JPH11303164A - Piping unit work execution method - Google Patents

Piping unit work execution method

Info

Publication number
JPH11303164A
JPH11303164A JP18978298A JP18978298A JPH11303164A JP H11303164 A JPH11303164 A JP H11303164A JP 18978298 A JP18978298 A JP 18978298A JP 18978298 A JP18978298 A JP 18978298A JP H11303164 A JPH11303164 A JP H11303164A
Authority
JP
Japan
Prior art keywords
piping unit
work
site
central frame
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP18978298A
Other languages
Japanese (ja)
Inventor
Yoshichika Tanaka
義親 田中
Nanako Sugita
奈々子 杉田
Kazutaka Urata
和孝 浦田
Tomoaki Hagi
知明 萩
Yoshinao Kashino
吉直 樫野
Hideji Nakamori
秀二 中森
Yoshiharu Makino
義治 牧野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inax Corp
Original Assignee
Inax Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inax Corp filed Critical Inax Corp
Priority to JP18978298A priority Critical patent/JPH11303164A/en
Publication of JPH11303164A publication Critical patent/JPH11303164A/en
Pending legal-status Critical Current

Links

Landscapes

  • Sanitary Device For Flush Toilet (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a piping unit work execution method whereby a piping unit can be constructed continuously without waiting time at a construction site where finish work and electrical work for walls, floors, and ceilings and the work of constructing a booth are all complete. SOLUTION: A piping unit is constructed chiefly of a center frame 1 and side frames 4, 4 placed on both sides of the center frame 1. At a construction site where walls, floors, and ceilings are all completely finished, the center frame 1 is fixed in position and the side frames 4, 4 are fixed in upright positions while corresponding to a site frontage size with respect to the center frame 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】この発明は、配管ユニットを現場
に設置する施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method for installing a piping unit at a site.

【0002】[0002]

【従来の技術及びその課題】従来、配管ユニットは現場
に図14〜図24に示すような施工手順で施工されてお
り、現場に部材が搬入されて図14に示すように、現場
の床面F及び壁面Wに位置出しを行い、アンカーを打
ち、図15に示すように、床面Fに床固定材51を固定
し、図16に示すように、この床固定材51に配管フレ
ーム52を取付け、配管フレーム52の両端の柱を仮固
定する。なお、この配管フレーム52内には予め給水
管,排水管等の横引配管53が内装されたものとなって
いる。この図16のように配管フレーム52を仮固定さ
せた後に建築業者による天井工事が行われ、また、ブー
ス業者によるブース工事が行われて、その間、工事が中
断される。
2. Description of the Related Art Conventionally, a piping unit has been installed on a site in accordance with an installation procedure as shown in FIGS. 14 to 24, and members are carried into the site, and as shown in FIG. F and the wall surface W are positioned, an anchor is struck, and a floor fixing member 51 is fixed to the floor surface F as shown in FIG. 15, and a piping frame 52 is fixed to the floor fixing member 51 as shown in FIG. Attach and temporarily fix the columns at both ends of the piping frame 52. The piping frame 52 is preliminarily provided with horizontal piping 53 such as a water supply pipe and a drain pipe. After temporarily fixing the piping frame 52 as shown in FIG. 16, the ceiling work is performed by the builder, and the booth work is performed by the booth company. During that time, the work is suspended.

