JPH1061169A - Moving scaffold device for high lift work - Google Patents

Moving scaffold device for high lift work

Info

Publication number
JPH1061169A
JPH1061169A JP22125796A JP22125796A JPH1061169A JP H1061169 A JPH1061169 A JP H1061169A JP 22125796 A JP22125796 A JP 22125796A JP 22125796 A JP22125796 A JP 22125796A JP H1061169 A JPH1061169 A JP H1061169A
Authority
JP
Japan
Prior art keywords
scaffold
parallel links
wire
longitudinally
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP22125796A
Other languages
Japanese (ja)
Inventor
Takashi Murakami
隆志 村上
Teruo Kamiki
輝雄 神木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Priority to JP22125796A priority Critical patent/JPH1061169A/en
Publication of JPH1061169A publication Critical patent/JPH1061169A/en
Withdrawn legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a scaffold which can be easily arranged at a job site of a small space without requiring to secure a flat space to arrange the scaffold by arranging the scaffold on the tips of vertically freely movable parallel links joined to a pair of left and right columns by pins. SOLUTION: Parallel links 2 are joined to a pair of left and right columns 1 and 1 through pins 3 so as to be vertically freely movable, and a wire 6 wound round a winch 5 rotated by an electric motor 4 is hookingly installed on the tips of the parallel links 2. The parallel links 2 vertically move by towing the wire 6, and a scaffold 8 is arranged between the parallel links 2 and 2 so as to be longitudinally freely movable through a longitudinally sliding device 7. Stairs 9 are arranged between the scaffold 8 and pin 3 joining, and the rear ends of the parallel links 2 and the columns 1 are connected to each other through a hydraulic cylinder 10. The parallel links 2 vertically move the scaffold 8 on its upper tips according to a diameter of a steel pipe by towing the wire 6, and the scaffold 8 also longitudinally moves by the longitudinally sliding device 7, and work just above the steel pipe is facilitated.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はパイプシーム溶接作
業などのような高所作業用移動足場装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mobile scaffold for working at heights such as pipe seam welding.

【0002】[0002]

【従来の技術】従来パイプシーム溶接作業に使用する足
場としては、市販されている台車に乗ったリンク式によ
る上下方向のみの昇降足場などであった。
2. Description of the Related Art Conventionally, as a scaffold used for pipe seam welding work, there has been a link-type vertically movable scaffold which is commercially available on a bogie.

【0003】[0003]

【発明が解決しようとする課題】従来の市販されている
移動足場などは、上下方向のみの移動で装置全体が台車
に載っているので、使用場所の床が台車が入ることがで
きるフラットなスペースを確保しなければならなかっ
た。そして構造上パイプの溶接作業をする上でパイプの
上半部の作業が困難であり、また装置全体がかなり大き
なもので床から作業足場の位置までのスペースが必要で
あり、小スペースの現場では使用不可能な場合もある。
In a conventional mobile scaffold, which is commercially available, the entire apparatus is mounted on a cart by moving only in the vertical direction, so that the floor at the place of use is a flat space where the cart can enter. Had to secure. And it is difficult to work on the upper half of the pipe when welding pipes due to its structure.Moreover, the whole equipment is quite large and requires space from the floor to the position of the work scaffold. In some cases, it cannot be used.

【0004】本発明はかかる問題点に対処するため開発
されたものであって、小スペースの現場でも、あるいは
床がフラットでなくても使用可能で、なおかつ溶接パイ
プの上半分の作業も容易な移動足場を得ることを目的と
する。
The present invention has been developed to address such a problem, and can be used even in a small space or even if the floor is not flat, and the work of the upper half of the welded pipe is easy. The aim is to get a mobile scaffold.

【0005】[0005]

【課題を解決するための手段】上記の目的を達成するた
めの本発明の構成は左右1対の柱にピンを介して平行リ
ンクを上下動自在にピン結合し、該平行リンクの先端に
前後動自在に足場を設置すると共に該足場と前記ピン結
合間に階段を設け、更に前記平行リンクの後端と前記柱
とを油圧シリンダを介して連結したことを特徴とする。
In order to achieve the above-mentioned object, according to the present invention, a parallel link is vertically connected to a pair of left and right pillars via pins so that the parallel link is vertically movable. A scaffold is movably installed, a stair is provided between the scaffold and the pin connection, and a rear end of the parallel link and the pillar are connected via a hydraulic cylinder.

【0006】[0006]

【発明の実施の形態】以下本発明の一実施例を図1及び
図2に基づいて説明すると1は左右1対の柱を示し、該
柱1、1に平行リンク2を上下動自在にピン3を介して
ピン結合し、平行リンク2の先端には、電動モータ4で
回動されるウインチ5に巻回されるワイヤー6を掛装し
てワイヤー6の懸引により平行リンク2は上下動すると
共に平行リンク2、2間に渉って前後動スライド装置7
を介して足場8が前後動自在に設置され、該足場8と前
記ピン3結合間に階段9を設けると共に前記平行リンク
2の後端と前記柱1とを油圧シリンダ10を介して連結
した。図中11は大小の鋼管を示す。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to FIGS. 1 and 2. Reference numeral 1 denotes a pair of right and left columns. A wire 6 wound around a winch 5 rotated by an electric motor 4 is mounted on the tip of the parallel link 2 so that the parallel link 2 moves up and down due to the suspension of the wire 6. And the forward and backward moving slide device 7 between the parallel links 2 and 2
A step 9 is provided between the joint of the scaffold 8 and the pin 3, and a rear end of the parallel link 2 is connected to the column 1 via a hydraulic cylinder 10. In the figure, reference numeral 11 denotes large and small steel pipes.

