JPH1036065A - Power shovel - Google Patents
Power shovelInfo
- Publication number
- JPH1036065A JPH1036065A JP19211696A JP19211696A JPH1036065A JP H1036065 A JPH1036065 A JP H1036065A JP 19211696 A JP19211696 A JP 19211696A JP 19211696 A JP19211696 A JP 19211696A JP H1036065 A JPH1036065 A JP H1036065A
- Authority
- JP
- Japan
- Prior art keywords
- hook assembly
- links
- bucket
- hook
- jib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Shovels (AREA)
- Load-Engaging Elements For Cranes (AREA)
- Jib Cranes (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、クレーン作業用の
フックアッセンブリを備えたパワーショベルに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a power shovel having a hook assembly for crane operation.
【0002】[0002]
【従来の技術】土木作業において、掘削作業とクレーン
作業の両方が行なわれる場合には、一般に、パワーショ
ベルとクレーンの2種類の建設機械が使用される。しか
し、特に小規模な工事において、2種類の建設機械を使
い分けることは、非常に繁雑であり、合理面で欠けると
ころがある。パワーショベル自体に起伏力があることを
考えれば、わざわざクレーン機械を使用することなく、
パワーショベルを利用して簡易的なクレーン作業を行な
う方が、土木作業の効率化の点で有益であることはいう
までもない。このようなことから、現在では、パワーシ
ョベルによって簡易的なクレーン作業を行なうことがで
きる各種の方式が考え出され実用化されている。2. Description of the Related Art In civil engineering work, when both excavation work and crane work are performed, two types of construction machines, a power shovel and a crane, are generally used. However, it is very complicated to use two types of construction machines properly, especially in small-scale construction, and there is a lack in rational aspects. Considering that the excavator itself has undulating power, without using a crane machine,
It goes without saying that performing a simple crane operation using a power shovel is beneficial in terms of improving the efficiency of civil engineering work. For this reason, at present, various methods capable of performing a simple crane operation by a power shovel have been devised and put into practical use.
【0003】図8ないし図12は、フックアッセンブリ
を備えることによって、それ自身でクレーン作業をも行
なうことができる、パワーショベルの従来例を示してい
る。図8に示されたパワーショベルは、周知の通り、ア
ーム100の先端に取付ピン109を介して回動可能に
取り付けられたバケット103と、バケット103を傾
動させる油圧シリンダ101とを備え、油圧シリンダ1
01のロッド101aの先端とバケット103のブラケ
ット104とが、リンク(以下、テッピングリンクとい
う。)102によって連結された構成となっている。そ
して、テッピングリンク102とブラケット104とを
連結する取付ピン(以下、バケットピンという。)10
5には、下端にフック107を有するフックアッセンブ
リ106Aが取付けられている。FIGS. 8 to 12 show a conventional example of a power shovel having a hook assembly, which can perform a crane operation by itself. As is well known, the power shovel shown in FIG. 8 includes a bucket 103 rotatably attached to the tip of an arm 100 via a mounting pin 109, and a hydraulic cylinder 101 for tilting the bucket 103. 1
The configuration is such that the tip of the rod 101a of the No. 01 and the bracket 104 of the bucket 103 are connected by a link (hereinafter referred to as a tapping link) 102. A mounting pin (hereinafter, referred to as a bucket pin) 10 for connecting the tapping link 102 and the bracket 104 is provided.
5, a hook assembly 106A having a hook 107 at the lower end is attached.
【0004】また、図9に示されたパワーショベルは、
バケット103の背面に別のブラケット110が溶接し
て設けられ、このブラケット110に対して、チェーン
またはワイヤの下端にフック107を取り付けてなるフ
ックアッセンブリ106Bが連結されている。[0004] The excavator shown in FIG.
Another bracket 110 is provided by welding on the back surface of the bucket 103, and a hook assembly 106B having a hook 107 attached to the lower end of a chain or a wire is connected to the bracket 110.
【0005】また、図10に示されたパワーショベル
は、バケット103とアーム100とを連結する取付ピ
ン109にフックアッセンブリ106Cが連結され、図
10の(b)に示すように、フックアッセンブリ106
Cをアーム100の下面側に格納保持できるようにした
ものである。In the power shovel shown in FIG. 10, a hook assembly 106C is connected to a mounting pin 109 for connecting the bucket 103 and the arm 100, and as shown in FIG.
C can be stored and held on the lower surface side of the arm 100.
【0006】また、図11に示されたパワーショベル
( 実開平2ー106050号公報)は、多関節構造の
リンク体からなるフックアッセンブリ106Dをバケッ
トピン105に回動可能に連結するとともに、テッピン
グリンク102の中央部に底面を有する凹部を形成し、
掘削作業時には、前記凹部内にフックアッセンブリ10
6Dを上下に折り畳んで収納するようにしたものであ
る。なお、凹部内におけるフックアッセンブリ106D
の収納状態は、ばね(図示せず)の付勢力によって保持
される。A power shovel (Japanese Utility Model Laid-Open No. 2-106050) shown in FIG. 11 connects a hook assembly 106D composed of a multi-jointed link body to a bucket pin 105 so as to be rotatable and tapping. Forming a recess having a bottom surface at the center of the link 102,
During excavation work, the hook assembly 10
6D is folded up and down for storage. Note that the hook assembly 106D in the recess is provided.
Is held by the urging force of a spring (not shown).
【0007】また、図12に示されたパワーショベル
(実公平7ー38308号公報)は、サポートアーム1
21とサポートリンク122とからなるジブ120をテ
ッピングリンク102に固着されたブラケット123に
回動可能に連結して、サポートアーム121を前方に突
出して張り出すとともに、サポートアーム121の先端
にフックアッセンブリ106Eを連結することにより、
バケット103とフックアッセンブリ 106Eとの間
に一定のクリアランスCを確保するようにしている。ま
た、掘削作業時には、フックアッセンブリ106Eをサ
ポートアーム121から取り外し、サポートアーム12
1とサポートリンク122とを、図12の(b)に二点
鎖線で示されるように格納するようにしている。A power shovel (Japanese Utility Model Publication No. 7-38308) shown in FIG.
A jib 120 including a support link 21 and a support link 122 is rotatably connected to a bracket 123 fixed to the tapping link 102, so that the support arm 121 protrudes forward and projects, and a hook assembly is attached to the tip of the support arm 121. By connecting 106E,
A certain clearance C is ensured between the bucket 103 and the hook assembly 106E. During excavation work, the hook assembly 106E is detached from the support arm 121, and the support arm 12
1 and the support link 122 are stored as shown by a two-dot chain line in FIG.
