JPH10205133A - Upper surface single action holding jig - Google Patents

Upper surface single action holding jig

Info

Publication number
JPH10205133A
JPH10205133A JP9025891A JP2589197A JPH10205133A JP H10205133 A JPH10205133 A JP H10205133A JP 9025891 A JP9025891 A JP 9025891A JP 2589197 A JP2589197 A JP 2589197A JP H10205133 A JPH10205133 A JP H10205133A
Authority
JP
Japan
Prior art keywords
concrete
height
shape
molding plate
mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP9025891A
Other languages
Japanese (ja)
Inventor
Naohisa Ishida
尚久 石田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP9025891A priority Critical patent/JPH10205133A/en
Publication of JPH10205133A publication Critical patent/JPH10205133A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve the execution property by molding a lower surface by an upper surface shape regulating means so that the upper surface is of a desired shape after concrete is hardened, and continuously urging the upper surface shape regulating means by an urging means to the upper surface until the concrete is hardened while the placed concrete is soft. SOLUTION: Concrete is poured in a mold 11. When a rough grading is performed, gravel is settled, and slag appears on the surface. An opening part of the mold 11 is covered by a molding plate 21. When the slag is covered by the molding plate 21, a leg 29 of an arch member 24 is provided astride the opening part of the mold 11, the arch member 24 is expanded outwardly, and rides over a single pipe 12, and lowered. When a hand is off, the leg 29 is returned to the original shape by elasticity, and an arc-shaped part 28 is hooked by the signal pipe 12. A strap 27 is located on the molding plate 21. A positioning bolt 26 is turned, and the molding plate 21 is pressed against the concrete upper surface before it is hardened.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は天端一発押え治具に
関し、詳しくは、コンクリート建造物の立ち上がり壁、
例えばマンションの通路手摺りの天端、ベランダ手摺り
の天端、コンクリート建物のパラペット天端などの一発
押えに使用して好適な天端一発押え治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a top-end press-down jig, and more particularly, to a rising wall of a concrete building,
For example, the present invention relates to a top-end press-holding jig suitable for use as a press-down press such as a top end of a handrail of a passage in an apartment, a top end of a veranda handrail, or a top end of a parapet of a concrete building.

【0002】[0002]

【従来の技術】コンクリート建造物の立ち上がり壁天端
の仕上げに関しては、近年、一発押えが指定されること
が多い。一発押えとは、これまでコンクリート硬化後に
改めて行なわれていたコテ仕上げに代え、コンクリート
打設直後のコンクリート硬化前にコテを当て、天端を仕
上げてしまうことをいう。例えば雑誌「建築知識」19
96年9月号第74ページでは、下記のように説明され
ている。なお同ページの図1を本願の図8として引用す
る。
2. Description of the Related Art In recent years, with regard to finishing a rising edge of a concrete building, a one-shot presser is often specified. The one-shot presser means that the iron tip is applied immediately before the concrete is cast and before the concrete is hardened to finish the top end, instead of the ironing which has been performed again after the concrete is hardened. For example, magazine "Architectural Knowledge" 19
On page 74 of the September 1996 issue, the explanation is as follows. FIG. 1 of the same page is referred to as FIG. 8 of the present application.

【0003】「パラペットなどの、立上がり壁天端の一
発押さえ部分では、水上の型枠を少し高めに建て、水下
の型枠はパラペットの天端の勾配に合わせ、コンクリー
トの天端の高さで(斜めに)カットする。この処置をと
らないと金ゴテが使いにくく(うまく押えられず)、天
端の平滑性とエッジの通りが悪くなる(図1(本願図
8)、写真1(引用せず))。また型枠天端にノロが載
っていると、脱型枠時に型枠にコンクリートが引っ張ら
れエッジが欠ける。打設後には必ずノロを除去する。金
ゴテで押さえながら丁寧に除去するか、打設後に固まり
始めたら、型枠の天端を木槌で軽く叩き、型枠の天端と
コンクリートを離すとよい。」
[0003] In the one-shot holding section of the rising wall such as a parapet, the form above the water is built slightly higher, and the form below the water is adjusted to the inclination of the parapet top, and the height of the concrete top is adjusted. Without this treatment, it is difficult to use the gold trowel (it cannot be pressed well), and the smoothness of the top end and the edge will be poor (Fig. 1 (Fig. 8 of the present application), Photo 1). (Not quoted)) Also, if a slag is placed on the top of the formwork, the concrete will be pulled by the formwork during the removal of the formwork, and the edge will be chipped. If it is carefully removed or begins to harden after casting, tap the top of the form with a mallet to separate the top of the form from the concrete. "

【0004】[0004]

【発明が解決しようとする課題】このように、一発押え
は、型枠造り、コテ作業何れも手間が掛かるものであ
り、作業性、採算が悪い。特に、図9に示すように、水
勾配(A)、面取り(B)、目地意匠(C)などを施す
場合、手間が一段と増加し、作業性、採算が悪い。ま
た、型枠は、一般に、前工程である型枠大工が材料持ち
込み(自分持ち)で形成する。経費節約の為、コンクリ
ート硬化後に解体したコンパネ(型枠板)は、持ち帰
り、次の現場で再使用する。
As described above, the one-shot presser requires time and labor both in forming the formwork and in the ironing work, and is poor in workability and profitability. In particular, as shown in FIG. 9, when a water gradient (A), a chamfer (B), a joint design (C), or the like is applied, labor is further increased, and workability and profitability are poor. In addition, the formwork is generally formed by a formwork carpenter who is a preceding process, bringing in materials (owned by himself). In order to save costs, the panels that have been dismantled after hardening the concrete will be brought back and reused at the next site.

