JPH11323949A - Dewatering construction method and earth retaining timbering used therefor - Google Patents

Dewatering construction method and earth retaining timbering used therefor

Info

Publication number
JPH11323949A
JPH11323949A JP13674398A JP13674398A JPH11323949A JP H11323949 A JPH11323949 A JP H11323949A JP 13674398 A JP13674398 A JP 13674398A JP 13674398 A JP13674398 A JP 13674398A JP H11323949 A JPH11323949 A JP H11323949A
Authority
JP
Japan
Prior art keywords
shoring
earth retaining
pumping pipe
facing
cross member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13674398A
Other languages
Japanese (ja)
Other versions
JP2923498B1 (en
Inventor
Kenichiro Hirahara
健一郎 平原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP13674398A priority Critical patent/JP2923498B1/en
Application granted granted Critical
Publication of JP2923498B1 publication Critical patent/JP2923498B1/en
Publication of JPH11323949A publication Critical patent/JPH11323949A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a dewatering method capable of easily and quietly performing pumping pipe driving work performed to drain water in an excavating groove for laying a potable/sewage water pipe. SOLUTION: Plural building frames 5 are provided in a ledge 4, plural earth retaining timbering 1 sticking face plates 3 between both building frames 5 facing to the earth retaining side are buried in the earth in a vertical row state, a sheet pile 15 is driven along the outside surface of the respective face plates 3, and earth in the timbering is excavated and removed to form an excavating groove 16. Then, plural pumping pipes 10 are driven at an interval in the vertical row direction toward the bottom surface of the excavating groove 16 from the inside of the timbering 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、上水管や下水管
(以下、上水管等と呼称する)を埋設する為に掘削した
溝内に湧き出る水を排水する水抜き工法及びそれに使用
する土留め用支保工に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a drainage method for draining water flowing into a trench excavated for embedding a water pipe or a sewer pipe (hereinafter referred to as a water pipe, etc.) and a retaining method used therefor. For shoring.

【0002】[0002]

【従来の技術】上水管等を埋設する作業は、通常、まず
道路を掘り起こし、掘削した溝の水抜きが終了した後に
上水管等を敷設し、続いて掘削溝に土砂の埋め戻しを行
って完了する。従来、水抜きをする場合は、下端部にウ
ェルポイントを備えた揚水管の外側を、ウェルポイント
の目詰りや変形を防ぐ保護管で覆い、揚水管を保護管と
共に、掘削溝から少し離れた箇所に沿って、間隔を開け
て地中に打ち込み、保護管を引き抜いた後に、揚水管の
頂部を、地上に別途敷設した集水管にホースを介して連
結し、該集水管に連結したポンプで水を吸い出す手法が
一般的である。
2. Description of the Related Art Normally, the work of burying water pipes or the like is performed by first digging a road, laying a water pipe after draining of the excavated trench is completed, and then backfilling the excavated trench with earth and sand. Complete. Conventionally, when draining water, the outside of the pumping tube with a well point at the lower end is covered with a protective tube that prevents clogging and deformation of the well point, and the pumping tube together with the protective tube is slightly away from the excavation groove. Along the location, it is driven into the ground at intervals, and after the protective tube is pulled out, the top of the pumping tube is connected to a collecting tube separately laid on the ground via a hose, and a pump connected to the collecting tube is used. The method of sucking water is common.

【0003】ところで道路の大半は地上にアスファルト
を敷設してある。そして、アスファルト層の硬度のた
め、揚水管を打ち込む作業は行い難く、しかも作業時
に、アスファルトを砕く騒音や振動が発生し、工事箇所
付近の住人に不快感を与えていた。また、アスファルト
を敷設してない道路の場合であっても、地表付近の土が
硬い条件下では同等の問題があった。
[0003] Most of the roads have asphalt laid on the ground. And, due to the hardness of the asphalt layer, it is difficult to drive the pumping pipe, and at the time of the operation, noise and vibrations are generated to break the asphalt, which gives discomfort to residents near the construction site. In addition, even on a road where no asphalt is laid, there is a similar problem under conditions where the soil near the ground surface is hard.