【0003】その後に図17に示すように、ブース板5
4の取付け後に前記配管フレーム52の両端の柱を本固
定し、図18に示すように、固定した配管フレーム52
の前面に前板受材58を取付け、その後に、この前板受
材58に図19に示すように、前板55を目地を揃えて
取付け、前板55の一部の点検口部前板55aは一時取
り外し、点検口Kを開口させて図20に示すように、前
板55,55の前面に便器56,56を取り付ける。こ
の状態で水道工事業者が入り込み、前記便器56,56
と横引配管53等との接続工事が行われ、さらに、電気
工事業者が入り込んで天井等への照明機器の取付け工事
とか電気機器への電気配線工事が行われて、この間、工
事が中断することとなる。
[0003] Thereafter, as shown in FIG.
After the mounting of the pipe frame 4, the pillars at both ends of the pipe frame 52 are permanently fixed, and as shown in FIG.
19, a front plate 55 is attached to the front plate receiving member 58 with the joints aligned as shown in FIG. 55a is temporarily removed, the inspection port K is opened, and the toilets 56, 56 are attached to the front surfaces of the front plates 55, 55 as shown in FIG. In this state, a waterworks contractor enters and the toilets 56, 56
Connection work with the horizontal pulling pipe 53 and the like is performed, and furthermore, an electric contractor enters to install lighting equipment on a ceiling or the like or perform electric wiring work on the electric equipment, and the work is interrupted during this time. It will be.

【0004】その後、図21に示すように、甲板57が
配管フレーム52の上面に取り付けられ、さらに図22
に示すように、前記点検口Kを閉ざすように点検口部前
板55a,55aが取り付けられ、その後に図23に示
すように、前記便器56,56に便座56a,56aが
取り付けられ、その後、漏水のチェックとか便器56の
チェック調整が行われた後、清掃されて、その後に図2
4に示すように、点検立会い検査が行われて施工が完了
される。
Thereafter, as shown in FIG. 21, a deck 57 is attached to the upper surface of the piping frame 52, and furthermore, FIG.
23, the inspection port front plates 55a, 55a are attached so as to close the inspection port K, and then, as shown in FIG. 23, the toilet seats 56a, 56a are attached to the toilets 56, 56, and thereafter, After the water leak check and the toilet 56 are checked and adjusted, they are cleaned.
As shown in FIG. 4, an inspection witness inspection is performed and the construction is completed.

【0005】このように従来においては、配管ユニット
を施工する設備業者は施工途中において、建設業者とか
ブース業者による天井工事とかブース工事が入り作業が
中断されるとともに、さらに水道工事業者とか電気工事
業者の工事が途中に入り、この間にも施工を中断する必
要が生じ、他の建築業者とか水道業者及び電気工事業者
の工事との兼ね合いで日程を調節しながら作業を行う必
要があり、待ち時間が多く、工事が遅れ易く、また、そ
の間に資材が破損したり紛失する可能性が高くなるとい
う問題点があった。
[0005] As described above, in the related art, a facility contractor who constructs a piping unit is interrupted by a ceiling contractor or a booth contracted by a contractor or a booth contractor during the construction process, and furthermore, a water supply contractor or an electric contractor. It is necessary to suspend the construction during this period, and it is necessary to work while adjusting the schedule in consideration of the construction of other contractors or water supply companies and electric contractors. In many cases, there is a problem that construction is easily delayed, and there is a high possibility that materials are damaged or lost during that time.

【0006】[0006]

【課題を解決するための手段】本発明は上記従来の問題
点に鑑み案出したものであって、他の工事業者の工事が
全て完了した後に、工事を中断することなく配管ユニッ
トを施工できる施工方法を提供せんことを目的とし、そ
の第1の要旨は、配管ユニットを現場に設置する施工方
法であって、前記配管ユニットは、中央フレームと該中
央フレームの両側方に配設されるサイドフレームを主体
として構成され、壁,床,天井の仕上げが全て完了した
後の現場において、前記中央フレームを位置決め固定
し、該中央フレームに対し現場の間口寸法に対応させた
間隔をおいて前記サイドフレームを立設固定させること
である。また、第2の要旨は、前記中央フレームに便器
等の機器を取付けた後、前記中央フレームと前記サイド
フレーム間の前面を覆う化粧板をネジ固定することであ
る。
SUMMARY OF THE INVENTION The present invention has been devised in view of the above-mentioned conventional problems, and is capable of constructing a piping unit without interrupting the construction after all other construction companies have completed the construction. A first gist of the present invention is to provide a construction method, in which a piping unit is installed at a site, wherein the piping unit is provided with a central frame and side walls arranged on both sides of the central frame. At the site after finishing the finishing of the wall, floor and ceiling, the center frame is positioned and fixed, and the side frames are spaced from the center frame by an interval corresponding to the frontage size of the site. This means that the frame is erected and fixed. A second gist is to fix a decorative plate for covering a front surface between the central frame and the side frames after attaching a device such as a toilet to the central frame.

