JPH1049597A - Method for calculating the planned selling number of commodities, or the planned producing number of commodities - Google Patents

Method for calculating the planned selling number of commodities, or the planned producing number of commodities

Info

Publication number
JPH1049597A
JPH1049597A JP20003696A JP20003696A JPH1049597A JP H1049597 A JPH1049597 A JP H1049597A JP 20003696 A JP20003696 A JP 20003696A JP 20003696 A JP20003696 A JP 20003696A JP H1049597 A JPH1049597 A JP H1049597A
Authority
JP
Japan
Prior art keywords
planned
sales
production
predetermined period
product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP20003696A
Other languages
Japanese (ja)
Inventor
Hiroyoshi Suzuki
浩佳 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP20003696A priority Critical patent/JPH1049597A/en
Publication of JPH1049597A publication Critical patent/JPH1049597A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To provide a method for calculating the number of commodities to be sold or the number of commodities to be produce, which is suitable for a sort of commodity of which period from the reception of order up to sales sharply changes in accordance with the demand of the commodity and the load or restriction of a production plant. SOLUTION: The planned number CKn of commodities for which order has been received but not sold in a prescribed future monthly period N is calculated based on the predicted number JYn of commodities to be order-received in the period N and an order remaining rate in a certain past months corresponding to the prescribed future months. The planned number H of the commodities to be sold in the prescribed future monthly period N is calculated based on the following equation. Namely Hkn = (the practical number CZn-1 of order remaining commodities or the planned number CKn-1 of order remaining commodities in a period just before the prescribed period) + (JYn in the prescribed period) - (CKn in the prescribed period).

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】例えば乗用車のように、商品
の受注を受けてから販売までの期間が、商品の売れ行
き、生産工場の負荷や制約により大きく変動する種類の
商品に適する販売または生産計画数量の算出方法に関す
るものである。
BACKGROUND OF THE INVENTION The sales or production planning quantity suitable for a type of product, such as a passenger car, in which the period from receipt of an order for an item to sales varies greatly depending on the sales of the item and the load and constraints of the production plant. Is related to the calculation method.

【0002】[0002]

【従来の技術】従来、販売計画及び生産計画の立案にお
いて、販売計画数量または生産計画数量を算出する方法
として、始めに、市場動向等より需要予測として販売数
量を予測し、その予測値に適正な在庫レベルを加味して
販売数量または生産数量を決める方法が用いられてい
た。
2. Description of the Related Art Conventionally, in planning a sales plan and a production plan, as a method of calculating a sales plan quantity or a production plan quantity, first, a sales quantity is predicted as a demand forecast from market trends and the like, and the predicted value is appropriately adjusted. A method of determining the sales quantity or the production quantity by taking into account various stock levels has been used.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、従来の
算出方法には、次のような問題があった。すなわち、受
注即販売といった小売りの世界では、あまり問題でない
が、受注から販売までの期間が製品の売れ行き、生産工
場の負荷や制約により大きく変動するケースでは、販売
の予測が純粋な市場の動向だけでなくメーカー自らの生
産の状況等の影響を含んだものとなってしまい、複雑な
与件を含んだ予測値となり、販売計画・生産計画等を決
める際の不確定要素が大きく増加し、予測値が大きく外
れる問題があった。例えば、乗用車では、販売店が受注
を受けてから工場で生産を開始するため、生産工場の混
み具合等により受注から販売までの期間が大きく変動す
るのが現実である。これは、生産工場には生産高に制約
があり、受注が多いからといって急に生産高を増やすこ
とは困難だからである。
However, the conventional calculation method has the following problems. In other words, in the retail world such as order-to-order sales, this is not a problem, but in the case where the period from order to sale fluctuates greatly due to product sales and the load and constraints of production plants, sales forecasts are based on pure market trends. Instead, it includes the effects of the manufacturer's own production situation, etc., resulting in forecast values that include complex requirements, and the uncertainties in determining sales and production plans increase significantly. There was a problem that the value greatly deviated. For example, in the case of a passenger car, since a dealer starts production at a factory after receiving an order, it is a reality that the period from the order receipt to the sale fluctuates greatly depending on how crowded the production factory is. This is because there is a restriction on the production amount at the production plant, and it is difficult to increase the production amount suddenly just because there are many orders.

【0004】本発明は、上記問題点を解決して、商品の
受注を受けてから販売までの期間が、商品の売れ行き、
生産工場の負荷や制約により大きく変動する種類の商品
に適する販売計画数量または生産計画数量の算出方法を
提供することを目的とする。
[0004] The present invention solves the above-mentioned problems, and the period from receipt of an order for a product until sale is such that the product is sold.
It is an object of the present invention to provide a method of calculating a sales plan quantity or a production plan quantity suitable for a product of a type that greatly fluctuates due to a load or a constraint of a production factory.

【0005】[0005]

【課題を解決するための手段】上記問題点を解決するた
めに本発明の商品の販売計画数量の算出方法は、特定の
商品について所定期間毎に、生産実績、注文を受けた受
注実績、販売実績、在庫実績、注文を受け生産中または
生産したが販売されずに残っている注残実績の各実績デ
ータを記憶していて、該各実績データを用いて将来の所
定期間における商品の販売計画数量を、与えられた受注
予測数量に基づいて立案するシステムで実行される商品
の販売計画数量の算出方法であって、将来の所定期間に
おける受注予測数量と、将来の所定期間に対応する過去
のある期間における注残実績数量とに基づいて、将来の
所定期間における注残計画数量CKを算出し、将来の所
定期間の商品販売計画数量Hを、 (商品の販売計画数量H)=(所定期間の直前の期間に
おける注残実績数量若しくは注残計画数量)+(所定期
間の受注予測数量)−(所定期間の注残計画数量CK) に基づいて算出する。
In order to solve the above problems, the present invention provides a method of calculating a sales plan quantity of a product, which comprises the steps of: Stores actual data of actual results, inventory results, and backlog results that are received or produced during production or have not been sold, and the sales plan of the product in a predetermined period in the future is stored using the actual data. A method of calculating a sales plan quantity of a product, which is executed by a system that plans a quantity based on a given forecasted order quantity, and includes a forecast order quantity in a future predetermined period and a past order quantity corresponding to a future predetermined period. Based on the actual back-order quantity in a certain period, the planned back-order quantity CK in the future predetermined period is calculated, and the product sales planned quantity H in the future predetermined period is calculated as follows: (product sales planned quantity H) = (predetermined period) Is calculated based on the actual backlog quantity or the planned backlog quantity in the immediately preceding period) + (the predicted order quantity in the predetermined period) − (the planned backlog quantity CK in the predetermined period).

【0006】また、本発明の商品の生産計画数量の算出
方法は、上記商品の販売計画数量の算出方法で求めた販
売計画数量と、将来の所定期間に対応する過去のある期
間における在庫実績数量とに基づいて、将来の所定期間
における在庫計画数量ZKを算出し、将来の所定期間の
商品の生産計画数量Sを、 (商品の生産計画数量S)=(所定期間の販売計画数量
H)−(所定期間の直前期間における在庫実績数量若し
くは在庫計画数量)+(所定期間の在庫計画数量ZK) に基づいて算出することを特徴とする。
Further, the method for calculating the production plan quantity of a product according to the present invention comprises the following steps: the sales plan quantity obtained by the above-described method for calculating the sales plan quantity of the product; and the actual inventory quantity in a past period corresponding to a predetermined future period. , The inventory plan quantity ZK in the future predetermined period is calculated, and the production plan quantity S of the product in the future predetermined period is calculated by: (production plan quantity S of the product) = (sales plan quantity H in the predetermined period) − It is characterized in that it is calculated based on (inventory actual quantity or inventory planned quantity in the period immediately before the predetermined period) + (inventory planned quantity ZK in the predetermined period).

【0007】ここで、用語の定義を説明する。予測数量
とは、現時点から将来のある時点に対象がどのようにな
るか、どのように変化するかを過去の傾向等から推測し
た数量をいう。また、計画数量とは、置かれている状況
下において、ある目的を達成するために必要な値として
意志決定された数量をいう。この定義により、本発明で
は、将来の所定期間における受注数量、注残率、在庫率
を予測数量として取り扱う。また、将来の所定期間にお
ける注残数量、在庫数量、販売数量、生産数量を計画数
量として取り扱う。注残率とは、受注を受けたが販売が
済んでいない商品の注残実績(計画)数量を分子とし、
受注実績(予測)数量を分母として求めたものである。
また、在庫率とは、在庫実績(計画)数量を分子とし、
販売実績(計画)数量を分母として求めたものである。
Here, the definition of terms will be described. The predicted quantity is a quantity obtained by estimating what the object will be from the current time to a certain point in the future and how it will change based on past trends and the like. In addition, the planned quantity refers to a quantity determined as a value necessary to achieve a certain purpose under a given situation. According to this definition, in the present invention, the order quantity, the backlog rate, and the stock rate in a predetermined period in the future are treated as predicted quantities. In addition, the unsold quantity, stock quantity, sales quantity, and production quantity in a predetermined period in the future are handled as planned quantities. The backlog rate is the numerator of the backlog actual (planned) quantity of products that have received orders but have not been sold.
This is obtained by using the actual (predicted) order quantity as the denominator.
The inventory ratio is defined as the actual (planned) quantity of inventory,
The actual sales (plan) quantity is calculated as the denominator.