【0004】さらに、揚水管は掘削溝から少し離れた箇
所に打設するので、掘削溝の水抜きをするには該溝深さ
の倍近くまで打込む必要があった。例えば、2mの深さ
に上水管等を埋設する場合は、水抜きパイプを4m程度
挿入するものであった。
Further, since the pumping pipe is installed at a position slightly away from the excavation groove, it has been necessary to drive the excavation groove to nearly twice the depth of the excavation groove in order to drain the water. For example, when burying a water pipe or the like at a depth of 2 m, a drain pipe is inserted about 4 m.

【0005】また、地上に敷設してある集水管は、路面
より一段高いので、道幅が狭められることは勿論、通行
する際に障害物となった。道路事情によっては、玄関先
を塞ぐように集水管を敷設する場合もあり、この場合、
足腰の弱い人や、車椅子を使用する人は、住宅に入るの
に大変な労力がかかることとなった。
[0005] Further, the water collecting pipe laid on the ground is one step higher than the road surface, so that not only the road width is narrowed, but also an obstacle when passing. Depending on road conditions, drainage pipes may be laid to block the entrance.
People with weak legs and people in wheelchairs have a great deal of trouble entering the house.

【0006】[0006]

【発明が解決しようとする課題】本発明のうち請求項1
記載の発明は、揚水管の打込み作業を容易且つ静かに行
える水抜き工法を提供することを目的とする。
The first object of the present invention is as follows.
An object of the invention described is to provide a drainage method capable of easily and quietly driving a pumping pipe.

【0007】本発明のうち請求項2記載の発明は、工事
中も道路をできる限り道幅の広い状態で使用することの
できる水抜き工法を提供することを目的とする。
It is an object of the present invention to provide a draining method that can use a road as wide as possible even during construction.

【0008】本発明のうち請求項3記載の発明は、請求
項2記載の発明の実施に直接使用する土留め用支保工を
提供することを目的とする。
Another object of the present invention is to provide an earth retaining shoring which is used directly for carrying out the present invention.

【0009】[0009]

【課題を解決するための手段】本発明のうち請求項1記
載の発明は、布枠に複数の建枠を備えると共に土留め側
に面する両建枠間に面板を付着してある複数の土留め用
支保工を、土中に縦列状態で埋設し、各面板の外面に沿
って矢板を打ち込み、支保工内の土を掘り取って掘削溝
を形成した後に、支保工内から掘削溝の底面に向かって
複数の揚水管を、縦列方向に沿って間隔を開けて打設す
ることを特徴とする。
According to the first aspect of the present invention, a plurality of building frames are provided on a cloth frame and a plurality of face plates are attached between the two building frames facing the earth retaining side. Embankment for earth retaining is buried in the soil in a tandem state, a sheet pile is driven along the outer surface of each face plate, and the soil in the shoring is dug to form a digging groove. It is characterized in that a plurality of pumping pipes are cast toward the bottom face at intervals along the column direction.

【0010】予め掘られた溝から揚水管を打ち込むわけ
だから、地上から打ち込むよりも打ち込み深さは短くて
済み、掘削溝の真下から水を汲み上げるので、掘削溝か
ら離れた箇所から水を汲み上げるよりも、水抜き効率が
向上すると共に、揚水管の下端位置も高くなる(揚水管
の埋め込み深さが浅くてすむ)。
[0010] Since the pumping pipe is driven from a previously dug groove, the driving depth is shorter than driving from the ground, and water is pumped from directly below the drill groove. In addition, the drainage efficiency is improved, and the lower end position of the pumping pipe is also increased (the filling depth of the pumping pipe is small).