【0008】[0008]
【発明が解決しようとする課題】ところで、図8および
図9のいずれの例も、バケット103を用いた掘削作業
時には、フックアッセンブリ106A,106Bが邪魔
となるため、フックアッセンブリ 106A,106B
を取り外す必要があり、その着脱作業が面倒である。ま
た、フックアッセンブリ106A,106Bがバケット
103に接触した状態であるため、すなわち、フックア
ッセンブリ106A,106Bとバケット103との間
にクリアランスが確保されていないため、クレーン作業
時にフックアッセンブリ106A,106Bがバケット
103に接触して損傷することがある。8 and 9, the hook assemblies 106A and 106B hinder the excavation work using the bucket 103, so that the hook assemblies 106A and 106B are disturbed.
Must be removed, and the attaching and detaching work is troublesome. Further, since the hook assemblies 106A and 106B are in contact with the bucket 103, that is, the clearance between the hook assemblies 106A and 106B and the bucket 103 is not secured, the hook assemblies 106A and 106B are 103 may be damaged by contact.
【0009】これに対して、図10の例では、フックア
ッセンブリ106Cを不使用時に格納することができる
ため、フックアッセンブリ106Cの着脱が不要であ
る。しかし、フックアッセンブリ106Cをアーム10
0の下面側に格納するため、掘削作業時に、図10の
(b)に示すように、バケット103上の土砂や岩石等
によってフックアッセンブリ106Cが押圧され損傷す
る虞がある。また、図10の(a)に示すようにバケッ
ト103を起こし返した状態でクレーン作業を行なうた
め、障害壁Wの近傍への吊り込み作業が困難となる。On the other hand, in the example of FIG. 10, since the hook assembly 106C can be stored when not in use, it is not necessary to attach and detach the hook assembly 106C. However, when the hook assembly 106C is
As shown in FIG. 10B, during the excavation work, there is a possibility that the hook assembly 106C is pressed and damaged by earth and sand, rocks and the like on the bucket 103 during the excavation work. Further, as shown in FIG. 10A, since the crane work is performed in a state where the bucket 103 is turned upside down, it is difficult to hang the bucket 103 near the obstacle wall W.
【0010】こうした図10の構成の欠点は、テッピン
グリンク102の凹部内にフックアッセンブリ106D
を収納する図11の構成によってほぼ解決される。しか
し、この図11の構成では、バケット103とフックア
ッセンブリ106Dとの間にクリアランスを確保できな
い。また、フックアッセンブリ106Dを上下に折り畳
んでテッピングリンク102の凹部内に収納するように
しているため、フックアッセンブリ106Dの全長が長
く、したがって、折り畳み回数が多くなる場合には、フ
ックアッセンブリ106Dがテッピングリンク102の
上方に大きく突出して、これが掘削作業時に邪魔になる
虞がある。これは、凹部の底面によって収納空間が下側
方向で制限されるためである。このように、フックアッ
センブリ106Dを上下に折り畳むことによって凹部内
に収納する手法は、凹部の幅方向(左右方向)の空間
と、凹部の底面によって閉塞されたテッピングリンク1
02の下側空間とを、収納空間として有効に利用できな
いため、フックアッセンブリ106Dの収納性という点
で問題がある。The drawback of the configuration of FIG. 10 is that the hook assembly 106D
Is almost solved by the configuration of FIG. However, in the configuration of FIG. 11, a clearance cannot be secured between the bucket 103 and the hook assembly 106D. Further, since the hook assembly 106D is folded up and down and housed in the concave portion of the tapping link 102, the entire length of the hook assembly 106D is long, so that when the number of times of folding is increased, the hook assembly 106D is There is a possibility that the projection protrudes significantly above the ping link 102, which may hinder the digging operation. This is because the storage space is limited in the lower direction by the bottom surface of the concave portion. As described above, the method of storing the hook assembly 106D in the recess by folding the hook assembly 106D up and down is based on the space in the width direction (left and right direction) of the recess and the tapping link 1 closed by the bottom surface of the recess.
Since the space below 02 cannot be effectively used as a storage space, there is a problem in terms of storage of the hook assembly 106D.
【0011】さらに、この図11の構成では、凹部内に
おけるフックアッセンブリ106Dの収納状態を保持す
るために、ばねの付勢力を利用している。しかし、ばね
の付勢力だけでフックアッセンブリ106Dを確実に保
持することは、特に掘削作業時の激しい衝撃力下では難
しい。Further, in the configuration of FIG. 11, the biasing force of the spring is used to hold the housed state of the hook assembly 106D in the recess. However, it is difficult to reliably hold the hook assembly 106D only by the biasing force of the spring, particularly under a severe impact force during excavation work.
【0012】これに対して、図12の構成は、バケット
103とフックアッセンブリ106Dとの間にクリアラ
ンスを確保できるが、掘削作業時にフックアッセンブリ
106Eを取り外さなくてはならない。また、サポート
リンク122によってサポートアーム121の回動を規
制してサポートアーム121(ジブ120)の張り出し
状態をセットするようにしているため、ジブ120の構
造が複雑になる。On the other hand, in the configuration of FIG. 12, a clearance can be secured between the bucket 103 and the hook assembly 106D, but the hook assembly 106E must be removed during excavation work. In addition, since the support link 122 restricts the rotation of the support arm 121 and sets the extended state of the support arm 121 (jib 120), the structure of the jib 120 is complicated.
【0013】また、この図12の構成では、サポートア
ーム121がバケットピン105よりもテッピングリン
ク102側に位置する支点を中心に回動するため、サポ
ートアーム 121を前方に大きく突出させて作業半径
を大きくするのには限界がある。仮に、サポートアーム
121を前方に大きく突出させるために、サポートアー
ム121の長さを長くすると、サポートアーム121に
作用する曲げモーメントが大きくなり、好ましくない。In the configuration shown in FIG. 12, the support arm 121 is pivoted about a fulcrum located on the side of the tipping link 102 with respect to the bucket pin 105. There is a limit to increasing. If the length of the support arm 121 is increased to protrude the support arm 121 greatly forward, the bending moment acting on the support arm 121 increases, which is not preferable.
【0014】本発明は上記事情に着目してなされたもの
であり、その目的とするところは、フックアッセンブリ
の着脱作業が不要となるようにフックアッセンブリの全
てを損傷を受けない位置に収納でき、クレーン作業時に
はバケットとフックアッセンブリとの間に十分なクリア
ランスを確保して作業半径を十分大きくとることができ
るとともに、構造が簡単で且つフックアッセンブリの張
出し性および収納性に優れたパワーショベルを提供する
ことにある。The present invention has been made in view of the above circumstances, and an object of the present invention is to store all of the hook assembly in a position where the hook assembly is not damaged so that the attachment / detachment work of the hook assembly becomes unnecessary. Provided is a power shovel that can secure a sufficient clearance between a bucket and a hook assembly during a crane operation so that a work radius can be sufficiently increased, and that has a simple structure, and is excellent in overhangability and storage of the hook assembly. It is in.
【0015】[0015]
【課題を解決するための手段】上記課題を解決するため
に、本発明のパワーショベルは、起伏可能なアームの先
端に回動可能に取り付けられたバケットと、互いに所定
距離離間して対向配置され、その一端側が前記バケット
を傾動させる油圧シリンダの先端に連結され且つその他
端側がバケットの背面部に取付ピンを介して回動可能に
連結された一対のリンクと、前記一対のリンク間に収納
可能なフックアッセンブリとを具備し、前記フックアッ
センブリは、前記リンク間の位置とリンクの前方の張り
出し位置との間で前記取付ピンを中心に回動可能で且つ
前記リンク間に収納可能な幅で互いに離間して対向する
一対の側板部を有する張出体と、その一端が前記張出体
の先端に回動可能に連結されるとともに他端にフックを
有し且つ前記側板部間に折り畳んで収納可能な多関節構
造のアッセンブリ本体とからなる。In order to solve the above-mentioned problems, a power shovel of the present invention is opposed to a bucket rotatably attached to the tip of an up-and-down arm at a predetermined distance from each other. A pair of links, one end of which is connected to the tip of a hydraulic cylinder that tilts the bucket, and the other end of which is rotatably connected to the back surface of the bucket via a mounting pin, and can be stored between the pair of links. A hook assembly that is rotatable about the mounting pin between a position between the links and a protruding position in front of the link and has a width that can be stored between the links. An overhanging body having a pair of side plate portions spaced apart from each other, one end of which is rotatably connected to a tip of the overhanging body, and a hook at the other end; Consisting of assembly body of folded and retractable articulated structure between.
【0016】[0016]
【発明の実施の形態】以下、図面を参照しつつ本発明の
一実施形態について説明する。図1はバケット 12を
用いて掘削作業を行なうパワーショベル(油圧ショベ
ル)1を示している。図示のように、パワーショベル1
は、台車4と、台車4の上部に回転自在に搭載された旋
回体3とを備えている。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 shows a power shovel (hydraulic shovel) 1 that performs excavation work using a bucket 12. As shown, the excavator 1
Includes a carriage 4 and a revolving unit 3 rotatably mounted on the upper part of the carriage 4.
【0017】旋回体3にはブームシリンダ7によって起
伏可能なブーム8が取り付けられ、ブーム8の先端には
アームシリンダ9によって回動自在なアーム10が取り
付けられている。また、アーム10の先端には、傾動シ
リンダ(以下、バケットシリンダという。)11によっ
て傾動自在なバケット12(具体的にはバケット12に
設けられた一対のブラケット27,27の第1の端部)
が、取付ピン26を介して回動可能に取り付けられてい
る。なお、旋回体3には、ブーム8とアーム10とバケ
ット12とによって構成される作業部20の操作及び台
車4の走行並びに旋回体3の回転操作等を行なうための
操作室2が設置されている。A boom 8 that can be raised and lowered by a boom cylinder 7 is attached to the revolving unit 3, and an arm 10 that is rotatable by an arm cylinder 9 is attached to the tip of the boom 8. A bucket 12 (specifically, a first end of a pair of brackets 27, 27 provided on the bucket 12) is provided at the tip of the arm 10 so as to be tiltable by a tilt cylinder (hereinafter, referred to as a bucket cylinder) 11.
Are rotatably mounted via mounting pins 26. The revolving unit 3 is provided with an operation room 2 for operating the work unit 20 including the boom 8, the arm 10, and the bucket 12, running the cart 4, rotating the revolving unit 3, and the like. I have.
【0018】バケット12は、バケットシリンダ11の
シリンダロッド11aを伸縮させてリンク機構30を動
作させることにより、傾動される。リンク機構30は、
その第1の端部がアーム10の先端部に取付ピン21を
介して回動自在に取付けられた一対の第1のリンク2
2,22と、その第1の端部がバケット12の一対のブ
ラケット27,27の第2の端部に回動自在に取り付け
られた一対の第2のリンク( 以下、テッピングリンク
という。)24,24とを有しており、第1のリンク2
2,22の第2の端部とテッピングリンク24,24の
第2の端部とシリンダロッド11aの先端部とを取付ピ
ン23によって回動可能に連結することにより構成され
る。この連結構成の詳細が図4に示されている。図4
は、図1(および図3)のAーA線に沿う断面図であ
る。図示のように、シリンダロッド11aの先端部の両
側にテッピングリンク24,24の第2の端部であるボ
ス部24a,24aが隣接して位置され、さらに、これ
らの部位を両側から挟み込むようにして第1のリンク2
2,22の第2の端部が位置された状態で、第1のリン
ク22,22の第2の端部とテッピングリンク24,2
4のボス部24a,24aとシリンダロッド11aの先
端部とにわたって取付ピン23が貫通している。The bucket 12 is tilted by operating the link mechanism 30 by expanding and contracting the cylinder rod 11a of the bucket cylinder 11. The link mechanism 30
A pair of first links 2 whose first ends are rotatably mounted to the distal end of the arm 10 via mounting pins 21.
2, 22 and a pair of second links (hereinafter, referred to as tapping links) whose first ends are rotatably attached to the second ends of the pair of brackets 27, 27 of the bucket 12. 24, 24 and the first link 2
The second ends of the rods 2 and 22, the second ends of the tapping links 24 and 24, and the distal end of the cylinder rod 11 a are rotatably connected by mounting pins 23. Details of this connection configuration are shown in FIG. FIG.
FIG. 4 is a sectional view taken along line AA of FIG. 1 (and FIG. 3). As shown in the drawing, boss portions 24a, 24a, which are the second ends of the tapping links 24, 24, are positioned adjacent to both sides of the tip of the cylinder rod 11a, and these portions are sandwiched from both sides. First link 2
With the second ends of the first and second links 22 and 22 positioned, the second ends of the first links 22 and 22 and the tapping links 24 and 2 are located.
The mounting pin 23 penetrates through the boss portions 24a, 24a of the No. 4 and the tip of the cylinder rod 11a.