【0007】[0007]

【実施例】以下、本発明の実施例を図面に基づいて説明
する。図1は、現場に搬入される大便器用の配管ユニッ
トの構成部材の分解斜視図であり、先ず、この構成部材
を図1により説明すると、中央フレーム1は、その前面
に開口部1cが形成されて、側面側も開口された箱枠状
に形成されており、前面側の開口部1cの外周には横長
状の横長孔1a,1a,1aが形成されたものとなって
おり、上面の補強材の上面にはマジックテープ1bが貼
着されたものとなっている。また、中央フレーム1の両
側方に立設される一対のサイドフレーム4,4は同一形
状に形成されて、コの字状断面をなし、前面と裏面には
縦長状の縦長孔4a,4a,4aが形成されたものとな
っており、また、裏面には予め両面テープTが貼着され
たものとなっている。また、前記中央フレーム1の前面
下部には前板6が取り付けられ、この前板6には手を入
れることのできる点検施工用の開口部6aが形成されて
いる。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is an exploded perspective view of components of a plumbing unit for a toilet bowl to be carried into a site. First, the components will be described with reference to FIG. 1. The central frame 1 has an opening 1c formed on the front surface thereof. It is also formed in a box frame shape with an opening on the side surface, and has horizontally long holes 1a, 1a, 1a formed on the outer periphery of the opening 1c on the front side. The magic tape 1b is stuck on the upper surface of the reinforcing material. A pair of side frames 4 and 4 erected on both sides of the central frame 1 are formed in the same shape, have a U-shaped cross section, and have vertically long holes 4a, 4a, 4a is formed, and a double-sided tape T is attached to the back surface in advance. Further, a front plate 6 is attached to a lower portion of the front surface of the central frame 1, and the front plate 6 is formed with an opening 6 a for inspection and construction that can be put in hand.

【0008】また、中央フレーム1とサイドフレーム4
間の前面に取り付けられる一対の下サイド化粧板7b,
7bと、その上方に配置される一対のサイド化粧板7,
7があり、この下サイド化粧板7b,7b及びサイド化
粧板7,7の裏側には、手回しネジ3をネジ込むことの
できる埋込ナット8,8,8が固設されたものとなって
いる。なお、上側のサイド化粧板7の上面は約90°に
折り曲げ可能な上面折曲片7cとなっている。また、一
対のサイド化粧板7,7の上面折曲片7c,7c間に掛
け渡し状に載置されるカウンター22が存在し、カウン
ター22の前面には垂下状の前垂れ片22aが形成され
ている。また、床面側には、ステンレス板等で形成され
た幅木17a,17bが配置されるものである。
Further, the center frame 1 and the side frames 4
A pair of lower decorative panels 7b attached to the front surface between
7b and a pair of side decorative panels 7,
7, embedded nuts 8, 8, 8 into which the hand screw 3 can be screwed are fixed to the lower side decorative plates 7 b, 7 b and the back side of the side decorative plates 7, 7. I have. The upper surface of the upper side decorative plate 7 is an upper surface bent piece 7c that can be bent at about 90 °. Also, there is a counter 22 which is placed in a bridging manner between the upper bent pieces 7c, 7c of the pair of side decorative plates 7, 7, and a front hanging piece 22a having a drooping shape is formed on the front surface of the counter 22. I have. On the floor side, skirting boards 17a and 17b made of a stainless steel plate or the like are arranged.