【0011】掘削溝の底面の中央部には通常、上水管等
を敷設するので、揚水管は、掘削溝の底面の側方に打設
する。掘削溝内に湧き出る水量が少ない場合には、掘削
溝の底面の左右側方のうち、何れか一方に沿って、揚水
管を間隔を開けて打設すれば良く、水量が多い場合に
は、掘削溝の底面の左右側方の両方に沿って、揚水管を
打設すれば良い。
Usually, a water pipe or the like is laid at the center of the bottom surface of the excavation groove. Therefore, the pumping pipe is cast on the side of the bottom surface of the excavation groove. If the amount of water that springs out into the digging trench is small, it is sufficient to drive the pumping pipes at intervals along one of the left and right sides of the bottom of the digging trench, and if the amount of water is large, Pumping pipes may be installed along both the left and right sides of the bottom of the excavation trench.

【0012】揚水管から汲み上げる水は、掘削溝から少
し離れた箇所に沿って地上に敷設した集水管に流し込む
手法もあるが、請求項2記載の発明のように、列設した
複数の土留め用支保工を、隣り合う布枠の土留め側に面
する中空の横材同士で連通して設け、これら横材を、揚
水管と地上に設置したポンプとを繋ぐ流路中に介在し、
揚水管から汲み上げる水を、横材内を通過させた後にポ
ンプへ導くようにしても良い。このようにすれば、地上
に集水管を敷設する必要がなくなる。
[0012] There is also a method of pouring water pumped up from the pumping pipe into a collecting pipe laid on the ground along a location slightly away from the excavation trench. The support works are provided in communication with the hollow cross members facing the earth retaining side of the adjacent cloth frame, and these cross members are interposed in the flow path connecting the pumping pipe and the pump installed on the ground,
The water pumped from the pumping pipe may be guided to the pump after passing through the crosspiece. In this way, there is no need to lay water collecting pipes on the ground.

【0013】掘削溝内に湧き出る水量に応じて、布枠を
構成する一対の横材のうち、一本のみに水を流しても良
いし、二本ともに水を流しても良い。
[0013] Depending on the amount of water flowing into the excavation trench, water may flow through only one of the pair of cross members constituting the cloth frame, or water may flow through both of the pair of cross members.

【0014】請求項3記載の発明は、布枠に複数の建枠
を備えると共に土留め側に面する両建枠間に面板を付着
してある土留め用支保工において、布枠を、土留め側に
面する一対の横材の両端部間に、縦材を挟まれる状態で
夫々架設して形成すると共に、横材を中空に設け、さら
に横材に、揚水管への接合部と、隣接する支保工の横材
への継手部と、を突設してあることを特徴とする。
According to a third aspect of the present invention, there is provided an earth retaining support in which a cloth frame is provided with a plurality of building frames and a face plate is attached between the two building frames facing the earth retaining side. Between both end portions of a pair of cross members facing the fastening side, each is formed by being erected in a state where a vertical member is sandwiched, the cross member is provided in a hollow, and further, in the cross member, a joint to a water pump pipe, And a joint portion to a cross member of an adjacent shoring is protruded.

【0015】継手部は、横材の端部であれば、上面や下
面から突設しても良いが、端面から長手方向に延長する
状態で突設すれば、隣接する横材の継手部への接続が容
易に行える。
The joint may project from the upper surface or the lower surface as long as it is the end of the cross member. Can be easily connected.

【0016】[0016]

【発明の実施の形態】本発明の土留め用支保工1は、図
2に示すように、櫓状に組んだ支保工本体2の土留め面
側に、面板3を付着した構造である。さらに詳しく言え
ば、支保工本体2は、長方形の枠体に形成した布枠4の
各隅角に、建枠5を垂設し、各建枠5の中間高さ箇所
に、補助材6を枠状に設け、各建枠5の下部を、面板3
より下方に延長する脚部となすものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An earth retaining shoring 1 of the present invention has a structure in which a face plate 3 is adhered to an earth retaining surface side of a tower-like supporting main body 2 as shown in FIG. More specifically, the shoring main body 2 has a construction frame 5 suspended at each corner of the cloth frame 4 formed in a rectangular frame body, and an auxiliary material 6 is provided at an intermediate height of each construction frame 5. Provided in a frame shape, the lower part of each building frame 5 is
The legs extend downward.

