes a software starting / stopping means, which is selected from the plurality of execution software 35 (1), 35 (2),.
Stop and start the corresponding execution software or make it an execution load module. Reference numeral 38 denotes a test request receiving means for notifying the version transfer request means 34 of a test execution request input from the system MMI device 4. In FIG.
Codes in the 100's are managed by the test management apparatus, and the numbers correspond to those on the monitoring control CPU 3-1 side.

【0024】次に作用について説明する。先ず、監視制
御CPU3-1 側のシステムMMI装置4から試験実施を
要求すると、これを受けた試験要求受付手段38は当該試
験実施要求をバージョン転送要求手段34に通知し、通知
を受けたバージョン転送要求手段34はバージョン保存部
32に記憶されたバージョン情報をWAM通信I/F手段
31に送信要求する。
Next, the operation will be described. First, when a test execution is requested from the system MMI device 4 on the side of the monitoring control CPU 3-1, the test request receiving means 38 receiving the request notifies the version transfer requesting means 34 of the test execution request, and receives the notified version transfer. The request means 34 is a version storage unit
WAM communication I / F means using version information stored in 32
Request transmission to 31.

【0025】バージョン情報は全ソフトウェアに対し
て、各プログラム単位に数字を使って、例えば「2.
1.0」のように表記される。先頭部分の数字が大きい
ほど新しく、先頭部分の数字が同じ時は次の部分の数字
が大きいほど新しく、以下の部分に対しても同様に評価
される。例えば「2.3.0」は「2.1.1」より新
しい。同じ名称の2つのプログラムのバージョン情報の
全ての部分が一致する時は、2つのプログラムのバージ
ョンは一致し、2つのプログラムのコードが同一である
ことを示す。
The version information is used for all software by using a number for each program unit, for example, "2.
1.0 ". When the number at the beginning is larger, the number is newer, and when the number at the beginning is the same, the number at the next part is larger, and the following parts are evaluated similarly. For example, “2.3.0” is newer than “2.1.1”. When all parts of the version information of two programs having the same name match, the versions of the two programs match, indicating that the codes of the two programs are the same.

【0026】WAM通信I/F手段31は当該バージョン
情報をWAN通信装置6-1 〜6-n ,WAN7,WAN通
信装置106 経由、WAN通信I/F手段131 に送信す
る。送信するバージョン情報の伝送フォーマット図を図
5に示す。図5のフォーマットは通信プロトコル制御コ
ード部(ヘッダ),送信元装置識別子,送信先識別子,
データID,総パケット数,シーケンス番号,送信日
時,データ(バージョン情報,バージョンアップ無し情
報,転送ソフトウェアコード),通信プロトコル制御コ
ード部からなっている。
The WAM communication I / F means 31 transmits the version information to the WAN communication I / F means 131 via the WAN communication devices 6-1 to 6-n, the WAN 7, and the WAN communication device 106. FIG. 5 shows a transmission format diagram of the version information to be transmitted. The format of FIG. 5 includes a communication protocol control code part (header), a source device identifier, a destination identifier,
It consists of a data ID, the total number of packets, a sequence number, a transmission date and time, data (version information, no upgrade information, transfer software code), and a communication protocol control code part.

【0027】WAN通信I/F手段131 は当該バージョ
ン情報をソフトウェア転送要求手段136 に受け渡す。こ
れを受けたソフトウェア転送要求手段136 は当該バージ
ョン情報とバージョン保存部132 に記憶された当該電力
監視制御装置のバージョン情報とを比較し、バージョン
保存部132 に記憶された当該電力監視制御装置のバージ
ョン情報の中に受信したバージョン情報よりバージョン
アップされたソフトウェア及び受信したソフトウェアの
中に無いソフトウェアがあれば、当該ソフトウェアをソ
フトウェア保存部102 から取り出して、取り出した当該
ソフトウェアをWAN通信I/F手段131 に送信要求す
る。
The WAN communication I / F unit 131 passes the version information to the software transfer request unit 136. The software transfer request unit 136 having received this compares the version information with the version information of the power monitoring control device stored in the version storage unit 132, and compares the version information of the power monitoring control device stored in the version storage unit 132. If the information includes software upgraded from the received version information and software not included in the received software, the software is extracted from the software storage unit 102, and the extracted software is extracted from the WAN communication I / F unit 131. Request to send to

【0028】ソフトウェア転送要求手段136 がソフトウ
ェア保存部102 から取り出し、WAN通信I/F手段13
1 に送信要求するソフトウェアの形態は、高級プログラ
ミング言語で書かれたプログラムでも、構造的プログラ
ミング言語で書かれたプログラムでも、インタプリタで
解釈実行される中間語(インタプリタ言語)で書かれた
プログラムでも、アセンブリ言語で書かれたプログラム
でも、機械語で書かれた目的プログラムでも、目的プロ
グラムを実行時ルーチンに結合したロードモジュールで
も、ソフトウェア起動・停止手段37で起動が可能な形態
であればよい。
The software transfer request means 136 retrieves the data from the software storage unit 102, and the WAN communication I / F means 13
The form of the software requested to be transmitted to 1 can be a program written in a high-level programming language, a program written in a structural programming language, a program written in an intermediate language (interpreted language) interpreted and executed by an interpreter, A program written in assembly language, a target program written in machine language, or a load module in which the target program is combined with a runtime routine may be in any form that can be started by the software start / stop means 37.

