JPH11295467A - Transport device for large diameter o-ring - Google Patents
Transport device for large diameter o-ringInfo
- Publication number
- JPH11295467A JPH11295467A JP10120107A JP12010798A JPH11295467A JP H11295467 A JPH11295467 A JP H11295467A JP 10120107 A JP10120107 A JP 10120107A JP 12010798 A JP12010798 A JP 12010798A JP H11295467 A JPH11295467 A JP H11295467A
- Authority
- JP
- Japan
- Prior art keywords
- ring
- diameter
- traveling support
- base
- mounting base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Gasket Seals (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】この発明は、大径Oリングの
搬送装置に関し、原子炉圧力容器のシール用のOリング
のような大径の金属Oリングを搬送するのに好適なもの
である。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a large-diameter O-ring conveying apparatus, and is suitable for conveying a large-diameter metal O-ring such as an O-ring for sealing a reactor pressure vessel.
【0002】[0002]
【従来の技術】Oリングは圧力容器等のフランジ部のシ
ールに広く用いられており、原子炉圧力力容器のフラン
ジ部のシールにも大径の金属Oリングが用いられてい
る。2. Description of the Related Art An O-ring is widely used for sealing a flange portion of a pressure vessel or the like, and a large-diameter metal O-ring is also used for sealing a flange portion of a reactor pressure vessel.
【0003】この原子炉圧力容器の金属Oリングは、定
期検査などで原子炉圧力容器を開放した後は新しいもの
に交換しなければならない。[0003] The metal O-ring of this reactor pressure vessel must be replaced with a new one after the reactor pressure vessel is opened for periodic inspection or the like.
【0004】従来、この原子炉圧力容器のOリングを交
換しようとすると、工場から運ばれった直径が例えば5
mにもなる新しい大径のOリングを原子炉建屋内の原子
炉圧力容器のところまで運び込まなければならず、大き
な平板状の架台を用意してこの架台上にOリングを取付
け、多数の作業者による人海戦術で原子炉建屋の大物搬
入口から架台を斜めに傾けるなどしてこの架台ごと搬入
している。Conventionally, when attempting to replace the O-ring of this reactor pressure vessel, the diameter delivered from the factory is, for example, 5 mm.
m new large-diameter O-rings must be carried to the reactor pressure vessel inside the reactor building. A large flat base is prepared, and the O-rings are mounted on this base. The gantry is carried along with the gantry by tilting the gantry obliquely from the large cargo entrance of the reactor building by human tactics.
【0005】[0005]
【発明が解決しようとする課題】ところが、このような
架台を用い、作業者による人海戦術で搬入する場合に
は、狭い通路を搬送しようとすると、架台ごと傾けたり
しなければならず、搬送・移動などに時間が掛かるとと
もに、多くの作業者が必要になるという問題がある。However, in the case of using such a stand and carrying it in by human naval tactics by an operator, in order to convey a narrow passage, the stand must be tilted together with the stand. -There is a problem that it takes time to move or the like and many workers are required.
【0006】また、原子炉圧力容器の金属Oリングの場
合には、搬送・移動に時間がかかると、作業者の被爆の
問題も考慮しなければならないという問題もある。Further, in the case of a metal O-ring of a reactor pressure vessel, there is a problem that if transporting and moving takes a long time, the problem of worker exposure must be considered.
【0007】この発明は上記従来技術の問題点に鑑みて
なされたもので、大径のOリングであっても効率良く短
時間に搬送することができる大径Oリングの搬送装置を
提供しようとするものである。SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems of the prior art, and aims to provide a large-diameter O-ring conveying device capable of efficiently conveying a large-diameter O-ring in a short time. Is what you do.