【0005】この為、再使用出来なくなることを嫌い、
型枠大工は一般にコンパネを切りたがらない。それ故、
立ち上がり壁の天端の場合でも、例えば図10に示すよ
うに、単に釘8か桟木9かで当たりを取っておいてくれ
るだけであり、天端の高さに合わせてコンパネを切断し
ておいたりはしてくれていない場合が多い。これでは一
発押えは困難である。その為、一発押えと指定はされて
いても、実際には、型枠取り外し後再び現場に行き、追
加作業として天端の仕上げをすることが多い。これも作
業性、採算の点で問題がある。
[0005] For this reason, I hate that it cannot be reused,
Formwork carpenters generally do not want to cut control panels. Therefore,
In the case of the top of the rising wall, for example, as shown in FIG. 10, only the nail 8 or the pier 9 can be used to keep the contact, and the control panel is cut according to the height of the top. In many cases, they have not been there. This makes it difficult to perform one-shot presser. Therefore, even if it is designated as a single presser foot, it is often the case that the user goes to the site again after removing the formwork and finish the top end as additional work. This also has problems in workability and profitability.

【0006】またコンクリート打設時には、作業者が型
枠の上に乗る。型枠の間にコンクリートを流し込むのだ
からそれは当然だが、多数の作業者が上に乗る為に、或
いはコンクリートの重み、機材の重みで、型枠が沈下し
てしまうことも多い。そうなっていたら、仮に型枠大工
が型枠天端を切断しておいてくれたとしても、それが無
駄になってしまう。
At the time of placing concrete, an operator rides on the formwork. Naturally, concrete is poured between the formwork, but the formwork often sinks due to the large number of workers riding on it or due to the weight of concrete and equipment. If so, even if the form carpenter cuts off the top of the form, it would be useless.

【0007】そこで、例えば実開昭56−70047に
記載のような手法を用いることも考えられる。この手法
は、建物のコンクリート基礎のモルタル下地仕上げに適
用されるもので、同じ建築とは言っても、分野、作業分
担何れの点でも異なるものであるが、天端というフリー
キーワードで調査して見たらこれが出て来たので、これ
を引用すると、この考案では、図11の天端押え板2
を、図12に示すように打ち終わったコンクリート上に
置く。ネジ5を回動して高さを調節し、その状態で硬化
を待つ(符号は、実開昭56−70047のものをその
まま引用した。これらの構造は、実開昭56−7004
7に示されるとおりである。)
Therefore, it is conceivable to use a method as described in, for example, Japanese Utility Model Laid-Open Publication No. 56-70047. This method is applied to the mortar foundation finishing of the concrete foundation of a building. Although it is the same building, it differs in both the field and the work allotment. When I looked at this, it came out, so quoting it, in this invention, the top holding plate 2 of FIG.
Is placed on the finished concrete as shown in FIG. The screw 5 is rotated to adjust the height and wait for curing in that state. (The reference numerals are those of Japanese Utility Model Laid-Open No. 56-70047.
As shown in FIG. )

【0008】しかし、この手法も、立ち上がり壁天端の
一発押えには向いていない点がある。と言うのは、この
手法は、コンクリートが硬化していく過程で発生する収
縮に対応出来ない可能性があるからである。周知のとお
り、コンクリートは硬化していく過程で収縮する。建物
の基礎の場合、これはあまり影響しない。何故なら、建
物の基礎は一般に丈(高さ)が小さく、収縮の絶対量が
小さいからである。また同じように収縮するので、全体
としての水平は保たれ、それでモルタル下地仕上げの目
的は達せられているからである。
[0008] However, this method is not suitable for a single presser press on the top of the rising wall. This is because this method may not be able to cope with the shrinkage that occurs during concrete hardening. As is well known, concrete shrinks as it hardens. For building foundations, this has little effect. This is because the foundation of a building is generally small in length (height) and the absolute amount of shrinkage is small. In addition, since they shrink in the same manner, the overall level is maintained, and the purpose of the mortar base finish is achieved.

【0009】これに対し立ち上がり壁は、例えばマンシ
ョン通路の手摺りですら1100mmの高さがある。パ
ラペットなら更に高いことが多い。このため、収縮の絶
対量は大きい。上記実開昭56−70047では、打設
後の柔らかい状態のとき、基礎天端を押え、そこで固定
している。従って硬化につれコンクリートが収縮する
と、天端押え板2とコンクリート天端との間に隙間が発
生し、硬化するまで正確に形状を規制できない。
On the other hand, the rising wall has a height of 1100 mm even for a handrail of an apartment passage, for example. Parapets are often higher. For this reason, the absolute amount of shrinkage is large. In Japanese Utility Model Application Laid-Open No. 70047/1981, when the casting is in a soft state after the casting, the top of the foundation is held down and fixed there. Therefore, when the concrete shrinks as it hardens, a gap is formed between the top holding plate 2 and the concrete top, and the shape cannot be accurately regulated until it hardens.

【0010】本発明の目的は、このような課題を解決
し、経験の浅いものでも確実に施工出来、しかも水勾配
や面取り、目地意匠などが付加されるでも、確実に施工
することが出来る天端一発押え治具を提供することにあ
る。また他の目的は、コンパネ(型枠板)を切断する必
要がなく、型枠大工の手間も掛からず、しかもコンパネ
再利用も可能な天端一発押え治具を提供することにあ
る。
An object of the present invention is to solve such a problem and to reliably perform the work even for inexperienced ones, and to perform the work reliably even when a water gradient, chamfer, joint design, etc. are added. An object of the present invention is to provide an end-to-end presser jig. Another object of the present invention is to provide a top-end press-down jig which does not require cutting of a control panel (form plate), does not require the labor of a form carpenter, and can be reused.