【0029】ソフトウェア転送要求手段136 はWAN通
信I/F手段131 から受けたバージョン情報とバージョ
ン保存部132 に記憶された当該電力系統監視制御装置の
バージョン情報とを比較し、バージョン保存部132 に記
憶された当該電力系統監視制御装置のバージョン情報の
中に、受信したソフトウェアが全て有りかつ全てのソフ
トウェアのバージョン情報が受信したソフトウェアのバ
ージョン情報より古くない場合は、バージョン無しの情
報をWAN通信I/F131 に送信要求する。
The software transfer request unit 136 compares the version information received from the WAN communication I / F unit 131 with the version information of the power system monitoring and control device stored in the version storage unit 132, and stores it in the version storage unit 132. If the received version information of the power system monitoring and control apparatus includes all the received software and the version information of all the software is not older than the version information of the received software, the information without the version is transmitted to the WAN communication I / O. Request transmission to F131.

【0030】WAN通信I/F手段31は当該ソフトウェ
ア又は当該バージョンアップ無しの情報をソフトウェア
転送要求手段36に受け渡す。この場合の当該ソフトウェ
ア又は当該バージョンアップ無しの情報の伝送フォーマ
ット図は前掲の図5の通りである。ソフトウェア転送要
求手段36は、当該ソフトウェアをソフトウェア起動・停
止手段37に渡す。
The WAN communication I / F unit 31 transfers the software or the information without the version upgrade to the software transfer request unit 36. In this case, the transmission format of the software or the information without version upgrade is as shown in FIG. 5 described above. The software transfer request unit 36 passes the software to the software start / stop unit 37.

【0031】又、ソフトウェア転送要求手段36は、バー
ジョンアップ無しの情報を受けた時、システムMMI装
置4-1 に環境構築終了(バージョンアップ無し)の情報
を表示する。一方、ソフトウェア起動・停止手段37はソ
フトウェア転送要求手段36から受けたソフトウェアを現
在の実行ソフトウェア35(1) ,35(2) ,…の中から探
す。その結果、現在の実行ソフトウェアの中に対象とな
る、ソフトウェア転送要求手段36から受けたソフトウェ
アが存在する場合は、ソフトウェア起動・停止手段37は
現在の実行ソフトウェアの中から対象となる実行ソフト
ウェア全てに対し停止・要求をかける。停止・要求をか
けた実行ソフトウェアが停止した後、ソフトウェア起動
・停止手段37はバージョンアップされたソフトウェアの
中から対象となるソフトウェアに対し起動要求をかけ、
実行ソフトウェアを生成して、試験管理装置のバージョ
ンと一致させる。
When the software transfer request means 36 receives the information indicating that there is no version upgrade, the software transfer requesting means 36 displays information indicating that the environment construction has been completed (no version upgrade) on the system MMI device 4-1. On the other hand, the software start / stop means 37 searches for the software received from the software transfer request means 36 from the currently executed software 35 (1), 35 (2),... As a result, if the target software is present in the current execution software and the software received from the software transfer request unit 36 is present, the software start / stop unit 37 sets the target execution software to all target execution software from the current execution software. Make a request to stop. After the execution software that has been stopped / requested has been stopped, the software start / stop means 37 issues a start request to the target software from among the upgraded software,
Generate the running software and match it with the version of the test management device.

【0032】ソフトウェア起動・停止手段37は現在の実
行ソフトウェアが無い場合は、当該ソフトウェアを起動
又は実行ロードモジュールファイルにする。なお、実行
ロードモジュールファイルをソフトウェア保存部2-1 に
格納する前に、現バージョンの実行ロードモジュールフ
ァイルがソフトウェア保存部2-1 に存在するかを確認
し、現バージョンの実行ロードモジュールファイルが保
存部2-1 に存在する時は現バージョンの実行ロードモジ
ュールファイルを待避後、バージョンアップされた実行
ロードモジュールファイルをソフトウェア保存部2-1 に
格納する。
If there is no current execution software, the software start / stop means 37 starts or sets the software to be an execution load module file. Before storing the execution load module file in the software storage unit 2-1, check whether the current version of the execution load module file exists in the software storage unit 2-1, and save the current version of the execution load module file. If it exists in the section 2-1, the current version of the execution load module file is saved, and the upgraded execution load module file is stored in the software storage section 2-1.

【0033】WAN通信I/F手段131 からWAN通信
I/F手段31に転送されたソフトウェアの形態がインス
プリタ言語で書かれたプログラムやその実行ファイルの
場合で、当該現バージョンの実行ロードモジュールファ
イルソフトウェアが画面入出力機能のように当該ソフト
ウェアの起動元により当該ソフトウェアの入力元又は出
力先が決定されるプログラムの場合は、ソフトウェア起
動・停止手段37は当該ソフトウェアを起動しない。
When the form of the software transferred from the WAN communication I / F unit 131 to the WAN communication I / F unit 31 is a program written in an interpreter language or an execution file thereof, the execution load module file software of the current version is used. Is a program whose input source or output destination is determined by the start source of the software, such as a screen input / output function, the software start / stop unit 37 does not start the software.

【0034】ソフトウェア起動・停止手段37はソフトウ
ェア転送要求手段36から受けた全ソフトウェアの停止・
起動処理が終了した段階で、ソフトウェア転送要求手段
36に環境構築終了を通知する。環境構築終了の通知を受
けたソフトウェア転送要求手段36はシステムMMI装置
に環境構築終了(バージョンアップ有り)の情報を表示
する。
The software start / stop means 37 stops / starts all software received from the software transfer request means 36.
At the stage when the startup process is completed, the software transfer request
Notify 36 of the end of environment construction. The software transfer requesting unit 36, having received the notification of the completion of the environment construction, displays information on the completion of the environment construction (version up) with the system MMI device.

【0035】試験完了後、システムMMI装置4-1 から
試験完了バージョン更新要求を入力すると、試験要求受
付手段38は当該試験完了バージョン更新要求をバージョ
ン管理手段33に通知する。バージョン管理手段33は当該
最新ソフトウェアによりソフトウェア保存部2-1 のソフ
トウェアを更新すると共に、当該最新バージョン情報に
よりバージョン保存部32のバージョン情報を更新する。
After the test is completed, when a test completed version update request is input from the system MMI device 4-1, the test request receiving means 38 notifies the version management means 33 of the test completed version update request. The version management unit 33 updates the software in the software storage unit 2-1 with the latest software, and updates the version information in the version storage unit 32 with the latest version information.

【0036】システムMMI装置4-1 から試験完了バー
ジョン更新要求が無い場合は、ソフトウェア保存部2-1
のソフトウェア及びバージョン保存部32のバージョン情
報は更新されない。なお、実行ロードモジュールファイ
ルをソフトウェア保存部2-1に格納したソフトウェアに
対しては、待避した現バージョンの実行ロードモジュー
ルファイルにより現バージョンに復元される。
If there is no test completion version update request from the system MMI device 4-1, the software storage unit 2-1
The software and the version information of the version storage unit 32 are not updated. Note that, for software in which the execution load module file is stored in the software storage unit 2-1, it is restored to the current version by the saved current version of the execution load module file.

【0037】本実施の形態によれば電力系統監視制御装
置の試験時に、当該電力系統監視制御装置の機能よりバ
ージョンアップされた試験管理装置の機能及び当該電力
系統監視制御装置に無い機能を試験管理装置から当該電
力系統監視制御装置に転送して、当該電力系統監視制御
装置上で実行されるので、現地試験のための工場等での
媒体への吸い上げ作業と、現地電力系統監視制御装置へ
の工場ソフトウェアのインストール・環境構築作業を不
要にし、又、現地電力系統監視制御装置のソフトウェア
工場等で保管するソフトウェアとの間で発生するバージ
ョン管理ミスによる不動作を回避することが可能とな
る。
According to the present embodiment, at the time of testing the power system monitoring and control device, the functions of the test management device upgraded from the functions of the power system monitoring and control device and the functions not present in the power system monitoring and control device are tested and managed. It is transferred from the device to the power system monitoring and control device and executed on the power system monitoring and control device. The installation of the factory software and the construction of the environment are not required, and the malfunction of the local power system monitoring and control device due to a version control error that occurs between the software and the software stored in the software factory can be avoided.

【0038】(第2の実施の形態)(請求項3,4に対
応) 図3は第2の実施の形態を示す構成図である。図3にお
いて図2と同一機能部分については同一符号を付して説
明を省略する。本実施の形態では図1に示す試験管理C
PUも監視制御CPUと同じ構成とし、これにより試験
管理装置101 側で試験時に、WAN7を経由して試験管
理装置101 に無い機能及びバージョンアップされた機能
を、当該電力系統監視制御装置1側から試験管理装置10
1 に転送して、試験管理装置101 上で実行するようにし
たものである。
(Second Embodiment) (Corresponding to Claims 3 and 4) FIG. 3 is a configuration diagram showing a second embodiment. 3, the same functional portions as those in FIG. 2 are denoted by the same reference numerals, and description thereof will be omitted. In the present embodiment, the test management C shown in FIG.
The PU also has the same configuration as the monitoring control CPU, so that when the test is performed on the test management apparatus 101 side, functions that are not present in the test management apparatus 101 via the WAN 7 and functions that have been upgraded are transferred from the power system monitoring and control apparatus 1 side. Test management device 10
1 to be executed on the test management apparatus 101.

