JPH1111866A - Container crane operating method - Google Patents

Container crane operating method

Info

Publication number
JPH1111866A
JPH1111866A JP16409697A JP16409697A JPH1111866A JP H1111866 A JPH1111866 A JP H1111866A JP 16409697 A JP16409697 A JP 16409697A JP 16409697 A JP16409697 A JP 16409697A JP H1111866 A JPH1111866 A JP H1111866A
Authority
JP
Japan
Prior art keywords
container
trolley
traverser
sea
side trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP16409697A
Other languages
Japanese (ja)
Inventor
Akira Kawase
晃 川瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP16409697A priority Critical patent/JPH1111866A/en
Publication of JPH1111866A publication Critical patent/JPH1111866A/en
Pending legal-status Critical Current

Links

Landscapes

  • Control And Safety Of Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To save energy in operation of a container crane and give a long lifetime to appliances and components. SOLUTION: A container crane operating method includes a sea side trolley 3 and land side trolley 4 traveling on a crane girder 2 and also a traverser 5 which travels on the girder 2 between the two trolleys 3 and 4, whereby loading and unloading of a container 10 to/from a container ship 9 is made by the sea side trolley 3 while handing-over of the container 10 to/from any ground facility is made by the land side trolley 4, and transport of the container 10 between the two trolleys 3 and 4 is made by the traverser 5. Therein the operating sequence of loading and unloading to/from the ship 9 is set, and the winding-up distance of the sea side trolley 3 and the moving distance of the traverser 5 in each operating position are calculated, and control is made consisting of decreasing the wind-up speeds of trolleys 3 and 4 or the moving speed of the traverser 5 so that the waiting time of the sea side 3 or land side trolley 4 when they are in the upper limit position or the waiting time of the traverser 5 at each trolley 3/4 is eliminated.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はコンテナ埠頭等の岸
壁に設置されコンテナ船にコンテナの積み卸しを行うコ
ンテナクレーンの運転方法に係り、特にエネルギの節約
と機器、部品の長寿命化を達成できる運転方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of operating a container crane installed on a quay such as a container wharf for loading and unloading containers on a container ship, and in particular, can save energy and extend the life of equipment and components. Related to driving method.

【0002】[0002]

【従来の技術】近年コンテナ船がますます大型化してお
り、従来のパナマックス船形よりもはるかに大きな船幅
を有するスーパーパナマックスと呼ばれる船形のコンテ
ナ船が使用されるようになってきている。それにともな
ってコンテナ積み卸し時間が長くなり、その短縮が大き
な課題となっている。
2. Description of the Related Art In recent years, container vessels have become larger and larger, and a ship-shaped container vessel called Super Panamax, which has a far greater width than a conventional Panamax boat, has been used. Along with this, the time for unloading and unloading containers has become longer, and shortening has become a major issue.

【0003】本願の発明者等は上記課題に対してコンテ
ナ船にコンテナを積み卸しする改良されたコンテナクレ
ーンについて特許出願(特許平7−337211号(未
公開))を行った。図9は上記出願に開示されたコンテ
ナクレーンの正面図である。図において、1はコンテナ
クレーンで岸壁8上に設けられたレール上を走行する。
2はクレーンガーダであり、海側に張り出した部分は起
伏可能なブームとなっている。3は海側トロリで横行可
能であり、コンテナ10に着脱可能なスプレッダをロー
プを介して吊り下げており、ロープの巻上、巻下により
コンテナを昇降させる。4は陸側トロリで構造は海側ト
ロリ3と同様である。
[0003] The inventors of the present application have filed a patent application (Japanese Patent Application Laid-Open No. 7-337211 (not disclosed)) for an improved container crane for loading and unloading containers on a container ship in response to the above-mentioned problems. FIG. 9 is a front view of the container crane disclosed in the above application. In the figure, reference numeral 1 denotes a container crane which runs on a rail provided on a quay 8.
Reference numeral 2 denotes a crane girder, and the portion that protrudes toward the sea side is a boom that can be raised and lowered. Numeral 3 is a sea-side trolley, and a spreader detachable from the container 10 is suspended via a rope, and the container is raised and lowered by winding up and down the rope. Reference numeral 4 denotes a land-side trolley, which has the same structure as the sea-side trolley 3.