【0017】布枠4は、断面方形の鋼材を長方形の枠体
に組んだもので、土留め側に面する一対の横材7と、両
横材7の対向する端部間に挟まれる状態で架設してある
一対の縦材8と、から構成されている。各横材7の上面
の長手方向に沿って、内部に連通する複数の接合部9
を、間隔を開けて突設し、図1に示すように接合部9を
揚水管10にホース11を介して連結することによっ
て、揚水管10から汲み上げた水を横材7内に流入させ
ている。各横材7の長手方向の両端には、内部に連通す
る継手部12を延長して設け、該継手部12を、隣接す
る支保工1の継手部12にチューブ状の締結具13で連
結するようにしてある。なお、接合部9や継手部12に
は、具体的にはエルボやT型継手、或いは雄ネジを外面
に刻設した筒体等を用いる。また、横材7の中間部に
は、吊り下げて搬送できるように掛止具14を突設して
ある。
The cloth frame 4 is formed by assembling a steel material having a rectangular cross section into a rectangular frame body, and is sandwiched between a pair of cross members 7 facing the retaining side and opposite ends of both cross members 7. And a pair of vertical members 8 erected in the above manner. A plurality of joints 9 communicating with the inside along the longitudinal direction of the upper surface of each cross member 7
Are protruded at intervals, and as shown in FIG. 1, the joint 9 is connected to the water pump 10 via a hose 11 so that water pumped up from the water pump 10 flows into the horizontal member 7. I have. At both ends in the longitudinal direction of each cross member 7, a joint portion 12 communicating with the inside is extended and provided. The joint portion 12 is connected to the joint portion 12 of the adjacent shoring 1 by a tubular fastener 13. It is like that. Note that, specifically, an elbow, a T-shaped joint, a cylindrical body having an external thread engraved on the outer surface, or the like is used for the joint 9 and the joint 12. In addition, a hook 14 is provided at an intermediate portion of the cross member 7 so as to be suspended and conveyed.

