JPH1021300A - Linking system of work flow system and scheduling system - Google Patents

Linking system of work flow system and scheduling system

Info

Publication number
JPH1021300A
JPH1021300A JP17228496A JP17228496A JPH1021300A JP H1021300 A JPH1021300 A JP H1021300A JP 17228496 A JP17228496 A JP 17228496A JP 17228496 A JP17228496 A JP 17228496A JP H1021300 A JPH1021300 A JP H1021300A
Authority
JP
Japan
Prior art keywords
schedule
user
workflow
work
processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17228496A
Other languages
Japanese (ja)
Inventor
Takashi Sakaguchi
孝 坂口
Koichi Ueno
浩一 上野
Hiroshi Kuwabara
宏 桑原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP17228496A priority Critical patent/JPH1021300A/en
Publication of JPH1021300A publication Critical patent/JPH1021300A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Information Transfer Between Computers (AREA)
  • Computer And Data Communications (AREA)

Abstract

PROBLEM TO BE SOLVED: To make a working processing smooth by linking a work flow system added with the processing time limit of a work and the priority of the work and each user's schedule system with each other. SOLUTION: The computer 205 of a server is one or plural computers for a server, and the work flow system 211 is provided with a work flow engine 206 managing the user of a work flow and the assignment of the work to the user and a schedule inquiring part 207 for the giving/receiving of the schedule system 208. Then the work flow engine 206 reads a work flow managing table 209. In this case the work flow engine 206 inquires a user's schedule to the schedule system 208 through the schedule inquiring part 207 and reads the schedule of the user of an asking destination from a schedule managing table 210.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、小規模なグループ
間や大規模な部署間で、作業を電子的に移動させるワー
クフローシステムに関するものである。ワークフローシ
ステムが適用される具体的な産業分野には、保険・金融
業における審査システム、製造業における受注−出荷シ
ステム、伝票審査業務、共同設計業務、等がある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a workflow system for electronically transferring work between small groups or large departments. Specific industrial fields to which the workflow system is applied include an examination system in the insurance and finance industries, an order-shipment system in the manufacturing industry, a slip examination operation, a joint design operation, and the like.

【0002】[0002]

【従来の技術】従来のワークフローシステムでは、作業
の処理期限をワークフローを処理するユーザー(依頼
元)が決定していた。依頼元は、作業を依頼されたユー
ザー(依頼先)のスケジュールの情報を知らずにワーク
フローを処理して、処理できる作業か処理できない作業
かを判別しないままに作業を処理し回覧していた。
2. Description of the Related Art In a conventional workflow system, a user (requester) who processes a workflow determines a processing deadline of a work. The requester processes the workflow without knowing the schedule information of the user (requestee) requested to perform the work, and processes and circulates the work without determining whether the work can be processed or not.

【0003】[0003]

【発明が解決しようとする課題】従来の技術では、作業
の処理期限はワークフローを処理するユーザーなどが決
定していた。処理を依頼されたユーザー(依頼先)が処
理期限の時に出張、会議などで不在の場合や、ユーザー
(依頼先)の処理量が膨大で処理時間までに処理できな
い場合がある。確実に作業を処理して円滑に進めていく
ために、ユーザー(依頼先)のスケジュール情報を活用
し、ユーザー(依頼先)が不在などで処理できない状態
をなくして円滑に処理し回覧を行う。
In the conventional technology, the processing deadline of a work is determined by a user who processes a workflow. The user (request destination) who has been requested to perform the processing may be absent during a business trip or meeting when the processing deadline is reached, or the processing volume of the user (request destination) may be so large that the processing cannot be completed by the processing time. In order to ensure that the work is processed and proceed smoothly, the schedule information of the user (recipient) is utilized to eliminate the situation in which the user (recipient) cannot be processed due to absence or the like, and to process and circulate smoothly.

【0004】本発明は、上記の課題を解決することによ
り作業処理の円滑化を図るワークフローシステムを提供
することにある。
[0004] It is an object of the present invention to provide a workflow system which solves the above-mentioned problems and facilitates work processing.

【0005】[0005]

【課題を解決するための手段】本発明は、前記課題を解
決すべく、次のような構成を採用するものである。
SUMMARY OF THE INVENTION The present invention adopts the following constitution in order to solve the above-mentioned problems.