【0019】一方、テッピングリンク24,24の第1
の端部であるボス部24b,24bは、テッピングリン
ク24,24の平行状態を保持するスペーサ29によっ
て、互いに所定距離だけ離間して位置されており、ボス
部24b,24bを両側から挟み込むようにしてバケッ
ト12のブラケット27,27が位置された状態で、ブ
ラケット27,27とボス部24b,24bとスペーサ
29とにわたって取付ピン(以下、バケットピンとい
う。)25が貫通している。つまり、テッピングリンク
24,24の第1の端部とブラケット27,27の第2
の端部とが取付ピン25によって回動可能に連結され、
また、スペーサ29が取付ピン25に回動可能に保持さ
れた状態となっている。On the other hand, the first of the tapping links 24, 24
The bosses 24b, 24b, which are the ends of the bosses 24b, 24b, are spaced apart from each other by a predetermined distance by a spacer 29 for maintaining the parallel state of the tapping links 24, 24 so that the bosses 24b, 24b are sandwiched from both sides. In a state where the brackets 27 of the bucket 12 are positioned, the mounting pins (hereinafter, referred to as bucket pins) 25 pass through the brackets 27, 27, the boss portions 24b, 24b, and the spacer 29. That is, the first ends of the tapping links 24, 24 and the second ends of the brackets 27, 27
Is rotatably connected to the end portion by a mounting pin 25,
Further, the spacer 29 is held rotatably by the mounting pin 25.
【0020】一対のテッピングリンク24,24間に
は、フック52によって荷を吊り上げるクレーン作業を
行なうフックアッセンブリ40が折り畳まれた状態で格
納されている。なお、図1には、簡略のため、フックア
ッセンブリ40が図示されていない。Between the pair of tapping links 24, a hook assembly 40 for performing a crane operation of lifting a load by a hook 52 is stored in a folded state. FIG. 1 does not show the hook assembly 40 for simplicity.
【0021】フックアッセンブリ40をテッピングリン
ク24,24間から張り出して展開した状態が図2に示
されている。図2に示すように、フックアッセンブリ4
0は、「く」の字型をなす板状の一対のジブ(側板部)
41,41からなる張出体と、フックアッセンブリ本体
59とからなる。FIG. 2 shows a state in which the hook assembly 40 is extended from the stepping links 24, 24 and is deployed. As shown in FIG.
0 is a pair of jibs (side plate portions) in the shape of a "ku".
An overhanging body composed of 41 and 41 and a hook assembly main body 59 are provided.
【0022】図4に示すように、各ジブ41,41は、
その基端がスペーサ29の両端部にそれぞれ溶接されて
おり(図4参照)、スペーサ29とともにバケットピン
25を中心として回動できるようになっている。また、
ジブ41,41同士は、これらがテッピングリンク2
4,24間に格納可能で且つフックアッセンブリ本体5
9をジブ41,41間に収納できる距離で、互いに離間
している。As shown in FIG. 4, each jib 41, 41
The base ends thereof are welded to both ends of the spacer 29 (see FIG. 4), and can be rotated together with the spacer 29 about the bucket pin 25. Also,
Jib 41, 41, these are the tapping link 2
Hook assembly body 5 that can be stored between 4, 24 and
9 are separated from each other by a distance that can be stored between the jib 41, 41.
【0023】図2および図7に示すように、各ジブ4
1,41の先端側には、後述する第1のロックピン80
( 図4参照)が貫通可能な貫通孔71が設けられてい
る。また、各ジブ41,41の基端側には、後述する第
2のロックピン81(図4参照)が貫通可能な貫通孔7
2が設けられている。なお、各テッピングリンク24,
24には、後述するようにジブ41,41をテッピング
リンク24,24間に格納してテッピングリンク24,
24と対面させた状態で貫通孔71と対向する部位に、
第1のロックピン80が貫通可能な貫通孔87が設けら
れている。As shown in FIGS. 2 and 7, each jib 4
A first lock pin 80 to be described later
(See FIG. 4). In addition, a through hole 7 through which a second lock pin 81 (see FIG. 4) to be described later can penetrate is provided on the base end side of each jib 41.
2 are provided. Each tapping link 24,
24, the jib 41, 41 is stored between the tapping links 24, 24, as described later.
In a portion facing the through hole 71 in a state facing the 24,
A through-hole 87 through which the first lock pin 80 can pass is provided.
【0024】各ジブ41,41の基端部には、テッピン
グリンク24の第1の端部であるボス部24bに設けら
れたストッパ74と当接する部位に、爪部73が設けら
れている。この爪部73は、バケットピン25を中心に
ジブ41,41を回動させて張り出した際にストッパ7
4に突き当たって、ジブ41,41のそれ以上の回動を
規制する。At the base end of each jib 41, 41, a claw 73 is provided at a position where it comes into contact with a stopper 74 provided on the boss 24b, which is the first end of the tapping link 24. . When the jib 41 is pivoted about the bucket pin 25 to protrude, the claw 73
4, the jib 41 restricts further rotation of the jib 41.
【0025】図2に示すように、フックアッセンブリ本
体59は、複数の連結部材42,44,48と剛性の長
尺ロッド47とからなる多関節構造のリンク体の下部に
フック 52を有する支持体51を連結した構造をなし
ており、その展開状態において、各ジブ41,41の他
端部から垂下される。フックアッセンブリ本体59を構
成する第1の連結部材42は、各ジブ41,41の他端
部に、取付ピン53を介して回動可能に連結されてい
る。具体的には、この第1の連結部材42は、各ジブ4
1,41の他端部間に位置した状態で取付ピン53に回
動可能に保持されている。第1の連結部材42の下端に
は互いに平行な一対のブラケット42a,42aが設け
られており、これらのブラケット42a,42a間には
第2の連結部材44が取付ピン43によって回動可能に
挟持されている。また、第2の連結部材44は、その下
端に、一対のブラケット42a,42aに対して垂直な
方向で平行に延びる一対の固着体45,45を有してお
り、これらの固着体45,45間には長尺ロッド47の
上端が取付ピン46によって回動可能に挟持されてい
る。 すなわち、このような連結状態では、第1の連結
部材42と第2の連結部材44とを連結する取付ピン4
3の貫通方向(取り付け方向)が、第2の連結部材44
と長尺ロッド47とを連結する取付ピン46の貫通方向
(取り付け方向)に対して垂直となる。つまり、第1の
連結部材42に対する第2の連結部材44の回動方向が
第2の連結部材42に対する長尺ロッド47の回動方向
に対して直角となる。したがって、この連結状態によっ
て、長尺ロッド47を互いに直角な2軸をそれぞれ中心
として自在に回動させることができるユニバーサルジョ
イントが形成される。As shown in FIG. 2, the hook assembly main body 59 is a support having a hook 52 at the lower part of a multi-jointed link comprising a plurality of connecting members 42, 44, 48 and a rigid long rod 47. The jib 41 is suspended from the other end of each jib 41 in the deployed state. The first connecting member 42 constituting the hook assembly main body 59 is rotatably connected to the other ends of the gibs 41, 41 via mounting pins 53. Specifically, the first connecting member 42 is connected to each jib 4
It is rotatably held by the mounting pin 53 in a state located between the other ends of the first and the first 41. A pair of parallel brackets 42a, 42a are provided at the lower end of the first connecting member 42, and a second connecting member 44 is rotatably held between the brackets 42a, 42a by the mounting pin 43. Have been. Further, the second connecting member 44 has a pair of fixed members 45, 45 extending at a lower end thereof in a direction perpendicular to the pair of brackets 42a, 42a, and these fixed members 45, 45 are provided. The upper end of the long rod 47 is rotatably held by the mounting pin 46 therebetween. That is, in such a connection state, the mounting pins 4 connecting the first connection member 42 and the second connection member 44 are connected.
