JPH10332048A - Buried member for fixation of piping and wiring, and piping and wiring fixture - Google Patents

Buried member for fixation of piping and wiring, and piping and wiring fixture

Info

Publication number
JPH10332048A
JPH10332048A JP10076929A JP7692998A JPH10332048A JP H10332048 A JPH10332048 A JP H10332048A JP 10076929 A JP10076929 A JP 10076929A JP 7692998 A JP7692998 A JP 7692998A JP H10332048 A JPH10332048 A JP H10332048A
Authority
JP
Japan
Prior art keywords
piping
wiring
pipe
shaft
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10076929A
Other languages
Japanese (ja)
Other versions
JP4234222B2 (en
Inventor
Koichiro Hakamata
幸一郎 袴田
Takehisa Makino
剛久 牧野
Inemi Hirata
稲美 平田
Kenichi Nakamura
健一 中村
Satoshi Ozawa
聡 小澤
Hiroshi Harada
廣志 原田
Minoru Mabuchi
実 馬渕
Yasuhiro Tanaka
康弘 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Furukawa Electric Co Ltd
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Furukawa Electric Co Ltd
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Furukawa Electric Co Ltd, Shimizu Construction Co Ltd, Shimizu Corp filed Critical Furukawa Electric Co Ltd
Priority to JP07692998A priority Critical patent/JP4234222B2/en
Publication of JPH10332048A publication Critical patent/JPH10332048A/en
Application granted granted Critical
Publication of JP4234222B2 publication Critical patent/JP4234222B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily fix a piping and a wiring on a concrete slab, etc., by forming a shaft engaging part so as to allow insertion of a shaft from below a drum part but to resist extraction of the shaft and providing an upper part space above the shaft engaging part inside of the drum part and a lower part space below it. SOLUTION: A buried member 11 is constituted of a build-in member main body 15 and an installing member 17, and the build-in member main body 15 has a hollow drum part 19 and a cover part 21 to close an upper end of the drum part 19. A ring projected edge 23 is integrally formed on an intermediate stage of an inner peripheral surface of the drum part 19. The cover part 21 has a cylindrical part a lower end of which makes contact with this ring projected edge 23, and a shaft engaging member 25 is sandwiched between a lower end of the cylindrical part and the ring projected edge 23. Integrally an upper part space 27 is formed above the shaft engaging member 25 in the drum part 19, a lower part space 29 is formed below the shaft engaging member 25 and a collar part 31 is formed on an upper end of the drum part 19. Consequently, it is possible to fix a piping by extremely simple work.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、配管や配線を天
井、壁、柱、床面などに固定するのに使用する配管・配
線固定用埋め込み部材と、それを用いた配管・配線固定
具に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pipe / wire fixing embedded member used for fixing a pipe or wiring to a ceiling, a wall, a pillar, a floor, or the like, and a pipe / wire fixing device using the same. Things.

【0002】[0002]

【従来の技術】従来、屋内配管、例えば給水・給湯配管
システムのさや管ヘッダー工法に用いられるさや管や、
配線に用いられる可とう電線管を、建築物のコンクリー
トスラブ等に固定する場合には、図24に示すようなサ
ドル1が用いられている。このサドル1は、凹部1aに
配管3を収容した状態で両側の取り付け片1bをコンク
リート釘5によりコンクリートスラブに固定するもので
ある。図25は天井スラブ7にサドル1により配管3を
固定した状態を示す。
2. Description of the Related Art Conventionally, sheath pipes used for indoor pipes, for example, a sheath header method of a water supply / hot water supply piping system,
When a flexible conduit used for wiring is fixed to a concrete slab or the like of a building, a saddle 1 as shown in FIG. 24 is used. The saddle 1 fixes the mounting pieces 1b on both sides to a concrete slab with concrete nails 5 in a state where the pipe 3 is accommodated in the concave portion 1a. FIG. 25 shows a state in which the pipe 3 is fixed to the ceiling slab 7 by the saddle 1.

【0003】このほか、図26に示すような配管保持具
9を用いる方法も公知である。この場合は、まず配管保
持具9をコンクリート釘5により天井スラブ7等に固定
した後、配管保持具9に配管3を押し込むことにより配
管3を固定する。
In addition, a method using a pipe holder 9 as shown in FIG. 26 is also known. In this case, first, the pipe holder 9 is fixed to the ceiling slab 7 or the like with the concrete nail 5, and then the pipe 3 is fixed by pushing the pipe 3 into the pipe holder 9.

【0004】[0004]

【発明が解決しようとする課題】しかしながら図24の
ようなサドル1を使用する場合には、配管3を手でスラ
ブ面に押しつけながら配管3にサドル1を装着し、さら
にサドル1が落ちたり、ずれたりしないようにサドル1
を手で押さえながら電動ドリルドライバー等を使ってコ
ンクリート釘5を打ち込む、という面倒な作業が必要と
なる。特に天井スラブに配管を固定する場合には、作業
者が脚立にのぼり、天井を見上げた状態で上記の作業を
行わなければならないため、非常に作業性がわるく、ま
た危険でもある。
However, when a saddle 1 as shown in FIG. 24 is used, the saddle 1 is attached to the pipe 3 while the pipe 3 is pressed against the slab surface by hand, and the saddle 1 is dropped. Saddle 1 so that it does not shift
Is necessary to drive the concrete nail 5 with an electric drill driver or the like while holding down with the hand. In particular, when the pipe is fixed to the ceiling slab, the worker must climb the stepladder and perform the above-mentioned work while looking up at the ceiling, which is extremely inconvenient and dangerous.

【0005】また図26のような配管保持具9を使用す
る場合にも、配管保持具9を手で押さえながら電動ドリ
ルドライバー等を使ってコンクリート釘を打ち込む、と
いう面倒な作業が必要であり、特に天井配管の場合はサ
ドル使用の場合と同様な問題がある。また配管保持具9
を使用すると、スラブ7と配管3の間に配管保持具9の
厚さに相当する隙間Gができるため、配管の安定性がわ
るい。また給水・給湯用配管の場合は水撃(ウォーター
ハンマー)が発生すると配管3がスラブ7面を叩いて騒
音が発生するという問題がある。
Also, when using the pipe holder 9 as shown in FIG. 26, it is necessary to perform a troublesome operation of driving a concrete nail with an electric drill driver or the like while holding the pipe holder 9 by hand. Especially in the case of ceiling piping, there is a problem similar to the case of using a saddle. In addition, piping holder 9
Is used, a gap G corresponding to the thickness of the pipe holder 9 is formed between the slab 7 and the pipe 3, so that the stability of the pipe is poor. In the case of a water supply / hot water supply pipe, when a water hammer occurs, the pipe 3 hits the surface of the slab 7 to generate noise.