【0004】5はトラバーサで、一点鎖線で示すように
コンテナ10を載せてクレーンガーダ2上を横行する。
なお、上記2つのトロリ3,4とトラバーサ5はクレー
ンガーダ2上の別のレール上を横行するので互いにすれ
ちがいが可能である。
[0004] Reference numeral 5 denotes a traverser, on which the container 10 is placed and traversed on the crane girder 2 as shown by a dashed line.
Since the two trolleys 3 and 4 and the traverser 5 traverse on different rails on the crane girder 2, they can pass each other.

【0005】6は高架軌道、7は高架軌道上を無人走行
する台車(シャーシ)である。8は岸壁、9はコンテナ
船である。
Reference numeral 6 denotes an elevated track, and reference numeral 7 denotes a bogie (chassis) which runs unmannedly on the elevated track. 8 is a quay and 9 is a container ship.

【0006】かかるコンテナクレーン1において、海側
トロリ3と陸側トロリ4はコンテナの荷役場所に止まっ
ていて、コンテナ10の巻上、巻下げに専念し、トラバ
ーサ5が2つのトロリ3,4の間を往復して、コンテナ
10の横移動を行う。トロリ3,4からトラバーサ5に
コンテナ10を移す場合、それぞれのトロリ3、4がコ
ンテナ10を把持した状態で巻上上限にあることを確認
した後、トラバーサ5がそれぞれのトロリ3、4の直下
まで移動する。それぞれのトロリ3、4はわずかに巻下
して着床させ、スプレッダをコンテナ10から離し、コ
ンテナ10をトラバーサ5にあずける。トラバーサ5が
コンテナ10を載せて横行した後、次の荷役のため各ト
ロリ3、4はスプレッダを巻下す。
In such a container crane 1, the sea-side trolley 3 and the land-side trolley 4 are stopped at the container loading / unloading place, and are dedicated to hoisting and lowering the container 10. The container 10 reciprocates and moves laterally. When the containers 10 are transferred from the trolleys 3 and 4 to the traverser 5, it is confirmed that the respective trolleys 3 and 4 are at the upper limit of the hoisting state while holding the container 10, and then the traverser 5 is directly below the respective trolleys 3 and 4. Move up to. Each trolley 3, 4 is slightly rolled down and landed, the spreader is separated from the container 10, and the container 10 is put into the traverser 5. After the traverser 5 has loaded the container 10 and traversed, each trolley 3, 4 unwinds the spreader for the next cargo handling.

【0007】一般に、トロリ3、4がコンテナ10を把
持した状態で横行する場合、急発進、急停止するとコン
テナ10が大きく横揺れするので、トロリ3、4の横行
速度を大きくしても横行時間を短縮することが困難であ
る。これに対し、上記発明では横行をトラバーサ5に専
念させるので、高速化と急加減速が可能であり、特にコ
ンテナ船9が広幅の場合に有効である。
In general, when the trolleys 3 and 4 traverse while holding the container 10, the container 10 largely rolls when the trolleys 3 and 4 are suddenly started and suddenly stopped. Is difficult to shorten. On the other hand, in the above-mentioned invention, since the traverser 5 concentrates on the traversing, the speeding up and the rapid acceleration / deceleration are possible, and it is particularly effective when the container ship 9 is wide.

【0008】[0008]

【発明が解決しようとする課題】以上説明したコンテナ
クレーンの運転方法において、陸側トロリ4は、一定場
所で、かつ、巻上、巻下距離も一定で荷役を行っている
が、海側コンテナ3は荷役場所も巻上、巻下距離も変化
する。したがって、トラバーサ5の横行速度およびトロ
リ3、4の巻上、巻下速度が一定であると、海側トロリ
の位置または巻上、巻下距離によっては、トラバーサ5
または各トロリ3、4に待ち時間が発生する。すなわ
ち、例えば海側トロリ3が、コンテナ船9の陸側最下段
のコンテナ10を荷役する場合にはトラバーサ5の横行
距離が短く、海側トロリ3の巻上・巻下時間が長いの
で、トラバーサ5に待ち時間が生じるし、コンテナ船9
の海側最上段のコンテナ10を荷役する場合にはトラバ
ーサ5の横行距離が長く、海側トロリ3の巻上・巻下時
間が短いので、海側トロリ3または陸側トロリ4に待ち
時間が生じる。
In the operation method of the container crane described above, the land-side trolley 4 performs loading and unloading at a constant location and with a constant lifting and lowering distance. In No. 3, the loading / unloading location also changes in the winding and unwinding distances. Therefore, if the traversing speed of the traverser 5 and the hoisting and lowering speeds of the trolleys 3 and 4 are constant, depending on the position of the seaside trolley or the hoisting and lowering distance, the traverser 5 may be used.
Alternatively, a waiting time occurs in each of the trolleys 3 and 4. That is, for example, when the sea-side trolley 3 loads the container 10 at the lowest land side of the container ship 9, the traverser 5 has a short traversing distance, and the sea-side trolley 3 has a long hoisting / unwinding time. 5 has a waiting time and the container ship 9
When the container 10 in the uppermost stage on the sea side is to be unloaded, the traverser 5 has a long traversing distance and the winding and unwinding time of the sea side trolley 3 is short. Occurs.