3 is connected to the second connecting member 44.
It is perpendicular to the direction of penetration (the direction of attachment) of the attachment pin 46 connecting the rod and the long rod 47. That is, the rotation direction of the second connection member 44 with respect to the first connection member 42 is perpendicular to the rotation direction of the long rod 47 with respect to the second connection member 42. Accordingly, a universal joint that can freely rotate the long rod 47 around two axes perpendicular to each other is formed by this connection state.
【0026】長尺ロッド47の下端には、一対の第3の
連結部材48,48が長尺ロッド47を挟み込むように
して取付ピン49により回動可能に連結されている。各
連結部材48,48には、後述するようにテッピングリ
ンク24,24間でジブ41,41とともに連結部材4
8,48を格納して連結部材48,48をジブ41,4
1と対面させた状態で貫通孔72と対向する部位に、第
2のロックピン81が貫通可能な貫通孔50が設けられ
ている。A pair of third connecting members 48 and 48 are rotatably connected to the lower end of the long rod 47 by mounting pins 49 so as to sandwich the long rod 47. Each connecting member 48, 48 has a connecting member 4 along with the jib 41, 41 between the tapping links 24, 24, as described later.
8 and 48, and the connecting members 48 and 48 are
A through-hole 50 through which the second lock pin 81 can pass is provided in a portion facing the through-hole 72 in a state of facing the first lock pin 81.
【0027】そして、第3の連結部材48,48の下端
には、フック52を有する支持体51の上端に設けられ
た一対のブラケット51a,51aが、取付ピン52を
介して、回動可能に連結されている。At the lower ends of the third connecting members 48, 48, a pair of brackets 51a, 51a provided on the upper end of a support body 51 having a hook 52 are rotatably mounted via mounting pins 52. Are linked.
【0028】次に、上記構成の作用について説明する。
フックアッセンブリ40を図2に示す張り出し状態から
テッピングリンク24,24間に格納する場合には、例
えば、連結部材42,44と長尺ロッド47と第3の連
結体48,48と支持体51とをその対応する取付ピン
46,49,52,53を中心に回動させることにより
折り畳み、フック52とその支持体51とをジブ41,
41間に位置させる。そして、この状態で、ジブ41,
41をバケットピン25を中心に後方に回動させてテッ
ピングリンク24,24間のスペース内に位置させる。
なお、この状態が図3および図4に示されている。ま
た、図4のBーB線に沿う断面図が図5に、図4のCー
C線に沿う断面図が図6にそれぞれ示されている。Next, the operation of the above configuration will be described.
When the hook assembly 40 is stored between the tapping links 24, 24 from the extended state shown in FIG. 2, for example, the connecting members 42, 44, the long rod 47, the third connecting bodies 48, 48, and the support body 51 Are pivoted about their corresponding mounting pins 46, 49, 52, 53 to fold the hook 52 and its support 51 together with the jib 41,
Position between 41. And in this state, jib 41,
41 is pivoted rearward about the bucket pin 25 to be positioned in the space between the tapping links 24, 24.
This state is shown in FIG. 3 and FIG. FIG. 5 is a sectional view taken along line BB of FIG. 4, and FIG. 6 is a sectional view taken along line CC of FIG.
【0029】この格納状態において、ジブ41,41
は、図4に示すように、テッピングリンク24,24と
近接して並行する位置で、テッピングリンク24,24
間のスペース内に収納される。また、第1および第2の
連結部材42,44はジブ41,41から上方に立ち上
がるようにして延び、長尺ロッド47はジブ41,41
と略平行に延びる。さらに、第3の連結部材48,48
は、ジブ41,41間に収納位置されたフック支持体5
1から上方に立ち上がるようにして延びる。すなわち、
フック52とその支持体51とは、連結部材42,4
4,48および長尺ロッド47によって抱え込まれるよ
うな状態でジブ41,41間に収納され、この収納状態
でジブ41,41をテッピングリンク24,24間のス
ペース内に位置させることにより、フックアッセンブリ
40がテッピングリンク24,24間に格納されるもの
である。In this stored state, the jib 41, 41
As shown in FIG. 4, the tapping links 24, 24 are positioned close to and parallel to the tapping links 24, 24.
It is stored in the space between them. The first and second connecting members 42, 44 extend upward from the jib 41, 41, and the long rod 47 is connected to the jib 41, 41.
And extend substantially in parallel. Further, the third connecting members 48, 48
Are hook supports 5 stored between the jib 41
It extends so as to rise upward from 1. That is,
The hook 52 and its support 51 are connected to the connecting members 42 and 4.
The jib 41 is accommodated between the jib 41 and 41 in such a state that the jib 41 and 41 are held by the long rod 47. An assembly 40 is stored between the tapping links 24,24.
【0030】こうした格納状態は、2つのロックピン8
0,81によって保持される。すなわち、格納状態で
は、テッピングリンク24,24とジブ41,41とが
対面されてテッピングリンク24,24の貫通孔87と
ジブ41,41の貫通孔71とが略同軸的に対向され、
ジブ41,41と第3の連結部材48,48とが対面さ
れてジブ41,41の貫通孔72と第3の連結部材4
8,48の貫通孔50とが略同軸的に対向される。した
がって、貫通孔87と貫通孔71とに第1のロックピン
80を貫通させてテッピングリンク24,24に対して
ジブ41,41を固定するとともに、図6に示すよう
に、フック52を第1のロックピン80に引掛け、ま
た、貫通孔72と貫通孔50とに第2のロックピン81
を貫通させてジブ41,41に対して第3の連結部材4
8,48を固定すれば、テッピングリンク24,24間
におけるフックアッセンブリ40の格納状態が保持され
る。Such a stored state corresponds to two lock pins 8
0,81. That is, in the stored state, the tapping links 24, 24 and the jibs 41, 41 face each other, and the through-hole 87 of the tapping links 24, 24 and the through-hole 71 of the jibs 41, 41 face substantially coaxially.