【0006】本発明の目的は、コンクリートスラブ等に
配管・配線を簡単に固定することができると共に、コン
クリートスラブ等と配管・配線との間の隙間を十分に小
さくできる配管・配線固定用埋め込み部材と、それを用
いた配管・配線固定具を提供することにある。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a pipe / wire fixing embedded member which can easily fix a pipe / wire to a concrete slab or the like and can sufficiently reduce a gap between the concrete slab or the like and the pipe / wire. And a pipe and wiring fixture using the same.

【0007】[0007]

【課題を解決するための手段】本発明に係る配管・配線
固定用埋め込み部材は、中空の胴部と、胴部の上端を塞
ぐ蓋部と、胴部の内部の中段に胴部と一体的に設けられ
た軸係止部と、胴部の外側に胴部の下端縁より上に位置
させて胴部と一体的に設けられた鍔部と、胴部の下端部
に着脱可能に又は一体に設けられた型枠への取り付け部
とを有し、前記軸係止部は、胴部下方からの軸の挿入は
許容するが軸の引き抜きには抵抗するように形成され、
前記胴部の内部の前記軸係止部より上には上部空間が、
下には下部空間が設けられている、ことを特徴とするも
のである。
According to the present invention, there is provided an embedding member for fixing piping and wiring, comprising a hollow body, a lid for closing an upper end of the body, and a middle part of the body inside the body. A flange provided on the upper part of the body, a flange part provided above the lower end edge of the body and provided integrally with the body, and detachably or integrally provided on the lower part of the body. The shaft locking portion is formed to allow insertion of the shaft from below the trunk portion, but to resist pulling out of the shaft,
An upper space above the shaft locking portion inside the body portion,
A lower space is provided below.

【0008】この埋め込み部材は、配管・配線を保持す
る保持部材と組み合わせて、次のように使用される。ま
ず型枠への取り付け部をコンクリート型枠の所定の位置
(埋め込み部材を設置しようとする位置)に固定する。
その後、型枠内にコンクリートを流し込み、固化させた
後、型枠を外す。すると埋め込み部材が下端を開口した
状態でコンクリートに埋め込まれた状態となる。この状
態で埋め込み部材は、鍔部がコンクリートに食い込んで
いるため、コンクリートから抜け出すおそれがない。
The embedding member is used as follows in combination with a holding member for holding piping and wiring. First, a portion to be attached to the mold is fixed to a predetermined position (a position where the embedding member is to be installed) of the concrete mold.
After that, concrete is poured into the form and solidified, and then the form is removed. Then, the embedded member is embedded in the concrete with the lower end opened. In this state, the embedding member has no risk of falling out of the concrete because the flange portion has cut into the concrete.

【0009】一方、保持部材は、配管・配線を保持する
ホルダーと、このホルダーから突出して前記埋め込み部
材の軸係止部に挿入される支持軸とを有している。した
がって配管・配線の固定作業としては、保持部材のホル
ダーに配管・配線を保持させた後、支持軸を埋め込み部
材の軸係止部に挿入するか、又は保持部材の支持軸を埋
め込み部材の軸係止部に挿入した後、ホルダーに配管・
配線を保持させるだけでよく、きわめて簡単に配管・配
線の固定を行うことができる。また埋め込み部材には軸
係止部の下に下部空間が設けられているため、前記ホル
ダーの支持軸のまわりの配管・配線表面からの出っ張り
部分を前記下部空間に収納することにより、配管・配線
とコンクリート面の間の隙間をなくすか、十分に小さく
することが可能となる。
On the other hand, the holding member has a holder for holding piping and wiring, and a support shaft protruding from the holder and inserted into the shaft locking portion of the embedded member. Therefore, as the work of fixing the piping and wiring, after holding the piping and wiring in the holder of the holding member, the supporting shaft is inserted into the shaft locking portion of the embedded member, or the supporting shaft of the holding member is connected to the shaft of the embedded member. After inserting it into the lock,
It is only necessary to hold the wiring, and the piping and wiring can be fixed very easily. Further, since the embedded member has a lower space below the shaft locking portion, the projecting portion from the surface of the pipe / wiring around the support shaft of the holder is housed in the lower space, so that the piping / wiring is provided. It is possible to eliminate the gap between the concrete and the concrete surface or to make it sufficiently small.

【0010】[0010]

【発明の実施の形態】以下、本発明の実施形態を図面を
参照して詳細に説明する。 〔実施形態1〕図1〜図6は本発明に係る配管固定具の
第1の実施形態を示す。この配管固定具は、埋め込み部
材11と、配管を保持する保持部材13との組み合わせ
からなる。
Embodiments of the present invention will be described below in detail with reference to the drawings. [Embodiment 1] FIGS. 1 to 6 show a first embodiment of a piping fixture according to the present invention. This piping fixture is composed of a combination of an embedding member 11 and a holding member 13 for holding the piping.

【0011】埋め込み部材11は、埋め込み部材本体1
5と取り付け部材17とで構成されている。埋め込み部
材本体15は、中空の胴部19と、胴部19の上端を塞
ぐ蓋部21とを有している。胴部19の内周面の中段に
は環状突縁23が一体に形成されている。前記蓋部21
は下端がこの環状突縁23に突き当たる円筒部21aを
有しており、この円筒部21aの下端と環状突縁23と
の間にはネジ係止部材25が挟持されている。以上の構
成により、胴部19内のネジ係止部材25より上には上
部空間27が、ネジ係止部材25より下には下部空間2
9が形成される。また胴部19の上端外周には鍔部31
が一体に形成されている。
[0011] The embedding member 11 is provided in the embedding member main body 1.
5 and a mounting member 17. The embedding member main body 15 has a hollow body 19 and a lid 21 that covers the upper end of the body 19. An annular protruding edge 23 is integrally formed in the middle of the inner peripheral surface of the body portion 19. The lid 21
Has a cylindrical portion 21a whose lower end abuts against the annular protruding edge 23. A screw locking member 25 is sandwiched between the lower end of the cylindrical portion 21a and the annular protruding edge 23. With the above configuration, the upper space 27 is provided above the screw locking member 25 in the body portion 19, and the lower space 2 is provided below the screw locking member 25.
9 is formed. A flange 31 is provided on the outer periphery of the upper end of the body 19.
Are integrally formed.

【0012】ネジ係止部材25はバネ弾性を有する金属
板からなるもので、図3に示すように、円板の中央部に
ネジ挿通穴33を形成し、そのネジ挿通穴33から四方
にスリットを入れることにより4つの弾性爪片35を形
成したものである。弾性爪片35は図1に示すように若
干上方に向くように折り曲げられている。ネジ挿通穴3
3の内径は、そこに挿通されるネジ(後述)の溝底外径
より若干小さく設定されている。
The screw locking member 25 is made of a metal plate having spring elasticity. As shown in FIG. 3, a screw insertion hole 33 is formed in the center of the disk, and slits are formed in four directions from the screw insertion hole 33. Are formed to form four elastic claw pieces 35. The elastic claw piece 35 is bent so as to face slightly upward as shown in FIG. Screw insertion hole 3
The inner diameter of 3 is set slightly smaller than the outer diameter of the groove bottom of a screw (described later) inserted therethrough.

【0013】また取り付け部材17は、図1および図4
に示すように、直径が胴部19の外径より大きい円板部
37を有している。円板部37の中心には上端部が前記
環状突縁23の穴に嵌合する円柱部39が突設され、そ
の周囲には前記胴部19の下端部の内側に嵌合する円筒
状の嵌合部41が突設されている。また円板部37の外
周付近には釘穴43が形成され、その周辺がコンクリー
ト型枠への取り付け部となっている。また円板部37
の、円柱部39と嵌合部41の間には、工具挿入穴45
が形成されている。
The mounting member 17 is shown in FIGS.
As shown in FIG. 5, the disk portion 37 has a diameter larger than the outer diameter of the body portion 19. A cylindrical portion 39 whose upper end fits into the hole of the annular protruding edge 23 protrudes from the center of the disk portion 37, and has a cylindrical shape fitted around the lower end of the body portion 19 around the cylindrical portion 39. A fitting portion 41 is provided to protrude. A nail hole 43 is formed in the vicinity of the outer periphery of the disc portion 37, and the periphery of the nail hole 43 is a portion to be attached to a concrete formwork. The disk 37
A tool insertion hole 45 is provided between the cylindrical portion 39 and the fitting portion 41.
Are formed.

【0014】一方、保持部材13は、配管を保持するホ
ルダー47と、このホルダー47から突出するネジ49
とで構成されている。ホルダー47は、図5に示すよう
なほぼ半円形の鞍型部材51と、図6に示すようなバン
ド53とで構成されている。鞍型部材51は中央部にネ
ジ49の頭部を収容する門型突起55を有し、この門型
突起55の両脚部にはバンド通し穴57が形成されてい
る。さらに鞍型部材51の外周にはバンド押さえ片59
が形成されている。バンド53はインシュロックという
商品名で市販されているもので、一端側に形成されたバ
ックル部61に他端側を挿入すると、ギザギザ63が引
っ掛かって引き抜けなくなるタイプのものである。ホル
ダー47は、このようなバンド53を鞍型部材51に図
1のように取り付けて、配管を締め付けるものである。
On the other hand, the holding member 13 includes a holder 47 for holding the pipe and a screw 49 protruding from the holder 47.
It is composed of The holder 47 includes a substantially semicircular saddle member 51 as shown in FIG. 5 and a band 53 as shown in FIG. The saddle-shaped member 51 has a gate-shaped protrusion 55 for accommodating the head of the screw 49 at the center, and a band through hole 57 is formed in both legs of the gate-shaped protrusion 55. Further, a band pressing piece 59 is provided on the outer periphery of the saddle member 51.
Are formed. The band 53 is commercially available under the trade name of Insulok. When the other end of the band 53 is inserted into the buckle 61 formed at one end, the jagged portion 63 is caught and cannot be pulled out. The holder 47 attaches such a band 53 to the saddle member 51 as shown in FIG. 1 and tightens the pipe.

【0015】次に、以上のように構成された配管固定具
の使用方法を図7〜図10を参照して説明する。まず図
7に示すように、埋め込み部材本体15と取り付け部材
17を嵌合させた状態で、取り付け部材17をコンクリ
ート型枠65の所定の位置に釘67により固定する。そ
の後、型枠65内にコンクリート69を流し込み、固化
させる。コンクリートを流し込むときは、埋め込み部材
本体15の下端開口部が取り付け部材17によって塞が
れているため、埋め込み部材本体15内の空間29、2
7にコンクリートが入り込むことはない。
Next, a method of using the pipe fixing device configured as described above will be described with reference to FIGS. First, as shown in FIG. 7, the mounting member 17 is fixed to a predetermined position of the concrete formwork 65 with a nail 67 in a state where the embedding member main body 15 and the mounting member 17 are fitted. Thereafter, the concrete 69 is poured into the formwork 65 and solidified. When pouring concrete, since the lower end opening of the embedding member main body 15 is closed by the mounting member 17, the spaces 29, 2, 2
No concrete enters 7.

【0016】コンクリート69が固化したら、型枠65
を外し、次いで図8に示すように取り付け部材17を工
具71で摘んで取り外す。なお取り付け部材17は型枠
65を外すときに一緒に取り外せる場合もある。取り付
け部材17を取り外すと、埋め込み部材本体15は下端
を開口させてコンクリート69(この場合は天井スラ
ブ)に埋め込まれた状態となる。この状態では鍔部31
がコンクリート69に食い込んでいるため、埋め込み部
材本体15がコンクリート69から抜け出すおそれはな
い。これで埋め込み部材本体15がコンクリート69の
所定位置に固定されたことになる。
When the concrete 69 is solidified, the form 65
Then, as shown in FIG. 8, the mounting member 17 is picked up with a tool 71 and removed. In some cases, the mounting member 17 can be removed together when the mold 65 is removed. When the attachment member 17 is removed, the embedded member body 15 is embedded in the concrete 69 (in this case, the ceiling slab) with the lower end opened. In this state, the collar 31
Is embedded in the concrete 69, so that there is no possibility that the embedded member main body 15 comes out of the concrete 69. Thus, the embedding member main body 15 is fixed at a predetermined position of the concrete 69.

【0017】次に図9に示すように、保持部材13のホ
ルダー47を配管3に取り付けた後、ネジ49を埋め込
み部材本体15のネジ係止部材25に挿入する。このと
きは弾性爪片35が上方へ弾性変形してネジ49の挿入
を許容する。ネジ49を最後まで押し込むと図10のよ
うになる。すなわち、ホルダー47の門型突起55が埋
め込み部材本体15の下部空間29に収納されるため、
配管3をコンクリート面69aとの間に殆ど隙間のない
状態で固定することができる。また弾性爪片35がネジ
49の谷部に食い込むため、保持部材13に下向きの荷
重がかかってもネジ49が引き抜けることはない。以上
のようにしてきわめて簡単な作業で配管の固定を行うこ
とができる。
Next, as shown in FIG. 9, after attaching the holder 47 of the holding member 13 to the pipe 3, a screw 49 is inserted into the screw locking member 25 of the embedded member main body 15. At this time, the elastic claw piece 35 is elastically deformed upward to allow the screw 49 to be inserted. When the screw 49 is pushed in to the end, it becomes as shown in FIG. That is, since the gate-shaped projection 55 of the holder 47 is stored in the lower space 29 of the embedded member main body 15,
The pipe 3 can be fixed with almost no gap between the pipe 3 and the concrete surface 69a. Further, since the elastic claw pieces 35 bite into the valleys of the screws 49, the screws 49 are not pulled out even if a downward load is applied to the holding member 13. As described above, the pipe can be fixed by a very simple operation.

【0018】埋め込み部材本体15は、配管のルートに
沿って適当な間隔毎に設置される。コンクリート型枠を
組み立てる段階で配管のルートが決まっていない場合
は、予想されるルートに余分に埋め込み部材本体15を
設置しておき、その中から実際のルートに合うものを選
択して使用すればよい。また保持部材13を間違ってル
ートから外れた埋め込み部材本体15に取り付けてしま
った場合、あるいは配管ルートの変更があった場合に
は、保持部材13から配管3を取り外した後、保持部材
13をネジ49を弛める方向に回転させれば、保持部材
13を埋め込み部材本体15から取り外すことができ
る。したがって作業ミスやルート変更などにも柔軟に対
応可能である。
The embedded member main bodies 15 are provided at appropriate intervals along the piping route. If the piping route is not determined at the stage of assembling the concrete formwork, an extra embedded member main body 15 is installed on the anticipated route, and the one that matches the actual route is selected and used. Good. If the holding member 13 is mistakenly attached to the embedded member main body 15 deviating from the route, or if the piping route is changed, after removing the pipe 3 from the holding member 13, the holding member 13 is screwed. By rotating 49 in the loosening direction, holding member 13 can be removed from embedded member body 15. Therefore, it is possible to flexibly respond to a work error or a route change.

【0019】〔実施形態2〕図11は埋め込み部材の他
の実施形態を示す。この埋め込み部材11は取り付け部
材17の外周付近に、図1の釘穴43の代わりに、突起
75を形成したものである。突起75は円板部37の一
部を下面側へ切り起こすことにより形成できる。このよ
うな突起75を形成しておけば、埋め込み部材11をコ
ンクリート型枠に固定するときに釘が不要となる。
[Embodiment 2] FIG. 11 shows another embodiment of the embedding member. The embedding member 11 has a projection 75 formed near the outer periphery of the mounting member 17 instead of the nail hole 43 of FIG. The protrusion 75 can be formed by cutting and raising a part of the disk portion 37 toward the lower surface side. If such protrusions 75 are formed, nails are not required when the embedded member 11 is fixed to the concrete formwork.

【0020】〔実施形態3〕図12は埋め込み部材11
に組み込まれるネジ係止部材25の他の実施形態を示
す。このネジ係止部材25は180°対称配置で2つの
弾性爪片35を形成したものである。
[Embodiment 3] FIG.
15 shows another embodiment of the screw locking member 25 incorporated in the screw lock member 25. The screw locking member 25 has two elastic claw pieces 35 formed in a 180 ° symmetrical arrangement.

【0021】〔実施形態4〕図13(A)(B)はそれ
ぞれ、保持部材の支持軸の他の実施形態を示す。前記第
1の実施形態では、支持軸としてネジ49を使用した
が、図13(A)では支持軸として先端に笠形突起77
を有する軸79を使用したものである。この場合は笠形
突起77が軸係止部材の弾性爪片に引っ掛かって引き抜
けない状態となる。笠形突起77は複数段に形成してお
いてもよい。また図13(B)は支持軸としてプラスチ
ック棒またはアルミ棒などの軟質棒81を使用したもの
である。軸係止部材25は一般に鋼板製であるので、上
記のような軟質棒81を使用すれば、弾性爪片35が軟
質棒81に食い込んで引き抜けない状態となる。
[Embodiment 4] FIGS. 13A and 13B show another embodiment of the support shaft of the holding member. In the first embodiment, the screw 49 is used as the support shaft. However, in FIG.
Is used. In this case, the cap-shaped projection 77 is caught by the elastic claw piece of the shaft locking member and cannot be pulled out. The cap-shaped projection 77 may be formed in a plurality of stages. FIG. 13B shows a case where a soft rod 81 such as a plastic rod or an aluminum rod is used as a support shaft. Since the shaft locking member 25 is generally made of a steel plate, if the above-described soft bar 81 is used, the elastic claw piece 35 bites into the soft bar 81 and cannot be pulled out.

【0022】〔実施形態5〕図14は保持部材の他の実
施形態を示す。この保持部材13は、配管ホルダー47
として一端側に適当な間隔で複数のフック83を、他端
側にフック引っ掛け穴85を形成したバンド87を用
い、このバンド87の中間部にネジ49を取り付けたも
のである。この保持部材13は、バンド87を配管に巻
き付けて、何れかのフック83を、フック引っ掛け穴8
5の縁に引っ掛けることにより配管を保持するものであ
る。
[Embodiment 5] FIG. 14 shows another embodiment of the holding member. This holding member 13 is
A band 87 having a plurality of hooks 83 at one end at appropriate intervals and a hook hole 85 at the other end is used, and a screw 49 is attached to an intermediate portion of the band 87. The holding member 13 wraps the band 87 around the pipe and attaches any of the hooks 83 to the hook hook holes 8.
The pipe is held by being hooked on the edge of No. 5.

【0023】〔実施形態6〕図15は保持部材のさらに
他の実施形態を示す。この保持部材13は、配管ホルダ
ー47として、配管外周の半周以上の周長を有する配管
保持具89を使用し、その配管保持具89の中間に設け
た門型突起55にネジ49を取り付けたものである。
[Embodiment 6] FIG. 15 shows still another embodiment of the holding member. The holding member 13 uses, as a pipe holder 47, a pipe holder 89 having a circumference equal to or more than half of the circumference of the pipe, and a screw 49 attached to a portal projection 55 provided in the middle of the pipe holder 89. It is.

【0024】〔実施形態7〕図16は保持部材のさらに
他の実施形態を示す。この保持部材13は、配管ホルダ
ー47として、鞍型部材51とバンド53を一体成形し
たものを使用し、前記鞍型部材51に支持軸(ネジ、プ
ラスチック棒またはアルミ棒等)91を挿通したもので
ある。バンド53は図6に示したものと同様に片面にギ
ザギザ63を形成したものである。鞍型部材51にはバ
ンド53を挿通、係止する孔が形成されている。なお支
持軸91を鞍型部材51と一体成形することも可能であ
る。
Embodiment 7 FIG. 16 shows still another embodiment of the holding member. The holding member 13 is a pipe holder 47 in which a saddle-shaped member 51 and a band 53 are integrally formed, and a support shaft (a screw, a plastic rod, an aluminum rod, or the like) 91 is inserted through the saddle-shaped member 51. It is. The band 53 has a jagged portion 63 formed on one side similarly to that shown in FIG. The saddle member 51 is formed with a hole through which the band 53 is inserted and locked. Note that the support shaft 91 can be integrally formed with the saddle member 51.

【0025】〔実施形態8〕図17は本発明に係る埋め
込み部材11のさらに他の実施形態を示す。この埋め込
み部材11は、取り付け部材17の嵌合部41を、埋め
込み部材本体15の胴部19の下端部外周に嵌合させた
ものである。それ以外は図1の実施形態と同様であるの
で、同一部分には同一符号を付して説明を省略する。
Embodiment 8 FIG. 17 shows still another embodiment of the embedding member 11 according to the present invention. In the embedding member 11, the fitting portion 41 of the mounting member 17 is fitted to the outer periphery of the lower end portion of the trunk 19 of the embedding member main body 15. The other parts are the same as those in the embodiment of FIG. 1, and the same parts are denoted by the same reference numerals and description thereof will be omitted.

【0026】〔実施形態9〕図18は本発明に係る埋め
込み部材11のさらに他の実施形態を示す。この埋め込
み部材11は、胴部19の下端にコンクリート型枠への
取り付け部93を一体に形成したものである。この取り
付け部93は釘穴43を有するフランジの形態である。
それ以外は図1の実施形態と同様であるので、同一部分
には同一符号を付して説明を省略する。
Embodiment 9 FIG. 18 shows still another embodiment of the embedding member 11 according to the present invention. This embedding member 11 is formed by integrally forming a mounting portion 93 to a concrete formwork at the lower end of the body portion 19. The mounting portion 93 is in the form of a flange having a nail hole 43.
The other parts are the same as those in the embodiment of FIG. 1, and the same parts are denoted by the same reference numerals and description thereof will be omitted.

【0027】〔実施形態10〕図19は本発明に係る埋
め込み部材11のさらに他の実施形態を示す。この埋め
込み部材11も、胴部19の下端にコンクリート型枠へ
の取り付け部93を一体に形成したものであるが、この
取り付け部93は、胴部19の外周に互いに反対方向に
突設された中空ブラケット101 と、中空ブラケット101
の上端を塞ぐ仮蓋102 と、仮蓋102 を下から支える脚部
103 とから構成されている。これらは一体に形成されて
いるが、仮蓋102 の周囲には溝104 が形成されていて、
仮蓋102は上から強く押されると、溝104 の部分が破断
して、中空ブラケット101 内に押し込まれるようになっ
ている。また仮蓋102 の先端部と中空ブラケット101 の
内面との境界には釘穴43が形成されている。それ以外
の構成は図1の実施形態と同様であるので、同一部分に
は同一符号を付してある。
[Embodiment 10] FIG. 19 shows still another embodiment of the embedding member 11 according to the present invention. The embedding member 11 also has an attachment portion 93 to a concrete formwork integrally formed at the lower end of the body portion 19, and the attachment portion 93 is provided on the outer periphery of the body portion 19 so as to protrude in opposite directions. Hollow bracket 101 and hollow bracket 101
Temporary lid 102 that covers the upper end of the lid, and legs that support the temporary lid 102 from below
103. These are formed integrally, but a groove 104 is formed around the temporary lid 102,
When the temporary lid 102 is strongly pushed from above, the groove 104 is broken and pushed into the hollow bracket 101. A nail hole 43 is formed at the boundary between the tip of the temporary lid 102 and the inner surface of the hollow bracket 101. The other configuration is the same as that of the embodiment of FIG. 1, and the same parts are denoted by the same reference numerals.

【0028】この埋め込み部材11は、コンクリート型
枠の所定位置に設置した後、釘穴43に釘67を挿入し
て打ち付けることによりコンクリート型枠に固定され
る。このとき仮蓋102 は脚部103 によって支持されてい
るので、中空ブラケット101 内に押し込まれることはな
く、普通に釘打ちを行うことができる。その後、コンク
リート型枠にコンクリートを流し込んで、埋め込み部材
11をコンクリートに埋め込む。コンクリートが硬化し
た後、図20のように型枠65を外すと、釘67が型枠
65に引っ張られ、釘67の頭部で仮蓋102 が中空ブラ
ケット101 内に押し込まれるので、釘67を型枠65と
共に取り外すことができる。なお、型枠65と共に釘6
7を外せなかったときは、残った釘67を曲げるように
よじれば、仮蓋102 を破って釘67を取り除くことがで
きる。
After the embedding member 11 is installed at a predetermined position on the concrete formwork, a nail 67 is inserted into the nail hole 43 and struck and fixed to the concrete formwork. At this time, since the temporary lid 102 is supported by the legs 103, the temporary lid 102 is not pushed into the hollow bracket 101, and can be nailed normally. Thereafter, the concrete is poured into the concrete formwork, and the embedding member 11 is embedded in the concrete. After the concrete has hardened, when the mold 65 is removed as shown in FIG. 20, the nail 67 is pulled by the mold 65, and the temporary lid 102 is pushed into the hollow bracket 101 by the head of the nail 67. It can be removed together with the mold 65. The nail 6 together with the formwork 65
If the nail 7 cannot be removed, the temporary nail 102 can be broken and the nail 67 can be removed by bending the remaining nail 67.

【0029】この実施形態によると実施形態1、2、8
で使用した取り付け部材17が不要となるので廃棄物を
少なくできると共に、実施形態9の場合にくらべ型枠の
取り外しが容易になる利点がある。なお、図19では取
り付け部93を胴部19の周囲2箇所に設けたが、取り
付け部93は必要に応じ胴部19の周囲3箇所以上に設
けることもできる。また取り付け部93は胴部19と別
部材として成形してもよい。この場合、取り付け部93
はリング状の部分に突設し、このリング状の部分に胴部
19が嵌め込まれるようにするとよい。
According to this embodiment, Embodiments 1, 2, and 8
This eliminates the need for the mounting member 17 used in the above, so that waste can be reduced, and there is an advantage that the removal of the formwork is easier than in the case of the ninth embodiment. In FIG. 19, the mounting portions 93 are provided at two locations around the body portion 19, but the mounting portions 93 may be provided at three or more locations around the body portion 19 as necessary. Further, the mounting portion 93 may be formed as a separate member from the body portion 19. In this case, the mounting portion 93
Is protruded from a ring-shaped portion, and the body 19 may be fitted into the ring-shaped portion.

【0030】〔実施形態11〕図21は本発明に係る埋
め込み部材11のさらに他の実施形態を示す。この実施
形態はコンクリート型枠としてデッキプレート(鉄板)
95を使用する場合である。デッキプレート95の場合
は埋め込み部材11を釘で固定することができないの
で、この埋め込み部材11は、取り付け部材17として
ゴム製円筒体を使用している。この円筒状取り付け部材
17の上端部は埋め込み部材本体15の下端部にきつく
嵌合しており、下端部は埋め込み部材本体15の下端か
ら突出している。
[Embodiment 11] FIG. 21 shows still another embodiment of the embedding member 11 according to the present invention. This embodiment uses a deck plate (iron plate) as a concrete formwork.
95 is used. In the case of the deck plate 95, the embedding member 11 cannot be fixed with a nail, so that the embedding member 11 uses a rubber cylindrical body as the attachment member 17. The upper end of the cylindrical mounting member 17 is tightly fitted to the lower end of the embedding member main body 15, and the lower end protrudes from the lower end of the embedding member main body 15.

【0031】デッキプレート95の埋め込み部材取り付
け位置には円筒状取り付け部材17が嵌合する穴が形成
される。円筒状取り付け部材17の下端部には、デッキ
プレート95への挿入を容易にするため、軸線方向に多
数のスリット97が形成されている。上記以外の構成は
図1の実施形態と同様であるので同一部分に同一符号を
付してある。
At the mounting position of the embedding member of the deck plate 95, a hole for fitting the cylindrical mounting member 17 is formed. A number of slits 97 are formed at the lower end of the cylindrical mounting member 17 in the axial direction to facilitate insertion into the deck plate 95. Since the configuration other than the above is the same as that of the embodiment of FIG. 1, the same portions are denoted by the same reference numerals.

【0032】以上のように構成された埋め込み部材11
は、円筒状取り付け部材17の下端部をデッキプレート
95の穴に挿入することによりデッキプレート95に取
り付けられる。この状態でコンクリートが打設され、埋
め込み部材本体15はコンクリート内に埋め込まれる。
コンクリートが固化した後は、図22に示すように取り
付け部材17を下方へ引き抜くようにして取り外す。デ
ッキプレート95はコンクリート69と一体となって残
る。このあとは図23に示すように、配管3に保持部材
13のホルダー47を取り付け、保持部材13のネジ4
9を埋め込み部材本体15内のネジ係止部材25に挿入
するだけで、配管3を固定することができる。
The embedding member 11 configured as described above
Is mounted on the deck plate 95 by inserting the lower end of the cylindrical mounting member 17 into a hole in the deck plate 95. Concrete is poured in this state, and the embedding member main body 15 is embedded in the concrete.
After the concrete is solidified, the mounting member 17 is removed by pulling it downward as shown in FIG. Deck plate 95 remains integral with concrete 69. Thereafter, as shown in FIG. 23, the holder 47 of the holding member 13 is attached to the pipe 3 and the screw 4 of the holding member 13 is attached.
The pipe 3 can be fixed only by inserting the screw 9 into the screw locking member 25 in the embedded member main body 15.

【0033】なお以上の実施形態では配管を固定する場
合について説明したが、本発明は配線を固定する場合に
も同様に適用可能である。
In the above embodiment, the case where the pipe is fixed has been described. However, the present invention is similarly applicable to the case where the wiring is fixed.

【0034】[0034]

【発明の効果】以上説明したように本発明によれば、コ
ンクリート釘などを用いることなく、保持部材の支持軸
を埋め込み部材に押し込むという簡単な操作で配管・配
線を固定することができる。したがって配管・配線作
業、特に天井スラブへの配管・配線作業を安全に、かつ
迅速に行うことができる。また埋め込み部材には軸係止
部より下に下部空間が設けられ、この下部空間に保持部
材の配管・配線より上の出っ張り部分を収納することが
できるため、配管・配線とコンクリート面の間の隙間を
なくすか、十分に小さくすることができる。したがって
配管・配線の安定性が向上するという利点があり、特に
配管が給水・給湯用の場合は水撃発生時の騒音を低減で
きるという効果もある。
As described above, according to the present invention, piping and wiring can be fixed by a simple operation of pushing the support shaft of the holding member into the embedding member without using concrete nails or the like. Therefore, the piping and wiring work, particularly the piping and wiring work to the ceiling slab, can be performed safely and quickly. In addition, a lower space is provided below the shaft locking portion in the embedded member, and a protrusion above the piping and wiring of the holding member can be stored in this lower space, so that the space between the pipe and wiring and the concrete surface can be stored. The gap can be eliminated or made sufficiently small. Therefore, there is an advantage that the stability of the piping and wiring is improved, and in particular, when the piping is used for water supply and hot water supply, there is also an effect that noise at the time of occurrence of water hammer can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る配管・配線固定具の一実施形態
を示す断面図。
FIG. 1 is a cross-sectional view showing an embodiment of a pipe / wiring fixture according to the present invention.

【図2】 図1の固定具における埋め込み部材本体の底
面図。
FIG. 2 is a bottom view of an embedding member main body in the fixture of FIG. 1;

【図3】 図1の固定具におけるネジ係止部材の平面
図。
FIG. 3 is a plan view of a screw locking member in the fixture of FIG. 1;

【図4】 図1の固定具における取り付け部材の平面
図。
FIG. 4 is a plan view of a mounting member in the fixture of FIG. 1;

【図5】 図1の固定具における保持部材の要部を示
す、(A)は平面図、(B)は正面図、(C)は側面
図。
5 (A) is a plan view, FIG. 5 (B) is a front view, and FIG. 5 (C) is a side view showing a main part of a holding member in the fixture of FIG.

【図6】 図5の保持部材に使用されるバンドの平面
図。
FIG. 6 is a plan view of a band used for the holding member of FIG. 5;

【図7】 図1の固定具の埋め込み部材をコンクリート
に埋め込んだ状態を示す断面図。
FIG. 7 is a sectional view showing a state in which the embedded member of the fixture of FIG. 1 is embedded in concrete.

【図8】 図7の状態からコンクリート型枠と取り付け
部材を取り外した状態を示す断面図。
FIG. 8 is a sectional view showing a state in which the concrete formwork and the mounting member have been removed from the state of FIG. 7;

【図9】 コンクリートに埋め込まれた埋め込み部材本
体に保持部材を取り付ける状態を示す断面図。
FIG. 9 is a cross-sectional view showing a state in which a holding member is attached to an embedding member main body embedded in concrete.

【図10】 図1の固定具により配管を固定した状態を
示す断面図。
FIG. 10 is a sectional view showing a state in which the pipe is fixed by the fixture of FIG. 1;

【図11】 本発明に係る埋め込み部材の他の実施形態
を示す断面図。
FIG. 11 is a sectional view showing another embodiment of the embedding member according to the present invention.

【図12】 本発明に用いるネジ係止部材の他の実施形
態を示す平面図。
FIG. 12 is a plan view showing another embodiment of the screw locking member used in the present invention.

【図13】 (A)は本発明に用いる支持軸の他の実施
形態を、(B)は同じくさらに他の実施形態を示す正面
図。
FIG. 13A is a front view showing another embodiment of the support shaft used in the present invention, and FIG. 13B is a front view showing still another embodiment.

【図14】 本発明に用いる保持部材の他の実施形態を
示す、(A)は平面図、(B)は正面図。
14A is a plan view and FIG. 14B is a front view showing another embodiment of the holding member used in the present invention.

【図15】 本発明に用いる保持部材のさらに他の実施
形態を示す正面図。
FIG. 15 is a front view showing still another embodiment of the holding member used in the present invention.

【図16】 本発明に用いる保持部材のさらに他の実施
形態を示す、(A)は平面図、(B)は正面図。
16 (A) is a plan view and FIG. 16 (B) is a front view showing still another embodiment of the holding member used in the present invention.

【図17】 本発明に係る埋め込み部材のさらに他の実
施形態を示す、(A)は断面図、(B)は底面図。
17 (A) is a sectional view, and FIG. 17 (B) is a bottom view, showing still another embodiment of the embedding member according to the present invention.

【図18】 本発明に係る埋め込み部材のさらに他の実
施形態を示す、(A)は断面図、(B)は底面図。
18 (A) is a sectional view and FIG. 18 (B) is a bottom view showing still another embodiment of the embedding member according to the present invention.

【図19】 本発明に係る埋め込み部材のさらに他の実
施形態を示す、(A)は断面図、(B)は(A)のB−
B線断面図、(C)は底面図。
19A and 19B show still another embodiment of the embedding member according to the present invention. FIG. 19A is a cross-sectional view, and FIG.
FIG. 3B is a sectional view taken along line B, and FIG.

【図20】 図19の埋め込み部材をコンクリートに埋
め込み、型枠を取り外しているときの状態を示す断面
図。
FIG. 20 is a cross-sectional view showing a state where the embedding member of FIG. 19 is embedded in concrete and the formwork is removed.

【図21】 本発明に係る埋め込み部材のさらに他の実
施形態を示す、(A)は断面図、(B)は底面図。
FIGS. 21A and 21B show still another embodiment of the embedding member according to the present invention, wherein FIG. 21A is a cross-sectional view and FIG.

【図22】 図21の埋め込み部材をコンクリートに埋
め込み、取り付け部材を取り外した状態を示す断面図。
FIG. 22 is a cross-sectional view showing a state in which the embedding member of FIG. 21 is embedded in concrete and an attachment member is removed.

【図23】 図22の埋め込み部材に配管を固定した状
態を示す断面図。
FIG. 23 is a sectional view showing a state in which the pipe is fixed to the embedded member of FIG. 22;

【図24】 従来の配管固定具の一例を示す斜視図。FIG. 24 is a perspective view showing an example of a conventional piping fixture.

【図25】 図24の配管固定具で配管を天井に固定し
た状態を示す斜視図。
FIG. 25 is a perspective view showing a state where the pipe is fixed to the ceiling with the pipe fixing tool of FIG. 24;

【図26】 従来の配管固定具の他の例を示す正面図。FIG. 26 is a front view showing another example of the conventional piping fixture.

【符号の説明】[Explanation of symbols]

3:配管 11:埋め込み部材 13:保持部材 15:埋め込み部材本体 17:取り付け部材 19:胴部 21:蓋部 23:環状突縁 25:ネジ係止部材 27:上部空間 29:下部空間 31:鍔部 35:弾性爪片 37:円板部 41:嵌合部 43:釘穴 47:ホルダー 49:ネジ 65:コンクリート型枠 69:コンクリート天井スラブ 3: Piping 11: Embedding member 13: Holding member 15: Embedding member main body 17: Mounting member 19: Body 21: Lid 23: Annular protruding edge 25: Screw locking member 27: Upper space 29: Lower space 31: Flange Part 35: Elastic claw piece 37: Disk part 41: Fitting part 43: Nail hole 47: Holder 49: Screw 65: Concrete formwork 69: Concrete ceiling slab

───────────────────────────────────────────────────── フロントページの続き (72)発明者 平田 稲美 東京都港区芝浦1丁目2番3号 清水建設 株式会社内 (72)発明者 中村 健一 東京都港区芝浦1丁目2番3号 清水建設 株式会社内 (72)発明者 小澤 聡 東京都千代田区丸の内2丁目6番1号 古 河電気工業株式会社内 (72)発明者 原田 廣志 東京都千代田区丸の内2丁目6番1号 古 河電気工業株式会社内 (72)発明者 馬渕 実 東京都千代田区丸の内2丁目6番1号 古 河電気工業株式会社内 (72)発明者 田中 康弘 東京都千代田区丸の内2丁目6番1号 古 河電気工業株式会社内 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Inami Hirata 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Kenichi Nakamura 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation Co., Ltd. (72) Inventor Satoshi Ozawa 2-6-1 Marunouchi, Chiyoda-ku, Tokyo Furukawa Electric Co., Ltd. (72) Inventor Hiroshi Harada 2-6-1 Marunouchi, Chiyoda-ku, Tokyo Furukawa Electric Co., Ltd. (72) Inventor Minoru Mabuchi 2-6-1 Marunouchi, Chiyoda-ku, Tokyo Furukawa Electric Co., Ltd. (72) Inventor Yasuhiro Tanaka 2-6-1 Marunouchi, Chiyoda-ku, Tokyo Furukawa Electric Inside the company

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】中空の胴部(19)と、胴部の上端を塞ぐ
蓋部(21)と、胴部の内部の中段に胴部と一体的に設
けられた軸係止部(35)と、胴部の外側に胴部の下端
縁より上に位置させて胴部と一体的に設けられた鍔部
(31)と、胴部の下端部に着脱可能に又は一体に設け
られた型枠への取り付け部(37、43)とを有し、 前記軸係止部(35)は、胴部(19)下方からの軸
(49)の挿入は許容するが軸(49)の引き抜きには
抵抗するように形成され、 前記胴部(19)の内部の前記軸係止部(35)より上
には上部空間(27)が、下には下部空間(29)が設
けられている、 ことを特徴とする配管・配線固定用埋め込み部材。
1. A hollow body portion (19), a lid portion (21) for closing an upper end of the body portion, and a shaft locking portion (35) provided integrally with the body portion in a middle portion of the inside of the body portion. A flange portion (31) provided on the outside of the body portion above the lower edge of the body portion and integrally provided with the body portion; and a mold detachably or integrally provided on the lower end portion of the body portion. And a shaft engaging portion (35) for allowing the shaft (49) to be inserted from below the body (19) but for pulling out the shaft (49). Are formed so as to resist, an upper space (27) is provided above the shaft engaging portion (35) inside the body portion (19), and a lower space (29) is provided below. An embedded member for fixing piping and wiring, characterized in that:
【請求項2】請求項1記載の埋め込み部材(11)と、
配管・配線の保持部材(13)との組み合わせからな
り、 前記保持部材(13)は、配管・配線を保持するホルダ
ー(47)と、このホルダー(47)から突出して前記
埋め込み部材(11)の軸係止部(35)に挿入される
支持軸(49)とを有しており、 前記埋め込み部材(11)の下部空間(29)は、前記
ホルダー(47)の支持軸(49)のまわりの配管・配
線表面からの出っ張り部分(55)を収納できる大きさ
になっている、 ことを特徴とする配管・配線固定具。
2. An embedding member (11) according to claim 1,
The holding member (13) includes a holder (47) for holding the piping and wiring, and a holder (47) protruding from the holder (47) for holding the embedded member (11). A support shaft (49) inserted into the shaft engaging portion (35), and a lower space (29) of the embedding member (11) is provided around a support shaft (49) of the holder (47). A pipe / wiring fixture characterized in that it is sized to accommodate a protruding portion (55) from the pipe / wiring surface.
JP07692998A 1997-04-02 1998-03-25 Piping and wiring fixture Expired - Fee Related JP4234222B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP07692998A JP4234222B2 (en) 1997-04-02 1998-03-25 Piping and wiring fixture

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP8388097 1997-04-02
JP9-83880 1997-04-02
JP07692998A JP4234222B2 (en) 1997-04-02 1998-03-25 Piping and wiring fixture

Publications (2)

Publication Number Publication Date
JPH10332048A true JPH10332048A (en) 1998-12-15
JP4234222B2 JP4234222B2 (en) 2009-03-04

Family

ID=26418042

Family Applications (1)

Application Number Title Priority Date Filing Date
JP07692998A Expired - Fee Related JP4234222B2 (en) 1997-04-02 1998-03-25 Piping and wiring fixture

Country Status (1)

Country Link
JP (1) JP4234222B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005048928A (en) * 2003-07-31 2005-02-24 Bridgestone Corp Ea material, and its mounting clip and mounting structure
KR100754508B1 (en) 2007-01-29 2007-09-03 주식회사 엑스텍 Pipe fixing element
KR200476569Y1 (en) * 2013-08-01 2015-03-12 하철상 conduit support holder
KR200476570Y1 (en) * 2013-08-01 2015-03-12 하철상 conduit support holder
CN109027423A (en) * 2018-09-29 2018-12-18 日丰企业(佛山)有限公司 Pipe clamp for furred ceiling

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005048928A (en) * 2003-07-31 2005-02-24 Bridgestone Corp Ea material, and its mounting clip and mounting structure
JP4581350B2 (en) * 2003-07-31 2010-11-17 株式会社ブリヂストン Impact energy absorber and its mounting structure
KR100754508B1 (en) 2007-01-29 2007-09-03 주식회사 엑스텍 Pipe fixing element
WO2008093906A1 (en) * 2007-01-29 2008-08-07 Extec Co., Ltd. Pipe fixing element
KR200476569Y1 (en) * 2013-08-01 2015-03-12 하철상 conduit support holder
KR200476570Y1 (en) * 2013-08-01 2015-03-12 하철상 conduit support holder
CN109027423A (en) * 2018-09-29 2018-12-18 日丰企业(佛山)有限公司 Pipe clamp for furred ceiling

Also Published As

Publication number Publication date
JP4234222B2 (en) 2009-03-04

Similar Documents

Publication Publication Date Title
US3979093A (en) Means for mounting pipes and conduits in studs and joists
AU1543299A (en) Masonry lead-in fixture
US5236158A (en) Pipe hanging clamp
US5154375A (en) Pipe hanging clamp
JPH10332048A (en) Buried member for fixation of piping and wiring, and piping and wiring fixture
JP3752047B2 (en) Piping / wiring fixing embedded member and piping / wiring fixture
JP6197064B1 (en) Construction sleeve
JPH11270752A (en) Ceiling insert for fixing hanging bolt
JP3500137B2 (en) End fitting for cable protection tube
JP2604678Y2 (en) Grommet
JP3847947B2 (en) Cable, sheath tube suspension cable and cable, sheath tube suspension method
JPH0619894Y2 (en) Pipe support structure inside the sheath pipe
JPH0419414B2 (en)
AU2011226834B2 (en) Cover with Clip Structure
JP3847942B2 (en) Cable, sheath tube suspension tube
JPH05252636A (en) Concrete-buried box
JP2941705B2 (en) Cable protection bushing
JPH0544269A (en) Insert for thermal insulation slab
JPH05336635A (en) Cable high tensile strength body fixing device
JP2545511Y2 (en) Nail mounting structure for components such as protective covers
JPH0237220Y2 (en)
JP2001152664A (en) Building frame work accompanying attachment of piping for concrete structure
JPH0516474Y2 (en)
JP2003049539A (en) End fixing tool for cable protecting tube
JP2639640B2 (en) Construction tools for concrete buried objects

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050318

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080820

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080821

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081006

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20081125

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20081211

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111219

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111219

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121219

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131219

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees