JPH102019A - Fixing structure of column and method therefor - Google Patents

Fixing structure of column and method therefor

Info

Publication number
JPH102019A
JPH102019A JP15665496A JP15665496A JPH102019A JP H102019 A JPH102019 A JP H102019A JP 15665496 A JP15665496 A JP 15665496A JP 15665496 A JP15665496 A JP 15665496A JP H102019 A JPH102019 A JP H102019A
Authority
JP
Japan
Prior art keywords
screw
column
building unit
fastener
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP15665496A
Other languages
Japanese (ja)
Inventor
Chika Iri
知香 伊理
Katsunori Onishi
克則 大西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JUKANKYO KENKYUSHO KK
Sekisui Chemical Co Ltd
Original Assignee
JUKANKYO KENKYUSHO KK
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JUKANKYO KENKYUSHO KK, Sekisui Chemical Co Ltd filed Critical JUKANKYO KENKYUSHO KK
Priority to JP15665496A priority Critical patent/JPH102019A/en
Publication of JPH102019A publication Critical patent/JPH102019A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve the confirmability of fixation of a column to a lower structure by preliminarily mounting a screw-like fastening tool to be inserted into the column of a building unit onto the column head in the state where it is protruded from the column head prior to screwing operation. SOLUTION: Then the column 14 of an upper floor building unit 11B is fixed to a lower floor building unit 11A, the unit 11B is lifted down onto the unit 11A. A fastening hole on the column leg 14B of the column 14 of the unit 11B is inserted while it is guided by the tapered guide part 21C of the screw-like receiving tool 21 of the unit 11A to load the unit 11B onto the unit 11A. Further, a screw-like fastening tool 22 arranged on the column head 14A of the column 14 of the unit 11B is inserted into the column 14 from the column head 14A by a fastening tool 31, and the screw-like fastening tool 22 is screwed to the screw-like receiving tool 21 to fix the column 14 of the unit 11B to the unit 11A.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ユニット建物にお
ける柱の固定構造とその方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a column fixing structure in a unit building and a method thereof.

【0002】[0002]

【従来の技術】ユニット建物にあっては、特開平6-1368
35号公報に記載の如く、工場生産した建物ユニットを施
工現場に輸送し、施工現場に予め設置してある基礎の上
に下階建物ユニットを搭載し、下階建物ユニットの上に
上階建物ユニットを搭載し、上階建物ユニットの上に屋
根構成材を搭載することとしている。
2. Description of the Related Art In a unit building, Japanese Patent Laid-Open No.
As described in Japanese Patent Publication No. 35, a factory-produced building unit is transported to a construction site, a lower-floor building unit is mounted on a foundation pre-installed at the construction site, and an upper-floor building is mounted on the lower-floor building unit. The unit will be mounted, and roof components will be mounted on the upper floor building unit.

【0003】然るに、従来技術では、基礎の上に下階建
物ユニットを搭載した後、下階建物ユニットの柱を基礎
に設けてあるアンカーボルト(ねじ状受け具)に固定
し、或いは、下階建物ユニットの上に上階建物ユニット
を搭載した後、上階建物ユニットの柱を下階建物ユニッ
トに設けてあるボルトもしくはナット(ねじ状受け具)
に固定することを必要としている。
However, in the prior art, after the lower-floor building unit is mounted on the foundation, the pillars of the lower-floor building unit are fixed to anchor bolts (screw-shaped receiving members) provided on the foundation, or After mounting the upper-floor building unit on the building unit, the bolts or nuts (screw-shaped support) provided on the lower-floor building unit with the pillars of the upper-floor building unit
Need to be fixed.

【0004】このとき、従来技術では、柱内に挿入でき
る締結工具を用い、締結工具の先端に保持したナットも
しくはボルトからなるねじ状締め具を柱内に挿入し、こ
の締結工具を回転操作することにて上記ねじ状締め具を
前記ねじ状受け具に螺合するものである。
At this time, in the prior art, a fastening tool that can be inserted into the column is used, a screw-shaped fastener made of a nut or a bolt held at the tip of the fastening tool is inserted into the column, and the fastening tool is rotated. In particular, the screw fastener is screwed into the screw receiver.

【0005】[0005]

【発明が解決しようとする課題】然しながら、従来技術
では、建物ユニットの柱を下部構造体(基礎もしくは下
階建物ユニット)に固定する部分が柱内に位置し、その
固定の有無を外部から確認することに困難がある。
However, in the prior art, a portion for fixing a pillar of a building unit to a lower structure (a foundation or a lower-floor building unit) is located inside the pillar, and whether or not the portion is fixed is checked from the outside. There are difficulties to do.

【0006】尚、前述の締結工具は、工場から建物ユニ
ットとともに建築現場に輸送されて使用された後、回収
されて工場に返却されなければならず、締結工具の使用
個数をできるだけ少なくすることが望まれる。
[0006] The above-mentioned fastening tools must be transported from the factory to the building site together with the building unit and used, then collected and returned to the factory, and the number of fastening tools used must be reduced as much as possible. desired.

【0007】本発明の課題は、締結工具の使用個数を多
くすることなく、建物ユニットの柱を下部構造体に固定
したことの確認性を向上することにある。
SUMMARY OF THE INVENTION It is an object of the present invention to improve the confirmability of fixing a column of a building unit to a lower structure without increasing the number of fastening tools used.

【0008】[0008]

【課題を解決するための手段】請求項1に記載の本発明
は、下部構造体の上に建物ユニットを搭載し、建物ユニ
ットの柱内に挿入したねじ状締め具を下部構造体に設け
てあるねじ状受け具に螺合操作し、建物ユニットの柱を
下部構造体に固定する柱の固定構造において、前記ねじ
状締め具が、前記螺合操作前に予め柱頭から突出する状
態で該柱頭に取着されてなるようにしたものである。
According to the first aspect of the present invention, a building unit is mounted on a lower structure, and a screw fastener inserted into a pillar of the building unit is provided on the lower structure. In a column fixing structure for screwing a certain screw-shaped receiving member to fix a column of a building unit to a lower structure, the screw-shaped fastener may be protruded from the capital prior to the screwing operation. It is intended to be attached to.

【0009】請求項2に記載の本発明は、請求項1に記
載の本発明において更に、前記ねじ状締め具を螺合操作
する締結工具が締結部材を備え、該締結部材が締結工具
に保持される被保持部と、ねじ状締め具に接続する接続
部と、被保持部と接続部の間で一定トルクにより破断す
る脆弱部とを有してなるようにしたものである。
According to a second aspect of the present invention, in the first aspect of the present invention, a fastening tool for screwing the screw-shaped fastener includes a fastening member, and the fastening member is held by the fastening tool. And a connecting portion connected to the screw-shaped fastener, and a fragile portion that is broken by a constant torque between the held portion and the connecting portion.

【0010】請求項3に記載の本発明は、下部構造体の
上に建物ユニットを搭載し、建物ユニットの柱内に挿入
したねじ状締め具を下部構造体に設けてあるねじ状受け
具に螺合操作し、建物ユニットの柱を下部構造体に固定
する柱の固定方法において、前記ねじ状締め具を、前記
螺合操作前に予め柱頭から突出する状態で該柱頭に取着
しておき、該ねじ状締め具を締結工具により該柱頭から
柱内に挿入し、前記ねじ状受け具に螺合し、建物ユニッ
トの柱を下部構造体に固定するようにしたものである。
According to a third aspect of the present invention, there is provided a screw-type receiving device in which a building unit is mounted on a lower structure and a screw-like fastener inserted into a pillar of the building unit is provided on the lower structure. In the method of fixing a pillar by screwing operation and fixing a column of a building unit to a lower structure, the screw-shaped fastener is attached to the column capital in a state of projecting from the capital in advance before the screwing operation. The threaded fastener is inserted into the pillar from the capital by means of a fastening tool, screwed into the threaded receiver, and the pillar of the building unit is fixed to the lower structure.

【0011】請求項4に記載の本発明は、請求項3に記
載の本発明において更に、前記締結工具として、前記ね
じ状締め具に係合するとともに一定トルクで破断する締
結部材を備えたものを用い、該締結工具がねじ状締め具
をねじ状受け具に螺合する過程で一定トルクに達したと
き、上記締結部材を破断せしめるようにしたものであ
る。
According to a fourth aspect of the present invention, in the third aspect of the present invention, the fastening tool further includes a fastening member that engages with the threaded fastener and breaks at a constant torque. When the fastening tool reaches a certain torque in the process of screwing the screw fastener into the screw receiver, the fastening member is broken.

【0012】請求項1、3に記載の本発明によれば下記
、の作用がある。 ねじ状締め具が予め建物ユニットの柱頭に突出状態で
取着されている。従って、ねじ状締め具が柱頭に突出し
ている限り、その建物ユニットの上に上階建物ユニット
や屋根構成材を着座させて取り付ける如くができず、施
工を先に進めることができない。即ち、建物ユニットの
上に上階建物ユニットや屋根構成材を取り付ける段階
で、その建物ユニットの柱を下部構造体に固定したこと
の確認を必ず行なうことができる。
According to the first and third aspects of the present invention, the following operations are provided. The screw fastener is previously attached to the capital of the building unit in a protruding state. Therefore, as long as the screw fasteners protrude from the capital, it is not possible to seat the upper-floor building unit or the roof component on the building unit, and the construction cannot proceed. That is, at the stage of mounting the upper-floor building unit or the roof component on the building unit, it is always possible to confirm that the pillar of the building unit has been fixed to the lower structure.

【0013】上記の確認が、各柱の全てに予め締結
する工具を突出状に挿入しておくことによらず、各柱の
柱頭に予め設けられるねじ状締め具そのものが突出物を
形成することによってなされる。従って、締結工具を建
物ユニットの全ての柱に予めセットしておく必要はな
く、締結工具の使用個数を少なくし、締結工具の回収コ
スト低減等を実現できる。
[0013] The above confirmation is based on the fact that the screw fasteners provided in advance on the column heads of the columns themselves form protrusions, without the fact that a tool to be fastened to all the columns is preliminarily inserted in a protruding manner. Done by Therefore, it is not necessary to set the fastening tools on all the columns of the building unit in advance, and the number of fastening tools to be used can be reduced, and the cost for collecting the fastening tools can be reduced.

【0014】請求項2、4に記載の本発明によれば下記
の作用がある。 締結工具が、締結部材を介して、ねじ状締め具をねじ
状受け具に螺合する過程で、一定トルクに達したとき、
締結部材が破断する。これにより、締結工具を柱外から
操作しているにもかかわらず、ねじ状締め具を所望のト
ルクでねじ状受け具に螺合し、建物ユニットの柱を確実
に下階構造体に固定できる。
According to the present invention, the following effects are obtained. When the fastening tool reaches a certain torque in the process of screwing the screw fastener into the screw receiver via the fastening member,
The fastening member breaks. Thereby, even though the fastening tool is operated from outside the column, the screw-shaped fastener is screwed to the screw-shaped receiving member with a desired torque, so that the column of the building unit can be securely fixed to the lower structure. .

【0015】[0015]

【発明の実施の形態】図1はユニット建物の据付け過程
を示す模式図、図2は建物ユニットを示す模式図、図3
は柱の固定構造を示す模式図、図4は柱の固定手順を示
す模式図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a schematic diagram showing a process of installing a unit building, FIG. 2 is a schematic diagram showing a building unit, FIG.
FIG. 4 is a schematic diagram showing a column fixing structure, and FIG. 4 is a schematic diagram showing a column fixing procedure.

【0016】ユニット建物10は、図1に示す如く、工
場生産した複数の建物ユニット11を施工現場に輸送す
るとともに、施工現場には予め基礎12を設けておき、
建物ユニット11を吊り上げて基礎12上に据付けるこ
とにて構築される。
As shown in FIG. 1, the unit building 10 transports a plurality of factory-produced building units 11 to a construction site, and provides a foundation 12 in advance at the construction site.
The building unit 11 is constructed by lifting and installing the building unit 11 on the foundation 12.

【0017】このとき、建物ユニット11は、図2に示
す如く、工場の生産ラインで、 4本の形鋼製床梁13
と、 4本の角鋼管製柱14と、 4本の形鋼製天井梁15
を接合した骨組構造体であり、この骨組構造体に床面
材、天井面材、壁面材、窓等を取付けて生産される。
At this time, as shown in FIG. 2, the building unit 11 is connected to four section steel floor beams 13 on the production line of the factory.
And four square steel pipe columns 14 and four shaped steel ceiling beams 15
And a floor surface material, a ceiling surface material, a wall surface material, a window, and the like are attached to the skeleton structure.

【0018】然るに、建物ユニット11の柱14は、下
記(1) 〜(4) の如くに下部構造体(下階建物ユニット1
1Aもしくは基礎12)に固定される。尚、下記(1) 〜
(4)は、上階建物ユニット11Bの柱14を下階建物ユ
ニット11Aに固定する場合についての説明であるが、
下階建物ユニット11Aの柱14を基礎12に固定する
場合についても実質的に同じである。
However, the pillars 14 of the building unit 11 are provided in the lower structure (lower floor building unit 1) as shown in the following (1) to (4).
1A or fixed to the base 12). In addition, the following (1) ~
(4) describes the case where the pillar 14 of the upper floor building unit 11B is fixed to the lower floor building unit 11A,
The same applies to the case where the pillar 14 of the lower-floor building unit 11A is fixed to the foundation 12.

【0019】(1) 基礎12に固定した下階建物ユニット
11Aにおいて、柱14の柱頭14Aにねじ状受け具2
1を設けておく(図4(A))。ねじ状受け具21は、
ボルト状をなし、柱頭14Aに螺着される雄ねじ部21
Aと、ねじ状締め具22が螺着される雄ねじ部21B
と、テーパ状ガイド部21Cとを備える。
(1) In the lower-floor building unit 11A fixed to the foundation 12, the screw-shaped receiving member 2
1 is provided (FIG. 4A). The screw receiver 21 is
Male screw portion 21 which has a bolt shape and is screwed to capital 14A
A and a male screw portion 21B to which the screw fastener 22 is screwed.
And a tapered guide portion 21C.

【0020】上階建物ユニット11Bをクレーン等にて
吊り下ろし、上階建物ユニット11Bにおける柱14の
柱脚14Bに設けてある締結孔14Cを、下階建物ユニ
ット11Aに設けてある上述のねじ状受け具21のガイ
ド部21Cにガイドさせつつ挿通し、上階建物ユニット
11Bを下階建物ユニット11Aの上に搭載する(図3
(A)、図4(A))。
The upper-floor building unit 11B is suspended by a crane or the like, and the fastening holes 14C provided in the column bases 14B of the pillars 14 in the upper-floor building unit 11B are screwed into the above-mentioned screw-like holes provided in the lower-floor building unit 11A. The upper-floor building unit 11B is mounted on the lower-floor building unit 11A while being guided and inserted into the guide portion 21C of the receiver 21 (FIG. 3).
(A), FIG. 4 (A)).

【0021】(2) 上階建物ユニット11Bにおける柱1
4の柱頭14Aには、工場生産段階で予めねじ状締め具
22がセットされている。ねじ状締め具22は、ナット
状をなし、柱頭14Aに螺着される雄ねじ部22Aと、
ねじ状受け具21に螺着する雌ねじ部22Bとを備える
とともに、下端部に座金23を備えている。このとき、
ねじ状締め具22の上端部は柱14の柱頭14Aから突
出する状態で該柱頭14Aに螺着されている(図3
(A)、図4(B))。
(2) Pillar 1 in the upper floor building unit 11B
The threaded fastener 22 is set on the fourth capital 14A in advance at the factory production stage. The screw-shaped fastener 22 has a nut shape, and has a male screw portion 22A screwed to the capital 14A,
A female screw portion 22B screwed to the screw-shaped receiving member 21 is provided, and a washer 23 is provided at a lower end portion. At this time,
The upper end of the screw-shaped fastener 22 is screwed to the capital 14A so as to protrude from the capital 14A of the pillar 14 (FIG. 3).
(A), FIG. 4 (B)).

【0022】(3) 締結工具31により、ねじ状締め具2
2を柱14の柱頭14Aから柱内に挿入し、ねじ状締め
具22をねじ状受け具21に螺合し、上階建物ユニット
11Bの柱14(柱脚14B)を下階建物ユニット11
Aの柱14(柱頭14A)に固定する(図3(B)、図
4(C))。
(3) Threaded fastener 2 by the fastening tool 31
2 is inserted into the pillar from the capital 14A of the pillar 14, the screw-like fastener 22 is screwed into the screw-like receiving member 21, and the pillar 14 (the pillar 14B) of the upper-floor building unit 11B is attached to the lower-floor building unit 11
The column A is fixed to the column 14 (the column capital 14A) (FIGS. 3B and 4C).

【0023】このとき、締結工具31は締結部材32を
着脱して交換可能に備える。締結部材32は、締結工具
31の先端角孔状保持部31Aに係入保持される角棒状
被保持部32Aと、ねじ状締め具22の雌ねじ部22B
に螺着して接続されるフランジ付接続部32Bと、被保
持部32Aと接続部32Bとの間で一定トルクにより破
断するくびれ状脆弱部32Cとを有する。尚、締結部材
32の被保持部32Aは、締結工具31の角孔状保持部
31Aに止めピンもしくは磁力等により保持される。こ
れにより、上述の締結工具31がねじ状締め具22をね
じ状受け具21に螺合する過程で一定トルクに達したと
き、締結部材32が脆弱部32Cで破断し、ねじ状締め
具22をねじ状受け具21に所定のトルクで螺合できる
(図3(C)、図4(D))。
At this time, the fastening tool 31 is provided so that the fastening member 32 can be attached and detached and exchanged. The fastening member 32 includes a square rod-shaped held portion 32A that is engaged and held in the front end square hole-shaped holding portion 31A of the fastening tool 31, and a female screw portion 22B of the screw-shaped fastener 22.
And a flanged connecting portion 32B which is screwed to the connecting portion, and a constricted weak portion 32C which is broken by a constant torque between the held portion 32A and the connecting portion 32B. The held portion 32A of the fastening member 32 is held by the square hole-shaped holding portion 31A of the fastening tool 31 by a locking pin or a magnetic force. Thereby, when the above-mentioned fastening tool 31 reaches a certain torque in the process of screwing the screw fastener 22 to the screw receiver 21, the fastening member 32 is broken at the weak portion 32 </ b> C, and the screw fastener 22 is The screw can be screwed into the screw-shaped receiving member 21 with a predetermined torque (FIGS. 3C and 4D).

【0024】(4) 締結工具31は締結部材32の被保持
部32Aとともに柱外に抜去される。尚、締結部材32
の被保持部32Aを締結工具31の角孔状保持部31A
に止めピン等により固定的に保持したとき、上記(3) の
ねじ状締め具22をねじ状受け具21に螺合した後に
は、締結工具31の螺合操作により締結部材32の脆弱
部32Cを破断させない限り、締結工具31を柱外に抜
くことはできない。
(4) The fastening tool 31 is pulled out of the column together with the held portion 32A of the fastening member 32. The fastening member 32
The held portion 32A of the fastening tool 31 is
When the screw fastener 22 of the above (3) is screwed into the screw receiver 21 when fixedly held by a fixing pin or the like, the fragile portion 32C of the fastening member 32 is , The fastening tool 31 cannot be pulled out of the column.

【0025】以下、本実施形態の作用について説明す
る。 ねじ状締め具22が予め建物ユニット11の柱頭に突
出状態で取着されている。従って、ねじ状締め具22が
柱頭14Aに突出している限り、その建物ユニット11
の上に上階建物ユニット11Bや屋根構成材を着座させ
て取り付ける如くができず、施工を先に進めることがで
きない。即ち、建物ユニット11の上に上階建物ユニッ
ト11Bや屋根構成材を取り付ける段階で、その建物ユ
ニット11の柱を下部構造体に固定したことの確認を必
ず行なうことができる。
Hereinafter, the operation of the present embodiment will be described. The screw fastener 22 is attached to the capital of the building unit 11 in a protruding state in advance. Therefore, as long as the screw fastener 22 projects from the capital 14A, the building unit 11
The upper-floor building unit 11B and the roof component cannot be seated and mounted on the floor, and the construction cannot be advanced. That is, at the stage of mounting the upper-floor building unit 11B and the roof component on the building unit 11, it is always possible to confirm that the columns of the building unit 11 have been fixed to the lower structure.

【0026】上記の確認が、各柱14の全てに予め
締結する工具を突出状に挿入しておくことによらず、各
柱14の柱頭14Aに予め設けられるねじ状締め具22
そのものが突出物を形成することによってなされる。従
って、締結工具31を建物ユニット11の全ての柱14
に予めセットしておく必要はなく、締結工具31の使用
個数を少なくし、締結工具31の回収コスト低減等を実
現できる。
The above confirmation is based on the fact that the tool to be fastened to all of the columns 14 is inserted in a protruding manner in advance, but the screw-like fasteners 22 previously provided on the column head 14A of each column 14 are not used.
This is done by forming a protrusion. Therefore, the fastening tool 31 is connected to all the columns 14 of the building unit 11.
Need not be set in advance, the number of fastening tools 31 used can be reduced, and the collection cost of the fastening tools 31 can be reduced.

【0027】締結工具31が、締結部材32を介し
て、ねじ状締め具22をねじ状受け具21に螺合する過
程で、一定トルクに達したとき、締結部材32が破断す
る。これにより、締結工具31を柱外から操作している
にもかかわらず、ねじ状締め具22を所望のトルクでね
じ状受け具21に螺合し、建物ユニット11の柱14を
確実に下階構造体に固定できる。
When the fastening tool 31 reaches a certain torque in the process of screwing the screw fastener 22 into the screw receiver 21 via the fastening member 32, the fastening member 32 breaks. Thereby, even though the fastening tool 31 is operated from outside the column, the screw-shaped fastener 22 is screwed into the screw-shaped receiving member 21 with a desired torque, and the column 14 of the building unit 11 is securely placed on the lower floor. Can be fixed to a structure.

【0028】以上、本発明の実施の形態を図面により詳
述したが、本発明の具体的な構成はこの実施の形態に限
られるものではなく、本発明の要旨を逸脱しない範囲の
設計の変更等があっても本発明に含まれる。
The embodiment of the present invention has been described in detail with reference to the drawings. However, the specific configuration of the present invention is not limited to this embodiment, and the design can be changed within a range not departing from the gist of the present invention. The present invention is also included in the present invention.

【0029】[0029]

【発明の効果】以上のように本発明によれば、締結工具
の使用個数を多くすることなく、建物ユニットの柱を下
部構造体に固定したことの確認性を向上することができ
る。
As described above, according to the present invention, it is possible to improve the confirmation that the pillar of the building unit is fixed to the lower structure without increasing the number of fastening tools used.

【図面の簡単な説明】[Brief description of the drawings]

【図1】図1はユニット建物の据付け過程を示す模式図
である。
FIG. 1 is a schematic diagram showing an installation process of a unit building.

【図2】図2は建物ユニットを示す模式図である。FIG. 2 is a schematic diagram showing a building unit.

【図3】図3は柱の固定構造を示す模式図である。FIG. 3 is a schematic view showing a column fixing structure.

【図4】図4は柱の固定手順を示す模式図である。FIG. 4 is a schematic view showing a procedure for fixing a pillar.

【符号の説明】[Explanation of symbols]

10 ユニット建物 11、11A、11B 建物ユニット 14 柱 21 ねじ状受け具 22 ねじ状締め具 31 締結工具 32 締結部材 32A 被保持部 32B 接続部 32C 脆弱部 DESCRIPTION OF SYMBOLS 10 Unit building 11, 11A, 11B Building unit 14 Column 21 Screw-shaped receiver 22 Screw-shaped fastener 31 Fastening tool 32 Fastening member 32A Held part 32B Connection part 32C Weak part

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 下部構造体の上に建物ユニットを搭載
し、建物ユニットの柱内に挿入したねじ状締め具を下部
構造体に設けてあるねじ状受け具に螺合操作し、建物ユ
ニットの柱を下部構造体に固定する柱の固定構造におい
て、 前記ねじ状締め具が、前記螺合操作前に予め柱頭から突
出する状態で該柱頭に取着されてなることを特徴とする
柱の固定構造。
1. A building unit is mounted on a lower structure, and a screw fastener inserted into a pillar of the building unit is screwed into a screw receiver provided on the lower structure to operate the building unit. A column fixing structure for fixing a column to a lower structure, wherein the screw-like fastener is attached to the column capital in a state where the screw-shaped fastener is projected from the column capital in advance before the screwing operation. Construction.
【請求項2】 前記ねじ状締め具を螺合操作する締結工
具が締結部材を備え、 該締結部材が締結工具に保持される被保持部と、ねじ状
締め具に接続する接続部と、被保持部と接続部の間で一
定トルクにより破断する脆弱部とを有してなる請求項1
記載の柱の固定構造。
2. A fastening tool for screwing the screw fastener, comprising a fastening member, wherein the fastening member is held by the fastening tool, a connection part connected to the screw fastener, and 2. A fragile portion which is broken by a constant torque between the holding portion and the connecting portion.
The fixed structure of the pillar described.
【請求項3】 下部構造体の上に建物ユニットを搭載
し、建物ユニットの柱内に挿入したねじ状締め具を下部
構造体に設けてあるねじ状受け具に螺合操作し、建物ユ
ニットの柱を下部構造体に固定する柱の固定方法におい
て、 前記ねじ状締め具を、前記螺合操作前に予め柱頭から突
出する状態で該柱頭に取着しておき、 該ねじ状締め具を締結工具により該柱頭から柱内に挿入
し、前記ねじ状受け具に螺合し、建物ユニットの柱を下
部構造体に固定することを特徴とする柱の固定方法。
3. A building unit is mounted on a lower structure, and a screw fastener inserted into a pillar of the building unit is screwed into a screw receiver provided on the lower structure to operate the building unit. In the method for fixing a column to a lower structure, the screw-shaped fastener is attached to the column head in a state where the screw-shaped fastener is projected from the column head in advance before the screwing operation, and the screw-shaped fastener is fastened. A method for fixing a pillar, comprising inserting the pillar of the building unit to the lower structure by inserting the pillar into the pillar from the capital by means of a tool, screwing into the screw-shaped receiving member, and securing the pillar of the building unit to the lower structure.
【請求項4】 前記締結工具として、前記ねじ状締め具
に係合するとともに一定トルクで破断する締結部材を備
えたものを用い、 該締結工具がねじ状締め具をねじ状受け具に螺合する過
程で一定トルクに達したとき、上記締結部材を破断せし
める請求項3記載の柱の固定方法。
4. A fastening tool having a fastening member that engages with the threaded fastener and breaks at a constant torque as the fastening tool, and the fastening tool screws the threaded fastener into a threaded receiving member. 4. The method according to claim 3, wherein the fastening member is broken when a predetermined torque is reached during the process.
JP15665496A 1996-06-18 1996-06-18 Fixing structure of column and method therefor Pending JPH102019A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15665496A JPH102019A (en) 1996-06-18 1996-06-18 Fixing structure of column and method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15665496A JPH102019A (en) 1996-06-18 1996-06-18 Fixing structure of column and method therefor

Publications (1)

Publication Number Publication Date
JPH102019A true JPH102019A (en) 1998-01-06

Family

ID=15632387

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15665496A Pending JPH102019A (en) 1996-06-18 1996-06-18 Fixing structure of column and method therefor

Country Status (1)

Country Link
JP (1) JPH102019A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100329714B1 (en) * 1999-02-03 2002-03-21 유인균 Boxtype unit for building house
KR20190104942A (en) 2019-08-22 2019-09-11 유지씨 주식회사 Support means for fixing the dust diffusion prevention cover support and the supporting means is fixed work hanging scaffolding chair and fixed fixing means hanging scaffolding shackle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100329714B1 (en) * 1999-02-03 2002-03-21 유인균 Boxtype unit for building house
KR20190104942A (en) 2019-08-22 2019-09-11 유지씨 주식회사 Support means for fixing the dust diffusion prevention cover support and the supporting means is fixed work hanging scaffolding chair and fixed fixing means hanging scaffolding shackle

Similar Documents

Publication Publication Date Title
KR19990028448A (en) Building unit, unit building and construction method
US7987948B2 (en) Length adjustable passenger handle assembly for elevator
JPH102019A (en) Fixing structure of column and method therefor
JPH1136451A (en) Method and structure for installing unit
JPH04213664A (en) Connecting device for structure made of stone material or the like
JPH03191143A (en) Setting plate of house unit
JP3792346B2 (en) Column fixing structure and method
JP3465867B2 (en) Hole down fitting
JP2587649Y2 (en) Pillar fixtures such as handrails
JPH1088582A (en) Fastening tool for column and its method
JP2003138654A (en) Unit building
JPH11269999A (en) Fixing method of column and building unit
JPH0353544Y2 (en)
JPH031529Y2 (en)
JPH0849389A (en) Mounting structure of external wall panel
JPH0220778B2 (en)
JP2000303550A (en) Construction method for prefabricated house
JPH04213645A (en) Fitting structure of external wall panel
JPH09317068A (en) Panel mounting structure
JPH07158241A (en) Floor panel supporting column
JP2000120180A (en) Joining bolt for construction, panel, building unit, unitized building, and method for constructing panel
JPH053502B2 (en)
JP2001059298A (en) Fitting structure of external wall panel
JPH0681404A (en) Structure for installing unit box of unit construction building
JPH053498U (en) External wall panel mounting jig