【0008】[0008]
【課題を解決するための手段】上記課題を解決するため
この発明の請求項1記載の大径Oリングの搬送装置は、
大径Oリングを許容範囲内で楕円形に変形させて取付け
可能な取付台と、この取付台を傾斜させて支持するとと
もに、走行移動可能な走行支持台とを備え、これら取付
台および走行支持台が着脱可能な組立構造としてあるこ
とを特徴とするものである。According to a first aspect of the present invention, there is provided a large-diameter O-ring conveying apparatus.
A mounting base capable of mounting the large-diameter O-ring by deforming it into an elliptical shape within an allowable range, and a traveling support base that supports the mounting base at an angle and that can travel and move. It is characterized in that the base has a detachable assembly structure.
【0009】この大径Oリングの搬送装置によれば、取
付台にOリングを許容できる範囲で楕円形に変形して取
付け、この取付台を傾斜させた状態で支持できる走行支
持台を用意し、この走行支持台と前記取付台を着脱可能
な組立構造としてあり、トラックなどで運搬できる範囲
は取付台をトラックなどで搬送するようにし、トラック
などが使用できないところでは走行支持台を組み立てて
搬送するようにし、わずかな人数の作業者で短時間に大
径のOリングを狭い通路からでも搬入できるようにして
いる。According to this large-diameter O-ring transfer device, a traveling support is provided which can mount the O-ring on the mounting base by deforming the O-ring into an elliptical shape within an allowable range and support the mounting base in an inclined state. The traveling support base and the mounting base are detachably assembled so that the mounting base can be transported by a truck or the like in a range that can be transported by a truck or the like. In this way, a small number of workers can carry a large-diameter O-ring from a narrow passage in a short time.
【0010】[0010]
【発明の実施の形態】以下、この発明の一実施の形態に
ついて図面に基づき詳細に説明する。図1および図2は
この発明の大径Oリングの搬送装置を原子炉圧力容器の
金属Oリングに適用した一実施の形態にかかる概略斜視
図および部分詳細図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings. FIGS. 1 and 2 are a schematic perspective view and a partially detailed view showing an embodiment in which a large-diameter O-ring transfer device of the present invention is applied to a metal O-ring of a reactor pressure vessel.
【0011】この大径Oリングの搬送装置10は、大径
Oリング1を許容できる範囲内で楕円形に変形させて取
付ける取付台11を備えており、図1及び図2に示すよ
うに、パイプ構造の格子状に形成され、横方向に細長い
矩形12と縦方向に長い矩形13とを組み合わせた形状
としてある。そして、この取付台11は、横方向に細長
い矩形12部分で縦方向に2分割できるように、ほぼ中
央部に連結フランジ14が設けられ、収納時などに分割
できるようにしてある。The large-diameter O-ring transfer device 10 includes a mounting base 11 for mounting the large-diameter O-ring 1 by deforming the large-diameter O-ring 1 into an elliptical shape within an allowable range, as shown in FIGS. It is formed in a lattice shape of a pipe structure, and has a shape in which a horizontally elongated rectangle 12 and a vertically elongated rectangle 13 are combined. The mounting base 11 is provided with a connection flange 14 at a substantially central portion so that the mounting base 11 can be vertically divided into two parts by a rectangular part 12 elongated in the horizontal direction, and can be divided at the time of storage.
【0012】このようなパイプを用いた格子状の取付台
11の上面には、Oリング止め金具15が楕円形に変形
させる大径Oリング1の取付位置に対応して設けられ、
例えば図2(a)(b)に詳細を示すように、受板16
とネオプレンゴムの押え板17とで同時に2本の大径O
リング1を固定できるようになっている。An O-ring stopper 15 is provided on the upper surface of the lattice-shaped mounting base 11 using such a pipe in correspondence with the mounting position of the large-diameter O-ring 1 to be deformed into an elliptical shape.
For example, as shown in detail in FIGS.
And two large diameter O at the same time with the neoprene rubber holding plate 17
The ring 1 can be fixed.