【0009】このような構成部材が現場に搬入される時
には、既に図2に示すように、現場では壁,床,天井の
仕上げ工事が全て完了しており、さらに電気工事,照明
工事,ブース工事も全て完了した状態となっている。即
ち、他の業者による工事が全て完了した後に設備工事業
者により配管ユニットの施工工事が行われるものであ
る。図2では、壁面W及び床面Fの仕上げ工事が完了
し、床面Fには埋設排水管11及び埋設給水管12が既
に設置されており、ブース板20,20も設置された状
態となっている。
When such components are carried into the site, finishing work on the wall, floor, and ceiling has already been completed at the site as shown in FIG. 2, and furthermore, electrical work, lighting work, and booth work have been completed. Are all completed. That is, the installation work of the plumbing unit is performed by the equipment contractor after all the works by other contractors are completed. In FIG. 2, the finishing work of the wall surface W and the floor surface F is completed, and the buried drain pipe 11 and the buried water supply pipe 12 are already installed on the floor surface F, and the booth boards 20, 20 are also installed. ing.

【0010】この状態でブース板20,20間の各ブー
ス空間内にそれぞれ図3のように、中央フレーム1を固
定するための位置出しが行われ、図4に示すように、壁
面Wに取付ボルト孔21がドリルで形成される。この取
付ボルト孔21に取付ボルトを介し前記中央フレーム1
が図5に示すように固定されるものであり、中央フレー
ム1が壁面Wに固定された後に、図6に示すように、現
場の間口寸法に対応させて両側に一対のサイドフレーム
4,4が立設固定される。即ち、各サイドフレーム4に
は両面テープTが貼着されているため、この両面テープ
Tにより容易にサイドフレーム4を側壁面Waまたはブ
ース板20に当接状に固定させることができるものであ
る。
In this state, positioning for fixing the central frame 1 is performed as shown in FIG. 3 in each booth space between the booth plates 20, 20, and is mounted on the wall surface W as shown in FIG. A bolt hole 21 is formed by a drill. The center frame 1 is inserted into the mounting bolt holes 21 through mounting bolts.
After the central frame 1 is fixed to the wall surface W, as shown in FIG. 6, a pair of side frames 4 and 4 are provided on both sides corresponding to the frontage dimensions of the site. Is erected and fixed. That is, since the double-sided tape T is attached to each side frame 4, the side frame 4 can be easily fixed to the side wall surface Wa or the booth plate 20 by the double-sided tape T. .

【0011】その後に図7に示すように、一対の幅木1
7a,17bが中央フレーム1とサイドフレーム4,4
間に亘り取り付けられるが、この幅木17a,17bは
一部を重合させて現場の間口寸法に対応させることがで
きるものである。その後に図8に示すように、中央フレ
ーム1の前板6の前面に大便器24が取り付けられ、さ
らに図9に示すように、大便器24から可撓管14を介
し埋設排水管11等に接続工事が行われ、給水管及び排
水管の接続が簡単に行われる。
[0011] Thereafter, as shown in FIG.
7a and 17b are the center frame 1 and the side frames 4 and 4.
The skirting boards 17a and 17b can be partially overlapped so as to correspond to the frontage size of the site. Thereafter, as shown in FIG. 8, a toilet 24 is attached to the front surface of the front plate 6 of the central frame 1, and further, as shown in FIG. Connection work is performed, and connection of the water supply pipe and the drain pipe is easily performed.

【0012】その後に図10に示すように、前記下サイ
ド化粧板7b,7bが嵌め込まれ、手を入れて手回しネ
ジ3を横長孔1a,縦長孔4aに挿通させて埋込ナット
8に螺合させ、手回しネジ3を締め付けて下サイド化粧
板7bが前面に固定され、さらに上方にはサイド化粧板
7が嵌め込まれて、同様に手回しネジ3を埋込ナット8
に締め付けて固定される。なお、下サイド化粧板7b及
びサイド化粧板7の中央フレーム1側は前記前板6の裏
側に呑み込まれる形となり、そのため、下サイド化粧板
7b及びサイド化粧板7は横方向にずらして間口寸法に
対応させることができ、ずらした場合にも端縁側は前板
6の裏側に隠されるためスッキリとした設置状態とな
る。手回しネジ3を締め付けて前記下サイド化粧板7b
を固定する状態の平面構成図を図11に示す。
Thereafter, as shown in FIG. 10, the lower side decorative plates 7b, 7b are fitted, and the hand is inserted and the hand screw 3 is inserted through the horizontally long hole 1a and the vertically long hole 4a to be screwed into the embedding nut 8. Then, the hand screw 3 is tightened to fix the lower side decorative plate 7b on the front surface, and the side decorative plate 7 is further fitted upward.
To secure it. The lower decorative panel 7b and the side decorative panel 7 are swallowed by the rear side of the front panel 6 on the central frame 1 side. Even if it is shifted, the edge side is hidden behind the front plate 6, so that the installation state is refreshing. Tighten the screw 3 to tighten the lower side decorative board 7b
FIG. 11 is a plan view showing a state in which is fixed.