【0008】乗用車の販売においては、新製品の発表と
共に受注が急激に発生し、当初の期間は、需要が供給を
上回るため注残率は高い値となる。その後、注残率は、
少し下がりながら、主として季節により変動を繰り返
す。注残率の変動を月間別に見た場合、1月、4月、5
月及び8月における注残率が高い傾向にある。これは、
12月及び7月にはボーナスが支給され受注が増加する
ためであり、また、4月に就職、進学により受注が増加
するためである。一般に、乗用車の市場では、3〜6年
毎にモデルチェンジを行っている。新しいモデルを販売
する場合に、そのモデルの注残率は、1月及び8月を含
めて、旧モデルの注残率の変動と相似関係にあること
を、本発明者は発見した。そして、新しいモデルを販売
するときに、この注残率の相似関係を用いて、月間別の
販売数量・生産数量を正確に算出する方法を考え出し
た。
[0008] In the sales of passenger cars, orders are rapidly generated in conjunction with the announcement of new products, and in the initial period, demand exceeds supply, so the backlog rate is high. After that, the backlog rate is
While falling slightly, it fluctuates mainly depending on the season. Looking at the change in the backlog rate by month, January, April, 5
Monthly and August backlog rates tend to be high. this is,
This is because a bonus is paid in December and July to increase orders, and an order is increased in April due to employment and enrollment. Generally, in the passenger car market, model changes are performed every three to six years. When selling a new model, the inventor has discovered that the backlog rate of the model, including January and August, is analogous to the change in the backlog rate of the old model. Then, when selling a new model, a method for accurately calculating monthly sales volume and production volume using the similarity of the backlog rate was devised.

【0009】一方、在庫率は、乗用車の販売において
は、新製品の発表時に新規受注を見込んで在庫を増加さ
せているが、通常それ以上に発注が多いため、在庫率は
低い値となる。また、発売開始直前には、旧モデルの在
庫率は低下する。その後、在庫率は、少し上がりなが
ら、主として季節により変動を繰り返す。在庫率の変動
を月別に見た場合、1月、5月、及び8月における在庫
率が高い傾向にある。これは、12月及び7月にはボー
ナスが支給され受注が増加することが予測されるため販
売店が在庫を増加させる傾向があるためであり、同様
に、4月に就職、進学により受注が増加することが予測
されるため販売店が在庫を増加させる傾向があるためで
ある。一般に、乗用車の市場では、3〜5年毎にモデル
チェンジを行っている。新しいモデルを販売する場合
に、そのモデルの在庫率は、1月及び8月を含めて、旧
モデルの在庫率の変動と相似関係にあることを、本発明
者は発見した。そして、新しいモデルを販売するとき
に、この在庫率の相似関係を用いて、月間別の生産数量
を正確に算出する方法を考え出した。
On the other hand, the inventory ratio is increased in the sales of passenger cars in anticipation of a new order when a new product is announced. However, since the number of orders is usually larger than that, the inventory ratio is low. Immediately before the launch, the stock ratio of the old model drops. Thereafter, the stock ratio repeatedly fluctuates mainly depending on the season while slightly increasing. When looking at the change in the stock ratio by month, the stock ratio in January, May, and August tends to be high. This is because in December and July, bonuses are expected to be paid and orders are expected to increase, so that dealers tend to increase inventory. This is because retailers tend to increase inventory because they are expected to increase. Generally, in the passenger car market, model changes are performed every three to five years. The inventor has discovered that when a new model is sold, the stock ratio of the model, including January and August, is analogous to the change in stock ratio of the old model. Then, when a new model is sold, a method of accurately calculating the monthly production quantity using the similarity relationship of the stock ratio has been devised.

【0010】次に、上記算出方法の作用を説明する。コ
ンピュータの記憶手段が、特定の商品、例えば乗用車に
ついて、所定の期間例えば月間毎に、生産工場における
生産実績数量、販売店が注文を受けた受注実績数量、販
売店の販売実績数量、工場及び販売店等における在庫実
績数量、注文を受け生産したが販売されずに残っている
注残実績数量の各実績数量データを記憶している。ま
た、乗用車の月間別の受注予測数量は、別に与えられる
ものとする。本システムは、この与えられた受注予測数
量に基づき、該各実績数量データを用いて、将来の所定
の月間Nにおける商品の販売計画数量を次の手順で算出
する。
Next, the operation of the above calculation method will be described. The storage means of the computer stores, for a specific product, for example, a passenger car, for a predetermined period of time, for example, every month, the actual production quantity at the production factory, the actual order quantity received by the dealer, the actual sales quantity of the dealer, the factory and sales. The actual quantity data of the actual quantity of inventory at stores and the actual quantity of unsold parts remaining after being ordered but produced but not sold are stored. Also, the forecasted order volume of passenger cars by month is given separately. The present system calculates the sales plan quantity of the product in the future predetermined month N based on the given predicted order quantity using the actual quantity data in the following procedure.

【0011】(1)将来の所定の月間Nにおける受注予
測数量と、将来の所定月間Nに対応する過去のある月間
における注残実績数量とに基づいて、将来の所定月間N
における注残計画数量CKを算出する。すなわち、特定
の乗用車の旧モデルの注残率の実績が実績データとして
記憶されており、将来の所定の月間Nに対応する過去の
月間における注残率と受注予測数量を乗算することによ
り、注残計画数量CKを求めることができる。ここで、
新モデルの発表当初は、旧モデルの発売開始当時の月間
注残率を用いると正確な予測が可能である。さらに、乗
用車では、3〜6年毎にモデルチェンジが行われている
ため、旧モデル、旧々モデル等の発売開始当時の月間注
残率の平均値を採用すると、より正確な予測が可能とな
る。また、発売開始から数カ月過ぎて、受注が落ちつい
た段階では、過去数年分における、将来の所定の月間N
に対応する月間の注残率の平均値を採用すると、より正
確な予測が可能となる。
(1) Based on the predicted order quantity in the future predetermined month N and the actual backlog quantity in a past month corresponding to the future predetermined month N, the future predetermined month N
Is calculated. That is, the actual backlog rate of an old model of a specific passenger car is stored as actual data, and multiplied by the expected backlog rate in the past month corresponding to the predetermined future month N, and the expected order quantity is calculated. The remaining planned quantity CK can be obtained. here,
When the new model is first announced, accurate forecasts can be made using the monthly backlog at the time the old model was launched. In addition, since passenger cars undergo model changes every three to six years, more accurate predictions can be made by using the average monthly backlog at the time of the launch of old and old models. Become. In addition, when orders have settled down a few months after the launch of the product, a predetermined number of N
By using the average of the monthly backlog rates corresponding to the above, more accurate forecasts can be made.

【0012】(2)次に、将来の所定月間Nの商品の販
売計画数量Hを、 (商品の販売計画数量H)=(所定月間の直前月間にお
ける注残実績数量若しくは注残計画数量)+(所定月間
の受注予測数量)−(所定月間の注残計画数量CK) に基づいて算出する。すなわち、将来の所定月間Nの受
注予測数量に、将来の所定月間Nの直前月間N−1にお
ける注残実績数量と、将来の所定月間Nの注残計画数量
CKとの差を加算することにより、商品の販売計画数量
が求められる。将来の所定月間Nの直前月間N−1にお
ける注残実績数量が未だ入力されていない場合は、将来
の所定月間Nの直前月間N−1における注残計画数量を
代わりに用いることができる。将来の所定期間Nの直前
月間N−1における注残実績数量は、販売予定済みの商
品の数量であり、受注予測数量から引き算すべきもので
ある。また、将来の所定月間Nの注残計画数量Kは、受
注を受けることが予測されるものであり、受注予測数量
に加算すべきものである。
(2) Next, the sales plan quantity H of the product for the predetermined month N in the future is calculated by: (the sales plan quantity H of the product) = (the actual back-order quantity or the planned back-order quantity in the month immediately preceding the predetermined month) + It is calculated on the basis of (forecasted order quantity for a given month)-(backlog planned quantity CK for a given month). That is, by adding the difference between the actual back-order quantity in the month N-1 immediately before the future predetermined month N and the planned back-order quantity CK in the future predetermined month N to the expected order quantity for the future predetermined month N. And the sales plan quantity of the product. If the actual backlog quantity in the month N-1 immediately before the future predetermined month N has not been input yet, the planned backlog quantity in the month N-1 immediately before the future predetermined month N can be used instead. The actual backlog quantity in the preceding month N-1 of the future predetermined period N is the quantity of the products scheduled to be sold, and should be subtracted from the predicted order quantity. The planned backorder quantity K in the future predetermined month N is predicted to receive an order, and should be added to the predicted order quantity.

【0013】また、在庫計画数量に基づいて、以下の手
順により生産計画数量Sを求めることができる。 (3)上記で求めた販売計画数量Hと将来の所定月間N
に対応する過去のある月間における在庫実績数量とに基
づいて、将来の所定月間Nにおける在庫計画数量ZKを
算出する。すなわち、特定の乗用車の旧モデルの在庫率
の実績が実績データとして記憶されており、所定の月間
に対応する過去の月間における在庫率と(2)で求めた
販売計画数量Hを乗算することにより、注残計画数量K
を求めることができる。ここで、新モデルの発表当初
は、旧モデルの発売開始当時の月間在庫率を用いると正
確な予測が可能である。さらに、旧モデル、旧々モデル
等の発売開始当時の月間在庫率の平均値を採用すると、
より正確な予測が可能となる。また、発売開始から数カ
月過ぎて、受注が落ちついた段階では、過去数年分にお
ける、所定の月間に対応する月間の在庫率の平均値を採
用すると、より正確な予測が可能となる。
Further, based on the stock plan quantity, the production plan quantity S can be obtained by the following procedure. (3) Sales plan quantity H obtained above and future predetermined month N
Is calculated on the basis of the actual stock quantity in a certain past month corresponding to the stock plan quantity ZK in the future predetermined month N. That is, the actual stock ratio of the old model of the specific passenger car is stored as actual data, and the stock ratio in the past month corresponding to the predetermined month is multiplied by the sales plan quantity H obtained in (2). , Backlog planned quantity K
Can be requested. Here, when the new model is announced, accurate forecasts can be made by using the monthly inventory rate at the time of launching the old model. Furthermore, if we use the average monthly inventory rate at the time of launching old models and old models,
More accurate prediction is possible. Further, at the stage where orders have calmed down several months after the start of release, more accurate forecasts can be made by adopting the average value of the monthly stock ratio corresponding to the predetermined month in the past several years.

【0014】(4)次に、所定月間の商品の生産計画数
量Sを、 (商品の生産計画数量S)=(所定月間の販売計画数量
H)−(所定月間の直前月間における在庫実績数量若し
くは在庫計画数量)+(所定月間の在庫計画数量ZK) に基づいて算出する。すなわち、(2)で求めた将来の
所定月間Nの販売計画数量に、将来の所定月間Nの直前
月間N−1における在庫実績数量と、将来の所定月間N
の在庫計画数量ZKとの差を加算することにより、商品
の生産計画数量が求められる。将来の所定月間Nの直前
月間N−1における在庫実績数量が未だ入力されていな
い場合は、将来の所定月間Nの直前月間N−1における
在庫計画数量を代わりに用いることができる。将来の所
定月間Nの直前月間N−1における在庫実績数量は、現
実に在庫が存在する商品の数量であり、販売計画数量か
ら引き算すべきものである。また、将来の所定月間Nの
在庫計画数量は、在庫として残すことを予定するもので
あり、販売計画数量に加算すべきものである。
(4) Next, the production plan quantity S of the product for the predetermined month is calculated by: (Production production quantity S of the product) = (Sales plan quantity H for the predetermined month)-(Actual inventory quantity or the actual inventory quantity for the month immediately before the predetermined month) It is calculated based on (planned inventory quantity) + (planned inventory quantity ZK for a predetermined month). That is, the sales plan quantity of the future predetermined month N obtained in (2) is added to the actual inventory quantity in the month N-1 immediately before the future predetermined month N and the future predetermined month N
By adding the difference with the stock plan quantity ZK, the production plan quantity of the product is obtained. If the actual inventory quantity in the month N-1 immediately before the future predetermined month N has not yet been input, the inventory planned quantity in the month N-1 immediately before the future predetermined month N can be used instead. The actual inventory quantity in the month N-1 immediately before the predetermined month N in the future is the quantity of commodities that are actually in stock, and should be subtracted from the planned sales quantity. Also, the planned inventory quantity for the future predetermined month N is scheduled to be kept as inventory, and should be added to the planned sales quantity.

【0015】[0015]

【発明の実施の形態】本発明の一実施の形態である商品
販売計画数量の算出方法及び商品生産計画数量の算出方
法について、図面に基づいて詳細に説明する。本発明の
商品販売・生産計画数量の算出方法を行うシステムの構
成を図2に示す。また、本システムのハードウエア構成
図を図3に示す。本実施の形態では、商品として乗用車
を考えている。乗用車は、商品の受注を受けてから販売
までの期間が、商品の売れ行き、生産工場の負荷や制約
により大きく変動する種類の商品の1つである。図3に
示すように、ハードウエアの構成は、通常のコンピュー
タシステムである。すなわち、ホスト側のコンピュータ
であるサーバーコンピュータ23は、演算手段であるC
PU21と記憶手段であるディスク22より構成されて
いる。また、クライアント側のコンピュータであるクラ
イアントコンピュータ28は、演算手段であるCPU2
5と記憶手段であるディスク26より構成されている。
CPU21とCPU25とは、ISDN回線等のネット
ワーク27により通信可能に接続されている。CPU2
5には、入出力端末24が接続している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A method for calculating a planned product sales quantity and a method for calculating a planned product production quantity according to an embodiment of the present invention will be described in detail with reference to the drawings. FIG. 2 shows the configuration of a system for performing the method for calculating the planned product sales / production quantity according to the present invention. FIG. 3 shows a hardware configuration diagram of the present system. In the present embodiment, a passenger car is considered as a product. Passenger cars are one of the types of products in which the period from receipt of an order for a product to sale varies greatly depending on the sale of the product and the load and restrictions on the production factory. As shown in FIG. 3, the hardware configuration is an ordinary computer system. That is, the server computer 23 serving as the host computer is provided with the arithmetic means C
It comprises a PU 21 and a disk 22 as storage means. The client computer 28, which is a computer on the client side, has a CPU 2
5 and a disk 26 as storage means.
The CPU 21 and the CPU 25 are communicably connected by a network 27 such as an ISDN line. CPU2
5, an input / output terminal 24 is connected.

【0016】次に、ディスク22に記憶されているプロ
グラムの構成を図2に基づいて説明する。所定期間内に
販売が予測される販売予測台数を入力するための販売予
測台数入力手段11が、計画情報格納手段12に接続し
ている。ここで、乗用車の受注予測台数は、市場の動向
等より別に求められ、本システムに入力される。また、
受注予測台数入力手段11には、販売・生産計画立案手
段13が接続している。また、受注予測台数入力手段1
1には、結果出力手段16が接続している。販売・生産
計画立案手段13には、結果出力手段16が接続してい
る。また、販売・生産計画立案手段13には、実績情報
格納手段14が接続している。また、販売・生産計画立
案手段13には、生産条件格納手段15が接続してい
る。
Next, the structure of the program stored in the disk 22 will be described with reference to FIG. A predicted sales volume input unit 11 for inputting a predicted sales volume for which sales are predicted within a predetermined period is connected to the plan information storage unit 12. Here, the predicted number of orders for passenger cars is separately obtained from market trends and the like, and is input to the present system. Also,
Sales / production planning unit 13 is connected to predicted order number input unit 11. In addition, the order entry forecast number input means 1
1 is connected to the result output means 16. The sales / production planning unit 13 is connected to a result output unit 16. In addition, the sales information / production planning means 13 is connected to the performance information storage means 14. The sales / production planning unit 13 is connected to a production condition storage unit 15.

【0017】また、本システムで用いている期間、実績
数量及び計画数量等の具体的内容を図4に示す。始め
に、期間を所定の長さで一定に区切り、現在を含む月間
をNとする。N+1,N+2,・・・が将来の月間であ
り、販売計画・生産計画の立案対象となる月間である。
また、N−1,N−2,・・・が過去の月間であり、実
績台数データを収集する対象となる月間である。月間N
には、その月間における販売計画台量HKn、計画済み
の生産計画台量SKn、受注予測台量JYn、在庫計画
台量ZKn、注残計画台量CKnが記憶されている。同
様に、月間N+1には、月間N+1における販売計画台
量HKn+1、生産計画台量SKn+1、受注予測台量JY
n+1、在庫計画台量ZKn+1、注残計画台数CKn+1が
記憶されている。同様に、月間N−1には、月間N−1
における販売実績台数HZn-1、生産実績台数SZn-
1、受注実績台数JZn-1、在庫実績台数ZZn-1、注
残実績台数CZn-1が記憶されている。
FIG. 4 shows specific contents such as a period, an actual quantity, and a planned quantity used in the present system. First, the period is divided into predetermined lengths, and the month including the present is defined as N. .., N + 1, N + 2,... Are future months, and are months for which a sales plan / production plan is to be drafted.
.., N-1, N-2,... Are past months, and are months for which actual number data is to be collected. Month N
Stores the planned sales volume HKn, the planned production planning volume SKn, the predicted order sales volume JYn, the planned inventory volume ZKn, and the planned backlog volume CKn during the month. Similarly, in the monthly N + 1, the planned sales volume HKn + 1, the planned production volume SKn + 1, and the predicted order sales volume JY in the monthly N + 1.
n + 1, planned stock quantity ZKn + 1, and planned back-order quantity CKn + 1 are stored. Similarly, the monthly N-1 includes the monthly N-1.
Sales volume HZn-1 and production volume SZn-
1. The actual number of ordered orders JZn-1, the actual number of inventories ZZn-1, and the actual number of backorders CZn-1 are stored.

【0018】また、本システムで販売計画台数・生産計
画台数を立案する単位を図5に示す。また、本システム
の処理手順のフローチャートを図1に示す。また、本シ
ステムを説明する上で一例とする販売店H、メーカー
M、部品の仕入先Bの関係を図6に示す。
FIG. 5 shows a unit for planning the planned sales volume and the planned production volume in this system. FIG. 1 shows a flowchart of a processing procedure of the present system. FIG. 6 shows a relationship among a store H, a maker M, and a supplier B of parts as an example in describing the present system.

【0019】次に、上記構成を有するシステムの作用を
説明する。始めに、本システムにより立案される販売計
画・生産計画について説明する。販売計画・生産計画
は、メーカーMによって立案される将来の所定期間内で
の販売計画台数、生産計画台数を示しており、次の3つ
の目的のために立案される。 (1)受注予測台数に基づき販売する台数を計画し、そ
れに基づきメーカーM及び販売店Hが各種販売施策を立
案、実施するためである。 (2)立案された販売計画に対し、適正な製品在庫レベ
ル、適正な工場の稼働レベルを念頭に生産する台数を計
画し、それに基づきメーカーMが各種生産施策を立案、
実施していくためである。 (3)立案された生産計画を、製品を構成しているユニ
ット、部品のレベルに展開することでユニット、部品の
調達計画を導き、メーカーM及び仕入先Bが各部品調
達、生産のための施策を立案、実施していくためであ
る。
Next, the operation of the system having the above configuration will be described. First, a sales plan and a production plan created by the present system will be described. The sales plan / production plan indicates the number of sales plans and the number of production plans within a predetermined period in the future that are planned by the manufacturer M, and is planned for the following three purposes. (1) This is because the number of units to be sold is planned based on the predicted number of orders, and the manufacturer M and the store H plan and execute various sales measures based on the planned units. (2) Based on the planned sales plan, the number of units to be produced is planned with an appropriate product inventory level and an appropriate factory operation level in mind. Based on this, the manufacturer M plans various production measures.
It is to implement. (3) The procurement plan for units and parts is derived by applying the drafted production plan to the units and parts constituting the product, so that the manufacturer M and the supplier B can procure and produce each part. The purpose of this is to formulate and implement measures.

【0020】以上の目的のために立案される販売計画・
生産計画について、その内容、構成等について説明す
る。始めに、期間を月単位で一定に区切り、今現在を含
む月間をNとすると、N+1、N+2・・・・が計画対象区
間となり、N以前は実績を収集する区間となる。この
際、計画を立案、実績を集計する単位は、図5に示すよ
うに製品総数、製品種類1、製品種類1−1・・・・といっ
た階層構造の各々となる。全ての種類毎に計画を立案す
るわけでなく生産工場、ラインの都合により計画の対象
となる種類が選択される。
The sales plan formulated for the above purpose
The contents, configuration, and the like of the production plan will be described. First, assuming that the period is fixedly divided in units of months and the month including the present time is N, N + 1, N + 2,... At this time, the unit for planning and totaling the results has a hierarchical structure such as the total number of products, the product type 1, the product type 1-1,... As shown in FIG. A plan is not prepared for every type, but the type to be planned is selected depending on the production factory and the line.

【0021】次に各々の販売計画・生産計画を構成する
要素、内容について説明する。販売計画・生産計画は、
受注台数、注残台数、販売台数、在庫台数、生産台数の
5つの要素より構成される。さらに各々の要素は実績、
または予測/計画の2つに分類される。言葉から判るよ
うに、実績は月間N以前の既に実績となった値を意味し
ており、予測/計画は将来の値、すなわち本システムに
よって求めようとする値である。ここで予測と計画の使
い分けについて説明する。予測数量とは、現時点から将
来のある時点に対象がどのようになるか、どのように変
化するかを過去の傾向等から推測した数量をいう。ま
た、計画数量とは、置かれている状況下において、ある
目的を達成するために必要な値として企業経営者等によ
り意志決定された数量をいう。この定義により、本実施
の形態のシステムでは、将来の所定期間における受注台
数、注残率、在庫率を予測台数として取り扱う。また、
将来の所定期間における注残台数、在庫台数、販売台
数、生産台数を計画台数として取り扱う。受注台数の予
測は別の段階、別システムを用いて実施されており、本
システムにおいては単なる入力値として扱う。
Next, the components and contents constituting each sales plan / production plan will be described. Sales and production plans
It is composed of five elements: the number of orders received, the number of units sold, the number of units sold, the number of units in stock, and the number of units produced. In addition, each element is an achievement,
Or it is classified into two of prediction / plan. As can be seen from the words, the actual result means a value that has already been actual before the month N, and the forecast / plan is a future value, that is, a value to be obtained by the present system. Here, the proper use of the prediction and the plan will be described. The predicted quantity is a quantity obtained by estimating what the object will be from the current time to a certain point in the future and how it will change based on past trends and the like. In addition, the planned quantity refers to a quantity determined by a company manager or the like as a value necessary to achieve a certain purpose in a given situation. According to this definition, the system of the present embodiment treats the number of ordered units, the backlog rate, and the stock ratio in the future predetermined period as the predicted number. Also,
The number of units sold, the number of units sold, the number of units sold, and the number of units produced in the future period are treated as planned units. The prediction of the number of orders is performed at another stage and using another system, and in this system, it is treated as a simple input value.

【0022】次に、上記5つの台数要素について各々の
意味と台数要素間の関係について説明する。受注台数
は、顧客Cと販売店Hとが取引契約を結んだ件数を示す
ものであり、具体的な例で言えば注文書を交わした件数
である。販売台数は、所定期間内に販売店Hが乗用車を
顧客Cに届けたものの件数とする。ここで、受注から販
売までにかかる時間がθ=0であれば受注台数=販売台
数であるが、実際には有限の期間を必要とする。またこ
の期間も製品の売行き、在庫の状態、生産工場の負荷等
によりそれぞれ変化する。そのため受注はしたもののそ
の期間内に実際に販売できなかったものが発生する。こ
れを注残台数として取り扱う。
Next, the meaning of each of the five number elements and the relationship between the number elements will be described. The number of orders received indicates the number of cases in which the customer C and the store H have concluded a business contract, and more specifically, the number of orders placed. The number of units sold is the number of items that the store H delivered the passenger car to the customer C within a predetermined period. Here, if the time from order receipt to sales is θ = 0, the number of orders received = the number of units sold, but in practice a finite period is required. This period also changes depending on the sales of the product, the stock status, the load on the production factory, and the like. For this reason, there are orders that were ordered but could not be sold during that period. This is treated as the number of backlogs.

【0023】図4の月間N−1を例として具体的に説明
する。ただしこの場合、(受注から販売までのリードタ
イム)<(計画のために区切った期間)を前提としてい
る。月間N−1の受注実績台数JZn-1、販売実績台数
HZn-1、注残実績台数CZn-1、及び月間N−2末の注
残実績台数CZn-1との間には以下の関係が存在する。 (月間N−1末注残実績台数CZn-1)=(月間N−2末注残実績台数CZn-2 )+(月間N−1受注実績台数JZn-1)−(月間N−1販売実績台数HZn-1) ・・・式(1) 前々月間N−2での注残実績台数CZn-2 に、前月間N
−1の受注実績台数をJZn-1加え、前月間N−1に販
売できた販売実績台数HZn-1を差し引けば、前月間N
−1の注残実績台数CZn-1が求められるとの意味であ
る。
A specific description will be given by taking the month N-1 in FIG. 4 as an example. However, in this case, it is assumed that (lead time from order receipt to sales) <(period divided for planning). The following relationship is established between the actual number of ordered units JZn-1, the number of actual sold units HZn-1, the number of actual units CZn-1, and the number of actual units CZn-1 at the end of the month N-2. Exists. (Monthly N-1 end backlog actual number CZn-1) = (Month N-2 end backlog actual number CZn-2) + (Monthly N-1 ordered actual number JZn-1)-(Monthly N-1 sales actual Number of units HZn-1) Equation (1) The number of actual backlogs CZn-2 in the previous two months N-2 is added to the previous month's N
-1 is added to JZn-1 and the actual sales volume HZn-1 sold to N-1 during the previous month is subtracted from the previous month.
This means that an actual backlog number CZn-1 of -1 is obtained.

【0024】上記の式(1)は実績のみならず予測・計
画の値(月間N以降の要素)においても成立する関係で
ある。すなわち、 (月間N注残計画台数CKn)=(月間N−1注残実績台数CZn-1)+(月間 N受注予測台数JYn)−(月間N販売計画台数HKn) ・・・式(2) 前月間N−1での注残実績台数CZn-1に、今月間Nの
受注予測台数をJYn加え、今月間Nに販売する計画で
ある販売計画台数HKn を差し引けば、今月間Nの注残
計画台数CKnが求められるとの意味である。
The above equation (1) holds true not only for actual results but also for predicted / planned values (elements after N months). That is, (monthly N planned back-ordered units CKn) = (monthly N-1 actual back-ordered units CZn-1) + (monthly predicted N-ordered units JYn)-(monthly N planned sales units HKn) Formula (2) Add JYn to the forecasted number of orders for N this month to CZn-1 for the number of backlogs in N-1 for the previous month, and subtract the planned sales volume HKn to be sold in N for this month. This means that the remaining planned number CKn is obtained.

【0025】次に、販売台数、生産台数、在庫台数の関
係について説明する。前月間N−1の末時点での在庫台
数に今月間Nの生産台数を加え、今月間Nの販売台数を
差し引いた値が今月間の末時点での在庫台数となるとい
った関係が存在する。これを同じく月間N−1を例とし
て式に表すならば、 (月間N−1末在庫実績台数ZZn-1)=(月間N−2末在庫実績台数ZZn-2 )+(月間N−1生産実績台数SZn-1)−(月間N−1販売実績台数HZn-1) ・・・式(3) 式(3)の関係も実績だけでなく予測、計画値(月間N
以降の要素)においても成立する関係である。すなわ
ち、 (月間N末在庫計画台数ZKn)=(月間N−1末在庫実績台数ZZn-1)+( 月間N生産計画台数SKn)−(月間N販売計画台数HKn) ・・・式(4)
Next, the relationship between the number of units sold, the number of units produced, and the number of units in stock will be described. There is such a relationship that the value obtained by adding the production number of the current month N to the inventory number at the end of the previous month N-1 and subtracting the sales number of the current month N becomes the inventory number at the end of the current month. If this is also expressed in a formula using the monthly N-1 as an example, (N-1 actual inventory at the end of the month ZZn-1) = (N-2 actual inventory at the end of the month ZZn-2) + (N-1 monthly production) Actual number SZn-1)-(N-1 monthly actual sales number HZn-1) Expression (3) The relationship of Expression (3) is not only the actual result but also the forecast and plan value (N
And the following elements). That is, (N-monthly planned stock number ZKn) = (N-1-monthly actual stock quantity ZZn-1) + (Monthly N planned production quantity SKn)-(Monthly N planned sales quantity HKn) Equation (4)

【0026】次に、製品総数と製品種類1等との間の計
画値の関係について説明する。製品総数と製品種類の関
係が例えば図5の通りであるとする。これは製品がまず
製品種類1、2、3に大きく分類され、更に製品種類1
は製品種類11、12、13に細かく分類されることを
示している。この時各単位の計画値間では、 製品総数の値T=製品種類1の値TS1+製品種類2の値TS2 +製品種類3の値TS3 ・・・式(5) 製品種類1の値TS1=製品種類11の値TS11+製品種類12の値TS12 +製品種類13の値TS13 ・・・式(6) との関係が当然保たれなければならず、整合性の確保も
必須となる。
Next, the relationship between the planned values between the total number of products and the product type 1 and the like will be described. Assume that the relationship between the total number of products and the product type is, for example, as shown in FIG. This means that products are first broadly categorized into product types 1, 2, and 3.
Indicates that the product type is finely classified into 11, 12, and 13. At this time, between the planned values of each unit, the value of the total number of products T = the value TS1 of the product type 1 + the value TS2 of the product type 2 + the value TS3 of the product type 3 ... Formula (5) The value TS1 of the product type 1 = product The value TS11 of the type 11 + the value TS12 of the product type 12 + the value TS13 of the product type 13... (6) must be naturally maintained, and it is also essential to ensure consistency.