【0018】本発明の水抜き工法を図1に基づいて説明
する。まず、上水管等を埋設する箇所を、該埋設深さよ
り浅く掘削し、そこへ土留め用支保工1を挿入して、地
表より上側に突出する支保工1の上部を叩打し、支保工
1の下部を地中に埋め込む。その際、土質が柔軟であれ
ば、一挙に所定の深さまで埋め込むことができるが、硬
質で深く埋め込むことができなければ、叩き込んだ支保
工1内を掘削して再度叩き込む。こうして、支保工1が
その全高さが完全に嵌まり込んでから、次に、支保工1
の両側面に沿って鋼矢板15を夫々打ち込み、しかも、
掘削溝16の所定深さより深く打ち込んで土留めを完了
する。その後に、支保工1内の土を掘り下げて所定の深
さの掘削溝16とする。この作業を、上水管等の敷設予
定箇所に沿って繰り返し行い、複数の支保工1を縦一列
に連続した形態とする。続いて、ライザーパイプ17の
下端にウェルポイント18を延長してなる複数の揚水管
10を、支保工1内から掘削溝16の底面に向かってウ
ェルポイント工法によって打設する。なお、揚水管10
は、掘削溝16が2mの場合、掘削溝16の底面から約
1m程度の深さまで打ち込めば良い。また、揚水管10
は、上水管等を敷設する為に掘削溝16の中央部を避け
て、掘削溝16の側方部分(面板3の近傍箇所)に、し
かも、接合部9の下方位置に打設する。その後、揚水管
10の頂部と、接合部9をホース11で連結すると共
に、隣り合う支保工1の継手部12同士を、締結具13
で連結する。最後尾(図中、左側)の支保工1と、先頭
(右側)の支保工1には、隣り合う支保工1がないの
で、締結具13を設けない継手部12のうち先頭の支保
工1のものは、栓19をして、一方、最後尾の支保工1
はホース20でポンプ21に連結する。この状態で、ポ
ンプ21を駆動すれば、水は揚水管10を通過した後に
横材7内に達し、最終的にポンプ21へと導かれ、濾過
された後に別の箇所に排水される。なお、掘削溝16の
水抜きが終了すれば、上水管等の敷設作業、並びに揚水
管10の引き抜き作業は、どちらを先に行っても問題な
い。
The drainage method of the present invention will be described with reference to FIG. First, a place where a water pipe or the like is to be buried is excavated to a depth smaller than the burial depth, and an earth retaining shoring 1 is inserted there. Buried under the ground. At this time, if the soil is soft, it can be buried all at once to a predetermined depth. After the support 1 is completely fitted in its entire height, the support 1
Driving steel sheet piles 15 along both sides of
The earth retaining is completed by driving the excavation groove 16 deeper than a predetermined depth. After that, the soil in the shoring 1 is dug down to form an excavation groove 16 having a predetermined depth. This work is repeatedly performed along the planned laying point of the water pipe or the like, so that the plurality of the shoring works 1 are continuously arranged in a vertical line. Subsequently, a plurality of pumping pipes 10 formed by extending the well points 18 at the lower end of the riser pipe 17 are cast from the inside of the support 1 toward the bottom surface of the excavation groove 16 by the well point method. In addition, pumping pipe 10
When the depth of the excavation groove 16 is 2 m, it is sufficient to drive the excavation groove 16 to a depth of about 1 m from the bottom surface of the excavation groove 16. In addition, pumping pipe 10
In order to lay a water pipe or the like, it is placed in a side portion of the excavation groove 16 (a portion near the face plate 3) and at a position below the joint 9, avoiding the center of the excavation groove 16. Thereafter, the top of the water pipe 10 and the joint 9 are connected by the hose 11 and the joints 12 of the adjacent supports 1 are connected to each other by the fasteners 13.
Connect with. The last (left side in the figure) support 1 and the first (right) support 1 have no adjacent supports 1, and therefore, the first support 1 in the joint portion 12 in which the fastener 13 is not provided. The one with a stopper 19, while the last shoring 1
Is connected to a pump 21 by a hose 20. When the pump 21 is driven in this state, the water reaches the inside of the cross member 7 after passing through the water pump 10, is finally guided to the pump 21, and is drained to another place after being filtered. In addition, if drainage of the excavation groove 16 is completed, either of the work of laying the water pipe and the like and the work of pulling out the pumping pipe 10 may be performed in any order.

【0019】ところで各支保工1の横材7は、図2では
接合部9を二つ設けてあるが、これに限らず、一つ、或
いは三つ以上設けても良い。
The cross member 7 of each shoring 1 is provided with two joining portions 9 in FIG. 2, but is not limited thereto, and may be provided with one or three or more.

【0020】[0020]

【発明の効果】請求項1記載の発明は、揚水管を水抜き
が必要な箇所、即ち掘削溝に打ち込む方法なので、掘削
溝から離れた箇所に揚水管を保護管と共に打設する従来
の手法に比べて、打ち込む長さが短くて済み、その上、
本発明は揚水管を掘削溝の底面、即ち土の軟らかい層に
直接打ち込む方法なので、揚水管を保護管ごとアスファ
ルトの硬い層に打ち込んで砕き且つ保護管を引き抜く従
来の手法に比べて、保護管を引き抜く手間が省けるだけ
でなく、打ち込み作業を容易且つ静かに行え、その結
果、工事箇所付近の住人は普段と変わりない快適な生活
を送ることができる。なお、引抜き作業も土壌が軟らか
いので、容易に行える。
According to the first aspect of the present invention, since the pumping pipe is driven into a place where drainage is required, that is, into the excavation groove, a conventional method of driving the pumping pipe together with the protection pipe into a place away from the excavation groove is used. The length of the shot is shorter than that of
Since the present invention is a method of directly driving a pumping pipe into the bottom of a digging groove, that is, a soft layer of soil, the pumping pipe is driven into the hard layer of asphalt together with the protective pipe to crush and pull out the protective pipe. In addition to saving the labor of pulling out, the driving operation can be performed easily and quietly, and as a result, residents near the construction site can live a comfortable life as usual. In addition, since the soil is soft, the drawing operation can be easily performed.