【0013】なお、このOリング止め金具15の押え板
17には、楕円形に変形させる大径Oリング1の円弧に
沿った取付溝18が形成してある。The holding plate 17 of the O-ring stopper 15 has a mounting groove 18 formed along the arc of the large-diameter O-ring 1 to be deformed into an elliptical shape.
【0014】また、この取付台11の上面2か所に、図
2(c)に示すような吊り金具19が取付けられ、取付
台11を傾斜させた状態を保持して平衡状態で吊り上げ
ることができるように配置して取付けてある。A hanging bracket 19 as shown in FIG. 2 (c) is attached to two places on the upper surface of the mounting base 11, and the mounting base 11 can be lifted in an equilibrium state while maintaining the inclined state. It is arranged and installed as possible.
【0015】この大径Oリングの搬送装置10には、大
径Oリング1が取付けられる取付台11を傾斜させたま
ま支持するとともに、移動することができるよう走行支
持台20が設けられる。The large-diameter O-ring transfer device 10 is provided with a traveling support 20 so as to support the mounting base 11 to which the large-diameter O-ring 1 is mounted while being inclined and to be able to move.
【0016】この走行支持台20は、図1及び図2
(d)に示すように、パイプによる枠組構造とされ、取
付台11の下面に溶接されたブラケット21にボルト・
ナットで一方側が短く、他方側が長い2種類の支柱2
2,23の上端部を連結して着脱組立可能にされるとと
もに、支柱22,23の外側にブラケット24が溶接さ
れ、取付台11のブラケット21との間を斜めに連結す
る補強材25が配置されてボルト・ナットで着脱組立可
能に取付けられている。The traveling support 20 is shown in FIGS.
As shown in (d), a frame is formed by a pipe, and a bolt 21 is attached to a bracket 21 welded to the lower surface of the mounting base 11.
Two types of struts 2 with one side short and the other side long with a nut
The upper ends of the mounting members 11 are connected to each other so that they can be attached and detached. A bracket 24 is welded to the outer sides of the columns 22 and 23, and a reinforcing member 25 for connecting the bracket 21 of the mounting base 11 obliquely is disposed. It is mounted detachably with bolts and nuts.
【0017】そして、四隅の支柱22,23の下端部に
は、走行移動用のキャスタ26が取付られて移動可能と
されるとともに、一方側の短い支柱22は上端部を支点
にして回動させることで取付台11と平行にして収納で
き、他方側の長い支柱23の中間部には、フランジ27
が設けられて連結組立可能とされ、このフランジ27の
外側に突き出して取付けたヒンジ28を支点にして回動
させることで、キャスタ26が取付けられた支柱23の
下側部分を支柱23の上側部分と平行に上方に折り畳ん
で収納状態にできるようにしてある。A caster 26 for traveling movement is attached to the lower ends of the four corner posts 22 and 23 so as to be movable, and the short post 22 on one side is rotated with the upper end as a fulcrum. In this way, it can be stored in parallel with the mounting base 11, and a flange 27
Is provided so that the lower part of the column 23 on which the casters 26 are mounted can be turned by using the hinge 28 protruding outside of the flange 27 and being mounted as a fulcrum. It can be folded up in parallel with the box so that it can be stored.
【0018】また、これら支柱22,23間を連結して
枠組状態とするとともに、補強する水平連結材29が設
けられ、各水平連結材29の両端部はボルト・ナットで
着脱できるようにしてある。A horizontal connecting member 29 is provided for connecting the supporting columns 22 and 23 to form a frame, and reinforcing the connecting members. Both ends of each horizontal connecting member 29 can be attached and detached with bolts and nuts. .
【0019】次に、このように構成した大径Oリングの
搬送装置10の動作とともに、大径Oリング1の搬送に
ついて説明する。Next, the operation of the large-diameter O-ring conveying device 10 configured as described above and the conveyance of the large-diameter O-ring 1 will be described.
