JPH1045383A - Safety device of construction machine - Google Patents

Safety device of construction machine

Info

Publication number
JPH1045383A
JPH1045383A JP20369996A JP20369996A JPH1045383A JP H1045383 A JPH1045383 A JP H1045383A JP 20369996 A JP20369996 A JP 20369996A JP 20369996 A JP20369996 A JP 20369996A JP H1045383 A JPH1045383 A JP H1045383A
Authority
JP
Japan
Prior art keywords
boom
speed
predetermined
driving speed
driven
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20369996A
Other languages
Japanese (ja)
Other versions
JP3122043B2 (en
Inventor
Koji Yamagata
幸司 山形
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP08203699A priority Critical patent/JP3122043B2/en
Publication of JPH1045383A publication Critical patent/JPH1045383A/en
Application granted granted Critical
Publication of JP3122043B2 publication Critical patent/JP3122043B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To quickly perform operation in the automatic stop releasing direction while preventing sudden actuation by making driving speed when a boom is driven in the opposite direction of the prescribed direction faster than driving speed when it is driven in the prescribed direction after a first condition is realized. SOLUTION: For example, when a lever 5a of a crane is operated to the boom side, pressure reduced by a solenoid proportional pressure reducing valve 4 is reduced further by a pilot valve 5, and acts on one pilot port of a control valve 10 through a solenoid valve 8a of a boom raising side oil passage L2. Therefore, the control valve 10 is switched, and delivery oil of a main hydraulic pump 31 is introduced to a hydraulic motor 7, and the hydraulic motor 7 rotates, and a boom raising-lowering winch 21 is driven to the rope winding side. At ordinary boom raising-lowering time, opening of the solenoid proportional pressure reducing valve 4 is adjusted so that pressure of an operating oil passage L1 becomes a maximum value, and driving speed of a boom is increased.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、クレーン等の建設
機械に用いられる過負荷防止装置等の安全装置に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a safety device such as an overload prevention device used for a construction machine such as a crane.

【0002】[0002]

【従来の技術】建設機械の安全装置として、例えばブー
ム起伏時にブーム起伏角度が所定の停止角度θ2(例え
ば図1)に達したことを検出して強制的に停止するもの
がある。この種の安全装置は、ブームの操作油路等に配
置したソレノイドバルブを遮断位置に切換えてブームを
自動停止する構成のため、安全装置が作動するとブーム
が急激に停止して荷振れを起こす等の問題があった。こ
れを防止するものとして、例えば実開平5−69069
号公報に開示されているように、ブーム起伏角度が停止
角度θ2に達する前の所定角度θ1になるとブーム速度
を減速し、停止角度θ2に達したときに緩やかに停止さ
せるようにしたものが知られている。
2. Description of the Related Art As a safety device for a construction machine, for example, there is a safety device in which when a boom undulation angle reaches a predetermined stop angle θ2 (for example, FIG. 1) when the boom is undulated, the safety device is forcibly stopped. This type of safety device is configured to automatically stop the boom by switching the solenoid valve located in the operating oil passage of the boom to the shut-off position. There was a problem. To prevent this, for example, Japanese Utility Model Laid-Open No. 5-69069.
As disclosed in Japanese Patent Application Laid-Open Publication No. H10-115, the boom speed is reduced when the boom up / down angle reaches a predetermined angle θ1 before reaching the stop angle θ2, and the boom speed is gradually stopped when the boom up / down angle reaches the stop angle θ2. Have been.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上記公
報の方法では、ブーム起伏角度がθ1を超えるときにブ
ームを自動停止解除方向(図1では下げ方向)に駆動し
た場合、角度θ1に達するまではブームが緩慢に動くこ
とになり、迅速にブームを動かしたい場合に都合が悪
い。
However, according to the method disclosed in the above-mentioned publication, when the boom is driven in the automatic stop release direction (the downward direction in FIG. 1) when the boom up-and-down angle exceeds θ1, it is not until the angle θ1 is reached. The boom will move slowly, which is inconvenient if you want to move the boom quickly.

【0004】本発明の目的は、急激な作動を防止しつつ
も速やかに自動停止解除方向への動作を行えるようにし
た建設機械の安全装置を提供することにある。
[0004] It is an object of the present invention to provide a safety device for a construction machine capable of quickly operating in an automatic stop release direction while preventing abrupt operation.

【0005】[0005]

【課題を解決するための手段】請求項1の発明は、起伏
可能なブームを有し、このブームが所定方向に駆動され
ているときに第1の条件が成立するとブーム駆動速度を
低減し、その後に第2の条件が成立するとブームを停止
させる建設機械の安全装置に適用される。そして、第1
の条件成立後は、ブームが上記所定方向とは逆の方向に
駆動する際の駆動速度を所定方向に駆動する際の駆動速
度よりも速くする速度制御手段を備え、これにより上記
問題点を解決する。請求項2の発明は、起伏可能なブー
ムを有し、このブームが上げ方向に駆動される際にブー
ム起伏角度が第1の所定角度に達するとブーム駆動速度
を低減し、ブーム起伏角度が第1の所定角度よりも大き
い第2の所定角度に達するとブームを停止させる建設機
械の安全装置に適用される。そして、ブーム起伏角度が
第1の所定角度よりも大きいときには、ブームの下げ方
向の駆動速度を上げ方向の駆動速度よりも速くする速度
制御手段を備える。請求項3の発明は、起伏可能なブー
ムを有し、このブームが下げ方向に駆動される際にブー
ム起伏角度が第3の所定角度に達するとブーム駆動速度
を低減し、ブーム起伏角度が第3の所定角度よりも小さ
い第4の所定角度に達するとブームを停止させる建設機
械の安全装置に適用される。そして、ブーム起伏角度が
第3の所定角度よりも小さいときには、ブームの上げ方
向の駆動速度を下げ方向の駆動速度よりも速くする速度
制御手段を備える。請求項4の発明は、起伏可能なブー
ムを有し、ブーム起伏角度に応じた建設機械の負荷率が
第1の所定値まで増加するとブーム駆動速度を低減し、
負荷率が第1の所定値よりも大きい第2の所定値に達す
るとブームを停止させる建設機械の安全装置に適用され
る。そして、負荷率が第1の所定値よりも大きいときに
は、ブームの負荷率を低減させる方向の駆動速度を増加
させる方向の駆動速度よりも速くする速度制御手段を備
える。請求項5の発明は、起伏可能なブームを有し、ブ
ーム起伏角度に応じた建設機械の限界作業半径割合が第
1の所定値まで上昇するとブーム駆動速度を低減し、限
界作業半径割合が前記第1の所定値よりも大きい第2の
所定値に達するとブームを停止させる建設機械の安全装
置に適用される。そして、限界作業半径割合が第1の所
定値より大きいときには、ブームの限界作業半径割合を
低減させる方向の駆動速度を増加させる方向の駆動速度
よりも速くする速度制御手段を備える。限界作業半径割
合とは、ブーム起伏角度やブーム作用力等から演算され
る限界作業半径と実際の作業半径との比に相当し、実際
の作業半径が限界作業半径に達すると100%となるよ
うな値である。請求項6の発明は、起伏可能なブーム
と、ブームの駆動速度を規定する第1の物理量を演算
し、ブームが所定方向に駆動されているときに第1の条
件が成立すると演算結果に基づいてブーム駆動速度を低
減し、その後に第2の条件が成立するとブームを停止さ
せる第1のブーム動作手段と、ブームの駆動速度を規定
する第2の物理量を演算し、ブームが前記所定方向に駆
動されているときに第3の条件が成立すると演算結果に
基づいてブーム駆動速度を低減し、その後に第4の条件
が成立するとブームを停止させる第2のブーム動作手段
とを備えた建設機械の安全装置に適用される。そして、
第1の物理量で規定される駆動速度が第2の物理量で規
定される駆動速度よりも遅い場合には第1のブーム動作
手段を作動させ、第2の物理量で規定される駆動速度が
第1の物理量で規定される駆動速度よりも遅い場合には
第2のブーム動作手段を作動させる制御手段を備え、第
1のブーム動作手段は、第1の条件成立後は、ブームが
所定方向とは逆の方向に駆動する際の駆動速度を所定方
向に駆動する際の駆動速度よりも速くし、第2のブーム
動作手段は、第3の条件成立後は、ブームが所定方向と
は逆の方向に駆動する際の駆動速度を所定方向に駆動す
る際の駆動速度よりも速くする。請求項7の発明は、ブ
ームの先端に掛け回されて下端部にフックが取付けられ
るロープと、このロープの巻上げ/巻下げによりフック
を昇降させるウインチとを有し、ロープ巻上げ時にフッ
クとブーム先端との距離が第1の所定距離に達すると巻
上げ速度を低減し、フックとブーム先端との距離が第1
の所定距離よりも小さい第2の所定距離に達すると巻上
げを停止する建設機械の安全装置に適用される。そし
て、フックとブーム先端との距離が第1の所定距離より
も小さいときには、ロープの巻下げ速度を巻上げ速度よ
りも速くする速度制御手段を備える。
According to a first aspect of the present invention, there is provided a boom which can be raised and lowered, and when the first condition is satisfied when the boom is driven in a predetermined direction, the boom drive speed is reduced. Thereafter, when the second condition is satisfied, the present invention is applied to a safety device for a construction machine that stops the boom. And the first
After the above condition is satisfied, the boom is provided with speed control means for driving the boom in a direction opposite to the predetermined direction faster than the driving speed when driving the boom in the predetermined direction, thereby solving the above problem. I do. The invention according to claim 2 has a boom that can be raised and lowered, and when the boom is driven in the raising direction, the boom driving speed is reduced when the boom raising and lowering angle reaches a first predetermined angle. The present invention is applied to a safety device for a construction machine that stops a boom when a second predetermined angle that is larger than the first predetermined angle is reached. When the boom hoisting angle is larger than the first predetermined angle, a speed control means for increasing the driving speed in the lowering direction of the boom faster than the driving speed in the raising direction is provided. The invention according to claim 3 has a boom that can be raised and lowered, and when the boom is driven in the lowering direction, the boom driving speed is reduced when the boom raising and lowering angle reaches a third predetermined angle. The present invention is applied to a safety device for a construction machine that stops the boom when a fourth predetermined angle smaller than the third predetermined angle is reached. When the boom hoisting angle is smaller than the third predetermined angle, a speed control means is provided for increasing the driving speed in the raising direction of the boom faster than the driving speed in the lowering direction. The invention according to claim 4 has a boom that can be raised and lowered, and reduces the boom drive speed when the load factor of the construction machine according to the boom raising and lowering angle increases to a first predetermined value.
The present invention is applied to a safety device of a construction machine that stops a boom when a load factor reaches a second predetermined value larger than the first predetermined value. And, when the load factor is larger than the first predetermined value, a speed control means is provided for increasing the drive speed in the direction of decreasing the load factor of the boom to the drive speed in the direction of increasing. The invention according to claim 5 has a boom that can be raised and lowered, and reduces the boom drive speed when the critical working radius ratio of the construction machine according to the boom raising / lowering angle rises to a first predetermined value. The present invention is applied to a safety device for a construction machine that stops a boom when a second predetermined value that is larger than the first predetermined value is reached. When the limit operation radius ratio is larger than the first predetermined value, a speed control unit is provided for increasing the drive speed in the direction of decreasing the limit operation radius ratio of the boom in the direction of increasing the drive speed. The limit work radius ratio is equivalent to the ratio of the limit work radius calculated from the boom hoisting angle and the boom acting force to the actual work radius, and becomes 100% when the actual work radius reaches the limit work radius. Value. According to a sixth aspect of the present invention, a boom that can be raised and lowered and a first physical quantity that defines a driving speed of the boom are calculated, and when the first condition is satisfied when the boom is driven in a predetermined direction, the calculation is performed based on the calculation result. The boom drive speed is reduced by the first boom operating means for stopping the boom when the second condition is satisfied, and a second physical quantity defining the boom drive speed is calculated. A second boom operating means for reducing the boom driving speed based on a calculation result when the third condition is satisfied while the boom is being driven, and thereafter stopping the boom when the fourth condition is satisfied. Applied to safety devices. And
When the drive speed defined by the first physical quantity is lower than the drive speed defined by the second physical quantity, the first boom operating means is operated, and the drive speed defined by the second physical quantity is reduced to the first physical quantity. Control means for activating the second boom operation means when the drive speed is lower than the drive speed defined by the physical quantity of the first boom operation means. The driving speed at the time of driving in the opposite direction is faster than the driving speed at the time of driving in the predetermined direction, and after the third condition is satisfied, the boom operates in the direction opposite to the predetermined direction. The driving speed at the time of driving in the predetermined direction is higher than the driving speed at the time of driving in the predetermined direction. According to a seventh aspect of the present invention, there is provided a rope which is hung around the end of a boom and has a hook attached to a lower end thereof, and a winch which raises / lowers the hook by winding / lowering the rope. When the distance between the hook and the boom tip is reduced to the first predetermined distance, the winding speed is reduced.
Is applied to a safety device of a construction machine that stops winding when a second predetermined distance smaller than the predetermined distance is reached. When the distance between the hook and the end of the boom is smaller than the first predetermined distance, a speed control means is provided for making the rope lowering speed higher than the hoisting speed.