【0021】請求項2記載の発明は、隣り合う布枠の土
留め側に面する中空の横材同士で連通して設け、これら
横材を、揚水管と地上に設置したポンプとを繋ぐ流路中
に介在し、揚水管から汲み上げた水を、掘削溝の中に配
置してある土留め用支保工の横材内を通過させた後にポ
ンプへ導く方法なので、揚水管から地上に別途敷設した
集水管へ水を導く従来の手法に比べて、道幅を広い状態
で使用できるようになる。また、玄関先を塞ぐようなこ
とがなくなるので、家の出入りを支障なく行える。
According to a second aspect of the present invention, hollow cross members facing adjacent to the earth retaining side of the adjacent cloth frames are provided in communication with each other, and these cross members are connected to a pump connecting a pumping pipe and a pump installed on the ground. This is a method in which water pumped up from a pumping pipe intervenes in the road and is guided to the pump after passing through the cross-members of earth retaining supports placed in the excavation trench. In comparison with the conventional method of guiding water to the collected drainage pipe, the road can be used in a wider state. Also, since the entrance is not blocked, entry and exit of the house can be performed without any trouble.

【0022】請求項3記載の発明は、中空の横材に、揚
水管への接合部と、隣接する支保工の横材への継手部と
を突設してあるので、揚水管や横材との連結作業を容易
に行える。
According to the third aspect of the present invention, the hollow cross member is provided with a joint portion to the pumping pipe and a joint portion to the adjoining cross member of the supporting structure, so that the pumping pipe and the cross member are provided. The connection work with can be easily performed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の水抜き工法を示す縦断面図である。FIG. 1 is a longitudinal sectional view showing a drainage method according to the present invention.

【図2】本発明の土留め用支保工を示す斜視図である。FIG. 2 is a perspective view showing an earth retaining shoring according to the present invention.

【符号の説明】[Explanation of symbols]

1 土留め用支保工(支保工) 3 面板 4 布枠 5 建枠 7 横材 8 縦材 9 接合部 10 揚水管 12 継手部 15 矢板(鋼矢板) 16 掘削溝 21 ポンプ DESCRIPTION OF SYMBOLS 1 Earth retaining shoring (shoring) 3 Face plate 4 Cloth frame 5 Building frame 7 Horizontal material 8 Vertical material 9 Joint 10 Pumping pipe 12 Joint 15 Sheet pile (steel sheet pile) 16 Drilling groove 21 Pump

