JPH11268030A - Method and device for introducing kneading water for ready mixed concrete manufacturing plant - Google Patents

Method and device for introducing kneading water for ready mixed concrete manufacturing plant

Info

Publication number
JPH11268030A
JPH11268030A JP7874598A JP7874598A JPH11268030A JP H11268030 A JPH11268030 A JP H11268030A JP 7874598 A JP7874598 A JP 7874598A JP 7874598 A JP7874598 A JP 7874598A JP H11268030 A JPH11268030 A JP H11268030A
Authority
JP
Japan
Prior art keywords
water
amount
primary
measuring
discharge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP7874598A
Other languages
Japanese (ja)
Inventor
Toshiaki Tanigawa
敏明 谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nikko Co Ltd
Nikko KK
Original Assignee
Nikko Co Ltd
Nikko KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikko Co Ltd, Nikko KK filed Critical Nikko Co Ltd
Priority to JP7874598A priority Critical patent/JPH11268030A/en
Publication of JPH11268030A publication Critical patent/JPH11268030A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To meter primary water and secondary water at a time and introduce the desired divided volume of the primary water and the secondary water by the given periods. SOLUTION: When kneading water is metered, the preset water volume of primary water and secondary water in one water metering tank is metered. When the primary introduction period comes around, the metered water in a water metering tank 1 is discharged and simultaneously the discharge volume is sensed, and when the discharge volume reaches the preset primary water volume, the discharge of water is discontinued to complete the discharge of primary water. Also when the secondary water introduction period comes around, metered water remaining in the water metering tank 1 is discharged as the secondary water.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、砂利、砂、セメン
ト、水、混和剤の各種コンクリート材料を計量、混練し
て生コンクリートを製造する生コンクリート製造プラン
トの混練水投入方法及び装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and an apparatus for introducing mixed water in a ready-mixed concrete production plant for measuring and kneading various concrete materials such as gravel, sand, cement, water and an admixture to produce ready-mixed concrete.

【0002】[0002]

【従来の技術】生コンクリートを製造する際には、予め
計量された砂利、砂、セメント、水、混和剤を一定の時
間間隔を持たせて連続的にミキサに投入して混練する
が、近年、より品質の高いコンクリートを得るために、
混練水を一次と二次との2回に分けて投入し、一次投入
時期には砂とセメント及び一次水とを投入してモルタル
を製造し、その後、砂利と二次水とを投入して生コンク
リートを製造する方法が提案されている。
2. Description of the Related Art In the production of ready-mixed concrete, pre-measured gravel, sand, cement, water, and an admixture are continuously introduced into a mixer at predetermined time intervals and kneaded. In order to obtain higher quality concrete,
The kneading water is divided into two parts, primary and secondary, and the mortar is manufactured by adding sand, cement and primary water during the primary charging time, and then the gravel and secondary water are added. A method for producing ready-mixed concrete has been proposed.

【0003】そして、その一例として、特開平9−20
1817号公報に示されるように、一次水と二次水とを
同一の水計量槽により計量するようにし、一次水投入時
期には先ず一次水を計量してそれをミキサに投入し、更
に二次水投入時期になると次いで二次水を計量してそれ
をミキサに投入するようにしたものがある。
[0003] As one example, Japanese Patent Application Laid-Open No. 9-20
As shown in Japanese Patent Publication No. 1817, primary water and secondary water are measured by the same water measuring tank. At the time of charging the primary water, the primary water is first measured and charged into a mixer. In some cases, the secondary water is weighed and charged into a mixer when the next water is charged.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記従
来のように、一次水及び二次水の投入時期にその都度、
貯水槽の混練水を計量してミキサに投入する方式では、
計量回数が2回となり、計量時間の短縮や計量誤差を少
なくするという観点から更に改良の余地がある。
However, as in the prior art described above, each time the primary water and the secondary water are charged,
In the method of measuring the kneading water in the water tank and putting it into the mixer,
The number of times of weighing becomes two, and there is room for further improvement from the viewpoint of shortening the weighing time and reducing the weighing error.