【0006】[0006]

【発明の実施の形態】図1〜図12により本発明の一実
施の形態を説明する。図1は本実施の形態におけるクロ
ーラクレーンの概略側面図である。クレーン本体の前部
にはブーム1が起伏可能に連結され、ブーム1は本体に
設けられたブーム起伏ウインチ21の駆動によりブーム
起伏ロープ22を介して起伏される。本体の巻上げ/巻
下げウインチ23から繰出された巻上げ/巻下げロープ
24は、ブーム1の上端に設けられたシーブ1aに掛回
され、その下端にフック25が取付けられる。フック2
5に掛けられた吊り荷26は、ウインチ23の駆動によ
り巻上げ/巻下げロープ24を介して昇降される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described with reference to FIGS. FIG. 1 is a schematic side view of the crawler crane according to the present embodiment. A boom 1 is connected to the front part of the crane body so as to be able to be raised and lowered, and the boom 1 is raised and lowered through a boom raising and lowering rope 22 by driving a boom raising and lowering winch 21 provided on the main body. A hoisting / lowering rope 24 pulled out from a hoisting / lowering winch 23 of the main body is wound around a sheave 1 a provided at an upper end of the boom 1, and a hook 25 is attached to a lower end thereof. Hook 2
5 is lifted and lowered via the hoisting / lowering rope 24 by driving the winch 23.

【0007】図2は上記クローラクレーンのブーム起伏
用油圧/電気回路を示している。31はメインの油圧ポ
ンプであり、その吐出油はコントロールバルブ10を介
してブーム起伏ウインチ駆動用の油圧モータ7に導かれ
る。32は操作用油圧ポンプであり、その吐出圧力は電
磁比例減圧弁4,パイロットバルブ5およびソレノイド
バルブ8aまたは8bを介してコントロールバルブ10
のパイロットポートに作用する。パイロットバルブ5は
レバー5aにより操作される。電磁比例減圧弁4は、パ
イロットバルブ5に通ずる操作油路L1の圧力をその開
度に応じて調節するもので、コントローラ3からの信号
により開度制御される。ソレノイドバルブ8a,8b
は、パイロットバルブ5とコントロールバルブ10との
間の操作油路L2a,L2bをそれぞれ連通/遮断する
もので、コントローラ3からの信号により切換制御され
る。
FIG. 2 shows a hydraulic / electric circuit for raising and lowering the boom of the crawler crane. Reference numeral 31 denotes a main hydraulic pump, and its discharge oil is guided to a hydraulic motor 7 for driving a boom hoisting winch via a control valve 10. Reference numeral 32 denotes an operating hydraulic pump whose discharge pressure is controlled by the control valve 10 via the electromagnetic proportional pressure reducing valve 4, the pilot valve 5 and the solenoid valve 8a or 8b.
Act on pilot ports. The pilot valve 5 is operated by a lever 5a. The electromagnetic proportional pressure-reducing valve 4 adjusts the pressure of the operating oil passage L <b> 1 leading to the pilot valve 5 according to the opening thereof, and is controlled in opening by a signal from the controller 3. Solenoid valves 8a, 8b
Is for opening / closing the operation oil passages L2a, L2b between the pilot valve 5 and the control valve 10, respectively, and is controlled by a signal from the controller 3.

【0008】コントローラ3にはまた、ブーム1に取付
けられてブーム1の起伏角度を検出する角度センサ2
と、ブーム起伏ロープ22の張力を検出するロードセル
9と、ブーム上げ側および下げ側の操作油路L2aおよ
びL2bの圧力が所定値以上になるとそれぞれオンする
圧力スイッチ6a,6bと、ブーム1の起伏角度が所定
の停止角度θ2(図1),θ4(図4)に達するとそれ
ぞれオンするリミットスイッチ33a,33bと、シー
ブ1aの回転量および回転方向を検出するロータリエン
コーダ34とが接続されている。
[0008] The controller 3 also includes an angle sensor 2 attached to the boom 1 for detecting the elevation angle of the boom 1.
A load cell 9 for detecting the tension of the boom hoisting rope 22, pressure switches 6a and 6b which are turned on when the pressures of the operating oil passages L2a and L2b on the boom raising and lowering sides are equal to or higher than predetermined values, respectively. Limit switches 33a and 33b that are turned on when the angles reach predetermined stop angles θ2 (FIG. 1) and θ4 (FIG. 4), respectively, and a rotary encoder 34 that detects the amount and direction of rotation of the sheave 1a are connected. .

【0009】図示はしないが、上記クレーンには巻上げ
/巻下げウインチ23を駆動するための油圧回路が設け
られている。この油圧回路は図1の油圧回路とほぼ同様
の構成とされ、その中の比例電磁減圧弁,ソレノイドバ
ルブおよび圧力スイッチ(いずれも図1のものと同様に
機能する)がコントローラ3に接続される。また、フッ
ク25が図8の実線位置に達したことを検出する検出器
(以下、第1フック過巻と呼ぶ)と、破線位置に達した
ことを検出する検出器(以下、第2フック過巻と呼ぶ)
が設けられている。これらの検出器は周知であるので詳
細な説明は省略する。
Although not shown, the crane is provided with a hydraulic circuit for driving the hoisting / lowering winch 23. This hydraulic circuit has substantially the same configuration as the hydraulic circuit of FIG. 1, and a proportional electromagnetic pressure reducing valve, a solenoid valve and a pressure switch (all function similarly to those of FIG. 1) are connected to the controller 3. . Further, a detector for detecting that the hook 25 has reached the solid line position in FIG. 8 (hereinafter, referred to as a first hook overwinding) and a detector for detecting that the hook 25 has reached the broken line position (hereinafter, the second hook excess winding). Called a volume)
Is provided. Since these detectors are well known, detailed description is omitted.

【0010】以上のように構成されたクレーンにおい
て、レバー5aを例えばブーム上げ側に操作すると、電
磁比例減圧弁4にて減圧された圧力がパイロットバルブ
5で更に減圧され、ブーム上げ側油路L2aのソレノイ
ドバルブ8a(このとき連通位置にある)を介してコン
トロールバルブ10の一方のパイロットポートに作用す
る。これによりコントロールバルブ10が切換わり、メ
イン油圧ポンプ31の吐出油が油圧モータ7に導かれて
油圧モータ7が回転し、ブーム起伏ウインチ21がロー
プ繰込み側に駆動される。その結果、巻上げ/巻下げロ
ープ24を介してブーム1が上げ方向(図1の矢印方
向)に駆動される。レバー5aをブーム下げ側に操作し
た場合は、上述と同様の動作によりブーム1が下げ方向
(図4の矢印方向)に回動される。
In the crane constructed as described above, when the lever 5a is operated, for example, to the boom raising side, the pressure reduced by the electromagnetic proportional pressure reducing valve 4 is further reduced by the pilot valve 5, and the boom raising side oil passage L2a Act on one pilot port of the control valve 10 through the solenoid valve 8a (at this time, at the communication position). As a result, the control valve 10 is switched, the discharge oil of the main hydraulic pump 31 is guided to the hydraulic motor 7, and the hydraulic motor 7 rotates, and the boom hoist winch 21 is driven to the rope retraction side. As a result, the boom 1 is driven via the hoisting / lowering rope 24 in the raising direction (the direction of the arrow in FIG. 1). When the lever 5a is operated to lower the boom, the boom 1 is rotated in the lowering direction (the direction of the arrow in FIG. 4) by the same operation as described above.

【0011】通常のブーム起伏時には操作油路L1の圧
力が最大値となるように電磁比例減圧弁4の開度が調節
される。操作油路L1の圧力が大きいほど同一のレバー
操作量に対するコントロールバルブ10の切換量が大き
くなり、ブーム1の駆動速度が速くなる。
At the time of normal boom raising and lowering, the opening of the electromagnetic proportional pressure reducing valve 4 is adjusted so that the pressure in the operation oil passage L1 becomes a maximum value. As the pressure in the operation oil passage L1 increases, the switching amount of the control valve 10 for the same lever operation amount increases, and the driving speed of the boom 1 increases.

【0012】また、巻上げ/巻下げウインチ23に関し
ても、不図示のレバー操作に応じてウインチ23を巻上
げ方向あるいは巻下げ方向に回転駆動し、巻上げ/巻下
げロープ24を介してフック25すなわち吊り荷26を
昇降させる。
The winch / winding winch 23 is also driven to rotate in a hoisting direction or a lowering direction in response to a lever operation (not shown), and a hook 25, ie, a suspended load, is wound via a hoisting / lowering rope 24. 26 is raised and lowered.

【0013】以上はクレーンの基本動作であるが、安全
機能を含めた動作を以下に説明する。 (1)ブーム上げ自動停止 本実施の形態では、ブーム上げ方向駆動時にブーム1の
起伏角度(対地角度)が停止角度θ2(図1)に達する
と、ソレノイドバルブ8aを強制的に遮断位置に切換え
て油路L2aを遮断し、ブーム1を自動停止させる。そ
の際、ブーム1の急激な停止を防止するために、ブーム
起伏角度がθ2に達する前のθ1となった時点でブーム
1の駆動速度を減速させる。駆動速度の減速は、電磁比
例減圧弁4により操作油路L1の圧力を調節することに
より行うが、この圧力調節は例えば図3に示すようなマ
ップに基づいて行う。このマップは、ブーム起伏角度に
操作油路L1の圧力を対応づけたもので、ブーム起伏角
度がθ1からθ2に増加するに従って操作油路圧力が直
線的に減少するようになっている。これによれば、ブー
ム起伏角度がθ1に達してから後はブーム1は徐々に減
速し、θ2に達した時点で何らショックを与えずにブー
ム1を停止することができ、荷振れ等を防止できる。
The above is the basic operation of the crane. The operation including the safety function will be described below. (1) Automatic Boom Raising Stop In this embodiment, when the up-and-down angle (ground angle) of the boom 1 reaches the stop angle θ2 (FIG. 1) during driving in the boom raising direction, the solenoid valve 8a is forcibly switched to the shut-off position. To shut off the oil passage L2a and automatically stop the boom 1. At that time, in order to prevent the boom 1 from suddenly stopping, the drive speed of the boom 1 is reduced when the boom up / down angle reaches θ1 before reaching the θ2. The drive speed is reduced by adjusting the pressure of the operation oil passage L1 by the electromagnetic proportional pressure reducing valve 4, and this pressure adjustment is performed based on, for example, a map shown in FIG. This map associates the pressure of the operation oil passage L1 with the boom undulation angle, and the operation oil passage pressure decreases linearly as the boom undulation angle increases from θ1 to θ2. According to this, after the boom angle reaches θ1, the boom 1 gradually decelerates, and when the angle reaches θ2, the boom 1 can be stopped without giving any shock, thereby preventing load swing and the like. it can.

【0014】一方、ブーム起伏角度がθ1を超えるとき
にブーム1が下げ側に駆動された場合には、上記マップ
を用いた制御は行わない。この場合は、ブーム起伏角度
に拘らず操作油路L1の圧力が最大値となるように電磁
比例減圧弁4が制御され、ブーム1は当初から速やかに
回動する。したがってブーム1を迅速に所望の角度に設
定できる。
On the other hand, if the boom 1 is driven downward when the boom angle exceeds θ1, control using the above map is not performed. In this case, the electromagnetic proportional pressure-reducing valve 4 is controlled such that the pressure in the operation oil passage L1 becomes the maximum value regardless of the boom raising / lowering angle, and the boom 1 quickly rotates from the beginning. Therefore, the boom 1 can be quickly set to a desired angle.

【0015】(2)ブーム下げ自動停止 (2−1)ブーム角度による自動停止 同様にブーム下げ方向駆動時にブーム起伏角度が停止角
度θ4(図4)に達すると、ソレノイドバルブ8bを強
制的に遮断位置に切換えて油路L2bを遮断し、ブーム
1を自動停止させる。その際、ブーム1の急激な停止を
防止するために、ブーム起伏角度がθ4に達する前のθ
3となった時点でブーム1の駆動速度を減速させる。こ
の場合には例えば図5に示すようなマップを用いる。な
お、θ2>θ1>θ3>θ4である。
(2) Automatic stop of boom lowering (2-1) Automatic stop by boom angle Similarly, when the boom up / down angle reaches the stop angle θ4 (FIG. 4) during driving of the boom lowering direction, the solenoid valve 8b is forcibly shut off. The position is switched to the position, the oil passage L2b is shut off, and the boom 1 is automatically stopped. At this time, in order to prevent the boom 1 from suddenly stopping, the angle θ before the boom undulation angle reaches θ4 is set.
At the time point when the speed becomes 3, the drive speed of the boom 1 is reduced. In this case, for example, a map as shown in FIG. 5 is used. Note that θ2>θ1>θ3> θ4.

【0016】ブーム起伏角度がθ3を下回るときにブー
ム1が上げ側に駆動された場合には、上記マップは用い
ず、ブーム起伏角度に拘らず操作油路L1の圧力が最高
圧力となるように電磁比例減圧弁4が制御され、ブーム
1は当初から速やかに回動する。したがってブーム1を
迅速に所望の角度に設定できる。
If the boom 1 is driven upward when the boom angle is less than θ3, the above-mentioned map is not used, and the pressure in the operation oil passage L1 becomes the maximum pressure regardless of the boom angle. The electromagnetic proportional pressure reducing valve 4 is controlled, and the boom 1 quickly rotates from the beginning. Therefore, the boom 1 can be quickly set to a desired angle.

【0017】(2−2)負荷率による自動停止 コントローラ3は、ブーム起伏角度やブーム起伏ロープ
22の張力、その他のパラメータに基づいてクレーンの
負荷率(%)を逐次演算する。そして、ブームが下げ方
向(負荷率を増加させる方向)に駆動されているときに
負荷率が100%になるとブーム1を強制的に停止させ
る。その際、ブーム1の急激な停止を防止するために、
図6のマップに従って負荷率が90%になった時点でブ
ーム1の駆動速度を減速させる。これによれば、負荷率
が90%に達してから後はブーム1は徐々に減速し、1
00%に達した時点で何らショックを与えずに停止する
ことができ、荷振れ等を防止できる。
(2-2) Automatic stop based on load factor The controller 3 sequentially calculates the load factor (%) of the crane based on the boom hoisting angle, the tension of the boom hoisting rope 22, and other parameters. When the load factor reaches 100% while the boom is being driven in the lowering direction (direction for increasing the load factor), the boom 1 is forcibly stopped. At that time, in order to prevent sudden stop of the boom 1,
When the load factor becomes 90% according to the map of FIG. 6, the driving speed of the boom 1 is reduced. According to this, after the load factor reaches 90%, the boom 1 gradually decelerates to 1
When it reaches 00%, it can be stopped without giving any shock, and it is possible to prevent load swing and the like.

【0018】一方、負荷率が90%より大きいときにブ
ーム1が上げ方向(負荷率を減少させる方向)に駆動さ
れた場合には、上記マップは用いず、操作油路L1の圧
力が最高圧力となるように電磁比例減圧弁4が制御さ
れ、ブーム1は当初から速やかに回動する。したがって
ブーム1を迅速に所望の角度に設定できる。
On the other hand, if the boom 1 is driven in the raising direction (the direction of decreasing the load factor) when the load factor is greater than 90%, the above-mentioned map is not used, and the pressure of the operation oil passage L1 becomes the maximum pressure. The electromagnetic proportional pressure-reducing valve 4 is controlled such that the boom 1 rotates quickly from the beginning. Therefore, the boom 1 can be quickly set to a desired angle.

【0019】(2−3)限界作業半径割合による自動停
止 コントローラ3は、ブーム起伏角度やブーム起伏ロープ
22の張力、その他のパラメータに基づいて限界作業半
径および実際の作業半径を演算するとともに、両者の比
(%)を作業限界半径割合として求める。そして、ブー
ム1が下げ方向(限界作業半径割合を増加させる方向)
に駆動されているときに限界作業半径割合が100%に
なると、つまり実際の作業半径が限界作業半径に達する
とブーム1を強制的に停止させる。その際、ブーム1の
急激な停止を防止するために、図7のマップに従って限
界作業半径割合が90%になった時点でブーム1の駆動
速度を減速させる。これによれば、限界作業半径割合が
90%に達してから後はブーム1は徐々に減速し、10
0%に達した時点で何らショックを与えずに停止するこ
とができ、荷振れ等を防止できる。
(2-3) Automatic stop based on the limit work radius ratio The controller 3 calculates the limit work radius and the actual work radius based on the boom hoisting angle, the tension of the boom hoisting rope 22, and other parameters. Is calculated as the work limit radius ratio. Then, the boom 1 is lowered (the direction in which the marginal work radius ratio is increased).
When the limit working radius ratio reaches 100% when the motor is driven, that is, when the actual working radius reaches the limit working radius, the boom 1 is forcibly stopped. At that time, in order to prevent the boom 1 from suddenly stopping, the drive speed of the boom 1 is reduced when the limit work radius ratio becomes 90% according to the map of FIG. According to this, after the limit work radius ratio reaches 90%, the boom 1 gradually decelerates to 10%.
When it reaches 0%, it can be stopped without giving any shock, and the load swing can be prevented.

【0020】一方、限界作業半径割合が90%より大き
いときにブーム1が限界作業半径割合を減少させる方向
に駆動された場合には、上記マップは用いず、操作油路
L1の圧力が最高圧力となるように電磁比例減圧弁4が
制御され、ブーム1は当初から速やかに回動する。した
がってブーム1を迅速に所望の角度に設定できる。
On the other hand, if the boom 1 is driven in a direction to decrease the critical working radius ratio when the critical working radius ratio is larger than 90%, the above-mentioned map is not used, and the pressure of the operating oil passage L1 becomes the maximum pressure. The electromagnetic proportional pressure-reducing valve 4 is controlled such that the boom 1 rotates quickly from the beginning. Therefore, the boom 1 can be quickly set to a desired angle.

【0021】ここで、ブーム下げ駆動時には、ブーム角
度,負荷率および限界作業半径割合に関して各マップか
ら求めた操作油路圧力のうちの最小値が選択され、この
最小値となるように(ブーム駆動速度が最も遅くなるよ
うに)電磁比例減圧弁4が制御される。これによれば、
いずれの要因でブームが強制的に停止される場合でも前
もって確実にブーム駆動速度を減速させることができ
る。
At the time of the boom lowering drive, the minimum value of the operating oil passage pressure obtained from each map with respect to the boom angle, the load factor, and the limit operation radius ratio is selected, and is set to this minimum value (boom drive). The proportional solenoid pressure reducing valve 4 is controlled (at the lowest speed). According to this,
Even if the boom is forcibly stopped due to any of the factors, the boom drive speed can be reliably reduced in advance.

【0022】(3)フック過巻自動停止 以上ではブームの自動停止機能について説明したが、本
実施の形態では巻上げ/巻下げロープ24の過巻(以
下、フック過巻と呼ぶ)に対しても同様の制御を行う。
すなわち、巻上げ/巻下げロープ24が繰込まれている
とき(フック上昇中)にフック25が図8の破線位置に
達してフック25とシーブ1aとの距離がH2(図8)
になると、ソレノイドバルブを強制的に遮断位置に切換
えて巻上げ/巻下げウインチ23を自動停止させる。そ
の際、ウインチ23の急激な停止を防止するために、フ
ック25が実線位置に達したとき、つまりフック25と
シーブ1aとの距離がH2になる前のH1になった時点
でウインチ23の駆動速度を減速させる。駆動速度の減
速は、例えば図9のようなマップを用いて電磁比例減圧
弁を制御し、操作油路の圧力を調節することにより行
う。これによれば、フック25とシーブ1aとの距離が
H1に達してから後はウインチ巻上げ速度が徐々に減速
し、H2に達した時点でショックを与えずに巻上げを停
止することができ、荷振れ等を防止できる。
(3) Hook Overwind Automatic Stop Although the automatic stop function of the boom has been described above, in the present embodiment, overwinding of the hoisting / lowering rope 24 (hereinafter referred to as hook overwinding) is also described. The same control is performed.
That is, when the hoisting / lowering rope 24 is being retracted (while the hook is being lifted), the hook 25 reaches the position shown by the broken line in FIG. 8 and the distance between the hook 25 and the sheave 1a is H2 (FIG. 8).
, The solenoid valve is forcibly switched to the shut-off position, and the hoisting / lowering winch 23 is automatically stopped. At that time, in order to prevent the winch 23 from suddenly stopping, when the hook 25 reaches the solid line position, that is, when the distance between the hook 25 and the sheave 1a becomes H1 before becoming H2, the driving of the winch 23 is performed. Decrease speed. The drive speed is reduced by, for example, controlling the electromagnetic proportional pressure reducing valve using a map as shown in FIG. 9 and adjusting the pressure of the operating oil passage. According to this, after the distance between the hook 25 and the sheave 1a reaches H1, the winch hoisting speed gradually decreases, and when the distance reaches H2, hoisting can be stopped without giving a shock. Deflection can be prevented.

【0023】一方、フック25とシーブ1aとの距離が
H1未満の状態でウインチ23の巻下げ動作(フック下
降動作)を行うときには上記マップを用いた制御は行わ
ない。この場合は、フック25とシーブ1aとの距離に
拘らず操作油路圧力が最大値となるように電磁比例減圧
弁が制御され、当初から速やかな巻下げ動作が行われ
る。
On the other hand, when the lowering operation (hook lowering operation) of the winch 23 is performed in a state where the distance between the hook 25 and the sheave 1a is less than H1, the control using the above map is not performed. In this case, regardless of the distance between the hook 25 and the sheave 1a, the electromagnetic proportional pressure-reducing valve is controlled such that the operating oil passage pressure becomes the maximum value, and a quick lowering operation is performed from the beginning.

【0024】上述の動作を実現するためのフローチャー
トを図10〜図12に示す。この制御はコントローラ3
にて実行されるもので、図10,図11のフローが上記
(1),(2)の動作を含むもの、図12のフローが
(3)の動作を含むものである。これらのフローは不図
示のメインルーチンから周期的にコールされ実行され
る。
FIGS. 10 to 12 show flowcharts for realizing the above operation. This control is performed by the controller 3
10 and FIG. 11 include the above operations (1) and (2), and the flow of FIG. 12 includes the operation (3). These flows are called and executed periodically from a main routine (not shown).

【0025】図10および図11において、ステップS
1では角度センサ2にて検出されるブーム起伏角度およ
びロードセル9にて検出される起伏ロープ22の張力を
入力する。ステップS2では、これらの入力情報および
コントローラ3内に格納された種々の情報からクレーン
の負荷率(%),限界作業半径および限界作業半径割合
(%)を算出する。ステップS3では、図6のマップか
ら負荷率に応じた操作油路L1の圧力を求めるととも
に、図7のマップから限界作業半径割合に応じた操作油
路圧力を求める。ステップS4では上記求めた2つの操
作回路圧力のうち小さい方を選択し、これを第1の制御
圧力として記憶する。
Referring to FIG. 10 and FIG.
At 1, the boom hoisting angle detected by the angle sensor 2 and the tension of the hoisting rope 22 detected by the load cell 9 are input. In step S2, the load factor (%) of the crane, the critical working radius, and the critical working radius ratio (%) are calculated from the input information and various information stored in the controller 3. In step S3, the pressure of the operation oil passage L1 corresponding to the load factor is obtained from the map of FIG. 6, and the operation oil passage pressure corresponding to the limit work radius ratio is obtained from the map of FIG. In step S4, the smaller of the two operating circuit pressures determined above is selected and stored as the first control pressure.

【0026】ステップS5では、現在のブーム起伏角度
に応じた操作油路圧力を図3または図5のマップから求
め、これを第2の制御圧力として記憶する。ステップS
6では現在のブーム起伏角度(以下、θとする)を図3
のθ1と比較し、θ1<θであればステップS7で圧力
スイッチ6aのオン・オフを判定する。圧力スイッチ6
aがオンであればブーム1が上げ方向に駆動されている
と判断してステップS8に進み、ステップS5で求めた
第2の制御圧力となるように電磁比例減圧弁4の開度を
制御する。これによりブーム1の上げ側の速度が低減さ
れる。ステップS9ではリミットスイッチ33aのオン
・オフを判定し、オフであれば、つまりブーム起伏角度
がまだθ2に達していなければリターンする。リミット
スイッチ33aがオンであれば、つまりブーム起伏角度
がθ2に達した場合にはステップS10に進み、ソレノ
イドバルブ8aを遮断位置に切換える。これによりコン
トロールバルブ10が中立位置に戻り、ブーム1が強制
的に停止される。
In step S5, the operating oil passage pressure corresponding to the current boom hoisting angle is obtained from the map shown in FIG. 3 or FIG. 5, and this is stored as the second control pressure. Step S
6 shows the current boom undulation angle (hereinafter referred to as θ) in FIG.
If θ1 <θ, it is determined in step S7 whether the pressure switch 6a is on or off. Pressure switch 6
If a is on, it is determined that the boom 1 is being driven in the up direction, and the process proceeds to step S8, where the opening of the electromagnetic proportional pressure reducing valve 4 is controlled so as to have the second control pressure obtained in step S5. . Thus, the speed of the boom 1 on the raising side is reduced. In step S9, it is determined whether the limit switch 33a is on or off. If the limit switch 33a is off, that is, if the boom angle has not yet reached θ2, the process returns. If the limit switch 33a is ON, that is, if the boom angle reaches θ2, the process proceeds to step S10, and the solenoid valve 8a is switched to the shut-off position. As a result, the control valve 10 returns to the neutral position, and the boom 1 is forcibly stopped.

【0027】ステップS7でリミットスイッチ33aが
オフと判定された場合には、θ1<θの状態でブーム1
が上げ方向に駆動されていないと判断し、ステップS1
1に進む。ステップS11では、ステップS4で求めた
第1の制御圧力となるように電磁比例減圧弁4の開度を
制御する。ステップS12では、負荷率および限界作業
半径割合のいずれかが100%に達したか否かを判定
し、否定されるとリターンする。ステップS12が肯定
されるとステップS12でソレノイドバルブ8bを遮断
位置に切換え、ブーム1を停止する。
If it is determined in step S7 that the limit switch 33a is off, the boom 1
Is not driven in the up direction, and step S1
Proceed to 1. In step S11, the opening of the electromagnetic proportional pressure-reducing valve 4 is controlled so as to become the first control pressure obtained in step S4. In step S12, it is determined whether any of the load factor and the limit work radius ratio has reached 100%, and if negative, the process returns. When step S12 is affirmed, the solenoid valve 8b is switched to the shut-off position in step S12, and the boom 1 is stopped.

【0028】上記ステップS11以降の制御では図3の
マップを用いていないので、負荷率および限界作業半径
割合がいずれも90%未満の場合には、θ1<θであっ
てもブーム1は最高速度で下げ方向に駆動される。
Since the map shown in FIG. 3 is not used in the control after step S11, when both the load factor and the limit work radius ratio are less than 90%, the boom 1 is driven at the maximum speed even if θ1 <θ. Is driven in the downward direction.

【0029】一方、ステップS6でθ1≧θと判定され
た場合にはステップS14に進み、圧力スイッチ6bの
オン・オフを判定する。圧力スイッチ6bがオン、すな
わちブーム1が下げ方向に駆動されている場合にはステ
ップS15に進み、上記第1および第2の制御圧力のう
ち小さい方となるように電磁比例減圧弁4の開度を制御
する。つまりブーム1が下げ方向に移動してるときに問
題となるのは、負荷率,限界作業半径割合およびブーム
下げ角度限界であるので、いずれかのマップで求めた操
作油路圧力のうち最小の値(ブーム駆動速度を最も遅く
する値)を用いて電磁比例減圧弁4を制御する。
On the other hand, if it is determined in step S6 that θ1 ≧ θ, the process proceeds to step S14, where it is determined whether the pressure switch 6b is on or off. If the pressure switch 6b is on, that is, if the boom 1 is being driven in the lowering direction, the process proceeds to step S15, and the opening of the electromagnetic proportional pressure reducing valve 4 is set so that the first and second control pressures become smaller. Control. In other words, when the boom 1 is moving in the lowering direction, the problems are the load factor, the limit working radius ratio, and the boom lowering angle limit. The electromagnetic proportional pressure-reducing valve 4 is controlled by using (the value that makes the boom drive speed the slowest).

【0030】ステップS16では負荷率および限界作業
半径割合のいずれかが100%に達したか、あるいはリ
ミットスイッチ33bがオンしたかを判定し、否定され
るとリターンし、肯定されるとステップS13にてソレ
ノイドバルブ8bを遮断位置に切換えてブーム1を停止
させる。
In step S16, it is determined whether one of the load factor and the limit operation radius ratio has reached 100% or the limit switch 33b has been turned on. If the result is negative, the process returns. If the result is affirmative, the process returns to step S13. Then, the boom 1 is stopped by switching the solenoid valve 8b to the shut-off position.

【0031】一方、ステップS14で圧力スイッチ6b
がオフ、すなわちブーム1が上げ方向に駆動されている
か停止している場合にはステップS17に進む。θ1≧
θでブーム1が上げ方向に駆動されているときには何も
問題とならないので、上記マップによる制御は行わず、
操作油路圧力が最大値となるように(ブーム駆動速度が
最も速くなるように)電磁比例減圧弁4を制御する。
On the other hand, in step S14, the pressure switch 6b
Is off, that is, when the boom 1 is driven in the raising direction or stopped, the process proceeds to step S17. θ1 ≧
When the boom 1 is driven in the upward direction at θ, there is no problem.
The electromagnetic proportional pressure-reducing valve 4 is controlled so that the operating oil passage pressure becomes the maximum value (the boom driving speed becomes the fastest).

【0032】次に、フック過巻に対する処理を図12に
より説明する。不図示のメインルーチンでは、フック2
5とシーブ1aとの間の巻上/巻下げロープ25の掛け
数(予め入力される)に基づいて、シーブ−フック間距
離がH1からH2になるまでのロータリエンコーダ34
のパルス数(以下、基準カウント数と呼ぶ)を算出し記
憶しておく。
Next, the processing for the overwinding of the hook will be described with reference to FIG. In the main routine not shown, hook 2
The rotary encoder 34 until the sheave-hook distance changes from H1 to H2 based on the number of times the hoisting / lowering rope 25 is hung between the sheave 1 and the sheave 1a (preliminarily input).
(Hereinafter referred to as a reference count number) is calculated and stored.

【0033】図12において、ステップS21では第1
フック過巻がオンか否か、つまりフック25が図8の実
線位置よりも上に位置しているか否かを判定し、否定さ
れるとステップS29で所定のパルスカウンタをリセッ
トする。ステップS21が肯定されるとステップS22
に進み、上記パルスカウンタによりロータリエンコーダ
34のパルスをカウントする。
In FIG. 12, in step S21, the first
It is determined whether or not the hook overwinding is ON, that is, whether or not the hook 25 is located above the solid line position in FIG. 8. If the determination is negative, a predetermined pulse counter is reset in step S29. If step S21 is affirmed, step S22 is reached.
The pulse counter of the rotary encoder 34 is counted by the pulse counter.

【0034】ステップS23では、第2フック過巻がオ
ンか否か、つまりフック25が図8の破線位置に達した
か否かを判定し、否定されるとステップS24に進む。
ステップS24では、現在のパルスカウント数が上記記
憶されている基準カウント数の何%であるかを算出す
る。これは上記シーブ−フック間距離に相当するもので
ある。ステップS25ではステップS24での算出結果
から図9のマップを用いて操作油路圧力を求める。ステ
ップS26では、ロープ24の巻上げ操作回路に設けら
れた圧力スイッチがオンか否かを判定し、オンであれば
ロープ24の巻上げが行われていると判断してステップ
S27に進み、ステップS25で求めた操作油路圧力と
なるように電磁比例減圧弁を制御する。
In step S23, it is determined whether or not the second hook overwinding is ON, that is, whether or not the hook 25 has reached the position indicated by the broken line in FIG. 8, and if not, the flow proceeds to step S24.
In step S24, the percentage of the current pulse count to the stored reference count is calculated. This is equivalent to the sheave-hook distance. In step S25, the operation oil pressure is obtained from the calculation result in step S24 using the map shown in FIG. In step S26, it is determined whether or not the pressure switch provided in the winding operation circuit of the rope 24 is on. If it is on, it is determined that the winding of the rope 24 is being performed, and the process proceeds to step S27. The electromagnetic proportional pressure-reducing valve is controlled so as to have the obtained operating oil passage pressure.

【0035】一方、上記圧力スイッチがオフの場合には
ステップS28に進む。ここでは上記マップによる制御
は行わず、操作油路圧力が最大値となるように(ロープ
24の巻下げ速度が最も速くなるように)電磁比例減圧
弁を制御する。またステップS23で第2フック過巻が
オンと判定された場合には、ステップS30でソレノイ
ドバルブを遮断位置に切換えてコントロールバルブを中
立位置に戻し、巻上げ/巻下げウインチ23を停止す
る。
On the other hand, if the pressure switch is off, the process proceeds to step S28. Here, the control based on the above map is not performed, and the electromagnetic proportional pressure reducing valve is controlled so that the operating oil passage pressure becomes the maximum value (so that the lowering speed of the rope 24 becomes the highest). If it is determined in step S23 that the second hook overwinding is ON, the solenoid valve is switched to the shut-off position in step S30, the control valve is returned to the neutral position, and the hoisting / lowering winch 23 is stopped.

【0036】なお以上では、圧力スイッチをブーム上げ
方向および下げ方向の双方の操作油路に設けたが、上げ
方向油路のみに設けても同様な制御を行える。また圧力
スイッチに代えて、例えば油圧モータ7に回転センサを
設けて回転方向を検出し、これによりブーム起伏方向あ
るいはフック巻上げ/巻下げを判定してもよい。あるい
は角度センサ2の信号の時間的変化からブームの起伏方
向を判定してもよい。また、図3,図5,図6,図7お
よび図9のマップは一例を示したもので、ブームやフッ
クの減速の仕方はこれらに限定されるものではない。
In the above description, the pressure switches are provided in the operation oil passages in both the boom raising and lowering directions. However, the same control can be performed by providing the pressure switches only in the raising oil passages. Instead of the pressure switch, for example, a rotation sensor may be provided in the hydraulic motor 7 to detect the rotation direction, and thereby determine the boom up / down direction or the hook lifting / lowering. Alternatively, the up-and-down direction of the boom may be determined from a temporal change in the signal of the angle sensor 2. The maps in FIGS. 3, 5, 6, 7 and 9 show examples, and the manner of deceleration of the boom or hook is not limited to these.

【0037】[0037]

【発明の効果】請求項1の発明によれば、ブームが所定
方向に駆動されているときに第1の条件が成立するとブ
ーム駆動速度を低減し、その後に第2の条件が成立する
とブームを停止させるものにおいて、第1の条件が成立
した後は、ブームが所定方向とは逆の方向に駆動する際
の駆動速度を所定方向に駆動する際の駆動速度よりも速
くするようにしたので、ブームの急激な停止が防止でき
るとともに、ブームを迅速に安全側(自動停止解除側)
に駆動できる。請求項2の発明によれば、ブームが上げ
方向に駆動される際にその起伏角度が第1の所定角度に
達するとブーム駆動速度を低減し、ブーム起伏角度が第
1の所定角度よりも大きい第2の所定角度に達するとブ
ームを停止させるものにおいて、ブーム起伏角度が第1
の所定角度よりも大きいときには、ブームの下げ方向の
駆動速度を上げ方向の駆動速度よりも速くするようにし
たので、ブームの急激な停止が防止できるとともに、ブ
ームを迅速に下げ方向(自動停止解除側)に駆動でき
る。請求項3の発明によれば、ブームが下げ方向に駆動
される際にその起伏角度が第3の所定角度に達するとブ
ーム駆動速度を低減し、ブーム起伏角度が第3の所定角
度よりも小さい第4の所定角度に達するとブームを停止
させるものにおいて、ブーム起伏角度が第3の所定角度
よりも小さいときには、ブームの上げ方向の駆動速度を
下げ方向の駆動速度よりも速くするようにしたので、ブ
ームの急激な停止が防止できるとともに、ブームを迅速
に上げ方向(自動停止解除側)に駆動できる。請求項4
の発明によれば、建設機械の負荷率が第1の所定値まで
増加するとブーム駆動速度を低減し、負荷率が第1の所
定値よりも大きい第2の所定値に達するとブームを停止
させるものにおいて、負荷率が第1の所定値よりも大き
いときには、ブームの負荷率を低減させる方向の駆動速
度を増加させる方向の駆動速度よりも速くするようにし
たので、上述と同様の効果が得られる。請求項5の発明
によれば、限界作業半径割合が第1の所定値まで上昇す
るとブーム駆動速度を低減し、限界作業半径割合が前記
第1の所定値よりも大きい第2の所定値に達するとブー
ムを停止させるものにおいて、限界作業半径割合が第1
の所定値より大きいときには、ブームの限界作業半径割
合を低減させる方向の駆動速度を増加させる方向の駆動
速度よりも速くするようにしたので、上述と同様の効果
が得られる。請求項6の発明によれば、第1および第2
の条件でブームの減速および停止を行うとともに、第3
および第4の条件でも同様にブームの減速および停止を
行うものにおいて、第1の条件が成立したときのブーム
駆動速度と、第3の条件が成立したときのブーム駆動速
度のうち遅い方を選択して制御を行うようにしたので、
上述と同様の効果が得られると同時に、必要時に確実に
ブーム駆動速度を低減できる。請求項7の発明によれ
ば、巻上げ時にフックとブーム先端との距離が第1の所
定距離に達すると巻上げ速度を低減し、フックとブーム
先端との距離が第1の所定距離よりも小さい第2の所定
距離に達すると巻上げを停止するものにおいて、フック
とブーム先端との距離が第1の所定距離よりも小さいと
きには、ロープの巻下げ速度を巻上げ速度よりも速くす
るようにしたので、巻上げ/巻下げウインチの急激な停
止が防止できるとともに、フックを迅速に安全側(自動
停止解除側)に駆動できる。
According to the first aspect of the present invention, when the first condition is satisfied while the boom is driven in a predetermined direction, the boom drive speed is reduced, and when the second condition is satisfied, the boom is driven. In the stop, after the first condition is satisfied, the drive speed when the boom is driven in the direction opposite to the predetermined direction is set to be faster than the drive speed when the boom is driven in the predetermined direction. Abrupt stop of the boom can be prevented, and the boom can be quickly moved to the safe side (auto stop release side).
Can be driven. According to the invention of claim 2, when the boom is driven in the raising direction, the boom drive speed is reduced when the elevation angle reaches the first predetermined angle, and the boom elevation angle is larger than the first predetermined angle. A method for stopping a boom when a second predetermined angle is reached, wherein the boom undulation angle is the first
When the angle is larger than the predetermined angle, the driving speed in the lowering direction of the boom is set to be faster than the driving speed in the raising direction, so that abrupt stop of the boom can be prevented and the lowering direction of the boom can be quickly reduced (automatic stop release). Side). According to the invention of claim 3, when the boom is driven in the lowering direction, the boom drive speed is reduced when the up-and-down angle reaches the third predetermined angle, and the boom up-and-down angle is smaller than the third predetermined angle. When the boom angle is smaller than the third predetermined angle, the driving speed in the raising direction of the boom is made faster than the driving speed in the lowering direction. In addition, the boom can be prevented from suddenly stopping, and the boom can be quickly driven in the raising direction (the automatic stop release side). Claim 4
According to the invention, the boom drive speed is reduced when the load factor of the construction machine increases to the first predetermined value, and the boom is stopped when the load factor reaches the second predetermined value larger than the first predetermined value. When the load factor is larger than the first predetermined value, the drive speed in the direction to decrease the load factor of the boom is made faster than the drive speed in the direction to increase, so that the same effect as described above is obtained. Can be According to the fifth aspect of the present invention, the boom drive speed is reduced when the limit work radius ratio rises to the first predetermined value, and the limit work radius ratio reaches the second predetermined value larger than the first predetermined value. Then, in the one that stops the boom, the limit work radius ratio is the first
Is larger than the predetermined value, the drive speed in the direction of decreasing the limit working radius ratio of the boom is set to be faster than the drive speed in the direction of increasing, so that the same effect as described above can be obtained. According to the invention of claim 6, the first and the second are provided.
Decelerate and stop the boom under the conditions of
In the case where the boom is similarly decelerated and stopped under the fourth condition, the slower one of the boom drive speed when the first condition is satisfied and the boom drive speed when the third condition is satisfied is selected. Control.
The same effect as described above can be obtained, and at the same time, the boom drive speed can be reliably reduced when necessary. According to the invention of claim 7, when the distance between the hook and the boom tip reaches the first predetermined distance at the time of hoisting, the hoisting speed is reduced, and the distance between the hook and the boom tip is smaller than the first predetermined distance. When the distance between the hook and the end of the boom is smaller than the first predetermined distance, the hoisting speed of the rope is set to be higher than the hoisting speed. / The abrupt stop of the lowering winch can be prevented, and the hook can be quickly driven to the safe side (the automatic stop release side).

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態におけるクレーンの概略
側面図で、ブーム上げ方向自動停止機能を説明する図。
FIG. 1 is a schematic side view of a crane according to an embodiment of the present invention, illustrating a function of automatically stopping a boom raising direction.

【図2】上記クレーンのブーム駆動用油圧/電気回路
図。
FIG. 2 is a hydraulic / electrical circuit diagram for driving the boom of the crane.

【図3】ブーム起伏角度から操作油路圧力を決定するた
めのマップを示す図。
FIG. 3 is a diagram showing a map for determining an operation oil passage pressure from a boom undulation angle.

【図4】クレーンの概略側面図で、ブーム下げ方向自動
停止機能を説明する図。
FIG. 4 is a schematic side view of the crane, illustrating a boom lowering direction automatic stop function.

【図5】ブーム起伏角度から操作油路圧力を決定するた
めのマップを示す図。
FIG. 5 is a diagram showing a map for determining an operation oil passage pressure from a boom undulation angle.

【図6】負荷率から操作油路圧力を決定するためのマッ
プを示す図。
FIG. 6 is a diagram showing a map for determining an operation oil passage pressure from a load factor.

【図7】限界作業半径割合から操作油路圧力を決定する
ためのマップを示す図。
FIG. 7 is a diagram showing a map for determining an operation oil passage pressure from a limit work radius ratio.

【図8】クレーン概略側面図で、フック過巻防止機能を
説明する図。
FIG. 8 is a schematic side view of a crane illustrating a hook overwinding prevention function.

【図9】フック−シーブ間距離から操作油路圧力を決定
するためのマップを示す図。
FIG. 9 is a diagram showing a map for determining an operating oil passage pressure from a hook-sheave distance.

【図10】ブーム自動停止機能を説明するフローチャー
ト。
FIG. 10 is a flowchart illustrating a boom automatic stop function.

【図11】図10に続くフローチャート。FIG. 11 is a flowchart following FIG. 10;

【図12】フック過巻防止機能を説明するフローチャー
ト。
FIG. 12 is a flowchart illustrating a hook overwinding prevention function.

【符号の説明】[Explanation of symbols]

1 ブーム 1a シーブ 2 角度センサ 3 コントローラ 4 電磁比例減圧弁 5 パイロットバルブ 6a,6b 圧力スイッチ 7 油圧モータ 8a,8b ソレノイドバルブ 9 ロードセル 10 コントロールバルブ 21 ブーム起伏ウインチ 22 ブーム起伏ロープ 23 巻上げ/巻下げウインチ 24 巻上げ/巻下げロープ 25 フック 26 吊り荷 31 メイン油圧ポンプ 32 操作用油圧ポンプ 33a,33b リミットスイッチ 34 ロータリエンコーダ L1,L2a,L2b 操作油路 Reference Signs List 1 boom 1a sheave 2 angle sensor 3 controller 4 electromagnetic proportional pressure reducing valve 5 pilot valve 6a, 6b pressure switch 7 hydraulic motor 8a, 8b solenoid valve 9 load cell 10 control valve 21 boom hoisting winch 22 boom hoisting rope 23 hoisting / lowering winch 24 Hoisting / lowering rope 25 Hook 26 Suspended load 31 Main hydraulic pump 32 Operating hydraulic pump 33a, 33b Limit switch 34 Rotary encoder L1, L2a, L2b Operating oil passage

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 起伏可能なブームを有し、このブームが
所定方向に駆動されているときに第1の条件が成立する
とブーム駆動速度を低減し、その後に第2の条件が成立
するとブームを停止させる建設機械の安全装置におい
て、 前記第1の条件成立後は、前記ブームが前記所定方向と
は逆の方向に駆動する際の駆動速度を前記所定方向に駆
動する際の駆動速度よりも速くする速度制御手段を備え
ることを特徴とする建設機械の安全装置。
A boom that can be raised and lowered, the boom drive speed is reduced when a first condition is satisfied when the boom is driven in a predetermined direction, and the boom is reduced when a second condition is satisfied. In the safety device for a construction machine to be stopped, after the first condition is satisfied, a driving speed when the boom is driven in a direction opposite to the predetermined direction is faster than a driving speed when the boom is driven in the predetermined direction. A safety device for a construction machine, comprising:
【請求項2】 起伏可能なブームを有し、このブームが
上げ方向に駆動される際にブーム起伏角度が第1の所定
角度に達するとブーム駆動速度を低減し、ブーム起伏角
度が前記第1の所定角度よりも大きい第2の所定角度に
達するとブームを停止させる建設機械の安全装置におい
て、 前記ブーム起伏角度が前記第1の所定角度よりも大きい
ときには、前記ブームの下げ方向の駆動速度を上げ方向
の駆動速度よりも速くする速度制御手段を備えることを
特徴とする建設機械の安全装置。
2. A boom that can be raised and lowered, and when the boom is driven in a raising direction, the boom driving speed is reduced when the boom raising and lowering angle reaches a first predetermined angle. In a safety device for a construction machine that stops the boom when a second predetermined angle that is larger than the predetermined angle is reached, when the boom undulation angle is larger than the first predetermined angle, the drive speed of the boom in the lowering direction is reduced. A safety device for a construction machine, comprising speed control means for increasing a driving speed in a raising direction.
【請求項3】 起伏可能なブームを有し、このブームが
下げ方向に駆動される際にブーム起伏角度が第3の所定
角度に達するとブーム駆動速度を低減し、ブーム起伏角
度が前記第3の所定角度よりも小さい第4の所定角度に
達するとブームを停止させる建設機械の安全装置におい
て、 前記ブーム起伏角度が前記第3の所定角度よりも小さい
ときには、前記ブームの上げ方向の駆動速度を下げ方向
の駆動速度よりも速くする速度制御手段を備えることを
特徴とする建設機械の安全装置。
3. A boom that can be raised and lowered, and when the boom is driven in a lowering direction, the boom driving speed is reduced when the boom raising and lowering angle reaches a third predetermined angle. A safety device for a construction machine that stops the boom when a fourth predetermined angle smaller than the predetermined angle is reached, wherein when the boom undulation angle is smaller than the third predetermined angle, the driving speed of the boom in the raising direction is reduced. A safety device for a construction machine, comprising speed control means for increasing a driving speed in a lowering direction.
【請求項4】 起伏可能なブームを有し、ブーム起伏角
度に応じた建設機械の負荷率が第1の所定値まで増加す
るとブーム駆動速度を低減し、前記負荷率が前記第1の
所定値よりも大きい第2の所定値に達すると前記ブーム
を停止させる建設機械の安全装置において、 前記負荷率が前記第1の所定値よりも大きいときには、
前記ブームの前記負荷率を低減させる方向の駆動速度を
増加させる方向の駆動速度よりも速くする速度制御手段
を備えることを特徴とする建設機械の安全装置。
4. A boom that can be raised and lowered, and when the load factor of the construction machine according to the boom hoisting angle increases to a first predetermined value, the boom driving speed is reduced, and the load factor is reduced to the first predetermined value. A safety device for a construction machine that stops the boom when it reaches a second predetermined value that is larger than the second predetermined value. When the load factor is larger than the first predetermined value,
A safety device for a construction machine, comprising: speed control means for increasing a driving speed of the boom in a direction of decreasing the load factor in a direction of increasing a driving speed of the boom.
【請求項5】 起伏可能なブームを有し、ブーム起伏角
度に応じた建設機械の限界作業半径割合が第1の所定値
まで上昇するとブーム駆動速度を低減し、前記限界作業
半径割合が前記第1の所定値よりも大きい第2の所定値
に達すると前記ブームを停止させる建設機械の安全装置
において、 前記限界作業半径割合が前記第1の所定値より大きいと
きには、前記ブームの前記限界作業半径割合を低減させ
る方向の駆動速度を増加させる方向の駆動速度よりも速
くする速度制御手段を備えることを特徴とする建設機械
の安全装置。
5. A construction machine having a boom that can be raised and lowered, and when the critical working radius ratio of the construction machine according to the boom raising / lowering angle rises to a first predetermined value, the boom driving speed is reduced, and the critical working radius ratio is reduced to the first working value. A safety device for a construction machine that stops the boom when a second predetermined value greater than a first predetermined value is reached, wherein the limit operation radius of the boom is determined when the limit operation radius ratio is larger than the first predetermined value. A safety device for a construction machine, comprising: speed control means for increasing a driving speed in a direction of decreasing a ratio to a driving speed of a direction of increasing the driving speed.
【請求項6】 起伏可能なブームと、 前記ブームの駆動速度を規定する第1の物理量を演算
し、前記ブームが所定方向に駆動されているときに第1
の条件が成立すると前記演算結果に基づいてブーム駆動
速度を低減し、その後に第2の条件が成立するとブーム
を停止させる第1のブーム動作手段と、 前記ブームの駆動速度を規定する第2の物理量を演算
し、前記ブームが前記所定方向に駆動されているときに
第3の条件が成立すると前記演算結果に基づいてブーム
駆動速度を低減し、その後に第4の条件が成立するとブ
ームを停止させる第2のブーム動作手段とを備えた建設
機械の安全装置において、 前記第1の物理量で規定される駆動速度が前記第2の物
理量で規定される駆動速度よりも遅い場合には前記第1
のブーム動作手段を作動させ、前記第2の物理量で規定
される駆動速度が前記第1の物理量で規定される駆動速
度よりも遅い場合には前記第2のブーム動作手段を作動
させる制御手段を備え、 前記第1のブーム動作手段は、前記第1の条件成立後
は、前記ブームが前記所定方向とは逆の方向に駆動する
際の駆動速度を前記所定方向に駆動する際の駆動速度よ
りも速くし、前記第2のブーム動作手段は、前記第3の
条件成立後は、前記ブームが前記所定方向とは逆の方向
に駆動する際の駆動速度を前記所定方向に駆動する際の
駆動速度よりも速くすることを特徴とする建設機械の安
全装置。
6. An up-and-down boom and a first physical quantity defining a drive speed of the boom are calculated, and the first boom is driven when the boom is driven in a predetermined direction.
When the condition (1) is satisfied, the boom driving speed is reduced based on the calculation result, and thereafter, when the second condition is satisfied, a first boom operating means for stopping the boom; A physical quantity is calculated, and when the third condition is satisfied while the boom is driven in the predetermined direction, the boom driving speed is reduced based on the calculation result, and thereafter, when the fourth condition is satisfied, the boom is stopped. A safety device for a construction machine having a second boom operation means for causing the first physical quantity to be lower than the second physical quantity when the driving speed defined by the first physical quantity is lower than the first physical quantity.
Control means for operating the second boom operation means when the drive speed defined by the second physical quantity is lower than the drive speed defined by the first physical quantity. The first boom operating means, after the first condition is satisfied, sets a driving speed when the boom is driven in a direction opposite to the predetermined direction to a driving speed when the boom is driven in the predetermined direction. The second boom operating means may further include, after the third condition is satisfied, a drive speed when the boom is driven in a direction opposite to the predetermined direction and a drive speed when the boom is driven in the predetermined direction. A safety device for construction machinery, wherein the speed is higher than the speed.
【請求項7】 ブームの先端に掛け回されて下端部にフ
ックが取付けられるロープと、このロープの巻上げ/巻
下げにより前記フックを昇降させるウインチとを有し、
前記ロープ巻上げ時に前記フックとブーム先端との距離
が第1の所定距離に達すると巻上げ速度を低減し、前記
フックとブーム先端との距離が前記第1の所定距離より
も小さい第2の所定距離に達すると巻上げを停止する建
設機械の安全装置において、 前記フックとブーム先端との距離が前記第1の所定距離
よりも小さいときには、前記ロープの巻下げ速度を前記
巻上げ速度よりも速くする速度制御手段を備えることを
特徴とする建設機械の安全装置。
7. A rope which is hung around a tip of a boom and has a hook attached to a lower end thereof, and a winch which raises / lowers the hook by hoisting / lowering the rope,
When the distance between the hook and the end of the boom reaches a first predetermined distance during the winding of the rope, the winding speed is reduced, and the distance between the hook and the end of the boom is a second predetermined distance smaller than the first predetermined distance. A safety device for a construction machine that stops hoisting when the distance between the hook and the boom tip is smaller than the first predetermined distance; speed control for making the lowering speed of the rope faster than the hoisting speed. A safety device for a construction machine, characterized by comprising means.
JP08203699A 1996-08-01 1996-08-01 Safety equipment for construction machinery Expired - Lifetime JP3122043B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08203699A JP3122043B2 (en) 1996-08-01 1996-08-01 Safety equipment for construction machinery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08203699A JP3122043B2 (en) 1996-08-01 1996-08-01 Safety equipment for construction machinery

Publications (2)

Publication Number Publication Date
JPH1045383A true JPH1045383A (en) 1998-02-17
JP3122043B2 JP3122043B2 (en) 2001-01-09

Family

ID=16478391

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08203699A Expired - Lifetime JP3122043B2 (en) 1996-08-01 1996-08-01 Safety equipment for construction machinery

Country Status (1)

Country Link
JP (1) JP3122043B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008094623A (en) * 2006-09-14 2008-04-24 Kobelco Cranes Co Ltd Safety device for mobile crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008094623A (en) * 2006-09-14 2008-04-24 Kobelco Cranes Co Ltd Safety device for mobile crane

Also Published As

Publication number Publication date
JP3122043B2 (en) 2001-01-09

Similar Documents

Publication Publication Date Title
EP2241530B1 (en) Slewing stop control apparatus and method for slewing type working machine
EP3438467A1 (en) Hydraulic system and emergency operation method
JP3276130B2 (en) Wire rope turbulence prevention device when winch of mobile crane is overwound
KR100209122B1 (en) Prevention system for overhoist of crane
JP3122043B2 (en) Safety equipment for construction machinery
JP3434401B2 (en) Crane hook overwind prevention device
JP4268784B2 (en) Auto tension device in hydraulic crane
JPH0717688A (en) Drive control device for hydraulic winch
JP3351250B2 (en) Control method and control device for hoisting device
JP3294183B2 (en) Hydraulic winch counter balance circuit
JP2702058B2 (en) Drive control method and device for hydraulic winch
JPH0725591A (en) Drive control device of hydraulic winch
JP4527860B2 (en) Speed control method and apparatus for hydraulic winch of crane
JPH0717689A (en) Drive control device for hydraulic winch
JP2838055B2 (en) Drive control method and device for undulating member in crane
JP2576723Y2 (en) Automatic crane stopping device
JP2000198681A (en) Excessive winding-up prevention device for winch
JP2793147B2 (en) Crane winch drive control method and device
JPH11278795A (en) Hydraulic winding device and working machine loaded with its hydraulic winding device
JP2000313589A (en) Hook overwinding prevention device for construction machine
JP2788614B2 (en) Crane boom undulation control method and device
JP2001287891A (en) Deceleration control device for hydraulic winch
JPH045342A (en) Hydraulic driving gear for civil engineering construction machine
JPH08217388A (en) Hydraulic winch device
JPH0717687A (en) Drive control device for hydraulic winch

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071020

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081020

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091020

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091020

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101020

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101020

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111020

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111020

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121020

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121020

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131020

Year of fee payment: 13

EXPY Cancellation because of completion of term