【0009】本発明は従来技術のかかる問題点に鑑み案
出したもので、本発明のコンテナクレーンの運転方法
は、コンピュータ制御により、コンテナ10をコンテナ
船9に積み卸しを行う場合において、海側トロリ3、陸
側トロリ4またはトラバーサ5の待ち時間を無くすべ
く、それらの巻上速度または移動速度を減速することに
より、運転エネルギの節約と機器、部品の長寿命化を図
ることを目的とするものである。
The present invention has been devised in view of the problems of the prior art. The method of operating a container crane according to the present invention is a computer-controlled method for loading and unloading containers 10 to and from a container ship 9. An object of the present invention is to reduce the hoisting speed or moving speed of the trolley 3, the land-side trolley 4, or the traverser 5 in order to eliminate waiting time, thereby saving operating energy and extending the life of equipment and components. Things.

【0010】[0010]

【課題を解決するための手段】上記目的を達成するため
本発明のコンテナクレーンの運転方法は、クレーンガー
ダ上を移動する海側トロリと陸側トロリとを有するとと
もに、上記2つのトロリの間でクレーン、ガーダ上を移
動するトラバーサを有してなり、上記海側トロリによっ
てコンテナ船へのコンテナの積み卸しを行い、上記陸側
トロリによって地上設備との間でコンテナの受け渡しを
行い、上記トラバーサによって海側トロリと陸側トロリ
との間でコンテナの移送を行うコンテナクレーンの運転
方法であって、コンテナ船へのコンテナの荷役順序を設
定し、それぞれの荷役位置における海側コンテナの巻上
距離およびトラバーサの移動距離を計算して、海側トロ
リ、陸側トロリの巻上上限位置における待ち時間また
は、トラバーサの各トロリにおける待ち時間を無くすよ
うに各トロリの巻上速度またはトラバーサの移動速度を
減速するように制御するものである。
In order to achieve the above object, a method of operating a container crane according to the present invention comprises a sea-side trolley and a land-side trolley moving on a crane girder, and further comprises a trolley between the two trolleys. Crane, having a traverser moving on the girder, loading and unloading containers to and from the container ship by the sea-side trolley, transferring containers to and from ground equipment by the land-side trolley, and by the traverser A container crane operating method for transferring containers between a sea-side trolley and a land-side trolley, comprising: setting a container handling order to a container ship; a lifting distance of the sea-side container at each loading position and Calculate the travel distance of the traverser, and wait for the sea-side trolley, land-side trolley at the hoisting upper limit position, or To eliminate the latency in Lori and controls to decelerate the moving speed of the hoist speed or traverser of each trolley.

【0011】次に本発明の作用を説明する。先ずコンテ
ナ船へのコンテナの積み卸しの荷役順序を設定する。上
記順序に従ってコンテナの積み卸しを行う際に各コンテ
ナについて、海側トロリの巻上距離と、トラバーサの横
行距離を算出する。それぞれの距離について、設計速度
で運転した場合の海側トロリの巻上または、トラバーサ
の横行時間を算出する。巻上時間の方が横行時間より長
い場合にはトラバーサに待ち時間が生じるし、逆の場合
には海側トロリに待ち時間が生じる。待ち時間が生じる
側の運転速度を減速することにより、待ち時間を無くす
か、最小値におさえることができる。なお、陸側トロリ
については位置および巻上距離は一定であるが、トラバ
ーサの横行距離が大きい場合には待ち時間を生じるの
で、巻上速度を減速する。このようにトロリの巻上、巻
下の速度またはトラバーサの横行速度を、コンテナクレ
ーンの運転効率の減少を伴わずに減速することができる
ので、運転エネルギの節減が図れるとともに、加減速時
に無理な力がかからないので機器、部品の長寿命化が図
れる。
Next, the operation of the present invention will be described. First, a cargo handling sequence for loading / unloading containers to / from a container ship is set. When loading and unloading containers according to the above-described order, the rolling distance of the sea-side trolley and the traversing distance of the traverser are calculated for each container. For each of the distances, the hoisting time of the sea-side trolley or the traversing time of the traverser when driving at the design speed is calculated. If the hoisting time is longer than the traversing time, there will be a waiting time in the traverser, and vice versa. By reducing the operating speed on the side where the waiting time occurs, the waiting time can be eliminated or minimized. The position and hoisting distance of the land-side trolley are constant, but if the traversing distance of the traverser is large, a waiting time occurs, so the hoisting speed is reduced. In this way, the hoisting / unwinding speed of the trolley or the traversing speed of the traverser can be reduced without reducing the operation efficiency of the container crane, so that the operating energy can be saved and the acceleration / deceleration is impossible. Since no force is applied, the life of equipment and components can be extended.