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 布枠(4)に複数の建枠(5)を備える
と共に土留め側に面する両建枠(5)間に面板(3)を
付着してある複数の土留め用支保工(1)を、土中に縦
列状態で埋設し、各面板(3)の外面に沿って矢板(1
5)を打ち込み、支保工(1)内の土を掘り取って掘削
溝(16)を形成した後に、支保工(1)内から掘削溝
(16)の底面に向かって複数の揚水管(10)を、縦
列方向に沿って間隔を開けて打設することを特徴とする
水抜き工法。
1. A plurality of earth retaining supports having a plurality of building frames (5) on a cloth frame (4) and having a face plate (3) attached between the two building frames (5) facing the earth retaining side. The work (1) is buried in the soil in a row, and the sheet pile (1) is laid along the outer surface of each face plate (3).
5), and after excavating the soil in the shoring (1) to form a digging groove (16), a plurality of pumping pipes (10) from inside the shoring (1) toward the bottom surface of the digging groove (16). ) Is installed at intervals along the column direction.
【請求項2】 請求項1記載の水抜き工法において、列
設した複数の土留め用支保工(1)を、隣り合う布枠
(4)の土留め側に面する中空の横材(7)同士で連通
して設け、これら横材(7)を、揚水管(10)と地上
に設置したポンプ(21)とを繋ぐ流路中に介在し、揚
水管(10)から汲み上げる水を、横材(7)内を通過
させた後にポンプ(21)へ導くことを特徴とする水抜
き工法。
2. The drainage method according to claim 1, wherein the plurality of retaining struts (1) arranged in a row are formed by hollow cross members (7) facing the retaining side of an adjacent cloth frame (4). ) Are provided in communication with each other, and these cross members (7) are interposed in a flow path connecting the pumping pipe (10) and the pump (21) installed on the ground, and water pumped up from the pumping pipe (10) is provided. A draining method characterized in that it is guided to a pump (21) after passing through a cross member (7).
【請求項3】 布枠(4)に複数の建枠(5)を備える
と共に、土留め側に面する両建枠(5)間に面板(3)
を付着してある土留め用支保工(1)において、布枠
(4)を、土留め側に面する一対の横材(7)の両端部
間に、縦材(8)を挟まれる状態で夫々架設して形成す
ると共に、横材(7)を中空に設け、さらに横材(7)
に、揚水管(10)への接合部(9)と、隣接する支保
工(1)の横材(7)への継手部(12)と、を突設し
てあることを特徴とする土留め用支保工。
3. A cloth frame (4) having a plurality of building frames (5), and a face plate (3) between the two building frames (5) facing the retaining side.
A state in which a vertical frame (8) is sandwiched between both ends of a pair of cross members (7) facing the retaining side in a retaining shoring (1) to which is attached. And a cross member (7) is provided in a hollow, and a cross member (7) is further provided.
And a joint (9) to the pumping pipe (10) and a joint (12) to the cross member (7) of the adjacent shoring (1). Shoring for fastening.
JP13674398A 1998-05-19 1998-05-19 Drainage method and earth retaining support used for it Expired - Fee Related JP2923498B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13674398A JP2923498B1 (en) 1998-05-19 1998-05-19 Drainage method and earth retaining support used for it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13674398A JP2923498B1 (en) 1998-05-19 1998-05-19 Drainage method and earth retaining support used for it

Publications (2)

Publication Number Publication Date
JP2923498B1 JP2923498B1 (en) 1999-07-26
JPH11323949A true JPH11323949A (en) 1999-11-26

Family

ID=15182476

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13674398A Expired - Fee Related JP2923498B1 (en) 1998-05-19 1998-05-19 Drainage method and earth retaining support used for it

Country Status (1)

Country Link
JP (1) JP2923498B1 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100659599B1 (en) 2006-09-14 2006-12-20 주식회사 선진엔지니어링 종합건축사 사무소 Apartment house foundation work drainage member structure
CN104695457A (en) * 2015-03-27 2015-06-10 济南轨道交通集团有限公司 Construction method of novel vertical shaft horizontal rotation jet grouting pile foundation pit sealing bottom water-resisting layer
CN105178331A (en) * 2015-09-01 2015-12-23 中国十九冶集团有限公司 Deep foundation pit and ultra-deep foundation pit pile-anchor support method
CN108385706A (en) * 2018-02-09 2018-08-10 温州嘉成工程项目管理有限公司 A kind of well-points dewatering and drainage arrangement for deep basal pit
CN108589693A (en) * 2018-05-02 2018-09-28 中国铁道科学研究院深圳研究设计院 A kind of design of foundation pit method
CN108612106A (en) * 2016-12-10 2018-10-02 中铁十二局集团有限公司 Subway layer of sand open-cut foundation ditch construction method
CN110644514A (en) * 2019-08-22 2020-01-03 中国十七冶集团有限公司 Drainage method for large box type foundation and post-cast strip
CN111119192A (en) * 2019-12-31 2020-05-08 中铁十六局集团北京轨道交通工程建设有限公司 Foundation pit excavation method