【0007】かくて平行リンク2はワイヤー6の懸引に
よって、その上先端の足場8を図2の点線の如く鋼管1
1の径に合わせて上下動させ、更に足場8は前後動スラ
イド装置7により前後動して鋼管11の真上の作業も容
易となる。
Thus, the parallel link 2 is suspended by the wire 6 so that the scaffold 8 at the upper end thereof is connected to the steel pipe 1 as shown by the dotted line in FIG.
The scaffold 8 is moved up and down by the forward / backward slide device 7 so that the work directly above the steel pipe 11 is also facilitated.

【0008】[0008]

【発明の効果】上述した如く本発明によるときは、足場
を左右1対の柱にピン結合される上下動自在の平行リン
クの先端に設置したから、足場の設置にフラットなスペ
ースを確保する必要もなく小スペースの現場での設置が
容易となり、而も平行リンクの後端は柱と油圧シリンダ
を介して連結したから足場の落下を防止でき作業の安全
性が確保できる等の効果を有する。
As described above, according to the present invention, since the scaffold is installed at the tip of a vertically movable parallel link that is pin-connected to a pair of right and left columns, it is necessary to secure a flat space for installing the scaffold. Since the rear end of the parallel link is connected to the pillar via a hydraulic cylinder, it is possible to prevent the scaffold from dropping and to secure the work safety.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す平面図である。FIG. 1 is a plan view showing an embodiment of the present invention.

【図2】図1の側面図である。FIG. 2 is a side view of FIG.

【符号の説明】[Explanation of symbols]

1 柱 2 平行リンク 3 ピン 8 足場 9 階段 10 油圧シリンダ 1 pillar 2 parallel link 3 pin 8 scaffold 9 stairs 10 hydraulic cylinder

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 左右1対の柱にピンを介して平行リンク
を上下動自在にピン結合し、該平行リンクの先端に前後
動自在に足場を設置すると共に該足場と前記ピン結合間
に階段を設け、更に前記平行リンクの後端と前記柱とを
油圧シリンダを介して連結したことを特徴とする高所作
業用移動足場装置。
1. A pair of left and right pillars is connected to a pair of parallel links via pins so as to be vertically movable, and a scaffold is installed at the tip of the parallel link so as to be able to move back and forth, and a stair is provided between the scaffold and the pin connection. And a rear end of the parallel link and the column are connected to each other via a hydraulic cylinder.
JP22125796A 1996-08-22 1996-08-22 Moving scaffold device for high lift work Withdrawn JPH1061169A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22125796A JPH1061169A (en) 1996-08-22 1996-08-22 Moving scaffold device for high lift work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22125796A JPH1061169A (en) 1996-08-22 1996-08-22 Moving scaffold device for high lift work

Publications (1)

Publication Number Publication Date
JPH1061169A true JPH1061169A (en) 1998-03-03

Family

ID=16763944

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22125796A Withdrawn JPH1061169A (en) 1996-08-22 1996-08-22 Moving scaffold device for high lift work

Country Status (1)

Country Link
JP (1) JPH1061169A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ300695B6 (en) * 2003-11-27 2009-07-22 Assembling scaffolding
CN104264958A (en) * 2014-10-09 2015-01-07 浙江镜湖建设集团有限公司 Liftable equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ300695B6 (en) * 2003-11-27 2009-07-22 Assembling scaffolding
CN104264958A (en) * 2014-10-09 2015-01-07 浙江镜湖建设集团有限公司 Liftable equipment

Similar Documents

Publication Publication Date Title
US20030098150A1 (en) Mast and trolley arrangement for mobile multi-function rig
CN205583625U (en) Multifunctional cable take -up reel
JPH01309788A (en) Rail tensile displacement device
CN104552193B (en) A kind of trolley coach bogie frame turning device
CN105312798A (en) Steel structure numerical control assembly center
CN107931928A (en) A kind of Portable clamp for aiding in transverse and longitudinal beam welding equipment
JPH1061169A (en) Moving scaffold device for high lift work
CN211540030U (en) Workpiece moving, jacking, clamping and deflection welding mechanism
JP4167994B2 (en) Tunnel inspection apparatus and method
CA1122380A (en) Trailer mounted high floor drilling mast and substructure arrangement
US4174061A (en) Portable apparatus for fabricating wooden trusses
KR20100057564A (en) Welding assistant apparatus
JP2969539B2 (en) Gas insulated main bus connection device
JP3124497B2 (en) Method and apparatus for assembling bridge members
JPS63255424A (en) Construction of piping in tunnel and vehicle therefor
CN220520013U (en) Cast-in-place concrete joint die block hoisting device
CN216264165U (en) Device for preventing welding slag of wet joint welding of viaduct from dropping
CN204357471U (en) Modular support joist unit
JPH0626012A (en) Cable tension grip for cable stayed bridge and loading carriage thereof
CN220761469U (en) Inner welding arm support for arc U-shaped rib
JPS6136855Y2 (en)
JPH10102996A (en) Timbering erecting method and device therefor
CN106121535A (en) Semi-mounted stand alone type production rig with pressure
JP3392287B2 (en) Pipe inner surface joining device
CN106629361A (en) Elevator traction device, counterweight frame and counterweight frame assembling method

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20031104