【0012】[0012]

【発明の実施の形態】以下本発明の1実施形態について
図面を参照しつつ説明する。図1は本発明の運転方法を
制御するためのトロリ・トラバーサ運転制御装置のブロ
ック図である。図に示すように演算器11に、荷役順序
制御装置12から荷役順序設定の信号を送る。演算器1
1には、図に示すように各種の座標検出器から信号が送
られており、荷役順序と各種座標とから、トラバーサ5
の移動距離と移動時間、海側トロリ3の巻上距離と巻上
時間を算出する。その結果海側トロリ3、陸側トロリ4
およびトラバーサ5の待ち時間が算出できるので、それ
らの待ち時間を無くすか最小値になるようにトラバーサ
5の横行速度または各トロリ3、4の巻上速度の最適値
を算出し、各速度制御装置を介してモータの回転数を制
御する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram of a trolley / traverser operation control device for controlling the operation method of the present invention. As shown in the figure, a signal for setting the cargo handling order is sent from the cargo handling sequence control device 12 to the arithmetic unit 11. Arithmetic unit 1
1, a signal is sent from various coordinate detectors as shown in FIG.
, And the hoisting distance and hoisting time of the sea-side trolley 3 are calculated. As a result, the sea side trolley 3 and the land side trolley 4
Since the waiting time of the traverser 5 can be calculated, the optimum value of the traversing speed of the traverser 5 or the hoisting speed of each of the trolleys 3 and 4 is calculated so as to eliminate the waiting time or minimize the waiting time. To control the number of rotations of the motor.

【0013】以下本発明の運転方法でコンテナ船9から
コンテナ10を荷卸しする場合の手順についてフローシ
ートを用いて説明する。図2ないし図5は運転の手順を
示すフローシートである。なお、各図の接点は丸付きア
ルファベットで示している。図2に示すように荷役順序
を設定し、各座標を検出することにより待ち時間の予測
が可能となる。
Hereinafter, a procedure for unloading the container 10 from the container ship 9 by the operation method of the present invention will be described with reference to a flow sheet. 2 to 5 are flow sheets showing the procedure of the operation. In addition, the contacts in each drawing are indicated by circled alphabets. The waiting time can be predicted by setting the cargo handling order as shown in FIG. 2 and detecting each coordinate.

【0014】予測される待ち時間が陸側トロリ4、海側
トロリ3、またはトラバーサ5のいずれにも発生しない
場合には図3に移る。図3ではいずれにも待ち時間が発
生しないので、陸側トロリ、海側トロリおよびトラバー
サは所定の設計速度で運転すればよい。なお、トラバー
サ5が直接海側トロリ3または陸側トロリ4の直下まで
横行すると、トラバーサ5と各トロリ3、4に吊下げら
れたコンテナが衝突する危険があるので、各トロリ3、
4に待ち時間の有無を調べ待ち時間がある場合にはトロ
リ3、4が巻上上限位置にあることを確認して直下まで
横行し、待ち時間が無い場合は、各トロリ3、4の近傍
で一旦停止し、巻上が終了しているか否かを確認し再ス
タートする。また、図4で示すように、陸側トロリがト
ラバーサ5からコンテナ10を受け取った後はトラバー
サが海側に逃げたことを確認してからコンテナ10を把
持したスプレッダの巻下をスタートする。
If the expected waiting time does not occur in any of the land-side trolley 4, the sea-side trolley 3, or the traverser 5, the operation proceeds to FIG. In FIG. 3, since no waiting time occurs in any case, the land side trolley, the sea side trolley and the traverser may be operated at a predetermined design speed. If the traverser 5 traverses directly below the sea-side trolley 3 or the land-side trolley 4, there is a risk that the traverser 5 collides with the containers suspended on the trolleys 3 and 4.
4. Check if there is a waiting time, and if there is a waiting time, confirm that the trolleys 3 and 4 are at the winding upper limit position and traverse to just below. If there is no waiting time, close each trolley 3 and 4. To stop once, check whether winding is completed or not, and restart. Further, as shown in FIG. 4, after the land side trolley receives the container 10 from the traverser 5, it is confirmed that the traverser has escaped to the sea side, and then the lowering of the spreader holding the container 10 is started.