【0020】図3は、この発明の大径Oリングの搬送装
置10による搬送工程の説明図である。FIG. 3 is an explanatory view of a transfer process of the large-diameter O-ring transfer device 10 according to the present invention.
【0021】まず、原子炉建屋の外で取付台11を組み
立てて工場などから運ばれた2本の大径Oリング1をO
リング止め金具15の受板16上に載せ、取付溝18に
入れて押え板17で押えて許容できる範囲の楕円形にし
て取付ける。First, the mounting base 11 is assembled outside the reactor building, and two large-diameter O-rings 1 transported from a factory or the like are attached to the O-ring.
It is placed on the receiving plate 16 of the ring stopper 15, inserted into the mounting groove 18, pressed by the holding plate 17, and mounted in an oval shape within an allowable range.
【0022】この後、トラックなどの荷台30上で走行
支持台20を組み立てて取付台11を傾斜した状態で支
持する一方、走行支持台20のキャスタ26が取付けら
れた4本の支柱22,23を上側に収納した状態にして
おく。Thereafter, the traveling support 20 is assembled on a loading platform 30 such as a truck to support the mount 11 in an inclined state, while the four columns 22, 23 to which the casters 26 of the traveling support 20 are attached. Is stored in the upper side.
【0023】このように大径Oリング1が取付けられた
取付台11を走行支持台20を介してトラックの荷台3
0上に傾斜した状態で載せた後、原子炉建屋の通路をト
ラックを走行させることで大物搬入口内まで搬送する。The mounting table 11 on which the large-diameter O-ring 1 is mounted as described above is connected to the truck bed 3 via the traveling support table 20.
After being placed in a state of being inclined upward to zero, the truck is transported in the passage of the reactor building to the inside of the large cargo entrance.
【0024】これより先はトラックでの搬入が困難とな
ることから、走行支持台20の四隅のキャスタ26が取
付けてある支柱22,23を使用できるように組み立て
る。Since it is difficult to carry in the truck from here on, the columns 22 and 23 to which the casters 26 at the four corners of the traveling support 20 are mounted can be used.
【0025】そして、原子炉建屋のクレーンで取付台1
1に設けた2か所の吊り金具19にワイヤをかけて吊り
上げ、原子炉圧力容器の作業フロアに下ろす。Then, the mounting table 1 is mounted with the crane of the reactor building.
A wire is lifted by hanging wires on two suspending fittings 19 provided in 1 and lowered to the working floor of the reactor pressure vessel.
【0026】こうして作業フロアに走行支持台20ごと
下ろされた後は、キャスタ26を利用して所定の作業位
置まで押して移動することで搬送が完了する。After being lowered together with the traveling support 20 to the work floor in this way, the transfer is completed by pushing and moving the caster 26 to a predetermined work position.
【0027】このような大径Oリングの搬送装置10を
用いることで、大径のOリングであっても損傷すること
なく、原子炉建屋の狭い通路や大物搬入口から所定の原
子炉圧力容器のところまで搬送することができ、しかも
わずかな作業者で短時間に搬送することができる。これ
により、工期短縮と被爆低減を図ることができる。By using such a large-diameter O-ring transfer device 10, even if the large-diameter O-ring is not damaged, a predetermined reactor pressure vessel can be passed through a narrow passage of a reactor building or a large cargo port. And can be transported in a short time by a small number of workers. Thereby, it is possible to shorten the construction period and reduce the exposure.
【0028】また、径の異なる大径Oリングであっても
取付台11に、対応した径のOリング止め金具を予め取
付けておくことで、簡単に対処することができ、同様な
搬送作業に広く用いることができる。Even large diameter O-rings having different diameters can be easily dealt with by mounting O-ring stoppers having a corresponding diameter on the mounting base 11 in advance, and similar transport operations can be performed. Can be widely used.