【0013】前記サイド化粧板7の上面折曲片7c,7
cを中央フレーム1とサイドフレーム4間の上面に水平
状に折り曲げて、図12に示すように、上面折曲片7
c,7c間を跨ぐようにカウンター22を載置させ、上
面中央部をカウンター22で覆蓋することができ、サイ
ド化粧板7,7の前面に前垂れ部22aが当接してスッ
キリとした形状となる。なお、カウンター22の裏面に
マジックテープ22bを貼着させておき、前記中央フレ
ーム1のマジックテープ1bに押し付けることにより、
強固にカウンター22を中央フレーム1に着脱可能に固
定させることができる。これにより工事が一応完了し、
その後、前記大便器24の作動チェックとか調整が行わ
れた後に、全体を清掃仕上げして、立会い検査が行われ
引き渡されるものである。
The upper bent pieces 7c, 7 of the side decorative plate 7
c is horizontally bent on the upper surface between the center frame 1 and the side frames 4 to form upper surface bent pieces 7 as shown in FIG.
The counter 22 is placed so as to straddle between c and 7c, and the center of the upper surface can be covered with the counter 22, and the front hanging portion 22a abuts the front surface of the side decorative plates 7, 7 to form a neat shape. . In addition, by attaching a magic tape 22b to the back surface of the counter 22 and pressing it on the magic tape 1b of the central frame 1,
The counter 22 can be firmly fixed to the central frame 1 in a detachable manner. With this, the construction has been completed,
After that, after the operation of the toilet 24 is checked or adjusted, the entire toilet is cleaned and finished, and a witness inspection is performed and delivered.

【0014】このように本例では、建築業者による壁,
床,天井の仕上げ工事が全て完了し、またブース業者に
よるブース工事も完了し、さらに電気工事業者による照
明機器等の取付け工事も全て完了し、さらに水道工事業
者による配管工事も全て完了した後に、現場で間口寸法
に対応させて中央フレーム1及びサイドフレーム4を取
付け固定し、さらにその前面に大便器を設置し、さらに
化粧板及びカウンターを取り付けて、一連の組付け作業
を連続して行うことができ、従来のように工事途中で他
の業者が入り込むことがなく、工事の遅れが生ずること
がない。
As described above, in this example, the wall by the contractor,
After finishing the floor and ceiling finishing work, completing the booth work by the booth contractor, completing all the installation work for lighting equipment etc. by the electric work contractor, and completing all the plumbing work by the water supply contractor, Attaching and fixing the center frame 1 and side frames 4 in accordance with the frontage dimensions at the site, further installing a toilet bowl on the front side, further attaching a decorative board and a counter, and performing a series of assembling work continuously. Therefore, there is no need for other contractors to enter during the construction as in the prior art, and there is no delay in the construction.

【0015】なお、本例では、大便器用の配管ユニット
の施工を例示しているが、小便器用の配管ユニットにお
いても、ほぼ同様な構成部材により、待ち時間なく連続
して工事を行うことができるものである。
In this example, the construction of a plumbing unit for a urinal is illustrated. However, the construction of a plumbing unit for a urinal can be performed continuously with no waiting time using substantially the same components. You can do it.