The jib 41, 41 and the third connecting member 48, 48 face each other, and the through hole 72 of the jib 41, 41 and the third connecting member 4
8, 48 are substantially coaxially opposed to the through holes 50. Accordingly, the first lock pin 80 is passed through the through hole 87 and the through hole 71 to fix the jibs 41, 41 to the stepping links 24, 24, and as shown in FIG. The first lock pin 80 is hooked on the first lock pin 80, and the second lock pin 81 is inserted into the through hole 72 and the through hole 50.
Through the third connecting member 4 with respect to the jibs 41, 41.
When the hooks 8 and 48 are fixed, the stored state of the hook assembly 40 between the tapping links 24 and 24 is maintained.
【0031】また、この格納状態からフックアッセンブ
リ40を前方に張り出して展開する場合には、2つのロ
ックピン80,81を抜き取って前述した格納動作と逆
の動作を行なう。すなわち、まず、ジブ41,41をバ
ケットピン25を中心に前方側に回動させて張り出す。
この張り出し動作では、テッピングリンク24,24の
第1の端部であるボス部24b,24bに設けられたス
トッパ74,74にジブ41,41の爪部73,73が
突き当たって、バケットピン25を中心とするジブ4
1,41の回動が規制され、フックアッセンブリ40の
張出し状態がセットされる。ジブ41,41のこのよう
な位置決めの後、連結部材42,44と長尺ロッド47
と第3の連結体48,48と支持体51とをその対応す
る取付ピン46,49,52,53を中心に回動させて
展開すれば、フックアッセンブリ本体59は、ジブ4
1,41の張出しによってバケット12との間に十分な
クリアランスを確保した状態で、各ジブ41,41の他
端部から垂下され、これによって、フック52によるク
レーン作業が可能となる。When the hook assembly 40 is extended forward from the stored state and unfolded, the two lock pins 80 and 81 are pulled out and the operation reverse to the above-described storage operation is performed. That is, first, the jibs 41, 41 are turned forward about the bucket pin 25 to protrude.
In this overhang operation, the claw portions 73 of the jib 41, 41 abut against stoppers 74, 74 provided on the boss portions 24 b, 24 b which are the first ends of the tapping links 24, 24, and the bucket pins 25, 41. Jib 4 centered on
The rotation of the hook assemblies 40 is restricted, and the extended state of the hook assembly 40 is set. After such positioning of the jib 41, the connecting members 42, 44 and the long rod 47
And the third connecting members 48, 48 and the support member 51 are pivoted about the corresponding mounting pins 46, 49, 52, 53, and then unfolded, the hook assembly main body 59 becomes the jib 4
The jib 41 hangs down from the other end of the jib 41 in a state where a sufficient clearance is secured between the jib 41 and the bucket 12 by the overhang of the bucket 1, thereby enabling the crane operation by the hook 52.
【0032】以上説明したように、本実施形態のパワー
ショベル1は、フックアッセンブリ40がジブ41とフ
ックアッセンブリ本体59とから構成され、ジブ41,
41を介してフックアッセンブリ本体59が前方に張り
出されるようになっている。したがって、クレーン作業
時にフックアッセンブリ40を張り出すと、バケット1
2とフックアッセンブリ本体59との間に一定のクリア
ランスが確保される。その結果、クレーン作業時にフッ
クアッセンブリ本体59がバケット12と干渉して損傷
することがなく、また、前方の障害壁の近傍への吊り込
み作業が容易に行なえる。As described above, in the power shovel 1 of the present embodiment, the hook assembly 40 includes the jib 41 and the hook assembly main body 59, and the jib 41,
The hook assembly main body 59 is projected forward through 41. Therefore, when the hook assembly 40 is extended during the crane operation, the bucket 1
A certain clearance is secured between the hook assembly 2 and the hook assembly main body 59. As a result, the hook assembly main body 59 does not interfere with the bucket 12 and is not damaged during the crane operation, and the hanging operation in the vicinity of the front obstacle wall can be easily performed.
【0033】また、本実施形態のパワーショベル1は、
ジブ41,41がバケットピン24を中心に回動するた
め、ジブ41,41の長さを長くすることなく、図12
に示した従来例よりもジブ41,41を前方に大きく突
出させることができる。したがって、バケット12とフ
ックアッセンブリ40との間に十分なクリアランスを確
保できるとともに、作業半径を十分大きくとることがで
きる。The power shovel 1 of the present embodiment is
Since the jib 41, 41 rotates about the bucket pin 24, the jib 41, 41 can be extended without increasing the length of FIG.
The jib 41 can be made to protrude forward more than the conventional example shown in FIG. Therefore, a sufficient clearance can be secured between the bucket 12 and the hook assembly 40, and the working radius can be made sufficiently large.
【0034】また、本実施形態のパワーショベル1で
は、テッピングリンク24,24のボス部24b,24
bに設けられたストッパ74,74にジブ41,41の
爪部73,73が突き当たって、バケットピン25を中
心とするジブ41,41の回動が規制され、フックアッ
センブリ40の張出し状態がセットされる。つまり、ロ
ックピン等を使用することなく、ジブ41,41を単に
前方に張り出すだけで、ジブ41,41の回動が自動的
に規制される。したがって、フックアッセンブリ40の
張出し性に優れ、また、ジブ41,41の回動を規制す
る付加機構(例えば図12で示したサポートリンク12
2)も不要となるため、ジブ41,41の構造を簡略化
できる。In the power shovel 1 of the present embodiment, the boss portions 24b, 24 of the tapping links 24, 24 are provided.
The pawls 73, 73 of the jib 41, 41 abut against stoppers 74, 74 provided on the b, the rotation of the jib 41, 41 about the bucket pin 25 is restricted, and the extended state of the hook assembly 40 is set. Is done. That is, the rotation of the jib 41 is automatically restricted by simply extending the jib 41, 41 without using a lock pin or the like. Therefore, the hook assembly 40 has excellent overhanging properties, and an additional mechanism (for example, the support link 12 shown in FIG.
Since 2) is also unnecessary, the structure of the jib 41 can be simplified.
【0035】また、本実施形態のパワーショベル1は、
フックアッセンブリ40の全てを、フックアッセンブリ
40が損傷を受けにくい位置すなわちテッピングリンク
24,24間に、コンパクトに格納できる。すなわち、
フック52とその支持体51とを連結部材42,44,
48および長尺ロッド47によって抱え込むようにして
ジブ41,41間に収納し、この収納状態でジブ41,
41をバケットピン25を中心に後方に回動させてテッ
ピングリンク24,24間のスペース内に位置させるこ
とができる。したがって、掘削作業時にフックアッセン
ブリ40を取り外す必要がなく、作業効率の向上を図る
ことができる。The power shovel 1 of the present embodiment is
All of the hook assemblies 40 can be stored compactly in a position where the hook assemblies 40 are not easily damaged, that is, between the stepping links 24. That is,
The hook 52 and its support 51 are connected to the connecting members 42, 44,
48 and the long rod 47, and housed between the jib 41, 41. In this housed state, the jib 41,
41 can be pivoted rearward about the bucket pin 25 to be positioned in the space between the tapping links 24,24. Therefore, there is no need to remove the hook assembly 40 during excavation work, and the work efficiency can be improved.