【0006】ユーザーがワークフローで使用する情報を
入力するためのワークフローマンマシン部とユーザーが
スケジュールを入力するためのスケジュールシステムマ
ンマシン部とからなるクライアントコンピュータと、各
ユーザーのスケジュールを管理するスケジュールシステ
ムと、ユーザーを管理するとともにユーザーへの作業割
当てを管理するワークフローシステムと、からなるサー
バーコンピュータと、前記クライアントコンピュータと
前記サーバーコンピュータとを接続するネットワーク
と、を備え、前記ワークフローシステムは、前記スケジ
ュールシステムにユーザーのスケジュールを問い合わせ
ることによりスケジュールシステムと連携させる連携方
式。
A client computer comprising a workflow man-machine unit for inputting information used by a user in a workflow and a schedule system man-machine unit for a user to input a schedule; a schedule system for managing a schedule of each user; A workflow system that manages users and manages work assignments to users, comprising a server computer, and a network connecting the client computer and the server computer, wherein the workflow system includes a A linkage method that links with the schedule system by inquiring about the user's schedule.

【0007】また、ワークフローで使用されるデータ
に、作業の優先度を加えて、作業を依頼されたユーザー
または同一ロール内の他のユーザーのスケジュール情報
を利用し、ワークフローを処理する構成を採用する。
In addition, a configuration is adopted in which the priority of the work is added to the data used in the work flow, and the work flow is processed using the schedule information of the user who has been requested to work or another user in the same role. .

【0008】[0008]

【発明の実施の形態】以下に本発明の実施形態を図面を
用いて説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0009】図1はワークフロー全体の流れを示すもの
である。図中のボックスで示される部分をロール(例え
ば、経理主任、営業課長等の職名)とする。各ロールに
はあらかじめユーザーが割り当てられている。ワークフ
ローを実行してデータを受け渡された時点でロールに割
り当てられている各ユーザーは処理を実行できる。この
図の例では、ロール101のユーザーR1で処理完了後
に、ロール102のユーザーR2が処理を開始する。
FIG. 1 shows the flow of the entire workflow. A portion indicated by a box in the figure is a role (for example, a job title such as an accounting chief or a sales manager). Each role is assigned a user in advance. Each user assigned to a role at the time when the data is transferred by executing the workflow can execute the process. In the example of this figure, after the process is completed by the user R1 of the role 101, the user R2 of the role 102 starts the process.

【0010】ロール102の処理完了後に依頼者によっ
て設定された条件によりロール103のR3、ロール1
04のR4のいずれかが処理を開始する。ワークフロー
の定義によっては、ロール103とロール104が共に
作業を行い、両方の処理完了後にロール105の処理を
開始することもある。R3とR4の処理完了後にロール
105のR5が処理を開始する。本発明では、このよう
な一連の作業の流れを総称してワークフローと呼ぶこと
にする。
After the processing of the roll 102 is completed, R3 of the roll 103, roll 1
Any of R4 of 04 starts processing. Depending on the definition of the workflow, the role 103 and the role 104 work together, and the process of the role 105 may be started after both processes are completed. After the processing of R3 and R4 is completed, R5 of the roll 105 starts processing. In the present invention, such a series of work flows are collectively referred to as a workflow.

【0011】図2は本発明のワークフローシステムのシ
ステム構成図である。図2において、クライアントのコ
ンピュータ201は1台か複数台のクライアント用のコ
ンピュータで、ワークフローで使用される情報を入力す
るワークフローマンマシン部202と、ユーザーがスケ
ジュールを入力するためのスケジュールシステムマンマ
シン部203を持ち、ネットワーク204がある。
FIG. 2 is a system configuration diagram of the workflow system of the present invention. In FIG. 2, a client computer 201 is one or a plurality of client computers, and includes a workflow man-machine unit 202 for inputting information used in a workflow and a schedule system man-machine unit for a user to input a schedule. 203 and a network 204.

【0012】サーバーのコンピュータ205は1台か複
数台のサーバー用のコンピュータで、ワークフローシス
テム211は、ワークフローのユーザーとユーザーへの
作業の割り当てを管理するワークフローエンジン206
とスケジュールシステム208のやり取りをするための
スケジュール問い合わせ部207を持つ。
The server computer 205 is a computer for one or more servers, and the workflow system 211 is a workflow engine 206 for managing workflow users and the assignment of work to the users.
And a schedule inquiry unit 207 for exchanging information with the schedule system 208.

【0013】ワークフローエンジン206はワークフロ
ーで使用されるデータを管理するワークフロー管理テー
ブル209を持ち、各ユーザーのスケジュールを管理す
るスケジュールシステム208はワークフローに参加で
きるユーザーのスケジュールのデータを管理するスケジ
ュール管理テーブル210を持つ。
The workflow engine 206 has a workflow management table 209 for managing data used in the workflow. A schedule system 208 for managing the schedule of each user is a schedule management table 210 for managing schedule data of users who can participate in the workflow. have.

【0014】ここで扱われるコンピュータは、パーソナ
ルコンピュータ、UNIXワークステーション、メイン
フレームまたはこれらを組み合わせたネットワークシス
テムでも良い。
The computer handled here may be a personal computer, a UNIX workstation, a mainframe, or a network system combining these.

【0015】図3は本発明においての図2のワークフロ
ーエンジン206が動作するために参照するワークフロ
ー管理テーブル209の実施形態である。このテーブル
はワークフローエンジン206が管理し、テーブルは作
業の案件名301、処理する案件の優先度302、作業
の依頼先のロール303、依頼先のロールに割り当てら
れたユーザーの一覧304、作業の処理期限305を持
つ。作業の処理期限305は、データが入力されていな
くても良い。ユーザーが作業を実行するために入力した
データや参照するデータ306がある。
FIG. 3 shows an embodiment of the workflow management table 209 referred to for the operation of the workflow engine 206 of FIG. 2 in the present invention. This table is managed by the workflow engine 206, and the table includes the case name 301 of the work, the priority 302 of the case to be processed, the role 303 of the work request destination, a list 304 of users assigned to the request destination role, and the work processing. It has a deadline 305. The work processing deadline 305 does not have to be data. There is data 306 input and reference data 306 for the user to execute the work.

【0016】図4は本発明においての図2のスケジュー
ルシステムマンマシン部203の一例を示した図であ
る。ユーザーがユーザー自身のスケジュールを入力す
る。項目はユーザー名401、週402を入力すると日
付403が表示される。ユーザーが該当する日付に応じ
てスケジュール404、405などを入力する。入力さ
れたデータはスケジュール管理テーブル210に書き込
まれる。
FIG. 4 is a diagram showing an example of the schedule system man-machine section 203 of FIG. 2 according to the present invention. The user enters his or her own schedule. When the user inputs a user name 401 and a week 402, a date 403 is displayed. The user inputs schedules 404, 405, etc. according to the corresponding date. The input data is written to the schedule management table 210.

【0017】図5は本発明においての図2のスケジュー
ルシステム208が動作するために参照するスケジュー
ル管理テーブル210の実施形態である。このテーブル
はスケジュールシステム208が管理し、スケジュール
システムマンマシン部203によって入力されたデータ
である。このテーブルはユーザー名501、日付50
2、スケジュールの開始時間503、終了時間504、
スケジュール505を持つ。
FIG. 5 shows an embodiment of the schedule management table 210 referred to for the operation of the schedule system 208 of FIG. 2 in the present invention. This table is data managed by the schedule system 208 and input by the schedule system man-machine unit 203. This table contains user name 501, date 50
2. Schedule start time 503, end time 504,
It has a schedule 505.

【0018】図6はあるユーザーが依頼した作業の処理
期限の有無によって依頼された者の変更を行うことがで
きるフローチャートである。フローチャート601は、
ユーザーがワークフローを実行するとワークフローエン
ジン206がワークフロー管理テーブル209を読み込
む。フローチャート602は、読み込んだテーブルより
作業の処理期限305があるか判定を行う。
FIG. 6 is a flowchart in which a requested user can be changed depending on whether or not there is a processing deadline for the requested work. The flowchart 601 is
When the user executes the workflow, the workflow engine 206 reads the workflow management table 209. The flowchart 602 determines whether there is a work processing deadline 305 from the read table.