【0016】なお、図13では、洗面器用の配管ユニッ
トの構成部材を示しており、洗面器においても同様に、
全ての工事が完了した後の現場において中央フレーム1
を固定させ、さらにその両側方に現場の間口寸法に対応
させてサイドフレーム4,4を立設固定させ、中央フレ
ーム1の前面には前板6を取付け、さらに中央フレーム
1及びサイドフレーム4,4の上面には上面台31を取
付け、この上面台31に洗面器30を取り付けることが
でき、現場での施工を待ち時間なく、連続して良好に行
うことができるものとなる。
FIG. 13 shows components of a piping unit for a basin, and the same applies to a basin.
Central frame 1 at the site after all construction is completed
, And side frames 4 and 4 are erected and fixed on both sides thereof in accordance with the frontage size of the site. A front plate 6 is mounted on the front surface of the central frame 1. The upper surface base 31 is attached to the upper surface of the base 4 and the basin 30 can be attached to the upper surface base 31, so that the on-site construction can be performed continuously and favorably without waiting time.

【0017】[0017]

【発明の効果】本発明は、配管ユニットを現場に設置す
る施工方法であって、前記配管ユニットは、中央フレー
ムと該中央フレームの両側方に配設されるサイドフレー
ムを主体として構成され、壁,床,天井の仕上げが全て
完了した後の現場において、前記中央フレームを位置決
め固定し、該中央フレームに対し現場の間口寸法に対応
させた間隔をおいて前記サイドフレームを立設固定させ
ることとしたため、建築業者,電気工事業者,水道工事
業者等の他の業者による現場作業が全て完了した後に、
現場に配管ユニットを搬入して、中央フレームを固定
し、現場の間口寸法に対応させてサイドフレームを現合
状に良好に設置し、従来のように中断することなく、連
続的に配管ユニットの工事を短期間で施工することがで
きる効果を有する。
According to the present invention, there is provided an installation method for installing a piping unit at a site, wherein the piping unit mainly includes a central frame and side frames provided on both sides of the central frame. , At the site after finishing the floor and ceiling finishing, positioning and fixing the central frame, and standing and fixing the side frames to the central frame at an interval corresponding to the frontage size of the site. After all on-site work by other contractors, such as contractors, electrical contractors, and water contractors, was completed,
The piping unit is carried into the site, the center frame is fixed, and the side frames are properly installed in accordance with the frontage dimensions of the site, and the piping unit is continuously installed without interruption as in the past. This has the effect that construction can be performed in a short period of time.

【0018】また、前記中央フレームに便器等の機器を
取付けた後、前記中央フレームと前記サイドフレーム間
の前面を覆う化粧板をネジ固定することとしたため、中
央フレームとサイドフレーム間に化粧板をネジ固定によ
り良好に取り付けて、スッキリとした設置状態が得られ
る効果を有する。
[0018] Further, after a device such as a toilet bowl is attached to the central frame, a decorative plate for covering the front surface between the central frame and the side frames is fixed by screws, so that the decorative plate is provided between the central frame and the side frames. It has an effect that it can be mounted well by screw fixing and a neat installation state can be obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】大便器用の配管ユニットの構成部材の分解斜視
図である。
FIG. 1 is an exploded perspective view of components of a plumbing unit for a toilet bowl.

【図2】壁,床,天井等の仕上げ及び電気,ブース工事
が全て完了した状態の現場の斜視構成図である。
FIG. 2 is a perspective configuration view of a site where finishing of walls, floors, ceilings, etc., and electricity and booth construction are all completed.

【図3】現場での位置出し作業の説明図である。FIG. 3 is an explanatory diagram of a positioning operation at a site.

【図4】位置出し後に取付ボルト用孔を開ける作業説明
図である。
FIG. 4 is an explanatory view of an operation of opening a mounting bolt hole after positioning.

【図5】中央フレームを固定した作業説明図である。FIG. 5 is an explanatory diagram of a work in which a center frame is fixed.

【図6】中央フレームの両側方に現場の間口に対応させ
てサイドフレームを立設した状態の作業説明図である。
FIG. 6 is a work explanatory view in a state where side frames are erected on both sides of a central frame corresponding to frontage of a site.

【図7】さらに幅木を取り付ける作業説明図である。FIG. 7 is a work explanatory view for further attaching a baseboard.

【図8】さらに中央フレームの前面に便器を取り付ける
作業説明図である。
FIG. 8 is a work explanatory view for attaching a toilet to the front surface of the center frame.

【図9】さらに便器を可撓管で配管接続する作業説明図
である。
FIG. 9 is a work explanatory diagram for further connecting a toilet with a flexible tube.

【図10】化粧板の取付け作業説明図である。FIG. 10 is an explanatory diagram of a work of attaching a decorative board.

【図11】図10における平面概略図である。FIG. 11 is a schematic plan view of FIG.

【図12】さらにカウンターを取り付ける作業説明図で
ある。
FIG. 12 is a work explanatory view for further attaching a counter.

【図13】洗面器用の配管ユニットの構成部材の分解斜
視図である。
FIG. 13 is an exploded perspective view of components of a piping unit for a wash basin.

【図14〜図24】従来の配管ユニットの施工手順を示
す斜視構成図である。
14 to 24 are perspective configuration diagrams showing a procedure for installing a conventional piping unit.

【符号の説明】[Explanation of symbols]

1 中央フレーム 1a 横長孔 1b マジックテープ 1c 開口部 4 サイドフレーム 4a 縦長孔 6 前板 7 サイド化粧板 7b 下サイド化粧板 7c 上面折曲片 8 埋込ナット 11 埋設排水管 12 埋設給水管 14 可撓管 17a,17b 幅木 20 ブース板 21 取付ボルト孔 22 カウンター 22a 前垂れ片 24 大便器 30 洗面器 31 上面台 T 両面テープ W 壁面 F 床面 DESCRIPTION OF SYMBOLS 1 Central frame 1a Horizontal long hole 1b Velcro 1c Opening 4 Side frame 4a Vertical long hole 6 Front plate 7 Side decorative plate 7b Lower side decorative plate 7c Top bent piece 8 Embedded nut 11 Embedded drain pipe 12 Embedded water supply pipe 14 Flexible Pipe 17a, 17b Baseboard 20 Booth board 21 Mounting bolt hole 22 Counter 22a Hanging piece 24 Urinal 30 Wash basin 31 Upper surface table T Double-sided tape W Wall surface F Floor surface

───────────────────────────────────────────────────── フロントページの続き (72)発明者 萩 知明 愛知県常滑市鯉江本町5丁目1番地 株式 会社イナックス内 (72)発明者 樫野 吉直 愛知県常滑市鯉江本町5丁目1番地 株式 会社イナックス内 (72)発明者 中森 秀二 愛知県常滑市鯉江本町5丁目1番地 株式 会社イナックス内 (72)発明者 牧野 義治 愛知県常滑市鯉江本町5丁目1番地 株式 会社イナックス内 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Tomoaki Hagi 5-1-1 Koiehoncho, Tokoname-shi, Aichi Prefecture Inax Corporation (72) Inventor Yoshinao Kashino 5-1-1 Koiehonmachi, Tokoname-shi, Aichi Co., Ltd. Inside Inax (72) Inventor Shuji Nakamori 5-1-1 Koie Honcho, Tokoname City, Aichi Prefecture Inside Inax Company (72) Inventor Yoshiharu Makino 5-1-1 Koie Honcho, Tokoname City, Aichi Prefecture Inax Company

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 配管ユニットを現場に設置する施工方法
であって、前記配管ユニットは、中央フレームと該中央
フレームの両側方に配設されるサイドフレームを主体と
して構成され、壁,床,天井の仕上げが全て完了した後
の現場において、前記中央フレームを位置決め固定し、
該中央フレームに対し現場の間口寸法に対応させた間隔
をおいて前記サイドフレームを立設固定させることを特
徴とする配管ユニットの施工方法。
1. A construction method for installing a piping unit at a site, wherein the piping unit mainly includes a central frame and side frames disposed on both sides of the central frame, and includes a wall, a floor, and a ceiling. At the site after all of the finishing is completed, the central frame is positioned and fixed,
A method for constructing a piping unit, wherein the side frame is erected and fixed at an interval corresponding to a frontage dimension of a site with respect to the central frame.
【請求項2】 前記中央フレームに便器等の機器を取付
けた後、前記中央フレームと前記サイドフレーム間の前
面を覆う化粧板をネジ固定することを特徴とする請求項
1に記載の配管ユニットの施工方法。
2. The piping unit according to claim 1, wherein after a device such as a toilet bowl is attached to the central frame, a decorative plate for covering a front surface between the central frame and the side frames is fixed with screws. Construction method.
JP18978298A 1998-02-18 1998-06-19 Piping unit work execution method Pending JPH11303164A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18978298A JPH11303164A (en) 1998-02-18 1998-06-19 Piping unit work execution method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP10-54318 1998-02-18
JP5431898 1998-02-18
JP18978298A JPH11303164A (en) 1998-02-18 1998-06-19 Piping unit work execution method

Publications (1)

Publication Number Publication Date
JPH11303164A true JPH11303164A (en) 1999-11-02

Family

ID=26395069

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18978298A Pending JPH11303164A (en) 1998-02-18 1998-06-19 Piping unit work execution method

Country Status (1)

Country Link
JP (1) JPH11303164A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101162598B1 (en) 2010-03-04 2012-07-04 로얄앤컴퍼니 주식회사 Construction Method of Bathroom module
KR20210022256A (en) * 2019-08-20 2021-03-03 디엘이앤씨 주식회사 On floor drainage pipe system of bathroom
JP2021042802A (en) * 2019-09-10 2021-03-18 クリナップ株式会社 cabinet

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101162598B1 (en) 2010-03-04 2012-07-04 로얄앤컴퍼니 주식회사 Construction Method of Bathroom module
KR20210022256A (en) * 2019-08-20 2021-03-03 디엘이앤씨 주식회사 On floor drainage pipe system of bathroom
JP2021042802A (en) * 2019-09-10 2021-03-18 クリナップ株式会社 cabinet

Similar Documents

Publication Publication Date Title
US6301838B1 (en) Waste discharge system comprising water closet carrier
JPH11303164A (en) Piping unit work execution method
JP2016191244A (en) Fixing structure for sanitary equipment unit
JPH061658Y2 (en) Wall-mounted Western-style toilet installation structure
JPH0754370Y2 (en) Front plate mounting structure for equipment unit
JP3153987B2 (en) Toilet installation structure
JP2006283520A (en) Apparatus and method for mounting wall-mounted sanitary fixture
JPH061657Y2 (en) Urinal installation structure
JP7291484B2 (en) Fixtures for wall-mounted toilet bowls
JP2736622B2 (en) Installation method of kitchen equipment, etc. and equipment / members used in the method
JPH0617900Y2 (en) Urinal installation structure
KR20020028103A (en) The fixing method and its device for construeting board
JP2004512444A (en) Pre-assembled bathroom structure and bathroom installation method
JPH0754371Y2 (en) Toilet bowl installation structure
JP2007309051A (en) Frame arranging structure for installing sanitary facility
JP5317457B2 (en) Planar joining method of steel plate panel and tile panel
JPH0542142Y2 (en)
JPH0634460Y2 (en) Sanitary ware installation structure
JP2003138630A (en) Attaching structure of wall ornament type sanitary facility and equipment in sanitary unit
JPH0617901Y2 (en) Sanitary ware installation structure
JPH0716793Y2 (en) Sanitary ware installation structure
JP2536346Y2 (en) Connection structure between wall panel and ceiling panel in equipment unit
JPH0542139Y2 (en)
JPH11217857A (en) Piping unit
JPH0542140Y2 (en)

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040309