【0036】特に、本実施形態の格納方式では、アッセ
ンブリ本体59を一対のジブ41,41間に収納し、ジ
ブ41,41を一対の離間したテッピングリンク24,
24間に収納するいわばサンドイッチ方式を採用してい
るため、テッピングリンク24,24間のスペースを格
納空間として有効に利用して、フックアッセンブリ40
をコンパクトに収納できる。すなわち、この格納方式に
よれば、テッピングリンク24,24の下側空間をも有
効に利用して、テッピングリンク24,24間のスペー
スを上下左右で有効に利用できる。したがって、テッピ
ングリンクの凹部内にフックアッセンブリを上下に折り
畳んで収納する図11の構成に比べ、フックアッセンブ
リ40を掘削作業を妨げない態様で効率良く収納するこ
とができる。In particular, in the storage method according to the present embodiment, the assembly main body 59 is housed between the pair of jibs 41, 41, and the jibs 41, 41 are separated from each other by the pair of separated tapping links 24, 41.
Since the so-called sandwich method of storing the space between the stepping links 24 is adopted, the space between the tapping links 24 and 24 is effectively used as a storage space, and the hook assembly 40 is used.
Can be stored compactly. That is, according to this storage method, the space between the tapping links 24, 24 can be effectively used in the up, down, left, and right directions by effectively utilizing the space below the tapping links 24, 24. Therefore, the hook assembly 40 can be efficiently stored in a mode that does not hinder the excavation work, as compared with the configuration in FIG. 11 in which the hook assembly is folded up and down and stored in the recess of the tapping link.
【0037】また、フックアッセンブリ40の格納状態
の保持は、2つのロックピン80,81によって簡単に
行なえる。2つのロックピン80,81によるこのよう
な保持は、図11の構成のようなばねの付勢力による保
持に比べれば確実である。The holding state of the hook assembly 40 can be easily maintained by the two lock pins 80 and 81. Such holding by the two lock pins 80 and 81 is more reliable than holding by the biasing force of the spring as shown in FIG.
【0038】また、本実施形態のパワーショベル1で
は、フックアッセンブリ本体59が剛性のロッド47に
よって形成されているため、ワイヤに比べて摩耗が少な
く格納し易い。Further, in the power shovel 1 of the present embodiment, since the hook assembly main body 59 is formed by the rigid rod 47, it is easy to store the hook assembly 59 with less wear than the wire.
【0039】また、本実施形態では、ロッド47にフレ
キシブルなワイヤとほぼ同じ自由度を持たせるため、ロ
ッド47をユニバーサルジョイントを介してジブ41に
連結している。したがって、フック52の前後左右の揺
れに追従することが容易となる。In this embodiment, the rod 47 is connected to the jib 41 via a universal joint so that the rod 47 has substantially the same degree of freedom as a flexible wire. Therefore, it is easy to follow the swing of the hook 52 in the front-rear and left-right directions.
【0040】なお、本実施形態では、フックアッセンブ
リ本体59において、支持体51とロッド47とを第3
の連結部材48,48を介して回動可能に連結している
が、第3の連結部材48,48を介することなく、支持
体51とロッド47とを回動可能に直接に連結しても良
い。In this embodiment, in the hook assembly main body 59, the support body 51 and the rod 47 are connected to the third body.
Are rotatably connected via the connecting members 48, 48. However, even if the support body 51 and the rod 47 are directly connected rotatably without using the third connecting members 48, 48. good.
【0041】また、ジブ41,41同士が連結部材によ
って互いに連結されていても良い。すなわち、例えば側
板部であるジブ41,41同士を底板部によって連結す
ることにより張出体の断面を凹状に形成し、この凹部空
間内にフックアッセンブリ本体59を折り畳んで格納す
るようにしても良い。The gibs 41 may be connected to each other by a connecting member. That is, for example, the cross-section of the overhanging body may be formed in a concave shape by connecting the jibs 41, 41, which are side plate portions, with the bottom plate portion, and the hook assembly main body 59 may be folded and stored in the concave space. .
【0042】[0042]
【発明の効果】以上説明したように、本発明のパワーシ
ョベルは、フックアッセンブリの着脱作業が不要となる
ようにフックアッセンブリの全てを損傷を受けない位置
に収納でき、クレーン作業時にはバケットとフックアッ
センブリとの間に十分なクリアランスを確保して作業半
径を十分大きくとることができるとともに、構造が簡単
で且つフックアッセンブリの張出し性および収納性に優
れている。As described above, in the power shovel of the present invention, all of the hook assemblies can be stored in a position where they are not damaged so that the attachment and detachment work of the hook assemblies becomes unnecessary. And a sufficiently large working radius can be secured by securing a sufficient clearance between the hook assembly and the hook assembly.
【図1】本発明の一実施形態に係るパワーショベルの全
体図である。FIG. 1 is an overall view of a power shovel according to an embodiment of the present invention.
【図2】(a)はフックアッセンブリの張り出し状態を
示す拡大側面図、 (b)は(a)に示されたフックア
ッセンブリ本体の正面図である。FIG. 2A is an enlarged side view showing a protruding state of a hook assembly, and FIG. 2B is a front view of the hook assembly main body shown in FIG.
【図3】フックアッセンブリの格納状態を示す拡大側面
図である。FIG. 3 is an enlarged side view showing a stored state of the hook assembly.
【図4】図1および図3のAーA線に沿う断面図であ
る。FIG. 4 is a sectional view taken along the line AA of FIGS. 1 and 3;
【図5】図4のBーB線に沿う断面図である。FIG. 5 is a sectional view taken along the line BB in FIG. 4;
【図6】図4のCーC線に沿う断面図である。FIG. 6 is a sectional view taken along the line CC in FIG. 4;
【図7】図2のフックアッセンブリを構成するジブの側
面図である。FIG. 7 is a side view of a jib constituting the hook assembly of FIG. 2;
【図8】フックアッセンブリの取り付け機構の第1の従
来例を示す図である。FIG. 8 is a view showing a first conventional example of a hook assembly attaching mechanism.
【図9】フックアッセンブリの取り付け機構の第2の従
来例を示す図である。FIG. 9 is a view showing a second conventional example of an attachment mechanism of a hook assembly.
【図10】フックアッセンブリの取り付け機構の第3の
従来例を示す図である。FIG. 10 is a view showing a third conventional example of an attachment mechanism of a hook assembly.