【0005】本発明は上記の点に鑑み、一次水及び二次
水の計量を一回で済ませ、かつ所望量の一次水と二次水
とを所定の時期に分割投入できるようにした生コンクリ
ート製造プラントの混練水投入方法及び装置を提供する
ことを課題とする。
In view of the above, the present invention provides a ready-mixed concrete in which primary water and secondary water are measured only once, and a desired amount of primary water and secondary water can be dividedly charged at a predetermined time. An object of the present invention is to provide a method and an apparatus for charging kneading water in a manufacturing plant.

【0006】[0006]

【課題を解決するための手段】本発明は上記の課題を達
成するために、重量検出器を備えた一つの水計量槽に水
計量弁と放水弁とを備える一方、一次水量を設定する一
次水量設定器と、二次水量を設定する二次水量設定器を
備えると共に、混練水計量時に一次水量設定器と二次水
量設定器とに設定される一次水量と二次水量との合計量
と計量水量とを比較する計量比較器と、計量比較器より
の信号に応じて水計量弁を開閉する計量制御器と、一次
水投入時期に水計量槽よりの放水量と一次水量設定器の
設定水量とを比較する放水比較器と、放水比較器よりの
信号によって放水弁の開閉を制御すると共に、二次水投
入時期に水計量槽に残る残水を二次水として放水するよ
うに放水弁を開閉制御する放水制御器を備えたことを特
徴としている。
SUMMARY OF THE INVENTION In order to achieve the above-mentioned object, the present invention provides a water measuring tank provided with a weight detector, which is provided with a water measuring valve and a water discharging valve, while setting a primary water amount. With a water amount setting device, and a secondary water amount setting device for setting the secondary water amount, the total amount of the primary water amount and the secondary water amount set in the primary water amount setting device and the secondary water amount setting device at the time of kneading water measurement. A measuring comparator that compares the measured water amount, a measuring controller that opens and closes the water measuring valve according to the signal from the measuring comparator, and a setting of the amount of water discharged from the water measuring tank and the primary water amount setting device when the primary water is charged A water discharge comparator that compares the amount of water and a water discharge valve that controls the opening and closing of the water discharge valve with a signal from the water discharge comparator, and discharges residual water remaining in the water measuring tank as secondary water at the time of secondary water injection. It is characterized by having a water discharge controller for controlling opening and closing.

【0007】[0007]

【発明の実施の形態】本発明に係る混練水投入方法及び
装置によれば、予め一次水量設定器及び二次水量設定器
を介して投入する一次水量と二次水量とを設定してお
く。そして、計量比較器及び計量制御器を介して水計量
槽に一次水量と二次水量との合計量を一度に計量する。
そして、一次水投入時期になると、放水制御器を介して
放水弁を開いて放水を開始すると同時に、重量検出器に
より放水量を検出し、検出した放水量と予め設定した一
次水量とを放水比較器によって比較し、放水量と設定し
た一次水量とが一致すると放水制御器を介して放水弁を
閉じて一次水の投入を完了する。更に、二次水投入時期
になると、再び放水制御器を介して放水弁を開いて水計
量槽に残る混練水を二次水として放水してミキサ内に投
入する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS According to the kneading water charging method and apparatus according to the present invention, the amount of primary water and the amount of secondary water to be charged via a primary water amount setting device and a secondary water amount setting device are set in advance. Then, the total amount of the primary water amount and the secondary water amount is measured at one time in the water measuring tank via the measuring comparator and the measuring controller.
Then, at the time of primary water injection, the water discharge valve is opened via the water discharge controller to start water discharge, and at the same time, the water discharge amount is detected by the weight detector, and the detected water discharge amount is compared with the preset primary water amount. When the water discharge amount matches the set primary water amount, the water discharge valve is closed via the water discharge controller to complete the supply of the primary water. Further, at the time of charging secondary water, the water discharge valve is opened again via the water discharge controller, and the kneading water remaining in the water measuring tank is discharged as secondary water and charged into the mixer.

【0008】[0008]

【実施例】以下、本発明の一実施例を図面に基づいて説
明する。
An embodiment of the present invention will be described below with reference to the drawings.