【0027】次に、図1に基づいて本システムの処理の
手順、内容を説明する。 (1)5要素の実績台数の入力(S1)の手順 まず最初のステップ、5要素(受注、注残、販売、在
庫、生産)の各実績台数の入力について説明する。図4
における月間N−1以前の値は全て実績台数として図2
の実績情報格納手段14より販売・生産計画立案手段1
3に伝達される。これは具体的には、図3のサーバーコ
ンピュータ23のディスク22の内部に格納されている
情報がCPU21、ネットワーク27を介しクライアン
トコンピュータ28のCPU25に伝達されることであ
る。これにより、図4で言えば、ZZn-2,CZn-2,S
Zn-1,JZn-1,HZn-1,ZZn-1,CZn-1 の値が用
意される。
Next, the processing procedure and contents of the present system will be described with reference to FIG. (1) Procedure of inputting the actual number of five elements (S1) First, the input of the actual number of each of the five elements (order, backlog, sales, inventory, and production) will be described. FIG.
All values before the month N-1 in Fig.
Sales / production planning unit 1 from the actual information storage unit 14
3 is transmitted. Specifically, the information stored in the disk 22 of the server computer 23 in FIG. 3 is transmitted to the CPU 21 and the CPU 25 of the client computer 28 via the network 27. Thereby, in FIG. 4, ZZn-2, CZn-2, S
The values of Zn-1, JZn-1, HZn-1, ZZn-1, and CZn-1 are prepared.

【0028】(2)計画済の生産計画台数の入力(S
2)の手順 次のステップでは計画され、既に実施段階にある生産の
計画台数、具体的には月間Nの生産計画台数SKn が、
販売・生産計画立案手段13に計画情報格納手段12よ
り伝達される。これも上記の実績台数と同様に、図3の
サーバーコンピュータ23のディスク22より、クライ
アントコンピュータ28のCPU25に伝達される。 (3)受注予測台数の入力(S3)の手順 次は別に実施されている月間N、月間N+1以降必要な
時期までの受注台数の予測の結果の値が予測台数計画台
数入力手段11から入力され、計画情報格納手段12を
経て、販売・生産計画立案手段13に伝達される。具体
的には、サーバーコンピュータ23のディスク22の内
部に格納されている情報が、クライアントコンピュータ
28のCPU25に伝達される。これにより、図4で言
えばJYn,JYn+1の値が用意される。
(2) Input of planned production planned number (S
2) Procedure In the next step, the planned number of production, which is planned and already in the implementation stage, specifically, the production planned number SKn of N monthly,
The information is transmitted from the plan information storage unit 12 to the sales / production planning unit 13. This is also transmitted to the CPU 25 of the client computer 28 from the disk 22 of the server computer 23 in FIG. (3) Procedure of inputting the predicted number of orders (S3) Next, the value of the result of the prediction of the number of orders received from month N, which is separately performed until the required time after month N + 1, is input from the predicted number of planned units input means 11. Is transmitted to the sales / production planning unit 13 via the planning information storage unit 12. Specifically, information stored in the disk 22 of the server computer 23 is transmitted to the CPU 25 of the client computer 28. Thereby, the values of JYn and JYn + 1 are prepared in FIG.

【0029】(4)注残計画台数の決定(S4)の手順 次は月間N、月間N+1以降必要な時期までの注残計画
台数を決定する手順である。注残は製品の特性(在庫に
持ちやすいか否か等)、需要と供給の関係等複雑な要因
の結果であり、人が最終的に決定すべきものであるが、
本システムにおいては、そのベース案を提供することに
より、計画台数の信頼性を高めている。特に、乗用車等
のように、注残率が過去の時系列データと相関関係にあ
る場合には、ベース案自体の信頼性が高まり、実用的レ
ベルとなる。ベース案は、以下の手順で決定される。
(4) Procedure for Determining the Number of Unscheduled Plans (S4) The following is the procedure for deciding the planned number of unscheduled vehicles from the month N to the required time after the month N + 1. Backlog is the result of complex factors such as product characteristics (whether it is easy to hold in stock, etc.) and the relationship between supply and demand.
In this system, the reliability of the planned number is increased by providing the base plan. In particular, when the backlog rate is correlated with the past time-series data, such as in a car, the reliability of the base plan itself is increased, and the base plan itself is at a practical level. The base plan is determined by the following procedure.

【0030】対象製品の過去の注残率を求める。具体
的には実績格納手段14に格納されている各月間毎の注
残実績台数及び受注実績台数を販売・生産計画立案手段
13に伝達し、販売・生産計画立案手段13は、 注残率=注残実績台数/受注実績台数 ・・・式(7) により注残率を求める。 計算された注残率より適当なものを選び出す。によ
り求められた注残率の中から計画台数を求めるのに適当
な注残率を選び出す。具体的には、例えば、乗用車の旧
モデルにおける同一月間の注残率、乗用車のの過去の同
一月間における注残率である。 選び出された注残率の平均率を求める。により選び
出された注残率の平均値を求める。
The past backlog rate of the target product is obtained. Specifically, the actual number of backlogs and the number of actual orders received for each month stored in the actual storage unit 14 are transmitted to the sales / production planning unit 13, and the sales / production planning unit 13 calculates the backlog rate = The actual number of backlogs / the actual number of orders received: Calculate the backlog rate using equation (7). Select an appropriate one from the calculated backlog rate. An appropriate backlog rate for obtaining the planned number of vehicles is selected from the backlog rates obtained by the above. Specifically, for example, it is the backlog rate of the old model of the passenger car in the same month and the backlog rate of the passenger car in the past same month. Obtain the average rate of the selected backlog rates. The average value of the backlog rate selected by is calculated.

【0031】次に、注残率の具体的な決定方法について
詳細に説明する。本実施の形態のシステムにおいては、
この注残率の実績データは、図7及び図8のように時系
列データとして記憶されている。共に横軸は、月間を単
位としている。図8は例として、乗用車のモデルチェン
ジを行った年における注残率の変化を示している。本実
施の形態の乗用車は、4年毎に定期的にモデルチェンジ
を行っているものと仮定している。具体的には、昭和6
3年1月、平成4年1月、平成8年1月にモデルチェン
ジを行っている。図8には、モデルチェンジを行った年
の月間別の注残率の変化を実績データとして示してい
る。なお、平成8年のデータは、5月までしか示してい
ない。
Next, a specific method of determining the backlog rate will be described in detail. In the system of the present embodiment,
The actual data of the backlog rate is stored as time-series data as shown in FIGS. In both cases, the horizontal axis is in units of months. FIG. 8 shows, as an example, the change in the backlog rate in the year in which the model change of the passenger car was performed. It is assumed that the passenger car of the present embodiment is regularly changed every four years. Specifically, Showa 6
The model was changed in January, 1994, January, 1994 and January, 1996. FIG. 8 shows, as actual data, the change in the backlog rate for each month in the year of the model change. The data for 1996 are shown only until May.

【0032】図8から、新モデルの発表年における注残
率の変化が各モデル毎互いに、強い相関関係を示してい
ることがわかる。販売当初は、販売店等の在庫を増加さ
せて発注に備えているが、通常は、購入意欲が高く発注
が多いため、一般的に注残率は、高い値となり、数カ月
経過するにつれて定常状態となる。この高い相関関係か
ら、例えば、平成8年に新モデルを発売するときに、注
残台数を計画するための基礎となる注残率として、新モ
デルの発売開始時の数カ月間においては、図8に示す旧
モデル(平成4年度)及び旧々モデル(昭和63年度)
の月間毎の注残率の実績データの平均値を用いれば良い
ことがわかる。すなわち、新モデルの発売当初は、旧モ
デルの発売開始当時の月間注残率を用いると正確な予測
が可能である。さらに、乗用車では、3〜5年毎にモデ
ルチェンジが行われているため、旧モデル、旧々モデル
等の発売開始当時の月間注残率の平均値を採用すると、
より正確な予測が可能となる。
FIG. 8 shows that the change in the backlog rate in the year of the announcement of the new model shows a strong correlation among the models. At the beginning of sales, the stock of dealers is increased to prepare for orders.However, usually, since the willingness to purchase is high and the number of orders is large, the backlog rate generally becomes a high value. Becomes From this high correlation, for example, when a new model is released in 1996, as a backlog rate which is a basis for planning the number of units to be backlogged, the number of months after the start of the release of the new model is shown in FIG. Old model (FY 1994) and old model (FY 1988)
It can be seen that the average value of the actual data of the backlog rate for each month may be used. That is, when the new model is initially released, accurate prediction can be made by using the monthly backlog at the time of the release of the old model. In addition, since passenger cars undergo model changes every three to five years, using the average monthly backlog rate at the time of the launch of old and old models,
More accurate prediction is possible.

【0033】次に、発売から数カ月経過して定常状態と
なった場合を説明する。図7は例として、平成4年1月
から販売を開始したモデル3の月間毎の注残率の実績デ
ータを示している。H5が平成5年度の注残率を示し、
H6が平成6年度の注残率を示し、H7が平成7年度の
注残率を示している。図7に示すように、発売開始から
数カ月過ぎると受注が落ちつき、注残率は、季節により
毎年同じように変化する傾向がある。すなわち、H5,
H6,H7の実績データにおいて月間毎の変化に強い相
関関係が認められる。ここで、注残率の変動を月間別に
見た場合、1月、4月、5月及び8月における注残率が
高い傾向にある。これは、12月及び7月にはボーナス
が支給され受注が増加するためであり、また、4月に就
職、進学により受注が増加するためである。従って、例
えば、平成7年度の注残台数を計画するための基礎とな
る注残率として、H5,H6の平均値を用いれば良いこ
とがわかる。すなわち、発売開始から数カ月経過して受
注が落ちついた場合には、過去数年分における、将来の
所定の月間Nに対応する月間の注残率の平均値を採用す
ると、より正確な予測が可能となる。
Next, the case where a steady state is reached after several months from the release will be described. FIG. 7 shows, as an example, the actual data of the monthly backlog rate of the model 3 whose sale has been started in January 1992. H5 indicates the backlog rate in 1993,
H6 indicates the backlog rate in the 1994 fiscal year, and H7 indicates the backlog rate in the 1995 fiscal year. As shown in FIG. 7, orders are settled several months after the start of release, and the backlog rate tends to change in the same manner every year depending on the season. That is, H5
In the actual data of H6 and H7, a strong correlation is recognized for the monthly change. Here, when the fluctuations in the backlog rate are viewed by month, the backlog rates in January, April, May and August tend to be high. This is because a bonus is paid in December and July, and orders are increased, and orders are increased due to employment and enrollment in April. Therefore, for example, it can be understood that the average value of H5 and H6 should be used as the base ratio for planning the number of units to be backed in 1995. In other words, if orders are settled several months after the start of release, more accurate forecasts can be obtained by using the average value of the backlog rate for the past several years corresponding to the predetermined future month N in the past several years Becomes

【0034】注残計画台数のベース案を求める。に
より求められた注残率の平均値と受注予測台数より注残
計画台数は、 注残計画台数(ベース案)=注残率の平均値×受注予測台数 ・・・式(8) で求められる。以上〜が販売・生産計画立案手段1
3により実施される。具体的には図3のクライアントコ
ンピュータ28のCPU25により実施され、入出力端
末24に表示される。図4で言えばCKn,CKn+1の値
が用意される。
A base plan of the planned number of back orders is obtained. From the average value of the back-order rate and the predicted number of orders, the number of planned back-orders is calculated by the following formula: (8) . The above is sales / production planning method 1
3 is performed. Specifically, the processing is executed by the CPU 25 of the client computer 28 in FIG. In FIG. 4, values of CKn and CKn + 1 are prepared.

【0035】(5)販売計画台数の計算(S5)の手順 次に月間N、N+1以降必要な時期までの販売計画台数
が計算される。販売計画台数は、(S1)〜(S4)の
手順の結果求められた値を用い、以下の式(9)に基づ
き販売・生産計画立案手段13によって計算される。 月間N販売計画台数HKn=月間N−1注残実績台数CZn-1+月間N受注予 測台数JYn−月間N注残計画台数CKn ・・・式(9) 図4で言えばHKn,HKn-1が計算される。
(5) Procedure of Calculation of the Number of Sales Plans (S5) Next, the number of sales plans from the month N, N + 1 to the required time is calculated. The planned sales volume is calculated by the sales / production planning unit 13 based on the following equation (9) using the values obtained as a result of the procedures of (S1) to (S4). Monthly N planned sales volume HKn = Monthly N-1 actual backlog volume CZn-1 + Monthly N forecast order volume JYn-Monthly N planned backlog volume CKn ... Formula (9) HKn, HKn-1 in FIG. Is calculated.

【0036】(6)在庫計画台数の決定(S6)の手順 次に月間N、N+1以降必要な時期までの在庫計画台数
が決定される。これにはまず予測台数計画台数入力手段
11より月間N+1以降必要な時期までの在庫率が入力
されることより始まる。 在庫率=在庫実績(または計画)台数/販売実績(または計画)台数 ・・・式(10) として定義する。
(6) Procedure for Determining the Number of Planned Inventory Units (S6) Next, the number of planned inventory units from the month N, N + 1 to the required time is determined. This is started by inputting the stock ratio from the month N + 1 to the required time from the forecasted number planned number input means 11. Inventory rate = Actual (or planned) number of units / Actual (or planned) unit ... Defined as equation (10).

【0037】次に、在庫率の求める方法を詳細に説明す
る。本実施の形態のシステムにおいては、この在庫率の
実績データは、図10及び図9のように時系列データと
して記憶されている。共に横軸は、月間を単位としてい
る。図9は例として、乗用車のモデルチェンジを行った
年における在庫率の変化を示している。本実施の形態の
乗用車は、4年毎に定期的にモデルチェンジを行ってい
るものと仮定している。具体的には、昭和63年1月、
平成4年1月、平成8年1月にモデルチェンジを行って
いる。図9には、モデルチェンジを行った年の月間別の
在庫率の変化を実績データとして示している。なお、平
成8年のデータは、5月までしか示していない。
Next, a method for obtaining the stock ratio will be described in detail. In the system according to the present embodiment, the actual data of the stock ratio is stored as time-series data as shown in FIGS. In both cases, the horizontal axis is in units of months. FIG. 9 shows, as an example, a change in the stock ratio in the year in which the model change of the passenger car is performed. It is assumed that the passenger car of the present embodiment is regularly changed every four years. Specifically, in January 1988,
The model was changed in January 1994 and January 1996. FIG. 9 shows the change of the stock ratio for each month in the year of the model change as actual data. The data for 1996 are shown only until May.

【0038】図9から、新モデルの発表年における在庫
率の変化が各モデル毎互いに、相関関係を示しているこ
とがわかる。販売当初は、発注が増加して生産が追いつ
かないため、一般的に在庫率は、低い値となり、数カ月
経過するにつれて定常状態となる。この高い相関関係か
ら、例えば、平成8年に新モデルを発売するときに、在
庫台数を計画するための基礎となる在庫率として、新モ
デルの発売開始時の数カ月間においては、図9に示す旧
モデル(平成4年度)及び旧々モデル(昭和63年度)
の月間毎の在庫率の実績データの平均値を用いれば良い
ことがわかる。すなわち、新モデルの発売当初は、旧モ
デルの発売開始当時の月間在庫率を用いると正確な予測
が可能である。さらに、乗用車では、3〜5年毎にモデ
ルチェンジが行われているため、旧モデル、旧々モデル
等の発売開始当時の月間在庫率の平均値を採用すると、
より正確な予測が可能となる。
FIG. 9 shows that the change in the stock ratio in the year of the announcement of the new model shows a correlation between the models. At the beginning of sales, the inventory ratio generally becomes low because orders increase and production cannot keep up, and becomes a steady state as several months pass. Based on this high correlation, for example, when a new model is released in 1996, as shown in FIG. Old model (FY 1994) and old model (FY 1988)
It can be seen that it is sufficient to use the average value of the actual data of the inventory ratio for each month. That is, when the new model is released, an accurate prediction can be made by using the monthly inventory rate at the time of starting the release of the old model. In addition, since passenger cars undergo model changes every three to five years, using the average monthly inventory rate at the time of launching old and old models,
More accurate prediction is possible.

【0039】次に、発売から数カ月経過して定常状態と
なった場合を説明する。図10は例として、平成4年1
月から販売を開始したモデル3の月間毎の在庫率の実績
データを示している。H5が平成5年度の在庫率を示
し、H6が平成6年度の在庫率を示し、H7が平成7年
度の在庫率を示している。図10に示すように、発売開
始から数カ月過ぎると受注が落ちつき、在庫率は、季節
により毎年同じように変化する傾向がある。すなわち、
H5,H6,H7の実績データにおいて月間毎の変化に
強い相関関係が認められる。ここで、在庫率の変動を月
間別に見た場合、1月、5月及び8月における在庫率が
高い傾向にある。これは、12月及び7月にはボーナス
が支給され受注が増加するためであり、また、4月に就
職、進学により受注が増加するためである。従って、例
えば、平成7年度の注残台数を計画するための基礎とな
る在庫率として、H5,H6の平均値を用いれば良いこ
とがわかる。すなわち、発売開始から数カ月経過して受
注が落ちついた場合には、過去数年分における、将来の
所定の月間Nに対応する月間の在庫率の平均値を採用す
ると、より正確な予測が可能となる。
Next, a case where a steady state is reached after several months from the release will be described. FIG. 10 shows, as an example,
The figure shows the actual data of the monthly stock ratio of the model 3 whose sales started from the month. H5 indicates the stock ratio in 1993, H6 indicates the stock ratio in 1994, and H7 indicates the stock ratio in 1995. As shown in FIG. 10, orders are settled a few months after the start of release, and the stock ratio tends to change in the same manner every year depending on the season. That is,
In the actual data of H5, H6, and H7, a strong correlation is recognized for the monthly change. Here, when the change of the stock ratio is viewed by month, the stock ratio in January, May and August tends to be high. This is because a bonus is paid in December and July, and orders are increased, and orders are increased due to employment and enrollment in April. Therefore, for example, it can be seen that the average value of H5 and H6 should be used as the stock ratio serving as the basis for planning the number of units to be back ordered in 1995. In other words, if orders are settled after several months from the start of sales, more accurate forecasts can be made by using the average value of the monthly inventory rate corresponding to the predetermined future month N in the past several years. Become.

【0040】入力された在庫率は販売・生産計画立案手
段13に渡され、月間N+1以降の在庫計画台数が 月間N+1在庫計画台数ZKn+1 =月間N+1在庫率×月間N+1販売計画台 数 HKn+1 ・・・式(11) で計算される。ただし月間Nについては生産計画台数が
決定済であり、変更は不可とみなし、 月間N在庫計画台数ZKn=月間N−1在庫実績台数ZZn-1+月間N販売計画 台数HKn−月間N生産計画台数SKn ・・・式(12) で計算される。以上の計算により図4で言えばZKn,
ZKn+1が求められる。
The input stock ratio is passed to the sales / production planning unit 13, and the number of planned stocks after the month N + 1 is equal to the number of planned stocks ZKn + 1 = the monthly N + 1 stock ratio × the number N + 1 sales planned units HKn +. 1 ... Calculated by equation (11). However, as for the monthly N, the planned production quantity has been determined, and it is considered impossible to change it. The monthly N inventory planned quantity ZKn = the monthly N-1 actual inventory quantity ZZn-1 + the monthly N sales planned quantity HKn-the monthly N production planned quantity SKn ... Calculated by the equation (12). According to the above calculation, in FIG.
ZKn + 1 is determined.

【0041】(7)生産計画台数の決定(S7)の手順 続いて月間N+1以降必要な時期までの生産計画台数が
販売・生産計画立案手段13により計算される。計算方
法は以下の式(13)に示す通りである。 月間N+1生産計画台数SKn+1=月間N+1販売計画台数HKn+1−月間N在 庫計画台数ZKn+月間N+1在庫計画台数ZKn+1 ・・・式(13) 図4で言えばSKn+1が計算される。
(7) Procedure for Determining the Number of Planned Production Units (S7) Subsequently, the number of planned production units from the month N + 1 to the required time is calculated by the sales / production planning unit 13. The calculation method is as shown in the following equation (13). Monthly N + 1 production planned number SKn + 1 = Monthly N + 1 sales planned number HKn + 1-Monthly N planned stocked number ZKn + Monthly N + 1 planned stocked number ZKn + 1 Equation (13) In FIG. 4, SKn + 1 is calculated. Is done.

【0042】(8)計画の生産の稼働状況への影響の計
算(S8)の手順 (S1)〜(S7)の手順により決定された月間N+1
以降必要な時期までの生産計画台数が生産の稼働状況に
マッチしているか否かの表示を行う。この時には、生産
条件入力格納手段15に格納された月間N+1以降の、
月間毎の稼働日数、稼働時間、稼働率の予測値、ライン
タクトの計画値、製品と生産ライン対応及び比率が使用
される。ここで月間N+1の稼働日数をn[日]、稼働
時間をω[min /日]、稼働率の予測値をr、この製品
が生産されているラインのラインタクトをm[min /
個]、このラインで作られている全製品のうち当製品が
作られている比率をa[%]、そして月間N+1の生産
計画台数をX[個]とした時、このラインにおける生産
の過不足Y[分/日]は Y[分/日]=(ω − X・m/n・r)×100/a ・・・式(14) で表される。
(8) Procedure for calculating the effect of the plan on the operation status of the production (S8) Procedure of the month N + 1 determined by the procedures of (S1) to (S7)
Thereafter, a display is made as to whether or not the number of planned production until the necessary time matches the operation status of production. At this time, after the month N + 1 stored in the production condition input storage means 15,
The number of operating days, operating hours, operating rate prediction values, line tact plan values, product and production line correspondences and ratios for each month are used. Here, the number of operating days of the month N + 1 is n [days], the operating time is ω [min / day], the predicted value of the operating rate is r, and the line tact of the line on which this product is produced is m [min /
), The ratio of the production of this product out of all products produced in this line is a [%], and the planned production volume of N + 1 per month is X [pcs]. The shortage Y [minute / day] is represented by Y [minute / day] = (ω−X · m / n · r) × 100 / a (Equation (14)).

【0043】この値が販売・生産計画立案手段13によ
り計算され、結果出力手段16によって表示される。こ
の過不足Yがプラス、すなわち生産にアイドルが発生し
ている時にはこのラインのアワーレイト(分あたりにか
かる費用)を乗ずれば損失分の金額が求められる。また
この過不足がマイナスの場合は過負荷を示すが、これが
残業等による生産の柔軟性以内の値か否かが判断され
る。最終的には在庫計画台数、生産の過不足Yによって
この生産計画を採用するか否かが人により判断され、そ
の修正が必要な場合は(S4)〜(S8)の手順のいず
れかに立ち帰り、何らかの変更が実施され、同様の処理
が実行されていく。
This value is calculated by the sales / production planning unit 13 and displayed by the result output unit 16. When the excess or deficiency Y is positive, that is, when idle occurs in the production, the amount of the loss can be obtained by multiplying the hour rate (cost per minute) of this line. If this excess or deficiency is negative, it indicates an overload, but it is determined whether or not this value is within the flexibility of production due to overtime or the like. Ultimately, whether or not to adopt this production plan is determined by a person based on the planned number of units in stock and the excess or deficiency Y in production. If the production plan needs to be modified, the procedure goes to any of steps (S4) to (S8). On the way back, some changes are made and similar processing is performed.

【0044】(9)計画台数の表示と格納(S9)の手
順 (S8)までの手順により生産計画台数が最終的に決定
された後は図4の様な表形式で、結果が結果出力手段1
6により出力される。そして更に受注予測台数JYn,
JYn+1、注残計画台数CKn,CKn+1、販売計画台数
HKn,HKn+1、在庫計画台数ZKn,ZKn+1、生産計
画台数SKn+1が計画情報格納手段12に格納される。
これは具体的にはクライアントコンピュータ28のCP
U25上の情報がネットワーク27を介し、サーバーコ
ンピュータ23のCPU21によってサーバーコンピュ
ータ23のディスク22に格納されることである。
(9) Display and storage of the planned number (S9) After the production planned number is finally determined by the procedure up to (S8), the result is output in the form of a table as shown in FIG. 1
6 is output. And further, the forecasted order quantity JYn,
JYn + 1, planned back-order units CKn, CKn + 1, planned sales units HKn, HKn + 1, planned planned units ZKn, ZKn + 1, and planned planned production units SKn + 1 are stored in the plan information storage unit 12.
This is specifically the CP of the client computer 28.
The information on U25 is stored in the disk 22 of the server computer 23 by the CPU 21 of the server computer 23 via the network 27.

【0045】以上詳細に説明したように、本実施の形態
の商品の販売計画数量の算出方法によれば、将来の所定
月間Nにおける受注予測台数と、将来の所定月間Nに対
応する過去のある月間における注残率とに基づいて、将
来の所定月間Nにおける注残計画数量CKを算出し、将
来の所定月間Nの商品販売計画数量Hを、 (商品の販売計画数量H)=(所定期間の直前の期間に
おける注残実績数量若しくは注残計画数量)+(所定期
間の受注予測数量)−(所定期間の注残計画数量CK) に基づいて算出しているので、受注から販売までの期間
が、製品の売れ行きや生産工場の負荷・制約により大き
く変動する乗用車等の製品に関しても、その変動を予測
して正確な販売数量を予測することができる。
As described above in detail, according to the method of calculating the sales plan quantity of the product according to the present embodiment, the predicted number of orders received in the future predetermined month N and the past corresponding to the future predetermined month N are determined. Based on the monthly backlog rate, the planned backlog quantity CK in the future predetermined month N is calculated, and the product sales planned quantity H in the future predetermined month N is calculated as follows: (product planned sales quantity H) = (predetermined period) Is calculated on the basis of the actual backlog quantity or the planned backorder quantity in the period immediately before the above) + (the predicted order quantity for the predetermined period) − (the backlog planned quantity CK for the predetermined period). However, even with respect to products such as passenger cars, which greatly fluctuate due to the sales of the products and the load / constraint of the production plant, the fluctuations can be predicted, and the accurate sales quantity can be predicted.

【0046】また、本実施の形態の商品の生産計画数量
の算出方法によれば、上記商品の販売計画数量の算出方
法で求めた販売計画数量と、将来の所定月間Nに対応す
る過去のある月間における在庫率とに基づいて、将来の
所定月間Nにおける在庫計画数量ZKを算出し、将来の
所定月間Nの商品の生産計画数量Sを、 (商品の生産計画数量S)=(所定期間の販売計画数量
H)−(所定期間の直前期間における在庫実績数量若し
くは在庫計画数量)+(所定期間の在庫計画数量ZK) に基づいて算出しているので、受注から販売までの期間
が、製品の売れ行きや生産工場の負荷・制約により大き
く変動する乗用車等の製品に関しても、その変動を予測
して正確な生産数量を予測することができる。
Further, according to the method of calculating the production planned quantity of a product according to the present embodiment, the sales planned quantity obtained by the above-described method of calculating the sales planned quantity of the product and the past corresponding to the predetermined month N in the future. The planned inventory quantity ZK in the future predetermined month N is calculated based on the monthly inventory rate and the planned production quantity S of the product in the future predetermined month N is calculated as follows: (production planned quantity S of the product) = (predetermined period It is calculated based on (sales plan quantity H)-(actual inventory quantity or inventory plan quantity in the period immediately before the predetermined period) + (stock plan quantity ZK in the predetermined period). Even for products such as passenger cars that fluctuate greatly due to sales and the load and constraints of the production plant, the fluctuations can be predicted to accurately predict the production quantity.

【0047】以上本発明の実施の形態について説明した
が、本発明は、上記実施の形態に限定されることなく、
色々な応用が可能である。例えば、本実施の形態では、
注残計画数量を注残率から求めているが、毎年の総数に
変動がない製品においては、注残率を用いずに直接過去
の注残実績数量を用いることも可能である。また、本実
施の形態では、システムで注残率及び在庫率を算出して
いるが、予め求めた注残率及び在庫率をデータとして記
憶していても同様である。また、例えば、本実施の形態
では、期間を月単位で行っているが、製品の性質に応じ
て週単位、日単位で行っても良い。
Although the embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment.
Various applications are possible. For example, in this embodiment,
Although the backlog planned quantity is calculated from the backlog rate, it is possible to use the past backlog quantity directly without using the backlog rate for products that do not change in the total number each year. Further, in the present embodiment, the system calculates the back-order rate and the stock rate, but the same applies if the previously-determined back-order rate and the stock rate are stored as data. Further, for example, in the present embodiment, the period is performed on a monthly basis, but may be performed on a weekly or daily basis depending on the characteristics of the product.

【0048】[0048]

【発明の効果】本発明の商品の販売計画数量の算出方法
によれば、将来の所定期間における受注予測数量と、将
来の所定期間に対応する過去のある期間における注残実
績数量とに基づいて、将来の所定期間における注残計画
数量CKを算出し、将来の所定期間の商品販売計画数量
Hを、 (商品の販売計画数量H)=(所定期間の直前の期間に
おける注残実績数量若しくは注残計画数量)+(所定期
間の受注予測数量)−(所定期間の注残計画数量CK) に基づいて算出しているので、受注から販売までの期間
が、製品の売れ行きや生産工場の負荷・制約により大き
く変動する製品に関しても、その変動を予測して正確な
販売数量を予測することができる。
According to the method for calculating the planned sales quantity of a product according to the present invention, the expected order quantity in the future predetermined period and the actual backlog quantity in the past certain period corresponding to the future predetermined period are obtained. Calculate the backlog planned quantity CK in the future predetermined period, and calculate the merchandise sales planned quantity H in the future predetermined period by (product sales planned quantity H) = (the actual backlog quantity or the note in the period immediately before the predetermined period). Since it is calculated based on (remaining planned quantity) + (predicted order quantity for a predetermined period) − (remaining planned quantity CK for a predetermined period), the period from order receipt to sales depends on product sales and production factory load / load. Even for a product that fluctuates greatly due to restrictions, the fluctuation can be predicted, and the accurate sales quantity can be predicted.