【図11】フックアッセンブリの取り付け機構の第4の
従来例を示す図である。FIG. 11 is a diagram showing a fourth conventional example of a hook assembly mounting mechanism.
【図12】フックアッセンブリの取り付け機構の第5の
従来例を示す図である。FIG. 12 is a view showing a fifth conventional example of a hook assembly mounting mechanism.
1…パワーショベル 10…アーム 12…バケット 11…バケットシリンダ 24…テッピングリンク 40…フックアッセンブリ 41…ジブ(張出体) 47…長尺ロッド 52…フック 59…フックアッセンブリ本体 DESCRIPTION OF SYMBOLS 1 ... Power shovel 10 ... Arm 12 ... Bucket 11 ... Bucket cylinder 24 ... Tapping link 40 ... Hook assembly 41 ... Jib (extended body) 47 ... Long rod 52 ... Hook 59 ... Hook assembly main body
Claims (2)
り付けられたバケットと、 互いに所定距離離間して対向配置され、その一端側が前
記バケットを傾動させる油圧シリンダの先端に連結され
且つその他端側がバケットの背面部に取付ピンを介して
回動可能に連結された一対のリンクと、 前記一対のリンク間に収納可能なフックアッセンブリ
と、 を具備し、 前記フックアッセンブリは、前記リンク間の位置とリン
クの前方の張り出し位置との間で前記取付ピンを中心に
回動可能で且つ前記リンク間に収納可能な幅で互いに離
間して対向する一対の側板部を有する張出体と、その一
端が前記張出体の先端に回動可能に連結されるとともに
他端にフックを有し且つ前記側板部間に折り畳んで収納
可能な多関節構造のアッセンブリ本体とからなることを
特徴とするパワーショベル。1. A bucket rotatably attached to a tip of an arm which can be raised and lowered, and opposed to each other with a predetermined distance therebetween, one end of which is connected to the tip of a hydraulic cylinder for tilting the bucket and the other end thereof. A pair of links that are rotatably connected to the back surface of the bucket via mounting pins, and a hook assembly that can be stored between the pair of links, wherein the hook assembly is located between the links. A projecting body having a pair of side plates that are rotatable about the mounting pin and between the links and that are spaced apart from each other and face each other, and one end of the projecting body. And an assembly body having a multi-joint structure that is rotatably connected to the tip of the overhanging body, has a hook at the other end, and can be folded and stored between the side plates. Power shovel, characterized in that.
ストッパに当接して張出体の張り出し位置への回動を規
制する爪部を有していることを特徴とする請求項1に記
載のパワーショベル。2. The overhanging body according to claim 1, wherein the overhanging body has a claw for abutting against a stopper provided on the link to restrict rotation of the overhanging body to the overhanging position. A power shovel according to item 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19211696A JP3398283B2 (en) | 1996-07-22 | 1996-07-22 | Power shovel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP19211696A JP3398283B2 (en) | 1996-07-22 | 1996-07-22 | Power shovel |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH1036065A true JPH1036065A (en) | 1998-02-10 |
JP3398283B2 JP3398283B2 (en) | 2003-04-21 |
Family
ID=16285942
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP19211696A Expired - Fee Related JP3398283B2 (en) | 1996-07-22 | 1996-07-22 | Power shovel |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3398283B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100674120B1 (en) * | 1999-09-24 | 2007-01-26 | 가부시키가이샤 고마쓰 세이사쿠쇼 | Hang-up equipment for hydraulic excavator |
KR100786434B1 (en) * | 2000-09-28 | 2007-12-17 | 가부시키가이샤 고마쓰 세이사쿠쇼 | Bucket link with hook |
CN104988960A (en) * | 2015-07-08 | 2015-10-21 | 黄运新 | Working device with excavation function and lifting function |
JP2018043856A (en) * | 2016-09-14 | 2018-03-22 | コベルコ建機株式会社 | Hook holding structure and construction machine |
JP2020115779A (en) * | 2019-01-23 | 2020-08-06 | 小橋工業株式会社 | Levee plastering machine |
-
1996
- 1996-07-22 JP JP19211696A patent/JP3398283B2/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100674120B1 (en) * | 1999-09-24 | 2007-01-26 | 가부시키가이샤 고마쓰 세이사쿠쇼 | Hang-up equipment for hydraulic excavator |
KR100786434B1 (en) * | 2000-09-28 | 2007-12-17 | 가부시키가이샤 고마쓰 세이사쿠쇼 | Bucket link with hook |
CN104988960A (en) * | 2015-07-08 | 2015-10-21 | 黄运新 | Working device with excavation function and lifting function |
JP2018043856A (en) * | 2016-09-14 | 2018-03-22 | コベルコ建機株式会社 | Hook holding structure and construction machine |
JP2020115779A (en) * | 2019-01-23 | 2020-08-06 | 小橋工業株式会社 | Levee plastering machine |
Also Published As
Publication number | Publication date |
---|---|
JP3398283B2 (en) | 2003-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3398283B2 (en) | Power shovel | |
JP4105611B2 (en) | Swivel construction machine | |
JP3730551B2 (en) | Offset boom type construction machine | |
JP4031137B2 (en) | Hook mounting structure of crane specification type backhoe | |
JP2011021440A (en) | Bucket link with hook housing device | |
JP4324069B2 (en) | Construction work machine | |
JPH078598Y2 (en) | Connection structure between work vehicle and work machine | |
JP3718466B2 (en) | Offset boom swing control mechanism | |
JPH1136357A (en) | Crane device for hydraulic shovel | |
JP2019163645A (en) | Shovel with hook | |
JP2003034946A (en) | Structure for reinforcing arm of excavation working machine | |
JPH09316911A (en) | Working machine device for hydraulic type excavation machine | |
JPH07268905A (en) | Stabilizer for loader installed vehicle | |
JP2000257114A (en) | Hydraulic shovel | |
JP4351841B2 (en) | Construction machine swivel frame | |
JP5499230B2 (en) | Construction machine working machine | |
JPH04216721A (en) | Back hoe equipment for service vehicle | |
JP2003034945A (en) | Offset boom tape construction machinery | |
JPH093953A (en) | Excavating machine | |
JPH1037228A (en) | Hook mounting mechanism with power shovel basket | |
JP3373787B2 (en) | Hook mechanism of hydraulic excavator combined with crane | |
JP2003012267A (en) | Hook mechanism of crane-specified work machine | |
JPH0738398Y2 (en) | Shovel arm | |
JP2002088793A (en) | Excavating device provided with crane device | |
JPH0316912Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090214 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100214 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 8 Free format text: PAYMENT UNTIL: 20110214 |
|
LAPS | Cancellation because of no payment of annual fees |