【0015】図2において、トロリ3、4に待ち時間が
発生する場合には図5へ移る。図5に示すように、トラ
バーサ5が海側トロリ3に到着する時刻を確認し、海側
トロリ3が通常の巻上速度で巻上げたとき、上記到着時
刻までに余裕を持って巻上を完了する場合に、余裕が無
くなるように巻上速度を減速した、最適巻上速度を設定
する。図6に示すように陸側トロリ4についても同様で
ある。
In FIG. 2, if a waiting time occurs in the trolleys 3 and 4, the process proceeds to FIG. As shown in FIG. 5, the time when the traverser 5 arrives at the sea-side trolley 3 is confirmed, and when the sea-side trolley 3 hoists at a normal hoisting speed, the hoisting is completed with a margin by the arrival time. In this case, the optimum hoisting speed is set by reducing the hoisting speed so that there is no margin. The same applies to the land-side trolley 4 as shown in FIG.

【0016】図2においてトラバーサ5に待ち時間が発
生する場合には図7に移る。図7に示すように海側トロ
リ3の巻上上限位置到着時刻を確認し、トラバーサ5が
海側トロリ3まで通常の速度で横行したときに、上記巻
上上限位置到着時刻までに余裕を持ってトラバーサ5の
到着が完了する場合に、その余裕がなくなるように横行
速度を減速した、最適横行速度を設定する。図8に示す
ように陸側トロリ4についても同様である。
If a waiting time occurs in the traverser 5 in FIG. 2, the operation proceeds to FIG. As shown in FIG. 7, when the traverser 5 traverses to the sea-side trolley 3 at a normal speed after checking the arrival time of the sea-side trolley 3 at the winding upper-limit position, there is a margin before the arrival time of the winding-up upper-limit position. When the arrival of the traverser 5 is completed, the optimum traversing speed is set by reducing the traversing speed so that there is no margin. The same applies to the land-side trolley 4 as shown in FIG.

【0017】以上コンテナ船9からコンテナ10を荷卸
しする場合の手順について説明したが、コンテナ船9に
コンテナ10を積込む場合についても同様の手順により
行えばよい。
Although the procedure for unloading the container 10 from the container ship 9 has been described above, the same procedure can be used for loading the container 10 on the container ship 9.

【0018】本発明は以上説明した実施形態に限定され
るものではなく、発明の要旨を逸脱しない範囲で種々の
変更が可能である。
The present invention is not limited to the embodiment described above, and various changes can be made without departing from the gist of the invention.

【0019】[0019]

【発明の効果】以上説明したように本発明のコンテナク
レーンの運転方法は、通常の速度で巻上または横行した
場合に各トロリまたはトラバーサに発生する待ち時間
を、それぞれの速度を減速するように制御して待ち時間
を無くすようにしたので、無駄な高速運転をしなくてす
み、省エネルギと機器、部品の長寿命化が達成できるな
どの優れた効果を有する。
As described above, the method of operating a container crane of the present invention reduces the waiting time generated in each trolley or traverser when hoisting or traversing at a normal speed by reducing the speed of each. Since the control is performed so as to eliminate the waiting time, unnecessary effects of high-speed operation can be avoided, and excellent effects such as energy saving and long life of equipment and components can be achieved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の運転方法を制御する制御装置のブロッ
ク図である。
FIG. 1 is a block diagram of a control device for controlling an operation method according to the present invention.

【図2】本発明の運転方法のフローシートである。FIG. 2 is a flow sheet of the operation method of the present invention.

【図3】本発明の運転方法のフローシートである。FIG. 3 is a flow sheet of the operation method of the present invention.

【図4】本発明の運転方法のフローシートである。FIG. 4 is a flow sheet of the operation method of the present invention.

【図5】本発明の運転方法のフローシートである。FIG. 5 is a flow sheet of the operation method of the present invention.

【図6】本発明の運転方法のフローシートである。FIG. 6 is a flow sheet of the operation method of the present invention.

【図7】本発明の運転方法のフローシートである。FIG. 7 is a flow sheet of the operation method of the present invention.

【図8】本発明の運転方法のフローシートである。FIG. 8 is a flow sheet of the operation method of the present invention.

【図9】コンテナクレーンの正面図である。FIG. 9 is a front view of the container crane.

【符号の説明】[Explanation of symbols]

1 コンテナクレーン 2 クレーンガーダ 3 海側トロリ 4 陸側トロリ 5 トラバーサ 9 コンテナ船 10 コンテナ DESCRIPTION OF SYMBOLS 1 Container crane 2 Crane girder 3 Sea side trolley 4 Land side trolley 5 Traverser 9 Container ship 10 Container

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 クレーンガーダ上を移動する海側トロリ
と陸側トロリとを有するとともに、上記2つのトロリの
間でクレーンガーダ上を移動するトラバーサを有してな
り、上記海側トロリによってコンテナ船へのコンテナの
積み卸しを行い、上記陸側トロリによって地上設備との
間でコンテナの受け渡しを行い、上記トラバーサによっ
て海側トロリと陸側トロリとの間でコンテナの移送を行
うコンテナクレーンの運転方法であって、コンテナ船へ
のコンテナの積み卸しの荷役順序を設定し、それぞれの
荷役位置における海側コンテナの巻上距離およびトラバ
ーサの移動距離を計算して、海側トロリ、陸側トロリの
巻上上限位置における待ち時間またはトラバーサの各ト
ロリにおける待ち時間を無くすように各トロリの巻上速
度またはトラバーサの移動速度を減速するように制御す
ることを特徴とするコンテナクレーンの運転方法。
1. A container ship having a sea-side trolley and a land-side trolley that moves on a crane girder, and a traverser that moves on a crane girder between the two trolleys. Operation method of a container crane that loads and unloads containers to and from the ground equipment by the above-mentioned land trolley, and transfers containers between the sea trolley and the land trolley by the above traverser The order of loading and unloading containers to and from the container ship is set, the lifting distance of the seaside container and the moving distance of the traverser at each loading position are calculated, and the winding of the seaside trolley and the landside trolley are calculated. The hoisting speed or traverser of each trolley is adjusted so as to eliminate the waiting time at the upper and upper limit positions or the waiting time at each trolley of the traverser. A method for operating a container crane, wherein the moving speed of the container is controlled to be reduced.
JP16409697A 1997-06-20 1997-06-20 Container crane operating method Pending JPH1111866A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16409697A JPH1111866A (en) 1997-06-20 1997-06-20 Container crane operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16409697A JPH1111866A (en) 1997-06-20 1997-06-20 Container crane operating method

Publications (1)

Publication Number Publication Date
JPH1111866A true JPH1111866A (en) 1999-01-19

Family

ID=15786698

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16409697A Pending JPH1111866A (en) 1997-06-20 1997-06-20 Container crane operating method

Country Status (1)

Country Link
JP (1) JPH1111866A (en)

Similar Documents

Publication Publication Date Title
US5478181A (en) Method and apparatus for moving containers between a ship and a dock
US5538382A (en) Variable level lifting platform for a cargo container handling crane
JPH10324493A (en) Container crane
JP4295784B2 (en) crane
JPH1111866A (en) Container crane operating method
JP2014189389A (en) Crane and control method for the same
JPH1129288A (en) Container crane
JP2002234618A (en) Operating method for unloader
JPH1111867A (en) Container crane operating method
JPH04266397A (en) Crane with jib
JP2012206825A (en) Method for controlling crane, and control device of the crane
JP2759304B2 (en) Method and apparatus for controlling wheel load in crane
JPH03194013A (en) Mooring facility in dam or the like and method of mooring ship
JPH0432394Y2 (en)
JPH01271395A (en) Initial swing suppressive control for suspended load
Jordan Future-Proof Your Crane
JP2003246583A (en) Collision preventing method and apparatus for traverse trolley of crane
JPH09301681A (en) Container crane
JPH11278790A (en) Container crane
JPS6322490A (en) Container shifter
JPH11157777A (en) Container crane
JPS60248592A (en) Method and device for automatically operating crane
JPH0958973A (en) Container crane
JP3089531B2 (en) Delivery device with crane
JPH0592892A (en) Cargo handling bridge crane device at quay and operating method thereof