【0029】さらに、この大径Oリングの搬送装置10
では、パイプによる枠組構造としたので、軽量化を図る
ことができるとともに、取付台11がフランジを介して
分割できるとともに、キャスタ26部分をヒンジを介し
て収納でき、運搬や保管が容易である。Further, this large-diameter O-ring conveying device 10
In this case, since the frame structure is formed by pipes, the weight can be reduced, the mounting base 11 can be divided via the flange, and the caster 26 can be stored via the hinge, so that the transportation and storage are easy.
【0030】なお、上記実施の形態では、大径Oリング
を用いる機器として原子炉圧力容器を対象にして説明し
たが、これに限らず他のプラントの圧力容器等の大径O
リングの搬送に広く適用することができる。In the above embodiment, the apparatus using the large-diameter O-ring has been described with respect to the reactor pressure vessel. However, the present invention is not limited to this.
It can be widely applied to transporting rings.
【0031】[0031]
【発明の効果】以上、一実施の形態とともに具体的に説
明したようにこの発明の請求項1記載の大径Oリングの
搬送装置によれば、取付台にOリングを許容できる範囲
で楕円形に変形して取付け、この取付台を傾斜させた状
態で支持できる走行支持台を用意し、この走行支持台と
前記取付台を着脱可能な組立構造としたので、トラック
などで運搬できる範囲は取付台をトラックなどで搬送す
ることができ、トラックなどが使用できないところでは
走行支持台を組み立てて搬送するこで、わずかな人数の
作業者で短時間に大径のOリングを狭い通路からでも搬
入することができる。As described above in detail with one embodiment, according to the large-diameter O-ring conveying apparatus according to the first aspect of the present invention, the mounting base has an elliptical shape as long as the O-ring can be tolerated. A traveling support base that can support the mounting base in an inclined state is prepared, and the traveling support base and the mounting base are detachably assembled. The platform can be transported by truck, etc., and in places where trucks etc. cannot be used, the traveling support is assembled and transported, so that a small number of workers can quickly bring in a large O-ring from a narrow passage. can do.
【0032】これにより、原子炉圧力容器の定期検査な
どの場合には、工期の短縮を図ることができるととも
に、作業者の被爆低減を図ることができる。Thus, in the case of periodic inspection of the reactor pressure vessel, etc., it is possible to shorten the construction period and reduce the exposure of workers.
【図1】この発明の大径Oリングの搬送装置を原子炉圧
力容器の金属Oリングに適用した一実施の形態にかかる
概略斜視図である。FIG. 1 is a schematic perspective view of an embodiment in which a large-diameter O-ring transfer device of the present invention is applied to a metal O-ring of a reactor pressure vessel.
【図2】この発明の大径Oリングの搬送装置を原子炉圧
力容器の金属Oリングに適用した一実施の形態にかかる
部分詳細図である。FIG. 2 is a partial detailed view of an embodiment in which the large-diameter O-ring transfer device of the present invention is applied to a metal O-ring of a reactor pressure vessel.
【図3】この発明の大径Oリングの搬送装置を原子炉圧
力容器の金属Oリングに適用した一実施の形態にかかる
搬送工程の説明図である。FIG. 3 is an explanatory view of a transfer process according to an embodiment in which the large-diameter O-ring transfer device of the present invention is applied to a metal O-ring of a reactor pressure vessel.