【0019】期限がある場合は、フローチャート603
でスケジュール問い合わせ部を通じてサーバー側のスケ
ジュールシステム208にロール303に割り当てられ
たユーザー304のスケジュールをスケジュール管理テ
ーブル210から読み出す。
If there is a time limit, the flow chart 603
Then, the schedule of the user 304 assigned to the role 303 by the schedule system 208 on the server side is read from the schedule management table 210 through the schedule inquiry unit.

【0020】フローチャート604で取り出したスケジ
ュールより処理期限の時間にユーザーにスケジュールが
あるかないかの判定を行い処理可能であれば、その処理
のために、フローチャート609でクライアント側のス
ケジュールシステムマンマシン部203のユーザーのス
ケジュールに追加および更新し、スケジュール管理テー
ブル210を更新し、フローチャート610で依頼先の
ユーザーのクライアントマシンのワークフローマンマシ
ン部202にネットワーク204を通じて作業を送信す
る。
It is determined from the schedule extracted in the flowchart 604 whether or not the user has a schedule at the time of the processing expiration. If the schedule can be processed, the schedule system man-machine section 203 on the client side is used in the flowchart 609 for the processing. In addition, the schedule management table 210 is updated and the schedule management table 210 is updated, and the work is transmitted to the workflow man machine unit 202 of the client machine of the request destination user via the network 204 in a flowchart 610.

【0021】フローチャート602の判定で処理の期限
がない場合、スケジュールシステムの問い合わせをスキ
ップする。フローチャート604の判定でユーザーが処
理できなければ、フローチャート605で依頼先(ユー
ザー)304に割り当てられた同一ロール内の他のユー
ザーのスケジュールをスケジュールシステム208から
スケジュール管理テーブル210を読み込む。読み込ん
だテーブルより期限の時間にユーザーのスケジュールの
有無により処理可能か否か判定する。
If the processing in the flowchart 602 has no expiration date, the inquiry of the schedule system is skipped. If the user cannot perform the processing in the determination of the flowchart 604, the schedule management table 210 is read from the schedule system 208 for the schedule of another user in the same role assigned to the request destination (user) 304 in the flowchart 605. From the read table, it is determined whether the processing can be performed based on the presence or absence of the user's schedule at the time of the deadline.

【0022】処理可能ならばワークフローエンジン20
6が依頼者の変更を行い、フローチャート607におい
てワークフローエンジン206がワークフロー管理テー
ブル209を更新し、依頼元のユーザーに対して依頼者
の変更のメッセージを送りフローチャート609、フロ
ーチャート610の処理を行う。依頼先のユーザーが期
限305までに作業を処理できない場合は、フローチャ
ート608においてワークフローエンジン206が依頼
先のユーザーが処理できないことを依頼元のユーザーに
報告し、期限の変更などの見直しを促す。
If processing is possible, the workflow engine 20
6 changes the requester, the workflow engine 206 updates the workflow management table 209 in a flowchart 607, sends a requester change message to the requesting user, and performs the processes in the flowcharts 609 and 610. If the requested user cannot process the work by the deadline 305, the workflow engine 206 reports in the flowchart 608 that the requested user cannot perform the processing to the requesting user, and urges the user to review the change of the deadline.

【0023】図7は作業を処理するときに優先度がある
場合のフローチャートである。フローチャート701で
はワークフローエンジン206がワークフロー管理テー
ブル209の読み込みを行う。フローチャート702で
はワークフローエンジン206がスケジュール問い合わ
せ部207を通じてスケジュールシステム208にユー
ザーのスケジュールを問い合わせ、スケジュール管理テ
ーブル210から依頼先のユーザーのスケジュールを読
み込む。
FIG. 7 is a flowchart in the case where there is a priority when processing an operation. In the flowchart 701, the workflow engine 206 reads the workflow management table 209. In the flowchart 702, the workflow engine 206 inquires the schedule system 208 of the user's schedule via the schedule inquiry unit 207, and reads the schedule of the requested user from the schedule management table 210.

【0024】フローチャート703で読み込んだテーブ
ルより期限の時間にユーザーのスケジュールの有無によ
り処理可能か否か判定を行い、処理可能ならばフローチ
ャート712、フローチャート713を実行する。フロ
ーチャート712、フローチャート713はフローチャ
ート609、フローチャート610と同じ機能である。
フローチャート703で依頼先のユーザーが処理できな
ければ、ワークフロー管理テーブル209から読み込ん
だテーブルよりフローチャート704で作業の優先度を
調べる。作業の優先度が高ければ、依頼先(ロール)3
03に割り当てられている他のユーザーすべてのスケジ
ュールをスケジュールシステム208からスケジュール
管理テーブル210を読み込む。
It is determined from the table read in the flow chart 703 whether or not the processing can be performed based on the presence or absence of the user's schedule at the time of the expiration date. The flowcharts 712 and 713 have the same functions as the flowcharts 609 and 610.
If the requested user cannot be processed in the flowchart 703, the priority of the work is checked in the flowchart 704 from the table read from the workflow management table 209. If the priority of the work is high, the request destination (role) 3
The schedule management table 210 is read from the schedule system 208 for the schedules of all the other users assigned to 03.

【0025】読み込んだテーブルより他のユーザーが処
理期限までに処理可能ならば、フローチャート709で
ワークフローエンジン206がワークフロー管理テーブ
ル209を更新して依頼先(ユーザー)304を処理可
能なユーザーに変更する。その後はフローチャート71
2、フローチャート713を実行する。フローチャート
710はフローチャート608と同様にワークフローエ
ンジン206からメッセージを依頼元に送る。
If another user can process the read table before the processing time limit, the workflow engine 206 updates the workflow management table 209 in a flowchart 709 and changes the request destination (user) 304 to a user who can process. After that, the flowchart 71
2. The flowchart 713 is executed. The flowchart 710 sends a message from the workflow engine 206 to the request source similarly to the flowchart 608.

【0026】フローチャート704で作業の優先度が高
くない場合、フローチャート706で依頼先のユーザー
のスケジュールをスケジュールシステム208からスケ
ジュール管理テーブル210を読み込み、フローチャー
ト708で期限305に近い時間に処理期限を変更し、
ワークフロー管理テーブル209を更新する。
If the priority of the work is not high in the flowchart 704, the schedule management table 210 is read from the schedule system 208 for the schedule of the requested user in the flowchart 706, and the processing deadline is changed to a time close to the deadline 305 in the flowchart 708. ,
Update the workflow management table 209.

【0027】フローチャート711では、期限の変更を
クライアントのワークフローマンマシン部に変更のメッ
セージを送り、依頼元のユーザーに期限の変更があった
ことを伝える。
In the flowchart 711, a change message is sent to the workflow man-machine section of the client to notify the requesting user that the change has been made.

【0028】[0028]

【発明の効果】以上説明したように、本発明は、作業の
処理期限および作業の優先度を加味したワークフローシ
ステムと各ユーザーのスケジュールシステムとを連携さ
せることにより、作業処理の円滑化を図ることができ
る。
As described above, according to the present invention, the work processing is smoothed by linking the workflow system considering the processing deadline of the work and the priority of the work with the schedule system of each user. Can be.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明によるワークフローモデルである。FIG. 1 is a workflow model according to the present invention.

【図2】ワークフローシステムとスケジュールシステム
の連携構成図である。
FIG. 2 is a diagram illustrating a cooperation configuration between a workflow system and a schedule system.

【図3】ワークフロー管理テーブルである。FIG. 3 is a workflow management table.

【図4】スケジュールシステムマンマシン部の例であ
る。
FIG. 4 is an example of a schedule system man-machine unit.

【図5】スケジュール管理テーブルである。FIG. 5 is a schedule management table.

【図6】処理期限有無でユーザーの割り当てを変更する
ワークフローシステムのフローチャートである。
FIG. 6 is a flowchart of a workflow system that changes the assignment of a user depending on whether there is a processing time limit.

【図7】優先度有無で期限を変更するワークフローシス
テムのフローチャートである。
FIG. 7 is a flowchart of a workflow system that changes a time limit depending on the presence or absence of a priority.

【符号の説明】[Explanation of symbols]

201 クライアントコンピュータ 202 ワークフローマンマシン部 203 スケジュールシステムマンマシン部 204 ネットワーク 205 ユーザーコンピュータ 206ワークフローエンジン 207 スケジュール問い合わせ部 208 スケジュールシステム 209 ワークフロー管理テーブル 210 スケジュール管理テーブル 201 Client Computer 202 Workflow Man Machine Section 203 Schedule System Man Machine Section 204 Network 205 User Computer 206 Workflow Engine 207 Schedule Inquiry Section 208 Schedule System 209 Workflow Management Table 210 Schedule Management Table

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 ユーザーがワークフローで使用する情報
を入力するためのワークフローマンマシン部とユーザー
がスケジュールを入力するためのスケジュールシステム
マンマシン部とからなるクライアントコンピュータと、 各ユーザーのスケジュールを管理するスケジュールシス
テムと、ユーザーを管理するとともにユーザーへの作業
割当てを管理するワークフローシステムと、からなるサ
ーバーコンピュータと、 前記クライアントコンピュータと前記サーバーコンピュ
ータとを接続するネットワークと、を備え、 前記ワークフローシステムは、前記スケジュールシステ
ムにユーザーのスケジュールを問い合わせることにより
スケジュールシステムと連携させることを特徴とする連
携方式。
1. A client computer comprising a workflow man-machine unit for a user to input information used in a workflow and a schedule system man-machine unit for a user to input a schedule, and a schedule for managing a schedule of each user. A server computer comprising a system, a workflow system for managing users and managing work assignments to users, and a network for connecting the client computer and the server computer. A coordination method characterized by cooperating with the schedule system by inquiring the system of the user's schedule.
【請求項2】 請求項1に記載の連携方式において、 前記スケジュールシステムは、ユーザーのスケジュール
のデータを管理するスケジュール管理テーブルを保持
し、 前記ワークフローシステムは、ワークフローで使用され
るデータを管理するワークフロー管理テーブルを保持す
ることを特徴とする連携方式。
2. The cooperation system according to claim 1, wherein the schedule system holds a schedule management table for managing data of a user's schedule, and the workflow system manages data used in the workflow. A cooperation method characterized by holding a management table.
【請求項3】 請求項1または2に記載の連携方式にお
いて、 ユーザが依頼した作業に処理期限があるか否かを判定
し、 処理期限がある場合、ロール内の依頼されたユーザのス
ケジュールを前記スケジュールシステムに問い合わせ
て、そのユーザが処理期限内に処理可能であるか否かを
判定し、 処理可能である場合、前記スケジュールシステムマンマ
シン部におけるそのユーザーのスケジュールを更新し、 そのユーザが処理可能でない場合、前記ロールと同一ロ
ール内の他のユーザーのスケジュールを前記スケジュー
ルシステムに問い合わせて、他のユーザが処理期限内に
処理可能であるか否かを判定して、処理可能であれば、
依頼されるユーザーの変更を行ない、前記スケジュール
システムマンマシン部における他のユーザーのスケジュ
ールを更新し、 他のユーザが処理期限内に処理可能でなければ、ユーザ
ーが作業の処理をできないことを依頼元のユーザーに報
告する、 という機能を具備した前記ワークフローシステム。
3. The cooperative method according to claim 1, wherein it is determined whether or not the work requested by the user has a processing time limit. If the processing time has a time limit, the schedule of the requested user in the role is determined. The schedule system is inquired to determine whether or not the user can process within the processing time limit. If the process is possible, the schedule of the user in the schedule machine man-machine section is updated, and the user performs the process. If not possible, query the schedule system for the schedule of another user in the same role as the role, determine whether other users can be processed within the processing deadline, if it can be processed,
Change the requested user, update the schedule of the other user in the scheduling system man-machine section, and request that the user cannot process the work unless the other user can process it within the processing deadline. The workflow system having a function of reporting to a user.
【請求項4】 請求項1または2に記載の連携方式にお
いて、 ユーザが依頼した作業の処理期限内に、ロール内の依頼
されたユーザーが前記スケジュールシステムへの問い合
わせの結果、処理可能でない場合に、作業の優先度を調
べ、 前記優先度が高い場合、前記ロールと同一ロール内の他
のユーザーのスケジュールを前記スケジュールシステム
に問い合わせて、他のユーザが処理期限内に処理可能で
あるか否かを判定して、処理可能であれば、依頼される
ユーザーの変更を行ない、前記スケジュールシステムマ
ンマシン部における他のユーザーのスケジュールを更新
し、 前記優先度が高くない場合、前記依頼されたユーザーの
空き時間を前記スケジュールシステムに問い合わせて、
その空き時間に作業の処理期限を変更し、 前記期限の変更を作業の依頼元のワークフローマンマシ
ン部に伝える、 という機能を具備した前記ワークフローシステム。
4. The cooperative system according to claim 1, wherein the requested user in the role cannot be processed as a result of the inquiry to the schedule system within the processing deadline of the work requested by the user. Investigate the priority of the work, if the priority is high, query the schedule system for the schedule of another user in the same role as the role, and check if the other user can process within the processing deadline. If the processing is possible, the requested user is changed, the schedule of another user in the scheduling system man-machine section is updated, and if the priority is not high, the requested user is Ask the schedule system for free time,
The workflow system having a function of changing a processing deadline of a work during the idle time, and transmitting the change of the deadline to a workflow man-machine unit that has requested the work.
JP17228496A 1996-07-02 1996-07-02 Linking system of work flow system and scheduling system Pending JPH1021300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17228496A JPH1021300A (en) 1996-07-02 1996-07-02 Linking system of work flow system and scheduling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17228496A JPH1021300A (en) 1996-07-02 1996-07-02 Linking system of work flow system and scheduling system

Publications (1)

Publication Number Publication Date
JPH1021300A true JPH1021300A (en) 1998-01-23

Family

ID=15939080

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17228496A Pending JPH1021300A (en) 1996-07-02 1996-07-02 Linking system of work flow system and scheduling system

Country Status (1)

Country Link
JP (1) JPH1021300A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010049457A (en) * 2008-08-21 2010-03-04 Ricoh Co Ltd Task management system, task management apparatus, task management method, task management program, and recording medium
JP2013246523A (en) * 2012-05-23 2013-12-09 Mizuho Information & Research Institute Inc Approval management system, approval management method and approval management program

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010049457A (en) * 2008-08-21 2010-03-04 Ricoh Co Ltd Task management system, task management apparatus, task management method, task management program, and recording medium
JP2013246523A (en) * 2012-05-23 2013-12-09 Mizuho Information & Research Institute Inc Approval management system, approval management method and approval management program

Similar Documents

Publication Publication Date Title
US8219431B2 (en) Workflow management system, method and device for managing a workflow including plural hierarchically-classified tasks
JP3873365B2 (en) Business processing system using bulletin board type database and processing method thereof
US20140316831A1 (en) Dynamic interface between bpss conversation management and local business management
US20030236693A1 (en) Method of implementing a collaborative business process
EP1623379A2 (en) Workflow services architecture
KR20010023302A (en) Universal adapter framework and providing a global user interface and global messaging bus
JP2005522755A (en) Definition of approval process for approval request (definition)
Busi et al. Towards a formal framework for choreography
JP2001282970A (en) Work flow managing system
JP3931941B2 (en) Work process management apparatus and work process management method
JPH1021300A (en) Linking system of work flow system and scheduling system
JPH08314872A (en) Cooperative processing method among application programs
Helal et al. The internet enterprise
JP3916199B2 (en) Workflow matter input method, workflow management system, and workflow matter automatic input device
US7757235B2 (en) Trigger support for a bi-directional broker
JPH07141439A (en) Group work supporting system
JP2007164365A (en) Business support system, method and program
JPH10326321A (en) Workflow system
JP3492900B2 (en) Workflow system
KR20010039172A (en) Interworking method between workflow system and legacy system
JP2001134668A (en) Progress management system using workflow management system
JP2000251004A (en) Method and device for managing document and recording medium storing document management program
Yan et al. CA-PLAN, an inter-organizational workflow model
JP2001222312A (en) System for instructing work and for managing result
Swenson Workflow and web service standards