【0039】電力系統監視制御装置側WAN通信I/F
手段31と試験管理装置側WAN通信I/F手段131 との
間では、一般に情報の転送にあたって通信パス(コネク
ション)を設定するコネクション型の通信を実施するた
め、電力系統監視制御装置1と試験管理装置101 は共に
通信アドレス(識別子)により通信する相手を特定して
いる。
Power system supervisory control device side WAN communication I / F
Between the means 31 and the WAN communication I / F means 131 on the test management apparatus side, in general, connection type communication for setting up a communication path (connection) for information transfer is performed. The devices 101 both specify a communication partner with a communication address (identifier).

【0040】したがって、試験管理装置101 は複数の電
力系統監視制御装置の中から、試験をする電力系統監視
制御装置を特定することが可能であり、システムMMI
装置104 から試験実施要求時に試験する電力系統監視制
御装置を指定可能とすることにより、1つの試験管理装
置で複数の電力系統監視制御装置の試験を順に行なうこ
とが可能である。
Therefore, the test management apparatus 101 can specify a power system monitoring and control device to be tested from among a plurality of power system monitoring and control devices.
By allowing the device 104 to specify a power system monitoring and control device to be tested at the time of a test execution request, a single test management device can sequentially test a plurality of power system monitoring and control devices.

【0041】(第3の実施の形態)(請求項5,6,7
に対応) 図4は第3の実施の形態を示す全体システム構成図であ
る。図4において、図1と同一機能部分については同一
符号を付して説明を省略する。本実施の形態では電力系
統監視制御装置のソフトウェアを全電力系統監視制御装
置共通の標準ソフトウェアと各電力系統監視制御装置固
有のオプションソフトウェアとに分け、全電力系統監視
制御装置共通の標準ソフトウェアは試験管理装置のソフ
トウェア保存部のソフトウェアをマスタ、電力系統監視
制御装置のソフトウェア保存部のソフトウェアをコピー
(スレーブ)とし、各電力系統監視制御装置固有のオプ
ションソフトウェアは電力系統監視制御装置のソフトウ
ェア保存部のソフトウェアをマスタ、試験管理装置のソ
フトウェア保存部のソフトウェアをコピー(スレーブ)
とし、試験管理装置側で試験をする電力系統監視制御装
置を特定できるようにしたものである。
(Third Embodiment) (Claims 5, 6, 7)
FIG. 4 is an overall system configuration diagram showing the third embodiment. 4, the same functional portions as those in FIG. 1 are denoted by the same reference numerals, and description thereof will be omitted. In this embodiment, the software of the power system monitoring and control device is divided into standard software common to all power system monitoring and control devices and optional software specific to each power system monitoring and control device. The software in the software storage unit of the management device is the master, the software in the software storage unit of the power system monitoring and control unit is copy (slave), and the optional software specific to each power system monitoring and control unit is the software in the software storage unit of the power system monitoring and control unit. Master software, copy software in software storage of test management device (slave)
The test management device can specify a power system monitoring and control device to be tested.

【0042】したがって、構成としてはソフトウェア保
存部2-1 及びソフトウェア保存部102 を、夫々全電力系
統監視制御装置共通の標準ソフト用の共通部2a,共通部
102aと、各電力系統監視制御装置固有のオプションソフ
ト用の固有部2b,固有部102bとに分け、バージョン保存
部32及びバージョン保存部132 を全電力系統監視制御装
置共通の標準ソフトウェア用と、各電力系統監視制御装
置固有のオプションソフトウェア用とに分けるようにし
た。
Therefore, the software storage unit 2-1 and the software storage unit 102 are configured as a common unit 2a and a common unit for standard software common to all power system monitoring and control devices, respectively.
102a and a unique unit 2b and a unique unit 102b for option software specific to each power system monitoring and control device. The version storage unit 32 and the version storage unit 132 are divided into one for standard software common to all power system monitoring and control devices. The system is divided into those for optional software specific to the power system monitoring and control device.

【0043】電力系統監視制御装置で試験を実施する時
は、全電力系統監視制御装置共通の標準ソフトウェアに
対して、バージョンアップを実施することが可能であ
る。又、試験管理装置で試験を実施する時は、各電力系
統監視制御装置固有のオプションソフトウェアに対し
て、バージョンアップを実施することが可能である。
When a test is performed by the power system monitoring and control device, it is possible to upgrade the version of standard software common to all power system monitoring and control devices. When the test is performed by the test management device, it is possible to upgrade the version of the optional software unique to each power system monitoring and control device.

【0044】電力系統監視制御装置側WAN通信I/F
手段31と試験管理装置側WAN通信I/F手段131 との
間では、一般に情報の転送にあたって通信パス(コネク
ション)を設定するコネクション型の通信を実施するた
め、電力系統監視制御装置1と試験管理装置101 は共に
通信アドレス(識別子)により通信する相手を特定して
いる。
Power system monitoring and control device side WAN communication I / F
Between the means 31 and the WAN communication I / F means 131 on the test management apparatus side, in general, connection type communication for setting up a communication path (connection) for information transfer is performed. The devices 101 both specify a communication partner with a communication address (identifier).