【0011】[0011]

【課題を解決するための手段】上記目的達成のため本発
明では、コンクリート硬化後に天端が所望形状になるよ
うにその下面が成型されている天端形状規制手段と、コ
ンクリート打設後それが柔軟である間にその天端に当接
された前記天端形状規制手段をコンクリートが硬化する
まで該天端に継続して付勢する付勢手段とを備える(請
求項1)。
In order to achieve the above object, according to the present invention, there is provided a top end shape regulating means having a lower surface molded so that the top end becomes a desired shape after hardening of concrete, Biasing means for continuously biasing the top end shape regulating means abutting on the top end thereof while the concrete is hardened to the top end until the concrete hardens (claim 1).

【0012】また弾力性のある同じ部材で前記天端形状
規制手段と前記付勢手段とが実現されている(請求項
2)。更に前記弾力性のある部材が発泡スチロールであ
る(請求項3)。
The top end shape regulating means and the urging means are realized by the same elastic member. Further, the elastic member is styrene foam (claim 3).

【0013】[0013]

【発明の実施の形態】以下、本発明の詳細を図示実施の
形態例に基いて説明する。第一の実施の形態例の治具1
0を図1に示す。図に於て、11は型枠、12、13は
この型枠11を支承する単管及びフォームタイである。
治具10の構成を図2に示す。治具10は、成型板21
と押え具22とで構成される。成型板21は発泡スチロ
ールからなり、下面が少し斜面にされている。これは、
天端の仕上り形状を図9(A)の形、即ち水勾配のある
天端にする為のものである。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below in detail based on illustrated embodiments. Jig 1 of the first embodiment
0 is shown in FIG. In the figure, 11 is a mold, and 12 and 13 are a single tube and a foam tie for supporting the mold 11.
FIG. 2 shows the configuration of the jig 10. The jig 10 includes a molded plate 21
And the presser 22. The molded plate 21 is made of polystyrene foam, and the lower surface is slightly inclined. this is,
This is for making the top end finish shape as shown in FIG. 9A, that is, the top end having a water gradient.

【0014】成型板21の下面形状は、夫々の仕様に合
わせて決定する。勿論その形状は任意であるが、図9に
示したように、それは幾つかの類型に分けられる。従っ
て、何種類かの形状の成型板21を準備しておき、仕様
に合わせてこれらから選択使用するのも良い。また、図
7に示すように、断面三角形の面取り用桟23を成型板
21とは別に用意し、これを成型板21の隅に接着固定
して、図9(B)のような面取り形状用にしても良い。
The shape of the lower surface of the molded plate 21 is determined according to each specification. Of course, the shape is arbitrary, but as shown in FIG. 9, it can be divided into several types. Therefore, it is also possible to prepare several types of shaped plates 21 and to select and use them according to the specifications. Further, as shown in FIG. 7, a chamfering bar 23 having a triangular cross section is prepared separately from the molding plate 21, and this is adhered and fixed to a corner of the molding plate 21 to form a chamfering shape as shown in FIG. You may do it.

【0015】押え具22は、アーチ部材24と、位置決
めボルト26と、当て金27とで構成される。アーチ部
材24は、その下端が単管12を巻くように内側に向っ
て屈曲され弧状部28とされている。上部水平部分中央
には、タップが切られており、そこに位置決めボルト2
6が螺合されている。位置決めボルト26の下端には、
該ボルトに対して回動自在の当て金27が取着されてい
る。
The holding member 22 includes an arch member 24, a positioning bolt 26, and a pad 27. The arch member 24 is bent inward so as to wind the single tube 12 at its lower end to form an arc-shaped portion 28. A tap is cut at the center of the upper horizontal part, and there is a positioning bolt 2
6 is screwed. At the lower end of the positioning bolt 26,
A rotatable pad 27 is attached to the bolt.

【0016】この治具10は以下の如く使用する。先ず
型枠11の中にコンクリートを注入する。次いで粗なら
しをする。これで砂利が沈み、表面にノロが出てくる。
そこで成型板21で、落し蓋の如く型枠11開口部を塞
ぐ。もっとも落し蓋とは違い、型枠11と成型板21の
間に隙間は無い。なお手摺りの場合、幅150が標準で
ある。従って成型板21も最初から幅150mmとし、
水勾配に相当する斜面になるように下面を形成しておく
と良い。標準幅でないものも何種類か用意しておけば対
応が容易になる。
The jig 10 is used as follows. First, concrete is poured into the mold 11. Next, roughing is performed. This will cause the gravel to sink and the surface to stick.
Then, the opening of the mold 11 is closed with a molding plate 21 like a dropping lid. Unlike the drop lid, however, there is no gap between the mold 11 and the molding plate 21. In the case of handrails, the width 150 is standard. Therefore, the width of the molded plate 21 is 150 mm from the beginning,
The lower surface is preferably formed so as to have a slope corresponding to a water gradient. If several types of non-standard widths are prepared, it will be easier to respond.