【0009】図中の1は生コンクリート製造プラントに
配設される水計量槽であって、該水計量槽1の本体には
計量する水の重量を検出する重量検出器2を配設すると
共に、上部開口には混練水を計量するときに上位に配設
した貯水槽(図示せず)より混練水を払い出す給水管3
を望ませており、該給水管3には払い出す水量を制御す
る水計量弁4を介装している。また、水計量槽1の下部
には水計量槽1内の計量水を下位のミキサ5に放水する
放水制御弁6を配設している。
In the figure, reference numeral 1 denotes a water measuring tank provided in a ready-mixed concrete production plant, and a weight detector 2 for detecting the weight of the water to be measured is provided in the main body of the water measuring tank 1. A water supply pipe 3 for discharging kneading water from an upper water tank (not shown) when measuring the kneading water in the upper opening.
The water supply pipe 3 is provided with a water metering valve 4 for controlling the amount of water to be discharged. In addition, a water discharge control valve 6 for discharging the measured water in the water measuring tank 1 to the lower mixer 5 is provided below the water measuring tank 1.

【0010】7は一次水量を入力設定する一次水量設定
器であり、8は二次水量を入力設定する二次水量設定器
である。9は計量比較器であって、計量時に前記設定器
と水計量槽1により計量される計量水量を比較するもの
である。また、10は前記計量比較器よりの信号を受け
て水計量弁4を開閉制御する計量制御器である。また、
11は放水比較器であって、放水時に水計量槽1より放
水される水量を比較するものである。また、12は前記
放水比較器11よりの信号を受けて放水弁6を開閉制御
する放水制御器である。そして、前記重量信号検出器2
より出力される信号はアンプ13により増幅され、その
増幅された信号は前記計量比較器9及び放水比較器11
に入力されるようになっている。
Reference numeral 7 denotes a primary water amount setting device for inputting and setting a primary water amount, and reference numeral 8 denotes a secondary water amount setting device for inputting and setting a secondary water amount. Reference numeral 9 denotes a measuring comparator, which compares the measuring water amount measured by the water setting tank 1 with the setting device at the time of measuring. Reference numeral 10 denotes a measurement controller that controls the opening and closing of the water measurement valve 4 in response to a signal from the measurement comparator. Also,
Reference numeral 11 denotes a water discharge comparator for comparing the amount of water discharged from the water measuring tank 1 at the time of water discharge. Reference numeral 12 denotes a water discharge controller which receives a signal from the water discharge comparator 11 and controls opening and closing of the water discharge valve 6. And the weight signal detector 2
The output signal is amplified by an amplifier 13, and the amplified signal is output from the weighing comparator 9 and the water discharge comparator 11.
To be entered.

【0011】次に、上記水投入装置により混練水の投入
を行う手順について図2のフローチャートに基づいて説
明する。図中のS1〜S22は混練水投入手順の各ステ
ップを示す。
Next, a procedure for introducing kneading water by the above-mentioned water charging device will be described with reference to a flowchart of FIG. S1 to S22 in the figure show each step of the kneading water charging procedure.

【0012】先ず、混練水の投入を行う前に初期設定と
して一次水量設定器7により一次水量の入力設定をする
(S1)と共に、二次水量設定器8により二次水量の入
力設定を行う(S2)。
First, before the kneading water is supplied, an input setting of a primary water amount is performed as an initial setting by a primary water amount setting device 7 (S1), and an input setting of a secondary water amount is performed by a secondary water amount setting device 8 (S1). S2).

【0013】計量開始操作(S3)によって、設定され
た一次水量と二次水量との値を合計(S4)し、計量制
御器10を介して水計量弁4を開き(S5)、混練水の
払い出しを開始する(S6)。貯水槽より水計量槽1に
混練水が払い出されると水計量槽1の重量検出器2によ
り払い出される混練水の重量を計量水量として検出する
(S7)。そして、計量比較器9では前記計量水量と予
め設定した一次水量及び二次水量との合計値とを比較し
(S8)、計量水量が前記合計値(実際には合計値より
落差分を差し引いた値)に到達したか否か判断し(S
9)、合計値に達していなければ混練水の計量を継続
し、合計値に達すると計量制御器10を介して水計量弁
4を閉じ(S10)、混練水の計量を終了する(S1
1)。
By the metering start operation (S3), the set values of the primary water amount and the secondary water amount are summed (S4), the water metering valve 4 is opened via the metering controller 10 (S5), and the mixing water is mixed. The payout is started (S6). When the mixing water is discharged from the water storage tank to the water measuring tank 1, the weight of the mixing water discharged by the weight detector 2 of the water measuring tank 1 is detected as a measured water amount (S7). Then, the measuring comparator 9 compares the measured water amount with the total value of the preset primary water amount and the secondary water amount (S8), and the measured water amount is obtained by subtracting a difference between the total amount (actually, the total value and the total difference). Value) or not (S
9) If the total value has not been reached, the measurement of the kneading water is continued. If the total value is reached, the water measuring valve 4 is closed via the measuring controller 10 (S10), and the measuring of the kneading water is terminated (S1).
1).

【0014】次いで、一次水の投入時期か否か判断し
(S12)、未だの場合には投入時期待ちとなり、投入
時期となると、放水制御器12を介して放水弁6を開き
(S13)、一次水の放水を開始する(S14)。一次
水の放水と同時に重量検出器2によって放水量を検出し
(S15)、放水比較器11によって前記放水量と設定
した一次水量とを比較し(S16)、前記放水量が予め
設定した一次水量に到達したか否か判断し(S17)、
まだ到達していなければ放水を継続し、一次水量に到達
すると放水制御器12を介して放水弁6を閉じ(S1
8)、一次水の放水を停止する(S19)。
Next, it is determined whether or not it is the time for charging the primary water (S12). If it is not yet, the charging time is awaited. When the time for charging is reached, the water discharge valve 6 is opened via the water discharge controller 12 (S13). The discharge of the primary water is started (S14). Simultaneously with the discharge of the primary water, the amount of water discharged is detected by the weight detector 2 (S15), and the amount of discharged water is compared with the set amount of primary water by the water discharge comparator 11 (S16). Is determined (S17),
If the primary water amount has not been reached yet, the water discharge is continued. If the primary water amount is reached, the water discharge valve 6 is closed via the water discharge controller 12 (S1).
8), the discharge of the primary water is stopped (S19).

【0015】次に、二次水の投入時期か否か判断し、
(S20)、未だの場合には投入時期待ちとなり、投入
時期となると、再び放水制御器12を介して放水弁6を
開き(S21)、今度は水計量槽1内に残留している混
練水を二次水として放水する(S22)。こうして1バ
ッチ分の混練水の放出が完了し、混練を継続する場合に
はするとステップS3またはS1に戻って以下の手順を
繰り返して混練水の計量、放出の操作を行う。
Next, it is determined whether or not it is time to supply secondary water,
(S20) If not, the charging time is waited. When the charging time comes, the water discharge valve 6 is opened again via the water discharge controller 12 (S21), and the kneading water remaining in the water measuring tank 1 is returned. Is discharged as secondary water (S22). In this way, the discharge of the kneading water for one batch is completed, and when the kneading is continued, the process returns to step S3 or S1, and the following procedure is repeated to measure and discharge the kneading water.

【0016】[0016]

【発明の効果】以上のように本発明に係る混練水投入方
法及び装置にあっては、計量開始に伴って一つの水計量
槽により予め設定した一次水量と二次水量との合計水量
を計量し、一次水投入時期には、水計量槽よりの放水量
を検出し、検出した放水量が予め設定した一次水量に達
すると水計量槽よりの放水を停止し、二次水投入時期に
は水計量槽に残留する計量水を二次水として放水するよ
うにしたので、一次水及び二次水の計量を一回で完了さ
せることができ、かつ所望量の一次水と二次水とを所定
の時期に分割投入できるので、計量時の時間短縮や計量
誤差を極力小さくすることができる。
As described above, in the kneading water charging method and apparatus according to the present invention, the total water amount of the primary water amount and the secondary water amount set in advance by one water measuring tank at the start of the measurement is measured. However, during the primary water charging time, the amount of water discharged from the water measuring tank is detected, and when the detected water discharging amount reaches the preset primary water amount, the water discharging from the water measuring tank is stopped. Since the measured water remaining in the water measuring tank is discharged as secondary water, the measurement of the primary water and the secondary water can be completed at one time, and the desired amounts of the primary water and the secondary water can be obtained. Since it can be dividedly charged at a predetermined time, the time at the time of weighing can be reduced and the weighing error can be minimized.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る混練水投入装置の構成を示す説明
図である。
FIG. 1 is an explanatory diagram showing a configuration of a kneading water charging device according to the present invention.

【図2】本発明に係る混練水投入方法の手順を示すフロ
ーチャートである。
FIG. 2 is a flowchart showing a procedure of a kneading water charging method according to the present invention.

【符合の説明】[Description of sign]

1…水計量槽 2…重量検出器 4…水計量弁 5…ミキサ 6…放水弁 7…一次水量設
定器 8…二次水量設定器 9…計量比較器 10…計量制御器 11…放水比較
器 12…放水制御器
DESCRIPTION OF SYMBOLS 1 ... Water measuring tank 2 ... Weight detector 4 ... Water measuring valve 5 ... Mixer 6 ... Water discharge valve 7 ... Primary water amount setting device 8 ... Secondary water amount setting device 9 ... Measuring comparator 10 ... Measuring controller 11 ... Water discharging comparator 12 ... water discharge controller

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】生コンクリート混練時の混練水を一次と二
次との2回に分けて投入する生コンクリート製造プラン
トの混練水投入方法において、予め前記一次水量と二次
水量とを設定しておき、混練水計量時には一つの水計量
槽により前記一次水量と二次水量との合計水量を一度に
計量し、一次水投入時期には水計量槽よりの放水量を検
出すると共に、検出した放水量が予め設定した一次水量
に達すると水計量槽よりの放水を停止し、二次水投入時
期には水計量槽に残留する計量水を二次水として放水す
るようにしたことを特徴とする生コンクリート製造プラ
ントの混練水投入方法。
In a method for feeding kneading water in a ready-mixed concrete production plant in which kneading water during kneading of ready-mixed concrete is divided into two parts, primary and secondary, the primary water amount and the secondary water amount are set in advance. At the time of kneading water measurement, the total water amount of the primary water amount and the secondary water amount is measured at a time by one water measuring tank, and at the time of primary water charging, the amount of water discharged from the water measuring tank is detected and the detected discharge amount is measured. When the amount of water reaches a preset primary water amount, water discharge from the water measuring tank is stopped, and at the time of secondary water charging, the measured water remaining in the water measuring tank is discharged as secondary water. Mixing water injection method for ready-mixed concrete production plant.
【請求項2】重量検出器を備えた一つの水計量槽に水計
量弁と放水弁とを備える一方、一次水量を設定する一次
水量設定器と、二次水量を設定する二次水量設定器を備
えると共に、混練水計量時に一次水量設定器と二次水量
設定器とに設定される一次水量と二次水量との合計量と
計量水量とを比較する計量比較器と、計量比較器よりの
信号に応じて水計量弁を開閉する計量制御器と、一次水
投入時期に水計量槽よりの放水量と一次水量設定器の設
定水量とを比較する放水比較器と、放水比較器よりの信
号によって放水弁の開閉を制御すると共に、二次水投入
時期に水計量槽に残る残水を二次水として放水するよう
に放水弁を開閉制御する放水制御器を備えたことを特徴
とする生コンクリート製造プラントの混練水投入装置。
2. A water measuring valve having a weight detector and a water measuring valve and a water discharging valve, and a primary water amount setting device for setting a primary water amount and a secondary water amount setting device for setting a secondary water amount. A measuring comparator for comparing the total amount of the primary water amount and the secondary water amount set in the primary water amount setting device and the secondary water amount setting device and the measuring water amount at the time of kneading water measurement, and a measuring comparator A metering controller that opens and closes a water metering valve in response to a signal, a water discharge comparator that compares the amount of water discharged from the water measuring tank with the set amount of the primary water amount setting device at the time of primary water injection, and a signal from the water discharge comparator And a water discharge controller that controls the opening and closing of the water discharge valve so that the residual water remaining in the water measuring tank is discharged as secondary water when the secondary water is charged. Mixing water input device of concrete manufacturing plant.
JP7874598A 1998-03-26 1998-03-26 Method and device for introducing kneading water for ready mixed concrete manufacturing plant Pending JPH11268030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7874598A JPH11268030A (en) 1998-03-26 1998-03-26 Method and device for introducing kneading water for ready mixed concrete manufacturing plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7874598A JPH11268030A (en) 1998-03-26 1998-03-26 Method and device for introducing kneading water for ready mixed concrete manufacturing plant

Publications (1)

Publication Number Publication Date
JPH11268030A true JPH11268030A (en) 1999-10-05

Family

ID=13670433

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7874598A Pending JPH11268030A (en) 1998-03-26 1998-03-26 Method and device for introducing kneading water for ready mixed concrete manufacturing plant

Country Status (1)

Country Link
JP (1) JPH11268030A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103033440A (en) * 2012-12-14 2013-04-10 中国水利水电第十四工程局有限公司 Method for testing air content of concrete mixture
CN105599147A (en) * 2014-11-22 2016-05-25 广州市盛恒工程机械有限公司 Concrete sand and stone sewage recycling system
JP2018127803A (en) * 2017-02-08 2018-08-16 オリエンタル白石株式会社 Refilling method of pc grout and mixing-kneading method of pc grout

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103033440A (en) * 2012-12-14 2013-04-10 中国水利水电第十四工程局有限公司 Method for testing air content of concrete mixture
CN105599147A (en) * 2014-11-22 2016-05-25 广州市盛恒工程机械有限公司 Concrete sand and stone sewage recycling system
JP2018127803A (en) * 2017-02-08 2018-08-16 オリエンタル白石株式会社 Refilling method of pc grout and mixing-kneading method of pc grout

Similar Documents

Publication Publication Date Title
US9180605B2 (en) Volumetric concrete mixing method and apparatus
JPH11268030A (en) Method and device for introducing kneading water for ready mixed concrete manufacturing plant
JP4431204B2 (en) Material input method to mixer
JP3303889B2 (en) Cement paste mixing equipment
JP5215926B2 (en) Material measurement control method and control apparatus for ready-mixed concrete production plant
JP5377113B2 (en) Cement measuring method and measuring device for ready-mixed concrete production plant
JPH04105907A (en) Mixing of ready-mixed concrete
KR100966051B1 (en) Precision Weighting Method of Large Amount Material and Precision Control Method of Concrete Component of Concrete Batch Plant Using the Weighting Method
JP3718540B2 (en) Method for correcting metered water when making ready-mixed concrete
JP5377099B2 (en) Kneaded water metering method and metering device for ready-mixed concrete production plant
JPH08332626A (en) Ready mixed concrete manufacturing device
JPH0394122A (en) Method for measuring volume of air gap in radioactive solid waste container and method for fixing radioactive solid waste
JPH1024410A (en) Production of highly flowable concrete and production equipment therefor
KR20090123273A (en) System for measuring sand moisture in weighing
JPH0422681B2 (en)
JP2742852B2 (en) Fresh concrete production method
JP2883289B2 (en) Method and apparatus for measuring water content of aggregate in batcher plant
JP4451937B2 (en) Concrete manufacturing method and weighing machine
JPS62275707A (en) Water weigher structure in concrete production unit
JPH0310009Y2 (en)
JP2002205304A (en) Method and apparatus for correcting composition of ready-mixed concrete
JPS6013813B2 (en) Method for controlling the amount of material input in batchya plants
JP2004154996A (en) Method and apparatus for producing ready-mixed concrete
JPH08183021A (en) Compounding correction apparatus for ready-mixed concrete material
JPH04125108A (en) Control method for concrete manufacturing plant