【0045】したがって、試験管理装置101 は複数の電
力系統監視制御装置の中から、試験をする電力系統監視
制御装置を特定することが可能であり、システムMMI
装置104 から試験実施要求時に試験する電力系統監視制
御装置を指定可能とすることにより、1つの試験管理装
置で複数の電力系統監視制御装置の試験を順に行なうこ
とが可能である。
Therefore, the test management apparatus 101 can specify the power system monitoring and control device to be tested from among the plurality of power system monitoring and control devices.
By allowing the device 104 to specify a power system monitoring and control device to be tested at the time of a test execution request, a single test management device can sequentially test a plurality of power system monitoring and control devices.

【0046】(第4の実施の形態)(請求項9に対応) 図2,図3において、バージョン保存部32のソフトウェ
アの中からバージョンアップ要求をするソフトウェア
を、システムMMI装置4-1 から指定して、指定された
ソフトウェアに対してバージョンアップを実施すること
に置き換えることも可能である。
(Fourth Embodiment) (corresponding to claim 9) In FIG. 2 and FIG. 3, the software for which a version upgrade request is made from the software in the version storage unit 32 is designated from the system MMI device 4-1. Then, it is also possible to replace the version upgrade with respect to the designated software.

【0047】バージョンアップ要求をするソフトウェア
を指定するシステムMMI装置の転送ソフトウェア指定
入力画面図を図6に示す。図6に示されるように自計算
機バージョン情報と相手計算機バージョン情報を対比し
て示し、バージョンの差のある部分を網かけして明示し
ている。
FIG. 6 shows a transfer software designation input screen of the system MMI device for designating software for which a version upgrade request is made. As shown in FIG. 6, the version information of the own computer and the version information of the partner computer are shown in comparison with each other, and portions having a version difference are clearly indicated by shading.

【0048】なお、上述した実施の形態において記載し
た手法は、コンピュータに実行させることのできるプロ
グラムとして、例えば磁気ディスク,光ディスク,半導
体メモリなどの記録媒体に書き込んで各種装置に適用し
たり、通信媒体により伝送して各種装置に適用すること
も可能である。本装置を実現するコンピュータは、記録
媒体に記録されたプログラムを読み込み、このプログラ
ムによって動作が制御されることにより、上述した処理
を実行する。
The method described in the above-described embodiment is applied to various devices by writing it on a recording medium such as a magnetic disk, an optical disk, or a semiconductor memory as a program that can be executed by a computer. And can be applied to various devices. A computer that realizes the present apparatus reads the program recorded on the recording medium, and executes the above-described processing by controlling the operation of the program.

【0049】[0049]

【発明の効果】以上説明したように、本発明によれば電
力系統監視制御装置の機能メンテナンス又は試験時に、
当該電力系統監視制御装置の機能よりもバージョンアッ
プされた試験管理装置の機能及び当該電力系統監視制御
装置に無い機能を、試験管理装置から当該電力系統監視
制御装置に転送して、当該電力系統監視制御装置上で実
行されるので、現地試験のための工場等での媒体への吸
い上げ作業と、現地電力系統監視制御装置への工場ソフ
トウェアのインストール・環境構築作業を不要にし、
又、現地電力系統監視制御装置のソフトウェアと工場等
で保管するソフトウェアとの間で発生するバージョン管
理ミスによる不動作を回避することが可能となる。
As described above, according to the present invention, at the time of function maintenance or test of the power system monitoring and control device,
The functions of the test management device upgraded from the functions of the power system monitoring and control device and the functions that are not included in the power system monitoring and control device are transferred from the test management device to the power system monitoring and control device to perform the power system monitoring and control. Since it is executed on the control unit, it eliminates the need to download the media to the media at the factory for on-site testing, and to install the factory software on the local power system monitoring and control unit and to build the environment.
In addition, it is possible to avoid a malfunction due to a version control error that occurs between the software of the local power system monitoring and control device and the software stored in a factory or the like.

【0050】又、試験管理装置での試験時には、試験管
理装置の機能よりもバージョンアップされた試験対象の
電力系統監視制御装置の機能及び試験管理装置に無い機
能を、当該電力系統監視制御装置から試験管理装置に転
送して、試験管理装置上で実行されるので、電力系統監
視制御装置のバージョンアップ時の工場等での試験のた
めの媒体への吸い上げ作業と、工場等での現地ソフトウ
ェアの管理作業と、工場等に設置した試験装置への現地
ソフトウェアのインストール・環境構築作業を不要に
し、又、現地電力系統監視制御装置のソフトウェアと工
場等で保管するソフトウェアとの間で発生するバージョ
ン管理ミスによる不動作を回避することが可能となる。
At the time of testing with the test management device, the functions of the power system monitoring and control device to be tested, which are upgraded from the functions of the test management device, and the functions that are not included in the test management device are transmitted from the power system monitoring and control device. The data is transferred to the test management device and executed on the test management device. Eliminates the need for management work, installation of local software on test equipment installed in factories, and environment construction work, and version management that occurs between software for local power system monitoring and control equipment and software stored in factories, etc. It is possible to avoid a malfunction due to a mistake.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による電力系統監視制御装置の試験管理
装置の実施の形態を示す全体システム構成図。
FIG. 1 is an overall system configuration diagram showing an embodiment of a test management device of a power system monitoring and control device according to the present invention.

【図2】本発明による監視制御CPUと試験管理CPU
の実施の形態を示す機能ブロック図。
FIG. 2 is a monitoring control CPU and a test management CPU according to the present invention.
FIG. 2 is a functional block diagram showing the embodiment.

【図3】本発明による監視制御CPUと試験管理CPU
の他の実施の形態を示す機能ブロック図。
FIG. 3 is a monitoring control CPU and a test management CPU according to the present invention.
FIG. 14 is a functional block diagram showing another embodiment.

【図4】本発明による電力系統監視制御装置の試験管理
装置の他の実施の形態を示す全体システム構成図。
FIG. 4 is an overall system configuration diagram showing another embodiment of the test management device of the power system monitoring and control device according to the present invention.

【図5】情報伝送フォーマット図。FIG. 5 is an information transmission format diagram.

【図6】システムMMI装置の転送ソフトウェア指定入
力画面図。
FIG. 6 is a view showing a transfer software designation input screen of the system MMI apparatus.

【符号の説明】[Explanation of symbols]

1-1 電力系統監視制御装置 2-1 電力系統監視制御装置側ソフトウェア保存部 3-1 監視制御CPU 4-1 電力系統監視制御装置側システムMMI装置 5-1 電力系統監視制御装置側周辺装置 6-1 〜6-n 電力系統監視制御装置側WAN通信装
置 7 WAN 101 試験管理装置 102 試験管理装置側ソフトウェア保存部 103 試験管理CPU 104 試験管理装置側システムMMI装置 105 試験管理装置側周辺装置 106 試験管理装置側WAN通信装置
1-1 Power system monitoring and control device 2-1 Software storage unit on power system monitoring and control device 3-1 Monitoring and control CPU 4-1 System MMI device on power system monitoring and control device 5-1 Peripheral device on power system monitoring and control device 6 -1 to 6-n WAN communication device on power system monitoring and control device 7 WAN 101 Test management device 102 Software storage on test management device 103 Test management CPU 104 System MMI device on test management device 105 Peripheral device on test management device 106 Test Management device side WAN communication device

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】 電力系統を監視制御し、電力情報を記
録,保存する1つ以上の電力系統監視制御装置と、この
電力系統監視制御装置にネットワークを介して接続され
た試験管理装置とで構成されたネットワークシステムで
あって、電力系統監視制御装置の機能よりもバージョン
アップされた試験管理装置の機能及び試験管理装置には
あるが当該電力系統監視制御装置に無い機能を、試験管
理装置から電力系統監視制御装置へ転送して、当該電力
系統監視制御装置上で実行することを特徴とする電力系
統監視制御装置の試験管理装置。
1. An electric power system comprising: at least one electric power system monitoring and control device for monitoring and controlling an electric power system and recording and storing electric power information; and a test management device connected to the electric power system monitoring and controlling device via a network. In a network system that has been upgraded, the functions of the test management device upgraded from the functions of the power system monitoring and control device and the functions of the test management device but not of the power system monitoring and control device are transferred from the test management device to the power management system. A test management device for a power system monitoring and control device, wherein the test management device is transferred to the system monitoring and control device and executed on the power system monitoring and control device.
【請求項2】 電力系統を監視制御し、電力情報を記
録,保存する1つ以上の電力系統監視制御装置と、この
電力系統監視制御装置にネットワークを介して接続され
た試験管理装置とで構成されたネットワークシステムで
あって、電力系統監視制御装置の機能よりもバージョン
アップされた試験管理装置の機能及び試験管理装置には
あるが当該電力系統監視制御装置に無い機能を、試験管
理装置から電力系統監視制御装置へ転送して、当該電力
系統監視制御装置上で実行する監視制御プログラムを記
録した記録媒体。
2. A power system monitoring and control device for monitoring and controlling a power system and recording and storing power information, and a test management device connected to the power system monitoring and control device via a network. In a network system that has been upgraded, the functions of the test management device upgraded from the functions of the power system monitoring and control device and the functions of the test management device but not of the power system monitoring and control device are transferred from the test management device to the power management system. A recording medium which records a monitoring control program to be transferred to the power system monitoring and control device and executed on the power system monitoring and control device.
【請求項3】 電力系統を監視制御し、電力情報を記
録,保存する1つ以上の電力系統監視制御装置と、この
電力系統監視制御装置にネットワークを介して接続され
前記電力系統監視制御装置と同一構成を有する試験管理
装置とで構成されたネットワークシステムであって、試
験管理装置の機能よりもバージョンアップされた電力系
統監視制御装置の機能及び電力系統監視制御装置にはあ
るが試験管理装置に無い機能を、電力系統監視制御装置
から試験管理装置へ転送して、試験管理装置上で実行す
ることを特徴とする電力系統監視制御装置の試験管理装
置。
3. A power system monitoring and control device for monitoring and controlling a power system and recording and storing power information, and the power system monitoring and control device connected to the power system monitoring and control device via a network. A network system configured with a test management device having the same configuration, wherein the functions of the power system monitoring and control device and the power system monitoring and control device upgraded from the functions of the test management device are included in the test management device. A test management device for a power system monitoring and control device, wherein a function that does not exist is transferred from the power system monitoring and control device to the test management device and executed on the test management device.
【請求項4】 電力系統を監視制御し、電力情報を記
録,保存する1つ以上の電力系統監視制御装置と、この
電力系統監視制御装置にネットワークを介して接続され
前記電力系統監視制御装置と同一構成を有する試験管理
装置とで構成されたネットワークシステムであって、試
験管理装置の機能よりもバージョンアップされた電力系
統監視制御装置の機能及び電力系統監視制御装置にはあ
るが試験管理装置に無い機能を、電力系統監視制御装置
から試験管理装置へ転送して、試験管理装置上で実行す
る監視制御プログラムを記録した記録媒体。
4. One or more power system monitoring and control devices for monitoring and controlling a power system and recording and storing power information, and the power system monitoring and control device connected to the power system monitoring and control device via a network. A network system configured with a test management device having the same configuration, wherein the functions of the power system monitoring and control device and the power system monitoring and control device upgraded from the functions of the test management device are included in the test management device. A recording medium that records a monitoring control program to be executed on the test management device by transferring the missing function from the power system monitoring control device to the test management device.
【請求項5】 請求項1又は請求項3記載の電力系統監
視制御装置の試験管理装置において、電力系統監視制御
装置を複数用意し、それら電力系統監視制御装置の機能
を全電力系統監視制御装置共通の標準機能と各電力系統
監視制御装置固有のオプション機能とに分け、電力系統
監視制御装置の機能メンテナンス又は試験時に、ネット
ワークを介して全電力系統監視制御装置共通の標準機能
の内、当該電力系統監視制御装置の機能よりもバージョ
ンアップした試験管理装置の機能を、試験管理装置から
電力系統監視制御装置に転送して、電力系統監視制御装
置上で実行することを特徴とする電力系統監視制御装置
の試験管理装置。
5. The test management device for a power system monitoring and control device according to claim 1, wherein a plurality of power system monitoring and control devices are prepared, and the functions of the power system monitoring and control devices are assigned to the entire power system monitoring and control device. The standard functions are divided into common standard functions and optional functions unique to each power system monitoring and control device.When the functions of the power system monitoring and control device are maintained or tested, the power The power system monitoring control, wherein the function of the test management device upgraded from the function of the system monitoring and control device is transferred from the test management device to the power system monitoring and control device and executed on the power system monitoring and control device. Equipment test management device.
【請求項6】 請求項2又は請求項4記載の記録媒体に
おいて、電力系統監視制御装置を複数用意し、それら電
力系統監視制御装置の機能を全電力系統監視制御装置共
通の標準機能と各電力系統監視制御装置固有のオプショ
ン機能とに分け、電力系統監視制御装置の機能メンテナ
ンス又は試験時に、ネットワークを介して全電力系統監
視制御装置共通の標準機能の内、当該電力系統監視制御
装置の機能よりもバージョンアップした試験管理装置の
機能を、試験管理装置から電力系統監視制御装置に転送
して、電力系統監視制御装置上で実行する監視制御プロ
グラムを記録した記録媒体。
6. The recording medium according to claim 2, wherein a plurality of power system monitoring and control devices are prepared, and the functions of the power system monitoring and control devices are defined as standard functions common to all power system monitoring and control devices and each power supply. It is divided into optional functions unique to the power system monitoring and control device, and during the maintenance or testing of the function of the power system monitoring and control device, the functions of the power system monitoring and control device are included in the standard functions common to all power system monitoring and control devices via the network. A recording medium in which a function of the test management device, which has been upgraded, is transferred from the test management device to the power system monitoring and control device, and a monitoring control program to be executed on the power system monitoring and control device is recorded.
【請求項7】 請求項3記載の電力系統監視制御装置の
試験管理装置において、電力系統監視制御装置を複数用
意し、それら電力系統監視制御装置の機能を全電力系統
監視制御装置共通の標準機能と各電力系統監視制御装置
固有のオプション機能とに分け、ネットワークを介して
試験管理装置に無い各電力系統監視制御装置固有のオプ
ション機能を、当該電力系統監視制御装置から試験管理
装置へ転送して、試験管理装置上で実行することを特徴
とする電力系統監視制御装置の試験管理装置。
7. The test management device for a power system monitoring and control device according to claim 3, wherein a plurality of power system monitoring and control devices are prepared, and the functions of the power system monitoring and control devices are standard functions common to all power system monitoring and control devices. And optional functions unique to each power system monitoring and control device, and transferring the optional functions unique to each power system monitoring and control device that are not in the test management device from the power system monitoring and control device to the test management device via the network. A test management device for a power system monitoring and control device, wherein the test management device is executed on a test management device.
【請求項8】 請求項4記載の記録媒体において、電力
系統監視制御装置を複数用意し、それら電力系統監視制
御装置の機能を全電力系統監視制御装置共通の標準機能
と各電力系統監視制御装置固有のオプション機能とに分
け、ネットワークを介して試験管理装置に無い各電力系
統監視制御装置固有のオプション機能を、当該電力系統
監視制御装置から試験管理装置へ転送して、試験管理装
置上で実行する監視制御プログラムを記録した記録媒
体。
8. The recording medium according to claim 4, wherein a plurality of power system monitoring and control devices are prepared, and the functions of these power system monitoring and control devices are standard functions common to all power system monitoring and control devices and each power system monitoring and control device. Divided into unique optional functions, transfer the optional functions specific to each power system monitoring and control device that are not in the test management device via the network from the power system monitoring and control device to the test management device and execute them on the test management device A recording medium that stores a monitoring control program to be executed.
【請求項9】 請求項1又は請求項3又は請求項5又は
請求項7記載の電力系統監視制御装置の試験管理装置に
おいて、転送する機能をシステムMMI装置の入出力装
置から指定して転送し、転送先の装置上で実行可能とす
ることを特徴とする電力系統監視制御装置の試験管理装
置。
9. The test management device for a power system monitoring and control device according to claim 1, wherein a transfer function is designated by an input / output device of a system MMI device and transferred. A test management device for a power system monitoring and control device, which can be executed on a transfer destination device.
【請求項10】 請求項2又は請求項4又は請求項6又
は請求項8記載の記録媒体において、転送する機能シス
テムMMI装置の入出力装置から指示して転送し、転送
先装置上で実行可能とする監視制御プログラムを記録し
た記録媒体。
10. The recording medium according to claim 2, wherein the transfer is performed by instructing from the input / output device of the functional system MMI device to be transferred and executed on the transfer destination device. A recording medium on which a monitoring control program is recorded.
JP9209955A 1997-07-18 1997-07-18 Test-managing equipment for power system monitor and controller, and recording medium with program recorded thereof Pending JPH1141809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9209955A JPH1141809A (en) 1997-07-18 1997-07-18 Test-managing equipment for power system monitor and controller, and recording medium with program recorded thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9209955A JPH1141809A (en) 1997-07-18 1997-07-18 Test-managing equipment for power system monitor and controller, and recording medium with program recorded thereof

Publications (1)

Publication Number Publication Date
JPH1141809A true JPH1141809A (en) 1999-02-12

Family

ID=16581442

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9209955A Pending JPH1141809A (en) 1997-07-18 1997-07-18 Test-managing equipment for power system monitor and controller, and recording medium with program recorded thereof

Country Status (1)

Country Link
JP (1) JPH1141809A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015012802A (en) * 2013-06-28 2015-01-19 ゼネラル・エレクトリック・カンパニイ System for synchronization of control applications for grid network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015012802A (en) * 2013-06-28 2015-01-19 ゼネラル・エレクトリック・カンパニイ System for synchronization of control applications for grid network

Similar Documents

Publication Publication Date Title
US20110173599A1 (en) Home network system, gateway device, and firmware update method
KR100596298B1 (en) System and method for the automatic installation and configuration of an operating system
US7958210B2 (en) Update management method and update management unit
US6964034B1 (en) Application development server and a mechanism for providing different views into the same constructs within a strongly encapsulated environment
US20060206757A1 (en) System and method for managing software patches
US20040060035A1 (en) Automated method and system for building, deploying and installing software resources across multiple computer systems
US8782636B2 (en) Information processing apparatus, control method thereof, and program
US20110010703A1 (en) Delivery system, server device, terminal device, and delivery method
US20100293201A1 (en) Nfs agent upgrade
JP2019159816A (en) Information processing device, electronic apparatus, and information process system
CN113193981B (en) Configuration issuing method and device and network system
JPH10171635A (en) System and method for managing software resource in distributed environments
JP2013068987A (en) Gateway device, firmware distribution system, and information distribution method
JP2004102379A (en) Patch application management program, method, and system
JP2006302174A (en) Terminal function update system
JPH1141809A (en) Test-managing equipment for power system monitor and controller, and recording medium with program recorded thereof
JP2018180722A (en) Data management system
JP3573387B2 (en) Online terminal program change system
CN112486504A (en) Interaction method, upper computer and computer readable storage medium
KR100677932B1 (en) Upgrade system of electronic equipment and control method thereof
CN118132450A (en) Management method and system for Windows integrated test environment
JP2018018273A (en) Information processing system, information processing apparatus, update control apparatus, and update control program
JP2002366361A (en) Computer management method, and implementing system and processing program therefor
JP2002063035A (en) Remote maintenance method for information processor
CN118277360A (en) Method and system for unified management and control of database versions deployed in multiple environments