1 原子炉圧力容器の大径Oリング 10 大径Oリングの搬送装置 11 取付台 14 連結フランジ 15 Oリング止め金具 20 走行支持台 22,23 支柱 25 補強材 26 キャスタ 28 ヒンジ 29 水平連結材 30 トラックの荷台 DESCRIPTION OF SYMBOLS 1 Large-diameter O-ring of reactor pressure vessel 10 Large-diameter O-ring conveying device 11 Mounting stand 14 Connecting flange 15 O-ring stopper 20 Running support 22, 23 Support 25 Reinforcement 26 Caster 28 Hinge 29 Horizontal connection 30 Track Bed
Claims (1)
させて取付け可能な取付台と、この取付台を傾斜させて
支持するとともに、走行移動可能な走行支持台とを備
え、これら取付台および走行支持台が着脱可能な組立構
造としてあることを特徴とする大径Oリングの搬送装
置。1. A mounting base capable of mounting a large-diameter O-ring by deforming it into an elliptical shape within an allowable range, and a traveling support base capable of supporting the mounting base while being inclined and traveling. A transfer device for a large-diameter O-ring, wherein the mounting base and the traveling support base have a detachable assembly structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10120107A JPH11295467A (en) | 1998-04-14 | 1998-04-14 | Transport device for large diameter o-ring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10120107A JPH11295467A (en) | 1998-04-14 | 1998-04-14 | Transport device for large diameter o-ring |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH11295467A true JPH11295467A (en) | 1999-10-29 |
Family
ID=14778114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10120107A Pending JPH11295467A (en) | 1998-04-14 | 1998-04-14 | Transport device for large diameter o-ring |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH11295467A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002248902A (en) * | 2001-02-26 | 2002-09-03 | Sanyo Electric Co Ltd | Caster device for machine tool |
KR101242170B1 (en) * | 2011-10-18 | 2013-03-18 | 한전케이피에스 주식회사 | Moving for o-ring |
KR102670234B1 (en) * | 2023-02-28 | 2024-05-30 | 한전케이피에스 주식회사 | Adjustable apparatus for installing large diameter gaskets |
-
1998
- 1998-04-14 JP JP10120107A patent/JPH11295467A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002248902A (en) * | 2001-02-26 | 2002-09-03 | Sanyo Electric Co Ltd | Caster device for machine tool |
JP4666790B2 (en) * | 2001-02-26 | 2011-04-06 | 株式会社日立ハイテクインスツルメンツ | Casters for machine tools |
KR101242170B1 (en) * | 2011-10-18 | 2013-03-18 | 한전케이피에스 주식회사 | Moving for o-ring |
KR102670234B1 (en) * | 2023-02-28 | 2024-05-30 | 한전케이피에스 주식회사 | Adjustable apparatus for installing large diameter gaskets |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101060020A (en) | Shipping package device up-ender | |
JPH11295467A (en) | Transport device for large diameter o-ring | |
JP5348609B2 (en) | Plate-shaped body loading device and transport vehicle | |
JP2013160675A (en) | Stock rack for storage container | |
JPH0940019A (en) | Apparatus for fixing object being carried | |
JP3999925B2 (en) | Metal material transport container with stacked structure | |
JP3027920B2 (en) | Piping unit and its installation method | |
CN112607662A (en) | Battery pack conveying, loading and unloading device and vibration testing system | |
JPH1113147A (en) | Manufacture and transporting method for housing unit | |
JP2009097300A (en) | Transfer device | |
KR20100000616A (en) | Jig for container demonstration of hatch cover top in container ship | |
JPH092776A (en) | Conveying device for square steel tubes | |
CN210285136U (en) | Subway train unit brake conveyer | |
US3717280A (en) | Tank support and bracing structure | |
CN215101772U (en) | Battery pack conveying, loading and unloading device and vibration testing system | |
JP4081717B2 (en) | Heavy object inspection jig and method of using the same | |
JP2920183B2 (en) | Method and apparatus for transporting long material | |
CN107985996A (en) | Flexible transport carriage for eight-corner tube gripping apparatus | |
JPH0361312A (en) | Method for fitting lower vessel and intermediate vessel in rh furnace | |
JPH0610674Y2 (en) | Wafer support device | |
JPH0351256Y2 (en) | ||
JP2000153732A (en) | Pipe loading method | |
JPS60123673A (en) | Method and apparatus for anchoring membrane panel of low temperature tank | |
JPH0642165A (en) | Scaffold device | |
JPH10329893A (en) | Container for unit type curtain wall |