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104452787B (en) * 2014-12-02 2017-03-08 青岛市勘察测绘研究院 Construction method and equipment that a kind of vertical pumping well-point pipe is installed
CN112160324A (en) * 2020-08-25 2021-01-01 南通大学 Construction method for deep foundation pit support
CN114150671B (en) * 2021-11-08 2023-12-19 鸿厦建设有限公司 Building foundation pit supporting and draining structure
CN114411789A (en) * 2022-03-05 2022-04-29 三明市水利水电工程有限公司 River channel precipitation construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100659599B1 (en) 2006-09-14 2006-12-20 주식회사 선진엔지니어링 종합건축사 사무소 Apartment house foundation work drainage member structure
CN104695457A (en) * 2015-03-27 2015-06-10 济南轨道交通集团有限公司 Construction method of novel vertical shaft horizontal rotation jet grouting pile foundation pit sealing bottom water-resisting layer
CN105178331A (en) * 2015-09-01 2015-12-23 中国十九冶集团有限公司 Deep foundation pit and ultra-deep foundation pit pile-anchor support method
CN108612106A (en) * 2016-12-10 2018-10-02 中铁十二局集团有限公司 Subway layer of sand open-cut foundation ditch construction method
CN108385706A (en) * 2018-02-09 2018-08-10 温州嘉成工程项目管理有限公司 A kind of well-points dewatering and drainage arrangement for deep basal pit
CN108385706B (en) * 2018-02-09 2020-04-07 温州嘉成工程项目管理有限公司 Well point dewatering and drainage device for deep foundation pit
CN108589693A (en) * 2018-05-02 2018-09-28 中国铁道科学研究院深圳研究设计院 A kind of design of foundation pit method
CN110644514A (en) * 2019-08-22 2020-01-03 中国十七冶集团有限公司 Drainage method for large box type foundation and post-cast strip
CN111119192A (en) * 2019-12-31 2020-05-08 中铁十六局集团北京轨道交通工程建设有限公司 Foundation pit excavation method
CN111119192B (en) * 2019-12-31 2021-11-02 中铁十六局集团北京轨道交通工程建设有限公司 Foundation pit excavation method

Also Published As

Publication number Publication date
JP2923498B1 (en) 1999-07-26

Similar Documents

Publication Publication Date Title
JP2923498B1 (en) Drainage method and earth retaining support used for it
KR100616123B1 (en) Device for drain underground water and method for construction the same
US20060179730A1 (en) Wall structural member and method for constructing a wall structure
JP3979466B2 (en) Temporary closing method
JP2001115458A (en) Deep well construction method using earth retaining wall
KR200396485Y1 (en) Device for drain underground water for construction the same
KR20140096731A (en) Underground water drainage system of excavated ground and pipeline construction method using the same
KR102195203B1 (en) Soil blocking method using horizontal Strut and slope Strut
KR100655383B1 (en) Method of drain construction for basement
KR100524136B1 (en) Basic bottom permanent drainage structure using trench and drainage member and it's construction method
JPS5847092Y2 (en) Earth retention shoring device for excavated trenches
KR200314875Y1 (en) Connector for apparatus draining
KR200450426Y1 (en) Bungae Sooro
KR100588185B1 (en) A construction method of concrete retaining wall
JP2809105B2 (en) How to build an underground tank
KR102571807B1 (en) Earth frame for the pipe laying
KR101352429B1 (en) Water-proofing type temporary soil sheathing construction method using crrugated steel plate segments
JP2002201632A (en) Impervious earth-retaining wall with function of maintaining underground water flow, and method of maintaining underground water flow
KR101966837B1 (en) Furring strip integrated earth retaining structure for provisional facilities and construction method thereof
KR100999410B1 (en) Assembled wale beam and construction method of underground structure using the same
JPS5847093Y2 (en) Earth retaining basket
JPS5847091Y2 (en) Earth retention shoring device for excavated trenches
JP2004124554A (en) Basement structure
JP2000220136A (en) Underground water vein restoring method by retaining wall with steel pipe column strip
KR20150108342A (en) Underground water drainage system of excavated ground and pipeline construction method using the same

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees