Prior art keywords
pipe
steel pipe
main pipe
pipe body
support members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8691497A
Other languages
Japanese (ja)
Inventor
Mitsuo Karasuda
光雄 烏田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP8691497A priority Critical patent/JPH10279029A/en
Publication of JPH10279029A publication Critical patent/JPH10279029A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rollers For Roller Conveyors For Transfer (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a guide device for moving a pipe which can move a main pipe smoothly by the traction of a wire even at a narrow place and use commonly for the piping work of the pipe with a different diameter. SOLUTION: A steel pipe body 1a is placed by four points contact at a symmetrical position on a pair of guide mechanism 21a, 21b consisting of ball bodies 22a, 22b and ball body receivers 23a, 23b. The ball body receivers 23a, 23b are pivoted to support members 25a, 25b by shafts 24a, 24b and swung in an arrow mark direction. In the ball body receivers 23a, 23b, pressing mechanism 26a, 26b, 26c, 26d for pressing the ball bodies 22a, 22b to the steel pipe body 1a are provided in respective vertical side and bottom side and even if the steel pipe body 1a is biased at the moving time, a restoring force is acted to the guide mechanism 21a, 21b and the steel pipe body 1 can be contacted at a normal position. As a interval adjust mechanism 28 is provided on the support members 25a, 25b and the interval can be adjusted properly, this device is used for plural piping works commonly and can move the steel pipe body 1a with a different pipe diameter.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は管移動用ガイド装置
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a guide device for moving a pipe.

【0002】[0002]

【従来の技術】近年、ガス、水道等に用いられる配管は
長距離化している。
2. Description of the Related Art In recent years, pipes used for gas, water, and the like have become longer.

【0003】そのために、河川を横切って設けられた橋
梁の桁内や、地中のトンネル内で他の施設と共存させた
狭隘な位置や、設置幅が狭隘な場所に配管されたりする
場合が多くなっている。
[0003] For this reason, pipes may be installed in narrow places where coexisting with other facilities or in places where installation widths are narrow, in bridge girders provided across rivers, in underground tunnels, or in other places. More.

【0004】上記のような配管工事、例えば道路脇の設
置幅の狭隘な場所では、一部を開削して覆工板をかけ、
交通阻害を最小限にして施工される。
[0004] In the above-mentioned plumbing work, for example, in a place where the installation width is narrow beside a road, part of the work is cut and covered with a lining plate.
Construction will be carried out with minimum traffic obstruction.

【0005】図5は設置幅の狭隘な場所における鋼管体
の配管の一例を示す一部切欠け概略平面図であり、図6
は図5の概略側面図であり、図7は図5のA−A線矢視
断面図である。
FIG. 5 is a partially cut-away schematic plan view showing an example of piping of a steel pipe in a place where the installation width is narrow.
5 is a schematic side view of FIG. 5, and FIG. 7 is a sectional view taken along line AA of FIG.

【0006】図5、図6では、道路脇の設置幅の狭隘な
場所Sに堀掘削を行ない、作業溝2を設け、その中に会
所3を設けている。作業溝2には搬入された鋼管体1a
が鼓型ローラ4に載置されている。また、覆工板5をか
けた開削溝6の鼓型ローラ4に先行の鋼管体が接続され
て形成した本管1が載置されている。
In FIGS. 5 and 6, a trench S is excavated in a narrow place S on the side of a road, and a work groove 2 is provided, and a meeting place 3 is provided therein. The steel pipe 1a carried into the working groove 2
Is placed on the drum roller 4. Further, the main pipe 1 formed by connecting the preceding steel pipe body to the hourglass roller 4 of the cut groove 6 covered with the lining plate 5 is placed.

【0007】本管1の後端と鋼管体1aが会所3で溶接
されると、本管1はその先端部に設けた図示しないワイ
ヤをウインチで牽引して全体を矢印の方向に移動させ
る。
When the rear end of the main pipe 1 and the steel pipe body 1a are welded at the meeting place 3, the main pipe 1 is pulled by a winch on a wire (not shown) provided at the front end thereof, and is entirely moved in the direction of the arrow.

【0008】図7において、鼓型ローラ4は支持部材7
a、7bの先端に設けた軸受8a、8bで軸支されてい
る。そして、鼓型ローラ4には本管1が面接触して載置
されている。本管1がワイヤにより牽引されると、鼓型
ローラ4は回転して本管1を移動させる。符号9は基盤
である。本管1が開削溝6の所定の位置に移動されて、
本管1の牽引が終了すると、鼓型ローラ4及びその附帯
設備は取外され、本管1は図示しない支持具でその位置
で固定される(従来技術1)。
In FIG. 7, the drum-shaped roller 4 has a support member 7.
The shafts are supported by bearings 8a and 8b provided at the tips of a and 7b. The main tube 1 is placed on the drum roller 4 in surface contact. When the main tube 1 is pulled by the wire, the hourglass roller 4 rotates to move the main tube 1. Reference numeral 9 is a base. The main pipe 1 is moved to a predetermined position of the cut groove 6,
When the traction of the main pipe 1 is completed, the hourglass roller 4 and its auxiliary equipment are removed, and the main pipe 1 is fixed at that position by a support (not shown) (prior art 1).