【0017】長さは任意である。取り扱いの便、成型の
便を考えると2m位が適当であろう。これを手摺りの長
さに合わせ、その儘、或いは切断して使用する。発泡ス
チロールなので、カッター等で簡単に切断でき、現場合
わせに適する。ゴムで形成するのも好ましい。この場
合、発泡スチロール製とゴム製の両方を用意し、ゴム製
はそのまま切断しないで使用し、発泡スチロール製は切
断して半端な長さのところへ使用する。こうすると経済
的である。木材を使用するのも良い。表面に木目が残
り、趣のある仕上りになる。
The length is arbitrary. Considering the convenience of handling and the convenience of molding, about 2m is appropriate. This is adjusted to the length of the handrail and used as it is or cut. Because it is Styrofoam, it can be easily cut with a cutter or the like, and is suitable for site adjustment. It is also preferable to form with rubber. In this case, both styrene foam and rubber are prepared, and the rubber is used without cutting, and the styrene foam is cut and used at an odd length. This is economical. It is good to use wood. The grain remains on the surface, giving a tasteful finish.

【0018】ノロの上を成型板21で覆ったら、アーチ
部材24を単管12に取り付ける。具体的には、アーチ
部材の足29を型枠11開口部に跨がせ、外側に広げて
単管12を乗り越えさせ、下に下ろす。ここで手を離せ
ば弾力で足29は元の形に戻り、弧状部28が単管12
に引っ掛かる。このとき当て金27が成型板21の上に
位置する。位置決めボルト26を回し、硬化前のコンク
リート天端に成型板21を押し付ける。
After the top of the noro is covered with the molded plate 21, the arch member 24 is attached to the single pipe 12. More specifically, the foot 29 of the arch member is straddled over the opening of the formwork 11, spread outward, ride over the single tube 12, and is lowered. If you release your hands, the feet 29 return to their original shape with elasticity, and the arc-shaped portions 28
Caught on At this time, the contact metal 27 is located on the molded plate 21. The positioning plate 26 is turned, and the molded plate 21 is pressed against the hardened concrete top.

【0019】発明者が計測したところでは、高さ110
0mmの手摺りで、打設直後の高さと硬化後の高さの差
(収縮量)は10mm程度であった。仕上げの高さ、例
えば1100mmにこの収縮量10mmを加えた高さ
を、このときの成型板21の設定高さとする。収縮量
は、生コン(生コンクリート)毎に少し異なるが、組成
(製造元)が同じなら、ほぼ一定である。従って通常
は、それ以前に得られている、そのコンクリートの収縮
率を参考にして、その高さに対応する収縮量を求める。
厳密に高さを管理したいなら、現場での前工程、例えば
躯体とかスラブとかのコンクリート打設時にサンプルを
とり、収縮量を確認しておくと良い。
According to the measurement by the inventor, the height 110
With a handrail of 0 mm, the difference (shrinkage) between the height immediately after casting and the height after curing was about 10 mm. The finishing height, for example, the height obtained by adding this shrinkage amount of 10 mm to 1100 mm is set as the set height of the molded plate 21 at this time. The amount of shrinkage is slightly different for each ready-mixed concrete (ready-mixed concrete), but is substantially constant if the composition (manufacturer) is the same. Therefore, usually, the shrinkage amount corresponding to the height is obtained with reference to the shrinkage ratio of the concrete obtained before that.
If you want to strictly control the height, it is advisable to take a sample during the pre-process at the site, for example, when placing concrete such as a skeleton or a slab, and check the amount of shrinkage.

【0020】前述の如く型枠11は人が載ったりして高
さが不正になることが多い。そこで、ここでは、位置決
めボルト26の頭を指標にして、水準器で高さ合わせを
する。先ず、指定された手摺りの寸法が、例えば水勾配
付き、勾配の真ん中(幅150mmの中央)での仕上り
高さ1105mmであったとする。また、成型板21の
中央(幅150mmの中央)の厚みが70mm、当て金
27の厚さが3mm、位置決めボルト26の全長が15
0mmであったとする。求める位置決めボルト26上端
の高さは、手摺りの仕上り高さ1105mmに、例えば
収縮量10mm、及びこれら各寸法70mm,3mm,
150mmを加えた1338mmである。
As described above, the height of the mold 11 is often incorrect due to the presence of a person. Therefore, here, the height is adjusted with a level using the head of the positioning bolt 26 as an index. First, it is assumed that the dimensions of the designated handrail are, for example, a finishing height of 1105 mm in the middle of the gradient (the center of the width of 150 mm) with a water gradient. Further, the thickness of the center of the molded plate 21 (the center of the width of 150 mm) is 70 mm, the thickness of the metal plate 27 is 3 mm, and the total length of the positioning bolt 26 is 15 mm.
It is assumed that it is 0 mm. The height of the upper end of the positioning bolt 26 to be obtained is, for example, a shrinkage amount of 10 mm and the dimensions 70 mm, 3 mm,
It is 1338 mm with 150 mm added.

【0021】成型板21の被せ方は少なくとも二通りあ
る。最初にノロの高さを厳密に管理せずに成型板を被せ
て行く手法を説明する。例えば手摺りの全長が20メー
トルであったとする。最初に、その全長、或いは途中の
適当な長さの所まで、生コンを打ち込み、粗均しをす
る。このとき、ノロの高さは所望の高さより高めにして
おく。次いで型枠11の端に成型板21を載せる。例え
ば成型板21の長さが2メートルであったら、型枠11
の端から最初の2メートルの所まで、この成型板21を
被せる。そして適当な間隔、例えば30cm間隔で一つ
づつ治具10を取り付ける。そして水準器を使って所望
高さまで位置決めボルト26を締め付けて行く。
There are at least two ways to cover the molded plate 21. First, a method of covering a molded plate without strictly controlling the height of the slag will be described. For example, assume that the total length of the handrail is 20 meters. First, the ready-mixed concrete is driven into the entire length or a suitable length in the middle, and the roughing is performed. At this time, the height of the stick is set higher than a desired height. Next, the molding plate 21 is placed on the end of the mold 11. For example, if the length of the molded plate 21 is 2 meters, the form 11
This molded plate 21 is covered from the end to the first two meters. Then, the jigs 10 are attached one by one at an appropriate interval, for example, at an interval of 30 cm. Then, the positioning bolt 26 is tightened to a desired height using a level.

【0022】端から順に位置決めボルト26で押えるか
ら、丁度練り歯磨きの如く、余ったノロは成型板21の
無いところに押し出される。ノロが固いときは短い成型
板21を使えば良い。このように押し出されたノロは、
そこで取りだすか、少し先に送る。そして次の成型板2
1を被せ、同じように治具10の取り付けて、位置決め
ボルト26を締め付けて行く。これを繰り返し、最後の
ところだけは、成型板21を載せる前にノロの高さをキ
チンと合わせる。或いは、成型板21を成型板21を被
せたり、持ち上げたりして、位置決めボルト26で高さ
を合わせ、ノロの追加、取り出しを行なって高さ合わせ
をする。終ったら位置決めボルト26を締め付ける。
Since the positioning bolts 26 are pressed in order from the end, the excess glue is pushed out to a place where there is no molding plate 21 just like toothpaste. When the glue is hard, a short molded plate 21 may be used. Noro extruded in this way,
Take it out or send it a little further. And the next molded plate 2
1, the jig 10 is attached in the same manner, and the positioning bolt 26 is tightened. This is repeated, and only at the end, the height of the slag is adjusted with the chitin before placing the molded plate 21. Alternatively, the molding plate 21 is covered with the molding plate 21 or lifted up, and the height is adjusted by the positioning bolts 26, and the height is adjusted by adding and removing the stick. When completed, the positioning bolt 26 is tightened.

【0023】最初からノロの高さを目標値に合わせるこ
とも出来る。ここで、ノロは流動するから、天端はほぼ
水平である。一方、仕上り形状は、水勾配、面取り、目
地意匠付き等と、水平でない。従って、これら仕上り形
状のものを同じ体積の水平形状のものに換算し、それに
より打ち込む生コンの高さを求める。具体的には、先ず
生コンを打ち込んだら粗均しをする。表面に出て来たノ
ロを水平に均し、スケールと水準器とを使って、その高
さを目標値に合わせる。それから成型板21を載せ、位
置決めボルト26を締め付ける。これでノロは成型板2
1の下面形状に沿って所望の仕上り形状になる。このあ
と、位置決めボルト26上端で再度高さを確認する。若
しズレが出ていたら、位置決めボルト26を弛め、成型
板21を持ち上げて、ノロの追加、取り出しを行なう。
From the beginning, the height of the slag can be adjusted to the target value. Here, since the slag flows, the top is almost horizontal. On the other hand, the finished shape is not horizontal, such as a water gradient, a chamfer, and a joint design. Therefore, these finished shapes are converted into horizontal shapes having the same volume, and the height of the ready-mixed concrete to be driven is determined. Specifically, first, the raw concrete is driven in, and then roughing is performed. The slime that comes out of the surface is leveled, and the height is adjusted to the target value using a scale and a level. Then, the molded plate 21 is placed, and the positioning bolt 26 is tightened. This is the molding plate 2
1 has a desired finished shape along the lower surface shape. Thereafter, the height is checked again at the upper end of the positioning bolt 26. If there is any deviation, the positioning bolt 26 is loosened, the molded plate 21 is lifted, and the slag is added or removed.

【0024】なお、ノロの状態で水準を取らない分、先
の手順の方が効率が良い。また、他の手順で高さ合わせ
をしても構わない。何れにしろ、上記治具10を使って
硬化前に天端の高さ、形状を規制してしまうのが、本発
明である。型枠11全体に成型板21を被せ終ったら、
位置決めボルト26の増し締めを行なう。これは、この
あとのコンクリートの収縮に備えたもので、成型板21
をこの収縮分以上に圧縮しておく。これにより、形状が
固定されるまで、成型板21がしっかりとノロを押え続
ける。なお図1は、この増し締めを行なう前の、治具1
0の高さのみを合わせた状態を示している。あとは、コ
ンクリート硬化後、成型板21と押え具22とを取り外
す。型枠11は、そのあとに続く作業の都合により残し
て置くこともある。
Note that the above procedure is more efficient because the level is not taken in the no-slung state. The height may be adjusted by another procedure. In any case, it is the present invention that the height and shape of the top end are regulated before curing using the jig 10. When the molding plate 21 is completely covered with the mold 11,
Retighten the positioning bolts 26. This is in preparation for the subsequent shrinkage of the concrete.
Is compressed more than this shrinkage. Thereby, until the shape is fixed, the molding plate 21 keeps firmly holding the slag. FIG. 1 shows a jig 1 before this retightening.
The state where only the height of 0 is adjusted is shown. After the concrete is hardened, the molded plate 21 and the presser 22 are removed. The formwork 11 may be left for the sake of the following work.

【0025】第二の実施の形態例を図3〜図6に示す。
図3が、この第二の実施の形態例の押え具42を示し、
これが第一の実施例の押え具22に相当する。これと第
一の実施の形態例の成型板21とで、第二の実施の形態
例の治具を構成する。押え具42は、水平部材43、脚
部材44、位置決めボルト53、スライドブッシュ4
7、及び当て金54とで構成される。これら部材は、以
下に説明する部分のみが第一の実施の形態例のものと異
なる。説明しない部分は第一の実施の形態例のものと同
じである。
FIGS. 3 to 6 show a second embodiment.
FIG. 3 shows the presser 42 of the second embodiment,
This corresponds to the presser 22 of the first embodiment. This and the molded plate 21 of the first embodiment constitute a jig of the second embodiment. The holding member 42 includes a horizontal member 43, a leg member 44, a positioning bolt 53, and a slide bush 4.
7 and a pad 54. These members are different from those of the first embodiment only in portions described below. Parts that are not described are the same as those of the first embodiment.

【0026】この実施の形態例では、水平部材43の中
央と両端に長孔45及び46が穿設されている。中央の
長孔45にはスライドブッシュ47が挿通されており、
ナット48で固定されている。スライドブッシュ47に
は、第一の実施例と同じ位置決めボルト53が螺合され
ており、ナット48を弛め、スライドブッシュ47を移
動させることで、この位置決めボルト53の立設位置を
調節できる。こうしておくと、位置決めボルト53の立
設位置の自由度が大きくなり、型枠から単管迄の距離が
左右等しくない場合でも、柔軟に対応できる。
In this embodiment, elongated holes 45 and 46 are formed at the center and both ends of the horizontal member 43. A slide bush 47 is inserted into the central long hole 45,
It is fixed with a nut 48. The same positioning bolt 53 as that of the first embodiment is screwed into the slide bush 47, and the standing position of the positioning bolt 53 can be adjusted by loosening the nut 48 and moving the slide bush 47. By doing so, the degree of freedom of the standing position of the positioning bolt 53 is increased, and it is possible to flexibly cope with the case where the distance from the mold to the single pipe is not equal on the left and right.

【0027】脚部材44にはボルト51が立設されてお
り、これが水平部材43の両端の長孔46に挿通され
る。このボルト51にナット52が螺合され、脚部材4
4が水平部材43に固定される。これを弛めて脚部材4
4をスライドさせれば、脚部材44の間隔を調節でき
る。こうしておくと、立ち上がり壁の幅が違っていても
柔軟に対応出来る。
A bolt 51 is provided upright on the leg member 44, and the bolt 51 is inserted into the elongated holes 46 at both ends of the horizontal member 43. A nut 52 is screwed into the bolt 51 and the leg member 4
4 is fixed to the horizontal member 43. Loosen this, leg member 4
By sliding 4, the distance between the leg members 44 can be adjusted. By doing so, it is possible to flexibly cope with different widths of the rising wall.

【0028】当て金54は、位置決めボルト53の下端
に首振り自在に取着されている。これらの中央縦断面を
図6に示す。位置決めボルト53の下端は球面にされて
おり、中央にネジ孔が形成されている。ここにキャップ
状のホルダー55が当接され、その中央の孔に下方から
ビス56が挿通され、上記ネジ孔に螺合されている。な
おビス56の顎も球面にされている。ホルダー55のフ
ランジから下の部分もネジ切りされており、これが当て
金54の中央に形成された浅いネジ孔に螺合されてい
る。これで当て金54は、位置決めボルト53に対し、
首振り自在になり、天端の傾斜が如何様であっても、こ
れに柔軟に対応する。
The backing plate 54 is attached to the lower end of the positioning bolt 53 so as to swing freely. FIG. 6 shows a central longitudinal section of these. The lower end of the positioning bolt 53 has a spherical surface, and a screw hole is formed in the center. Here, a cap-shaped holder 55 is abutted, and a screw 56 is inserted from below into a central hole thereof, and screwed into the screw hole. The jaws of the screw 56 are also spherical. The lower part of the flange of the holder 55 is also threaded, and this is screwed into a shallow screw hole formed in the center of the paddle 54. With this, the contact metal 54 is moved with respect to the positioning bolt 53.
You can swing freely and flexibly respond to any inclination of the top.

【0029】なお第二の実施の形態例の治具による天端
一発仕上げの手順は、第一の実施の形態例と同じであ
る。説明を略す。
Note that the procedure of the top-end one-shot finishing using the jig of the second embodiment is the same as that of the first embodiment. Description is omitted.

【0030】また、請求項にいう天端形状規制手段と
は、コンクリート硬化後に天端が所望形状になるよう、
その下面が成型されているものを言う。また、付勢手段
とは、コンクリート打設後それが柔軟な間にその天端に
当接された前記天端形状規制手段をコンクリート硬化後
まで該天端に継続して付勢するものを言う。実施の形態
例では、成型板21が、この二つの機能を兼ね備える。
これらは別部材にしても良い。例えば、アーチ部材24
に弾力を持たせ、この弾力で天端形状規制手段を下方に
付勢するようにしても良く、或いは位置決めボルト53
と当て金27の間にスプリングを介在させるなどしても
良い。
[0030] The top shape regulating means referred to in the claims means that the top shape becomes a desired shape after concrete hardening.
The lower surface is molded. In addition, the urging means means a means for continuously urging the top end shape regulating means abutting on the top end of the concrete until the concrete is hardened, after the concrete is cast, while it is flexible. . In the embodiment, the molded plate 21 has these two functions.
These may be separate members. For example, the arch member 24
The top end shape regulating means may be biased downward by this elasticity, or the positioning bolt 53
A spring may be interposed between the buckle 27 and the pad 27.

【0031】更に、立ち上り壁の天端の上に、欄杆の如
きパイプ等が立設される場合がある。この場合は、予め
成型板21に適宜の余裕を持たせた孔を開けておき、こ
こにそのパイプ等の根元を挿通し、生コンの中にその根
元を埋め込む作業を、この成型板21を被せる作業と一
緒に実行する。今まではコンクリート硬化後に後加工と
してこのパイプ等の立設作業を実施してきたが、こうす
れば、この作業も一緒に実施できる。また、ナット4
8,52は、蝶ナットその他にしても良い。
Further, there may be a case where a pipe or the like such as a column is erected on the top end of the rising wall. In this case, a hole having an appropriate margin is formed in the molding plate 21 in advance, and the root of a pipe or the like is inserted into the hole, and the operation of embedding the root in the ready-mixed concrete is covered with the molding plate 21. Perform with the work. Up to now, the work of erecting the pipes and the like has been carried out as post-processing after the concrete has hardened, but this work can also be carried out together. Also, nut 4
8, 52 may be wing nuts or the like.

【0032】[0032]

【発明の効果】以上説明したように、本発明では、コン
クリート硬化後に天端が所望形状になるようにその下面
が成型されている天端形状規制手段と、コンクリート打
設後それが柔軟な間にその天端に当接された前記天端形
状規制手段を該コンクリート硬化後まで該天端に継続し
て付勢する付勢手段とを用い、コンクリート打ち込み直
後にその天端の高さ、形状を規制するようにした(請求
項1)。従って、仕様通りの一発押えが実現でき、本当
の意味での仕上げ工程を省略できる。コンクリートも真
に一体化がされ、強度が増し、剥離など生じなくなる。
型枠大工の手間も増えず、コンパネも切らないで済む。
As described above, according to the present invention, the top end shape regulating means whose lower surface is molded so that the top end has a desired shape after hardening of the concrete, and the space between the top and bottom of the concrete which is soft after the concrete is cast. And a biasing means for continuously biasing the top end shape regulating means abutting on the top end to the top end after the concrete is hardened. (Claim 1). Therefore, a single presser as specified can be realized, and a finishing step in the true sense can be omitted. The concrete is also truly integrated, increasing its strength and eliminating flaking.
It does not increase the labor of the formwork carpenter and does not cut the control panel.

【0033】また、前記天端形状規制手段をゴムや発泡
スチロールなどの弾力性のある部材で形成すると、これ
らが前記天端形状規制手段と前記付勢手段の双方の機能
を兼ね、構成が簡素になる(請求項2)。また、前記弾
力性のある部材を発泡スチロールとすると、簡単に切断
できて現場合わせが容易であり、作業効率が良い。仕上
り表面も綺麗で、材料費も安い(請求項3)。
Further, if the top end shape regulating means is formed of an elastic member such as rubber or styrene foam, these functions as both the top end shape regulating means and the urging means, and the configuration is simplified. (Claim 2). Further, when the elastic member is made of styrene foam, it can be cut easily, can be easily adjusted on site, and has high working efficiency. The finished surface is beautiful and the material cost is low (Claim 3).

【図面の簡単な説明】[Brief description of the drawings]

【図1】第一の実施の形態例を示す縦断面図。FIG. 1 is a longitudinal sectional view showing a first embodiment.

【図2】第一の実施の形態例の構成を示す斜視図。FIG. 2 is a perspective view showing the configuration of the first embodiment.

【図3】第二の実施の形態例の押え具を示す正面図。FIG. 3 is a front view showing a presser according to a second embodiment.

【図4】第二の実施の形態例の水平部材を示す正面図
(A)及び平面図(B)。
FIG. 4 is a front view (A) and a plan view (B) showing a horizontal member according to the second embodiment.

【図5】第二の実施の形態例の各部材を示す平面図(A
1〜A3)、正面図(B1〜B3)。
FIG. 5 is a plan view (A) showing each member of the second embodiment.
1 to A3) and front views (B1 to B3).

【図6】第二の実施の形態例の位置決めボルト及び当て
金の中央縦断面図。
FIG. 6 is a central longitudinal sectional view of a positioning bolt and a backing plate according to a second embodiment.

【図7】成型板の形成手法の例を示す斜視図。FIG. 7 is a perspective view showing an example of a method of forming a molded plate.

【図8】パラペットの型枠施工例を示す縦断面図。FIG. 8 is a longitudinal sectional view showing an example of forming a parapet formwork.

【図9】手摺り形状例(A)〜(C)を示す縦断面図。FIG. 9 is a longitudinal sectional view showing examples of handrail shapes (A) to (C).

【図10】型枠大工による当たりの取り方の例を示す縦
断面図。
FIG. 10 is a longitudinal sectional view showing an example of how to win by a form carpenter.

【図11】実開昭56−70047に示された天端押え
板を示す斜視図。
FIG. 11 is a perspective view showing a top holding plate shown in Japanese Utility Model Application Laid-Open No. 56-70047.

【図12】実開昭56−70047に示された天端の押
え方を示す縦断面図。
FIG. 12 is a longitudinal sectional view showing how to hold the top end shown in Japanese Utility Model Application Laid-Open No. 56-70047.

【符号の説明】[Explanation of symbols]

8…釘 9…桟木 10…治具(実施の形態例) 11…型枠 12…単管 13…フォームタイ 21…成型板 22…押え具 23…面取り用桟 24…アーチ部材 26…位置決めボルト 27…当て金 28…弧状部 29…足 42…押え具(第二の実施の形態例) 43…水平部材 44…脚部材 45…長孔 46…長孔 47…スライドブッシュ 48…ナット 51…ボルト 52…ナット 53…位置決めボルト 54…当て金 55…ホルダー55 56…ビス DESCRIPTION OF SYMBOLS 8 ... Nail 9 ... Crosspiece 10 ... Jig (embodiment example) 11 ... Formwork 12 ... Single tube 13 ... Form tie 21 ... Molding plate 22 ... Holding tool 23 ... Chamfering bar 24 ... Arch member 26 ... Positioning bolt 27 .., A base 28, an arc-shaped portion 29, a foot 42, a presser (second embodiment) 43, a horizontal member 44, a leg member 45, a long hole 46, a long hole 47, a slide bush 48, a nut 51, and a bolt 52 ... Nut 53 ... Positioning bolt 54 ... Pad 55

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート硬化後に天端が所望形状に
なるようにその下面が成型されている天端形状規制手段
と、コンクリート打設後それが柔軟である間にその天端
に当接された前記天端形状規制手段をコンクリートが硬
化するまで該天端に継続して付勢する付勢手段とを備え
たことを特徴とする天端一発押え治具。
1. A top shape regulating means having a lower surface molded so that a top shape becomes a desired shape after hardening of concrete, and abuts on the top while the concrete is cast while it is flexible. A biasing means for continuously biasing the top end shape regulating means toward the top end of the concrete until the concrete hardens.
【請求項2】 弾力性のある同じ部材に前記天端形状規
制手段と前記付勢手段とが実現されていることを特徴と
する請求項1に記載の天端一発押え治具。
2. The top-end press-down jig according to claim 1, wherein the top-end shape regulating unit and the urging unit are realized on the same elastic member.
【請求項3】 前記弾力性のある部材が発泡スチロール
であることを特徴とする請求項2に記載の天端一発押え
治具。
3. The jig of claim 2, wherein the elastic member is styrofoam.
JP9025891A 1997-01-24 1997-01-24 Upper surface single action holding jig Pending JPH10205133A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9025891A JPH10205133A (en) 1997-01-24 1997-01-24 Upper surface single action holding jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9025891A JPH10205133A (en) 1997-01-24 1997-01-24 Upper surface single action holding jig

Publications (1)

Publication Number Publication Date
JPH10205133A true JPH10205133A (en) 1998-08-04

Family

ID=12178426

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9025891A Pending JPH10205133A (en) 1997-01-24 1997-01-24 Upper surface single action holding jig

Country Status (1)

Country Link
JP (1) JPH10205133A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105729621A (en) * 2016-04-13 2016-07-06 成都亨通兆业精密机械有限公司 Concrete member prefabrication component
CN105751355A (en) * 2016-04-13 2016-07-13 成都亨通兆业精密机械有限公司 Template fixing component for precast concrete component
CN105751356A (en) * 2016-04-13 2016-07-13 成都亨通兆业精密机械有限公司 Beam structure prefabricated formwork fixing component
CN105904577A (en) * 2016-04-13 2016-08-31 成都亨通兆业精密机械有限公司 Prefabricated part applicable to complicated beam structure
EP4043667A1 (en) * 2021-02-11 2022-08-17 Macc Smoothing ruler and method for using same

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105729621A (en) * 2016-04-13 2016-07-06 成都亨通兆业精密机械有限公司 Concrete member prefabrication component
CN105751355A (en) * 2016-04-13 2016-07-13 成都亨通兆业精密机械有限公司 Template fixing component for precast concrete component
CN105751356A (en) * 2016-04-13 2016-07-13 成都亨通兆业精密机械有限公司 Beam structure prefabricated formwork fixing component
CN105904577A (en) * 2016-04-13 2016-08-31 成都亨通兆业精密机械有限公司 Prefabricated part applicable to complicated beam structure
CN105751356B (en) * 2016-04-13 2018-07-27 广东建远建筑装配工业有限公司 Girder construction prefab-form fixing component
CN105729621B (en) * 2016-04-13 2019-02-19 四川行之智汇知识产权运营有限公司 A kind of concrete component prefabricated components
CN105904577B (en) * 2016-04-13 2019-02-19 四川行之智汇知识产权运营有限公司 A kind of prefabricated components for complicated girder construction
EP4043667A1 (en) * 2021-02-11 2022-08-17 Macc Smoothing ruler and method for using same

Similar Documents

Publication Publication Date Title
US6851235B2 (en) Building block with a cement-based attachment layer
US6397549B1 (en) Building block with a wooden attachment layer
US20060131475A1 (en) Modular concrete form system
Warland Modern practical masonry
JPH10205133A (en) Upper surface single action holding jig
IE851378L (en) Tool for making impressions in cement
JP3364688B2 (en) Column base connection member of wooden frame structure and column base connection structure using the same
CN111663770B (en) Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold
JP4665245B2 (en) Leveling tools and leveling method for floor construction
CN206971589U (en) A kind of hanging board device for being used to control cast-in-situ stair bench plate thickness
EP1321602A1 (en) Formwork for concrete structure
KR200249907Y1 (en) Device for adjusting level of a concrete form
US4616800A (en) Swimming pool bond beam form system
TR201703852A2 (en) LEVEL ADJUSTMENT MOUNTING
JPH0324747Y2 (en)
JP2511635Y2 (en) Basic top end setting jig
US20220213702A1 (en) Concrete form and related method of creating a cantilever reveal
JP3356853B2 (en) Formwork equipment
JP3154941B2 (en) Construction formwork leveling bracket
JPH0119716Y2 (en)
JPH084514Y2 (en) Concrete formwork
JP2006152678A (en) Construction method of protrusion
KR100207313B1 (en) Device for adjusting level to wall forms
JPH071478Y2 (en) Fence structure
JPS6111397Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 13

Free format text: PAYMENT UNTIL: 20080920

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20090920

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 15

Free format text: PAYMENT UNTIL: 20100920

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 16

Free format text: PAYMENT UNTIL: 20110920

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110920

Year of fee payment: 16