【0049】また、本発明の商品の生産計画数量の算出
方法によれば、上記商品の販売計画数量の算出方法で求
めた販売計画数量と、将来の所定期間に対応する過去の
ある期間における在庫実績数量とに基づいて、将来の所
定期間における在庫計画数量ZKを算出し、将来の所定
期間の商品の生産計画数量Sを、 (商品の生産計画数量S)=(所定期間の販売計画数量
H)−(所定期間の直前期間における在庫実績数量若し
くは在庫計画数量)+(所定期間の在庫計画数量ZK) に基づいて算出しているので、受注から販売までの期間
が、製品の売れ行きや生産工場の負荷・制約により大き
く変動する製品に関しても、その変動を予測して正確な
生産数量を予測することができる。
Further, according to the method for calculating the production plan quantity of a product according to the present invention, the sales plan quantity obtained by the above-mentioned method for calculating the sales plan quantity of the product is compared with the inventory in a past period corresponding to a predetermined period in the future. Based on the actual quantity and the planned quantity ZK in the future predetermined period, the inventory plan quantity ZK is calculated, and the production plan quantity S of the product in the future predetermined period is calculated by: (production plan quantity S of the product) = (sales plan quantity H in the predetermined period) ) − (Inventory actual quantity or inventory planned quantity in the period immediately before the predetermined period) + (Inventory planned quantity ZK in the predetermined period), so the period from order receipt to sales depends on product sales and production factories. With regard to products that greatly fluctuate due to the load and constraints of the above, it is possible to predict the fluctuations and accurately predict the production quantity.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態である販売計画数量・生
産計画数量算出方法を示すフローチャートである。
FIG. 1 is a flowchart showing a sales plan quantity / production plan quantity calculation method according to an embodiment of the present invention.

【図2】販売計画数量・生産計画数量算出方法を実行す
るためのシステムの構成を示すブロック図である。
FIG. 2 is a block diagram showing a configuration of a system for executing a sales plan quantity / production plan quantity calculation method.

【図3】システムのハードウェア構成を示すブロック図
である。
FIG. 3 is a block diagram showing a hardware configuration of the system.

【図4】立案される販売計画・生産計画の関係を示す説
明図である。
FIG. 4 is an explanatory diagram showing a relationship between a sales plan and a production plan to be drafted.

【図5】製品の総数と製品の種類との関係を示す説明図
である。
FIG. 5 is an explanatory diagram showing the relationship between the total number of products and the types of products.

【図6】顧客、販売店、メーカ及び仕入先の関係を示す
説明図である。
FIG. 6 is an explanatory diagram showing a relationship among a customer, a store, a maker, and a supplier.

【図7】注残率の月間変化を示すデータ図である。FIG. 7 is a data diagram showing monthly changes in the backlog rate.

【図8】新モデル発売初年度における注残率の月間変化
を示すデータ図である。
FIG. 8 is a data diagram showing monthly changes in the backlog rate in the first year of the new model release.

【図9】在庫率の月間変化を示すデータ図である。FIG. 9 is a data diagram showing monthly changes in the stock ratio.

【図10】新モデル発売初年度における在庫率の月間変
化を示すデータ図である。
FIG. 10 is a data diagram showing a monthly change in a stock ratio in a first year of a new model release.

【符号の説明】[Explanation of symbols]

11 受注予測台数入力手段 12 計画情報格納手段 13 販売・生産計画立案手段 14 実績情報格納手段 15 生産条件入力格納手段 16 結果出力手段 11 means for inputting the forecasted number of orders 12 means for storing plan information 13 means for planning sales and production 14 means for storing actual information 15 means for storing input of production conditions 16 means for outputting results

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 特定の商品について所定期間毎に、生産
実績、注文を受けた受注実績、販売実績、在庫実績、注
文を受け生産中または生産したが販売されずに残ってい
る注残実績の各実績データを記憶していて、該各実績デ
ータを用いて将来の所定期間における商品の販売計画数
量を、与えられた受注予測数量に基づいて立案するシス
テムで実行される商品の販売計画数量の算出方法におい
て、 前記将来の所定期間における受注予測数量と、前記将来
の所定期間に対応する過去のある期間における注残実績
数量とに基づいて、前記将来の所定期間における注残計
画数量CKを算出し、 前記将来の所定期間の商品の販売計画数量Hを、 (商品の販売計画数量H)=(所定期間の直前期間にお
ける注残実績数量若しくは注残計画数量)+(所定期間
の受注予測数量)−(所定期間の注残計画数量CK) に基づいて算出することを特徴とする商品の販売計画数
量の算出方法。
Claims: 1. For a predetermined product, for each predetermined period, a production result, an order received result, a sales result, an inventory result, and an order back result that is in production or has been received but has not been sold but has been sold. Each performance data is stored, and the sales plan quantity of the product for a predetermined period in the future using the respective performance data is calculated based on the given forecasted order quantity. In the calculation method, a backlog planned quantity CK in the future predetermined period is calculated based on the expected order quantity in the future predetermined period and the actual backlog quantity in a past period corresponding to the future predetermined period. Then, the sales plan quantity H of the product in the future predetermined period is calculated by: (sales plan quantity H of the product) = (actual back-order quantity or planned back-order quantity in the period immediately before the predetermined period) + (predetermined period A method for calculating a sales plan quantity of a product, which is calculated based on (forecasted order quantity during the period) − (a planned back order quantity CK for a predetermined period).
【請求項2】 請求項1に記載する商品の販売計画数量
の算出方法を用いて、前記将来の所定期間の生産計画数
量を算出する商品の生産計画数量の算出方法であって、 前記販売計画数量と、将来の所定期間に対応する過去の
所定期間における在庫実績数量とに基づいて、前記将来
の所定期間における在庫計画数量ZKを算出し、 前記将来の所定期間の商品の生産計画数量Sを、 (商品の生産計画数量S)=(所定期間の販売計画数量
H)−(所定期間の直前期間における在庫実績数量若し
くは在庫計画数量)+(所定期間の在庫計画数量ZK) に基づいて算出することを特徴とする商品の生産計画数
量の算出方法。
2. A method for calculating a production plan quantity of a product, wherein the production plan quantity of the future predetermined period is calculated by using the method of calculating a sales plan quantity of a product according to claim 1. Based on the quantity and the actual inventory quantity in the past predetermined period corresponding to the future predetermined period, the inventory plan quantity ZK in the future predetermined period is calculated, and the production plan quantity S of the product in the future predetermined period is calculated. , (Production planned quantity S) = (Sales planned quantity H for a predetermined period) − (Actual stock quantity or planned stock quantity in a period immediately before the predetermined period) + (Stock planned quantity ZK for a predetermined period). A method for calculating a production plan quantity of a product, characterized in that:
JP20003696A 1996-07-30 1996-07-30 Method for calculating the planned selling number of commodities, or the planned producing number of commodities Pending JPH1049597A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20003696A JPH1049597A (en) 1996-07-30 1996-07-30 Method for calculating the planned selling number of commodities, or the planned producing number of commodities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20003696A JPH1049597A (en) 1996-07-30 1996-07-30 Method for calculating the planned selling number of commodities, or the planned producing number of commodities

Publications (1)

Publication Number Publication Date
JPH1049597A true JPH1049597A (en) 1998-02-20

Family

ID=16417765

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20003696A Pending JPH1049597A (en) 1996-07-30 1996-07-30 Method for calculating the planned selling number of commodities, or the planned producing number of commodities

Country Status (1)

Country Link
JP (1) JPH1049597A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004102357A (en) * 2002-09-04 2004-04-02 Shiseido Co Ltd Production volume calculating method, device, system and program, and recording medium
US7440868B2 (en) 2003-03-24 2008-10-21 Nec Corporation Method for determining a position of an object
JP2015207086A (en) * 2014-04-18 2015-11-19 株式会社Jvcケンウッド Connected value chain support system and connected value chain support method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004102357A (en) * 2002-09-04 2004-04-02 Shiseido Co Ltd Production volume calculating method, device, system and program, and recording medium
US7440868B2 (en) 2003-03-24 2008-10-21 Nec Corporation Method for determining a position of an object
JP2015207086A (en) * 2014-04-18 2015-11-19 株式会社Jvcケンウッド Connected value chain support system and connected value chain support method

Similar Documents

Publication Publication Date Title
US5237496A (en) Inventory control method and system
US8504429B2 (en) System and method of displaying information by an electronic price label
US20020147622A1 (en) System and method for enabling a configurable electronic business exchange platform
US20030229550A1 (en) System and method for planning and ordering components for a configure-to-order manufacturing process
EP0984379A2 (en) System and method of altering transaction terms based upon current inventory levels
US5988498A (en) Method of delaying availability of price changes to checkout terminals following EPL price changes
WO2004022463A1 (en) Safe stock amount calculation method, safe stock amount calculation device, order making moment calculation method, order making moment calculation device, and order making amount calculation method
JPH01224864A (en) Automatic order placing system
US20050182696A1 (en) System and method for automatically controlling inventory
US20060277086A1 (en) System and method for optimization-based production capability planning
CN105574733B (en) Sharing inventory offline and online sales method and system
JP2012247964A (en) Progress management apparatus and progress management program
JP2003162619A (en) Sales prediction apparatus and method
JP2020149468A (en) Product management system and product management method
Mukhopadhyay et al. An EOQ model with shortages and selling price dependent time varying demand
JP2002007822A (en) Commodity transaction system, commodity shipping side terminal equipment, commodity transaction method and storage medium
CN112990982A (en) Method and device for sharing points of small and medium-sized enterprises and electronic equipment
JPH1049597A (en) Method for calculating the planned selling number of commodities, or the planned producing number of commodities
US6876975B1 (en) System and method for handling alternate information on electronic price labels
US7143059B2 (en) Managing stock available to on-line and in-person shoppers
EP0984376A2 (en) Electronic price label system promotional information verifier
JP3577914B2 (en) How to calculate sales plan quantity or production plan quantity of goods
US20210357895A1 (en) Information processing system, information processing device, information processing method, and recording medium storing program
US20040128213A1 (en) Material requirement planning system and method for re-scheduling purchase orders of materials
EP1357498A2 (en) Stock planning method