【0009】上記のようなワイヤ等の牽引による施工方
法は設置幅が狭隘な場所でも容易に配管できる反面、本
管1の配管される距離が長い場合には鼓型ローラ4及び
その附帯設備の数も多くなる。そのために、鼓型ローラ
を繰返して使用することが考えられる。
The above-mentioned construction method by pulling a wire or the like can easily perform piping even in a place where the installation width is narrow, but when the main pipe 1 is installed in a long distance, the drum-shaped roller 4 and its auxiliary equipment can be installed. The number also increases. For this purpose, it is conceivable to use the hourglass roller repeatedly.

【0010】しかし、複数の配管工事を行う場合、本管
1の管径は異なる場合が多く、一般に、一つの配管工事
で使用した多数の鼓型ローラ4は、そのままでは他の配
管工事に兼用することができない。
However, when a plurality of plumbing works are performed, the pipe diameter of the main pipe 1 is often different, and in general, a large number of drum-shaped rollers 4 used in one plumbing work are used as they are for other plumbing works. Can not do it.

【0011】これに対して、実開昭56−165708
号公報には各種管径の鋼管体に即応せしめる管移動用ロ
ーラが開示されている(従来技術2)。
On the other hand, Japanese Utility Model Application Laid-Open No. 56-165708
Japanese Patent Application Laid-Open Publication No. H11-163,086 discloses a roller for moving a pipe which can be immediately adapted to steel pipe bodies having various pipe diameters (prior art 2).

【0012】図8は上記管移動用ローラの一例を示す正
面図である。図8において、管移動用ローラは鋼管体1
aを載置するように一対のローラ10a、10bを対称
的に内側に傾けて軸支させている。そのために、ローラ
10a、10bの軸材11a、11bは内側に傾けたジ
ャッキシャフト13a、13bの上端に取付けたローラ
受体12a、12bに軸支させている。ジャッキシャフ
ト13a、13bはジャッキハンドル15a、15bに
よりジャッキシリンダ−14a、14b内を昇降し、そ
れによりローラ10a、10bは斜めに昇降操作され
る。符号16a、16bは支柱である。
FIG. 8 is a front view showing an example of the tube moving roller. In FIG. 8, the pipe moving roller is a steel pipe body 1.
The pair of rollers 10a and 10b are pivoted symmetrically inwardly inward so as to place a. For this purpose, the shaft members 11a, 11b of the rollers 10a, 10b are supported by roller receivers 12a, 12b mounted on the upper ends of the jack shafts 13a, 13b inclined inward. The jack shafts 13a, 13b are moved up and down in the jack cylinders 14a, 14b by jack handles 15a, 15b, whereby the rollers 10a, 10b are moved up and down diagonally. Reference numerals 16a and 16b are columns.

【0013】鋼管体1aの管径が異なった場合には、ジ
ャッキシリンダ−14a、14bのジャッキシャフト1
3a、13bをジャッキハンドル15a、15bにより
昇降操作し、間隔調整機構17を操作して両ローラ10
a、10bの間隔を調整して、自在に即応できる。
If the pipe diameter of the steel pipe body 1a is different, the jack shaft 1 of the jack cylinders 14a, 14b
3a and 13b are moved up and down by jack handles 15a and 15b, and the distance adjusting mechanism 17 is operated to move both rollers 10a and 13b.
The distance between a and 10b can be adjusted to respond immediately.

【0014】[0014]

【発明が解決しようとする課題】しかしながら、従来技
術1では、前述したように、一つの本管1の管径に一致
させた鼓型ロール4を用いているので、本管1の管径が
異なる配管工事の場合には、鼓型ロール4をそのまま適
用することができない。そのために、管径別に多数の鼓
型ローラ4とその附帯設備を準備しなければならず、コ
スト的に問題であり、また、鼓型ローラ4とその附帯設
備の保管、管理が煩雑である。
However, in the prior art 1, as described above, since the drum-shaped roll 4 which matches the diameter of one main pipe 1 is used, the pipe diameter of the main pipe 1 is reduced. In the case of different piping work, the drum-shaped roll 4 cannot be applied as it is. Therefore, it is necessary to prepare a large number of drum-shaped rollers 4 and associated equipment for each pipe diameter, which is a problem in terms of cost, and storage and management of the drum-shaped rollers 4 and associated equipment are complicated.

【0015】一方、従来技術2による管移動用ローラは
鋼管体1aの管径が異なる配管工事にも兼用することが
でき、それなりの効果が期待されるが、ワイヤで牽引し
ながら鋼管体1aを移動させて配管するような狭隘な場
所での配管工事に適用した場合には、以下のような問題
がある。
On the other hand, the pipe moving roller according to the prior art 2 can also be used for piping work in which the pipe diameter of the steel pipe body 1a is different, and a certain effect is expected, but the steel pipe body 1a is pulled while being pulled by a wire. When applied to piping work in a narrow place such as moving and piping, there are the following problems.

【0016】管移動用ローラは図8に示すように、一対
のローラ10a、10bと載置された鋼管体1aは2点
接触されている。しかし、鋼管体1aはワイヤで牽引し
て移動される場合に、ガダガタ揺れ、鋼管体1aが順次
接続されて長尺の本管になるに従い、配置された複数の
一対のローラ10a、10bの中に2点接触できないも
のが生じる。このような一対のローラ10a、10b群
の中で接触の不十分なものが一つでも生じると、本管に
偏りが生じて、ついには円滑な本管の移動が困難にな
る。
As shown in FIG. 8, a pair of rollers 10a, 10b and a placed steel pipe 1a are in two-point contact with each other. However, when the steel pipe body 1a is pulled and moved by the wire, the steel pipe body 1a sways, and as the steel pipe bodies 1a are sequentially connected to form a long main pipe, a plurality of arranged rollers 10a and 10b are disposed. May not be able to make two-point contact. If at least one of the pair of rollers 10a and 10b having insufficient contact occurs, the main pipe is biased, and it becomes difficult to smoothly move the main pipe.

【0017】本発明はこのような問題点の解決を図った
ものであり、本管をワイヤ等で牽引しながら移動させる
狭隘な場所でも円滑な本管の移動ができ、且つ管径の異
なる配管工事に兼用できる管移動用ガイド装置を提供す
ることを目的とする。
The present invention has been made to solve such a problem, and can smoothly move the main pipe even in a narrow place where the main pipe is moved while being pulled by a wire or the like, and pipes having different pipe diameters. An object of the present invention is to provide a pipe moving guide device that can be used for construction.

【0018】[0018]

【課題を解決するための手段】本発明は本管を対称位置
で載置する、内側に傾けた方向に配列した複数の球体か
らなる一対のガイド機構と、該ガイド機構を軸支し、本
管にガイド機構を押付ける押付機構を備えた一対の支持
部材と、該支持部材の間隔を調整する間隔調整機構とを
設けてなる管移動用ガイド装置である。
According to the present invention, there is provided a pair of guide mechanisms each comprising a plurality of spheres arranged in an inwardly inclined direction for placing a main pipe at a symmetrical position, and a pair of guide mechanisms which pivotally support the guide mechanisms. A pipe moving guide device including a pair of support members provided with a pressing mechanism for pressing a guide mechanism against a pipe, and an interval adjusting mechanism for adjusting an interval between the support members.

【0019】本発明において、本管を対称位置で載置す
る複数の球体からなる一対のガイド機構を設けたのは、
対称位置にある複数の球体により各々複数点接触で安定
して移動させるためであり、且つ管径が異なっても、同
様に安定して移動させるためである。
In the present invention, the reason why a pair of guide mechanisms composed of a plurality of spheres for mounting the main pipe at symmetric positions is provided is as follows.
This is because a plurality of spheres located at symmetrical positions can be moved stably at a plurality of point contacts, and even if the pipe diameters are different, the ball can be similarly stably moved.

【0020】一方側で1点接触で鋼管体を載置した場合
には不安定となり鋼管体を円滑に移動することが困難で
ある。
When the steel pipe is placed on one side in one-point contact, it becomes unstable and it is difficult to move the steel pipe smoothly.

【0021】本発明によれば、対象とする本管は一対の
ガイド機構の両側で常に球体に複数点接触で載置されて
安定して移動することができる。
According to the present invention, the target main pipe can be stably moved on both sides of the pair of guide mechanisms by always being placed on the sphere at a plurality of points of contact.

【0022】即ち、本発明の管移動用ガイド装置を複数
個狭隘な場所での配管工事に採用し、本管をワイヤで牽
引して移動させる場合に、各一対のガイド機構は常に複
数の球体により本管に追従して複数点接触する。この場
合、ガイド装置には本管に押付ける機構を備えているの
で、ガイド機構が本管と正常な位置で接触して回転する
ための復元力が生じる。
That is, when a plurality of the pipe moving guide devices of the present invention are employed in plumbing work in a narrow space, and the main pipe is pulled and moved by a wire, each pair of guide mechanisms always has a plurality of spherical bodies. To contact the main pipe at multiple points. In this case, since the guide device is provided with a mechanism for pressing against the main pipe, a restoring force is generated for the guide mechanism to rotate in contact with the main pipe at a normal position.

【0023】一方、一つの配管工事から他の配管工事に
本発明の管移動用ガイド装置を兼用する場合に、本管の
管径が異なっている時には、間隔調整機構により支持部
材の間隔を調整して、その本管の管径に適用させる。
On the other hand, in the case where the pipe moving guide device of the present invention is also used for one pipe work to another pipe work, when the pipe diameter of the main pipe is different, the interval between the support members is adjusted by the interval adjusting mechanism. Then, it is applied to the diameter of the main pipe.

【0024】従って、本発明では管径の異なる本管の配
管工事に兼用しても、本管を複数点接触させて円滑に移
動することができる。
Therefore, according to the present invention, even when the main pipe having a different pipe diameter is used for piping work, the main pipe can be moved smoothly by contacting at a plurality of points.

【0025】[0025]

【発明の実施の形態】図を用いて本発明の実施の形態を
説明する。図1は、本発明の一実施の形態を示す正面図
である。図1において,30は管移動用ガイド装置であ
り、21a、21bは各々2個の球体22a、22bか
らなる一対のガイド機構で、鋼管体1aが対称位置で4
点接触で載置されている。球体22a、22bは球体受
23a、23bに内側に傾けた方向に配列されて、回転
可能に支持されている。球体受23a、23bから突出
した球体21a、21bの部分は鋼管体1aと4点接触
する。図1では4点接触の場合を示したが、必要に応じ
て球体の数を増して片側当たり3点、4点等の複数点の
接触をさせることができる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a front view showing an embodiment of the present invention. In FIG. 1, reference numeral 30 denotes a pipe moving guide device, and reference numerals 21a and 21b denote a pair of guide mechanisms each composed of two spheres 22a and 22b.
It is placed in point contact. The spheres 22a and 22b are arranged in a direction inclined inward on the sphere receivers 23a and 23b, and are rotatably supported. The portions of the spheres 21a and 21b protruding from the sphere receivers 23a and 23b make four-point contact with the steel tube 1a. Although the case of four-point contact is shown in FIG. 1, the number of spheres can be increased as necessary to make contact at a plurality of points such as three points or four points per side.

【0026】球体22a、22bは鋼管体1aを接続し
て形成した本管を移動させるのに必要な強度を有する等
の通常の使用条件を備えることが前提であるが、本発明
では、更に他の配管工事にも管移動用ガイド装置を兼用
させるものであり、対象とする本管の管径範囲内で、い
ずれの場合でも対称位置でともに2点以上点接触できる
ように、球体22a、22bの形状、大きさを選定する
ことが必要である。
It is assumed that the spheres 22a and 22b have ordinary use conditions such as having a strength necessary for moving a main pipe formed by connecting the steel pipe bodies 1a. The pipe moving guide device is also used for the plumbing work, and the spheres 22a and 22b can be contacted at two or more points at symmetrical positions in any case within the range of the target main pipe diameter. It is necessary to select the shape and size of

【0027】球体受23a、23bは軸24a、24b
により支持部材25a、25bに軸支され、矢印の方向
に揺動できるようにしている。
The ball receivers 23a and 23b are shafts 24a and 24b
Thus, it is pivotally supported by the support members 25a and 25b, and can swing in the direction of the arrow.

【0028】球体受23a、23bは直角三角形状の箱
で斜辺側に球体受22a、22bが突出する開口部を設
け、その内側には球体22a、22bが自在に回転でき
る図示しない台座を設けている。
The sphere receivers 23a and 23b are right-angled triangular boxes provided with openings on the oblique sides from which the sphere receivers 22a and 22b protrude, and a pedestal (not shown) on which the spheres 22a and 22b can be freely rotated. I have.

【0029】球体受23a、23bには各々垂直側と底
面側に球体22a、22bを鋼管体1aに押付ける押付
け機構26a、26b、26c、26dを備えている。
The sphere receivers 23a, 23b are provided with pressing mechanisms 26a, 26b, 26c, 26d for pressing the spheres 22a, 22b against the steel tube 1a on the vertical side and the bottom side, respectively.

【0030】押付け機構26a、26b、26c、26
dとしては、通常バネ機構が採用される。
The pressing mechanisms 26a, 26b, 26c, 26
As d, a spring mechanism is usually employed.

【0031】この押付け機構26a、26b、26c、
26dによって、鋼管体1aが移動に際して偏っても、
ガイド機構21a、21bには復元力が働き、鋼管体1
が正常な位置で接触できるようになる。
The pressing mechanisms 26a, 26b, 26c,
Due to 26d, even if the steel pipe body 1a is deviated during the movement,
A restoring force acts on the guide mechanisms 21a and 21b, and the steel pipe 1
Can be contacted at a normal position.

【0032】また、支持部材25a、25bは架設基盤
27に固定されている。支持部材25a、25bはそれ
らの間隔を調整する間隔調整機構28が設けられてい
る。
The support members 25a and 25b are fixed to the erection base 27. The support members 25a and 25b are provided with an interval adjusting mechanism 28 for adjusting the interval between them.

【0033】上記において、支持部材25a、25bは
直接に配管基盤に固定することもできる。
In the above, the support members 25a and 25b can be directly fixed to the pipe base.

【0034】間隔調整機構28としてはスクリューネジ
等が用いられ、ハンドル28aによって簡単に一方の支
持部材25bが支持部材25a側に移動できるようにな
っている。この場合、架設基盤27に図示しない溝を設
けて、支持部材25bの移動をガイドする等のことが行
われる。
A screw screw or the like is used as the interval adjusting mechanism 28, and one of the support members 25b can be easily moved to the support member 25a side by the handle 28a. In this case, a groove (not shown) is provided in the erection base 27 to guide the movement of the support member 25b.

【0035】必要によっては、支持部材25a、25b
の両方を移動させて間隔を調整することができる。
If necessary, support members 25a, 25b
Can be moved to adjust the interval.

【0036】間隔調整機構28によって、支持部材25
a、25bの間隔が適宜調整できるので、複数の配管工
事に兼用させて、管径の異なる鋼管体1aを移動するこ
とができる。
The distance adjusting mechanism 28 allows the support member 25
Since the interval between a and 25b can be appropriately adjusted, the steel pipe 1a having a different pipe diameter can be moved while being used for a plurality of plumbing works.

【0037】本発明によれば、対象とする本管が管径の
異なる鋼管体1aであっても、本管は一対のガイド機構
の両方で常に球体に複数点接触で載置されて安定して移
動することができる。
According to the present invention, even if the target main pipe is a steel pipe body 1a having a different pipe diameter, the main pipe is always mounted on the sphere at a plurality of points in contact with both of the pair of guide mechanisms, and is stable. Can be moved.

【0038】図2は本発明の他の実施の形態を示す正面
図である。図1と共通する個所には同じ符号をつけて、
その説明を省略する。
FIG. 2 is a front view showing another embodiment of the present invention. The same parts as those in FIG.
The description is omitted.

【0039】図2において、21a、21bは各々5個
の球体22a、22b、22c、22d、22eからな
る一対のガイド機構で、鋼管体1aを10点接触で載置
している。球体受23a、23bは2角を裁断した直角
三角形状の箱で、球体22a〜22eは球体受23a、
23bの斜辺側に設けた開口部から突出しており、その
内側では球体22a〜22e自体が接触しながら自在に
回転できる図示しない台座を設けている。ここでは斜辺
側を湾曲させて、球体22〜22eが本管に接触し易い
ようにしている。
In FIG. 2, reference numerals 21a and 21b denote a pair of guide mechanisms each composed of five spheres 22a, 22b, 22c, 22d and 22e, on which the steel pipe 1a is placed in 10-point contact. The spherical receivers 23a and 23b are right-angled triangular boxes with two corners cut off, and the spherical bodies 22a to 22e are spherical receivers 23a,
The base protrudes from an opening provided on the hypotenuse side of 23b, and a pedestal (not shown) is provided inside which the spheres 22a to 22e can freely rotate while contacting with each other. Here, the hypotenuse side is curved so that the spheres 22 to 22e can easily contact the main pipe.

【0040】本発明では鋼管体1aから形成された本管
が移動する際に、一対のガイド機構の両方で球体22
a、24b、22c、22d、22eの2個以上が本管
に点接触する。
In the present invention, when the main pipe formed from the steel pipe body 1a moves, the spherical body 22 is formed by both of the pair of guide mechanisms.
Two or more of a, 24b, 22c, 22d, and 22e make point contact with the main pipe.

【0041】また、図1、図2では図示していないが、
支持部材25a、25bと架設基盤7の間にネジジャッ
キ等を設けて、上下方向の位置を調整すると、対象とす
る本管1の管径範囲を更に広げることができる。
Although not shown in FIGS. 1 and 2,
By providing a screw jack or the like between the support members 25a, 25b and the erection base 7 and adjusting the position in the vertical direction, the diameter range of the target main pipe 1 can be further expanded.

【0042】本発明の管移動用ローラ装置を解体する場
合には鋼管体1を接続して形成した本管を図示しない固
定具で所定位置に固定した後に、間隔調整機構28を操
作してガイド機構21a、21bを本管から離す。次
に、間隔調整機構28を取外すとガイド機構21a関係
部品とガイド機構21b関係部品に分離できるので、そ
れらをユニットとして架設基盤27から取外し、最後に
架設基盤27を取外す。
When the pipe moving roller device of the present invention is disassembled, the main pipe formed by connecting the steel pipe body 1 is fixed at a predetermined position with a fixture (not shown), and then the guide is operated by operating the interval adjusting mechanism 28. The mechanisms 21a and 21b are separated from the main pipe. Next, since the guide mechanism 21a-related parts and the guide mechanism 21b-related parts can be separated by removing the gap adjusting mechanism 28, they are removed as a unit from the erection base 27, and finally the erection base 27 is removed.

【0043】本発明の管移動用ガイド装置を配管工事に
用いる場合には、上記の手順を逆にすれば簡単に設置す
ることができる。
When the pipe moving guide device of the present invention is used for plumbing work, it can be easily installed by reversing the above procedure.

【0044】図3は本発明の管移動用ガイド装置を橋梁
の桁内にガス配管する場合に適用した概略側面であり、
図4はその要部を示す斜視図である。
FIG. 3 is a schematic side view of a pipe moving guide device according to the present invention applied to a case where gas pipes are installed in a bridge girder.
FIG. 4 is a perspective view showing the main part.

【0045】図3、図4において、橋梁29の桁内29
aにガス管を配管する位置に予め本発明の管移動用ガイ
ド装置30が複数個等間隔に架設されている。橋梁29
の一方の側には、作業溝2aが掘割されてその中に溶接
する場所として会所3aを設けている。また、橋梁29
の他方の側には、作業溝2bが掘割されて、その中に本
管1をワイヤ32で牽引するウインチ33を設置してい
る。
In FIG. 3 and FIG.
A plurality of pipe moving guide devices 30 of the present invention are previously installed at equal intervals at a position where a gas pipe is to be piped at a. Bridge 29
On one side, a work place 2a is provided as a place where a working groove 2a is cut and welded therein. In addition, bridge 29
On the other side, a working groove 2b is dug, and a winch 33 for pulling the main pipe 1 by a wire 32 is installed therein.

【0046】ここでは鋼管体1が搬送されてきて、鋼管
体1aが溶接機31で溶接されて本管1を形成して順次
移動される。移動方法は本管1の先端部にワイヤ32の
一端を取付け、他端をウインチ33に取付けて、ウイン
チ33の駆動により、本管1を牽引する。本管1の先端
部は先細にして各管移動用ガイド装置30に容易に載置
できるようにしている。
Here, the steel pipe 1 is conveyed, and the steel pipe 1a is welded by the welding machine 31 to form the main pipe 1 and is sequentially moved. The moving method is such that one end of the wire 32 is attached to the tip of the main pipe 1, the other end is attached to the winch 33, and the main pipe 1 is pulled by driving the winch 33. The distal end of the main pipe 1 is tapered so that it can be easily mounted on each pipe moving guide device 30.

【0047】各管移動用ガイド装置30に載置した本管
1はガイド機構21a、21bと両側で常に複数点接触
させており、且つ、押付け機構26a〜26dによっ
て、正常な状態に常に復元するようにするので、円滑に
移動することができる。
The main pipe 1 placed on each pipe moving guide device 30 is in constant contact with the guide mechanisms 21a and 21b on both sides at a plurality of points, and is always restored to a normal state by the pressing mechanisms 26a to 26d. As a result, it is possible to move smoothly.

【0048】本管1が所定の位置に移動され、所定の固
定具により固定されて、所定の配管工事が終了すると、
管移動用ガイド装置30が解体される。
When the main pipe 1 is moved to a predetermined position and fixed by a predetermined fixing tool and a predetermined plumbing work is completed,
The pipe moving guide device 30 is dismantled.

【0049】本発明では図示していないボルトナット等
の着脱機構を用いて管移動用ガイド装置30を組立てて
いるので、解体が容易である。
In the present invention, since the pipe moving guide device 30 is assembled using a detachable mechanism such as a bolt and nut (not shown), disassembly is easy.

【0050】また、一つの配管工事での使用を終えた本
発明の管移動用ガイド装置30は本管1の管径が所定範
囲の他の配管工事について、そのまま支持部材25a、
25b間の調整のみで兼用することができる。
Further, the pipe moving guide device 30 of the present invention, which has been used in one plumbing work, is used as it is for other plumbing works in which the pipe diameter of the main pipe 1 is within a predetermined range.
Only the adjustment between 25b can be used.

【0051】[0051]

【発明の効果】以上のように、本発明の管移動用ガイド
装置によれば、本管をワイヤ等で牽引しながら移動させ
る狭隘な場所でも円滑な本管の移動ができ、且つ管径の
異なる配管工事に兼用できる。
As described above, according to the pipe moving guide device of the present invention, the main pipe can be moved smoothly even in a narrow place where the main pipe is moved while being pulled by a wire or the like, and the pipe diameter can be reduced. Can be used for different plumbing works.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態を示す正面図である。FIG. 1 is a front view showing an embodiment of the present invention.

【図2】本発明の他の実施の形態を示す正面図である。FIG. 2 is a front view showing another embodiment of the present invention.

【図3】本発明の架設ローラ移送装置を用いて本管を移
動する場合の概略側面である。
FIG. 3 is a schematic side view of a case where the main pipe is moved using the erection roller transfer device of the present invention.

【図4】図2の要部を示す斜視図である。FIG. 4 is a perspective view showing a main part of FIG. 2;

【図5】従来の鋼管体の移動に用いるローラ装置の一例
を示す一部切欠け平面図である。
FIG. 5 is a partially cutaway plan view showing an example of a conventional roller device used for moving a steel pipe body.

【図6】図5の側面断面図である。FIG. 6 is a side sectional view of FIG. 5;

【図7】図5のA−A線矢視断面図である。FIG. 7 is a sectional view taken along line AA of FIG. 5;

【図8】従来の管移動用ローラ装置の他の例を示す正面
図である。
FIG. 8 is a front view showing another example of the conventional tube moving roller device.

【符号の説明】[Explanation of symbols]

1 本管 1a 鋼管体 2、2a、2b 作業溝 3、3a 会所 21a、21b ガイド機構 22a、22b、22a、22b 球体 23a、23b 球体受 24a、24b 軸 25a、25b 支持部材 26a、26b、26c、26d 押付け機構 27 架設基盤 28 間隔調整機構 28a ハンドル 29 橋梁 29a 桁 30 管移動用ガイド装置(本発明) 31 溶接機 32 ワイヤ 33 ウインチ 1 Main pipe 1a Steel pipe body 2, 2a, 2b Work groove 3, 3a Meeting place 21a, 21b Guide mechanism 22a, 22b, 22a, 22b Sphere 23a, 23b Sphere receiver 24a, 24b Shaft 25a, 25b Support member 26a, 26b, 26c, 26d Pressing mechanism 27 Erecting base 28 Spacing adjusting mechanism 28a Handle 29 Bridge 29a Girder 30 Guide device for pipe movement (this invention) 31 Welding machine 32 Wire 33 Winch

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 本管を対称位置で載置する、内側に傾け
た方向に配列した複数の球体からなる一対のガイド機構
と、該ガイド機構を軸支し、本管にガイド機構を押付け
る押付機構を備えた一対の支持部材と、該支持部材の間
隔を調整する間隔調整機構とを設けてなる管移動用ガイ
ド装置。
1. A pair of guide mechanisms comprising a plurality of spheres arranged in an inwardly inclined direction for mounting a main pipe at a symmetrical position, and supporting the guide mechanisms to press the guide mechanisms against the main pipe. A pipe moving guide device comprising: a pair of support members having a pressing mechanism; and an interval adjusting mechanism for adjusting an interval between the support members.
JP8691497A 1997-04-04 1997-04-04 Guide device for moving pipe Pending JPH10279029A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8691497A JPH10279029A (en) 1997-04-04 1997-04-04 Guide device for moving pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8691497A JPH10279029A (en) 1997-04-04 1997-04-04 Guide device for moving pipe

Publications (1)

Publication Number Publication Date
JPH10279029A true JPH10279029A (en) 1998-10-20

Family

ID=13900125

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8691497A Pending JPH10279029A (en) 1997-04-04 1997-04-04 Guide device for moving pipe

Country Status (1)

Country Link
JP (1) JPH10279029A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2202023A1 (en) * 2008-12-19 2010-06-30 L'AIR LIQUIDE, Société Anonyme pour l'Etude et l'Exploitation des Procédés Georges Claude Tool and process of butt positioning of metallic tubes
CN102718034A (en) * 2012-05-28 2012-10-10 宋扬 Device for automatically adjusting spiral line transfer for coating equipment on inner and outer walls of steel pipe
CN103287832A (en) * 2013-06-25 2013-09-11 上海鼎经自动化科技有限公司 C-type compressing centering mechanism
CN104590864B (en) * 2015-01-04 2016-09-28 无锡市源昌机械制造有限公司 A kind of multisystem flat feed appliance hopper adjusting means
CN107364705A (en) * 2017-08-04 2017-11-21 芜湖挺优机电技术有限公司 Suitable for cylindricality and the positioning arranging apparatus of spherical member
CN107879050A (en) * 2017-11-14 2018-04-06 浙江金洲管道科技股份有限公司 A kind of conveying equipment of flanged pipe fitting
KR102158810B1 (en) * 2020-01-16 2020-09-22 (주)비엔비아이엔티 Device for transferring goods
KR102268876B1 (en) * 2020-12-15 2021-06-24 주식회사 흥진캐노피 Transfer apparatus for steel pipe
JP2021528265A (en) * 2019-06-06 2021-10-21 バイストロニック レーザー アクチェンゲゼルシャフト Supporting equipment, machine tools, and methods for supporting rod-shaped workpieces
CN113911690A (en) * 2021-10-03 2022-01-11 江西耐乐铜业有限公司 Intelligent deviation correcting device for copper pipe
KR20220151816A (en) * 2021-05-07 2022-11-15 김미애 Processing equipment for pipe material
KR102599601B1 (en) * 2023-09-13 2023-11-08 주식회사 에이치엘테크 Pipe clamping conveying device

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2202023A1 (en) * 2008-12-19 2010-06-30 L'AIR LIQUIDE, Société Anonyme pour l'Etude et l'Exploitation des Procédés Georges Claude Tool and process of butt positioning of metallic tubes
CN102718034A (en) * 2012-05-28 2012-10-10 宋扬 Device for automatically adjusting spiral line transfer for coating equipment on inner and outer walls of steel pipe
CN103287832A (en) * 2013-06-25 2013-09-11 上海鼎经自动化科技有限公司 C-type compressing centering mechanism
CN104590864B (en) * 2015-01-04 2016-09-28 无锡市源昌机械制造有限公司 A kind of multisystem flat feed appliance hopper adjusting means
CN107364705A (en) * 2017-08-04 2017-11-21 芜湖挺优机电技术有限公司 Suitable for cylindricality and the positioning arranging apparatus of spherical member
CN107879050A (en) * 2017-11-14 2018-04-06 浙江金洲管道科技股份有限公司 A kind of conveying equipment of flanged pipe fitting
JP2021528265A (en) * 2019-06-06 2021-10-21 バイストロニック レーザー アクチェンゲゼルシャフト Supporting equipment, machine tools, and methods for supporting rod-shaped workpieces
KR102158810B1 (en) * 2020-01-16 2020-09-22 (주)비엔비아이엔티 Device for transferring goods
KR102268876B1 (en) * 2020-12-15 2021-06-24 주식회사 흥진캐노피 Transfer apparatus for steel pipe
KR20220151816A (en) * 2021-05-07 2022-11-15 김미애 Processing equipment for pipe material
CN113911690A (en) * 2021-10-03 2022-01-11 江西耐乐铜业有限公司 Intelligent deviation correcting device for copper pipe
KR102599601B1 (en) * 2023-09-13 2023-11-08 주식회사 에이치엘테크 Pipe clamping conveying device

Similar Documents

Publication Publication Date Title
JPH10279029A (en) Guide device for moving pipe
JPH10279031A (en) Roller device for moving pipe
JPH10279030A (en) Roller device for moving pipe
JP3725271B2 (en) Piping equipment connection structure
JPH08284424A (en) Method for constructing steel frame pillar and adjusting jig
JP2520240B2 (en) Steel pipe laying method inside piping
JP2011202443A (en) Hinge structure of connection bridge
CN112483724A (en) Angle-adjustable rolling support and construction method for laying pipeline
JP2007077656A (en) Construction method of bridge girder, and bridge girder
JP3775524B2 (en) Casing support device and casing connection method
JP2995680B1 (en) Floor slab removal equipment
JPS59118230A (en) Pipe bender
JPH03286008A (en) Morning arrangement for floating structure like floating pier
JPH0348109Y2 (en)
JPH0972004A (en) Lateral movement of roof mounting structure
JP2020193639A (en) Cylindrical body fixing jig
JPH1046975A (en) Rock-bed boring jig
JPH0740593Y2 (en) Scaffolding equipment
JP3450530B2 (en) Downward drilling device
JP4386550B2 (en) Cable surplus length processing equipment
JP2002137115A (en) Pipe cutter and pipe cutting method
JP2002303041A (en) Temporary form support device
RU2261785C1 (en) Device for welding sectional piping branches
JP2023036114A (en) Clamp device
KR950010020Y1 (en) Snake making apparatus