- Publication number
- JPH10186080A JPH10186080A JP8350962A JP35096296A JPH10186080A JP H10186080 A JPH10186080 A JP H10186080A JP 8350962 A JP8350962 A JP 8350962A JP 35096296 A JP35096296 A JP 35096296A JP H10186080 A JPH10186080 A JP H10186080A
- Authority
- JP
- Japan
- Prior art keywords
- jet pump
- clamp device
- pump clamp
- riser pipe
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Jet Pumps And Other Pumps (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、沸騰水型原子炉
(BWR)の原子炉圧力容器内に設置されたジェットポ
ンプのライザー管と、このライザー管に連結されたサー
マルスリーブとの溶接部に生じる流体振動による応力を
低減するために使用するジェットポンプクランプ装置お
よびその取扱装置に関する。The present invention relates to a weld between a riser pipe of a jet pump installed in a reactor pressure vessel of a boiling water reactor (BWR) and a thermal sleeve connected to the riser pipe. The present invention relates to a jet pump clamp device used for reducing stress caused by generated fluid vibration and a handling device thereof.
【0002】[0002]
【従来の技術】従来、BWRでは出力密度を大きくする
ために原子炉圧力容器外部に設置した再循環ポンプと原
子炉圧力容器内部に設けたジェットポンプとを組合せ
た、いわゆるジェットポンプシステムが採用されてい
る。以下、このジェットポンプシステムを採用したBW
Rのジェットポンプについて説明する。2. Description of the Related Art Conventionally, a BWR employs a so-called jet pump system in which a recirculation pump installed outside a reactor pressure vessel and a jet pump installed inside the reactor pressure vessel are combined to increase the power density. ing. Hereinafter, BW using this jet pump system
The R jet pump will be described.
【0003】図16および図17を参照して従来例を説
明する。図16はBWRの概略構成を示す縦断面図であ
る。図16に示すように、原子炉圧力容器1内には冷却
材2および炉心3が収容されており、この炉心3は図示
しない複数の燃料集合体および制御棒などから構成さ
れ、炉心シュラウド10内に収容されている。A conventional example will be described with reference to FIGS. FIG. 16 is a longitudinal sectional view showing a schematic configuration of the BWR. As shown in FIG. 16, a coolant 2 and a reactor core 3 are accommodated in a reactor pressure vessel 1. The reactor core 3 is composed of a plurality of fuel assemblies and control rods (not shown). Is housed in
【0004】冷却材2は、炉心3を上方に向かって流通
し、その際炉心3の核反応熱により昇温されて水と蒸気
との二相流状態となる。この二相流状態となった冷却材
2は、炉心3の上方に設置された気水分離器4内に流入
し、そこで水と蒸気とに分離される。このうち、蒸気は
気水分離器4の上方に設置された蒸気乾燥器5内に導入
され、乾燥蒸気となる。[0004] The coolant 2 flows upward through the reactor core 3, and at this time, the temperature thereof is increased by the nuclear reaction heat of the reactor core 3, and a two-phase flow of water and steam is formed. The coolant 2 in the two-phase flow state flows into the steam separator 4 installed above the reactor core 3, where it is separated into water and steam. Of these, the steam is introduced into a steam dryer 5 installed above the steam separator 4, and becomes dry steam.
【0005】この乾燥蒸気は、原子炉圧力容器1に接続
された主蒸気管6を介して図示しない蒸気タービンに移
送され、発電に供される。一方、分離された水は炉心3
と原子炉圧力容器1との間のダウンカマ部7を流れて炉
心3の下方に流下する。炉心3の下方には制御棒案内管
8が設置されており、この制御棒案内管8を介して制御
棒が炉心3内に挿入または引抜きされる。また、制御棒
案内管8の下方には制御棒駆動機構9が設置されてお
り、この制御棒駆動機構9により制御棒の炉心3への挿
入や引抜きが制御される。[0005] The dried steam is transferred to a steam turbine (not shown) via a main steam pipe 6 connected to the reactor pressure vessel 1 and is used for power generation. On the other hand, the separated water is
The gas flows through the downcomer portion 7 between the reactor and the reactor pressure vessel 1 and flows down below the reactor core 3. A control rod guide tube 8 is provided below the core 3, and a control rod is inserted into or pulled out of the core 3 via the control rod guide tube 8. A control rod drive mechanism 9 is provided below the control rod guide tube 8, and the control rod drive mechanism 9 controls the insertion and withdrawal of control rods into and from the reactor core 3.
【0006】ダウンカマ部7内には、ジェットポンプ1
1が周方向に等間隔で複数設置されている一方、原子炉
圧力容器1の外部には、図示しない再循環ポンプが設置
されており、この再循環ポンプ,ジェットポンプ11,
およびこれら両者間に配設された再循環配管により、再
循環系が構成されている。そして、再循環ポンプにより
ジェットポンプ11に駆動水が供給され、このジェット
ポンプ11の作用により冷却材2が炉心3内に強制循環
される。In the downcomer section 7, a jet pump 1 is provided.
1 are installed at equal intervals in the circumferential direction, while a recirculation pump (not shown) is installed outside the reactor pressure vessel 1.
A recirculation system is constituted by the recirculation piping disposed between the two. Driving water is supplied to the jet pump 11 by the recirculation pump, and the coolant 2 is forcibly circulated into the core 3 by the action of the jet pump 11.
【0007】ジェットポンプ11は、図17に図16の
要部を拡大して示すようにライザー管12を有し、この
ライザー管12は原子炉圧力容器1に固着されており、
再循環ポンプの再循環入口ノズル13から供給された冷
却材2を炉内に導入する。ライザー管12の上部には、
トランジションピース14を介して一対のエルボ15
(15A,15B)が接続されている。[0007] The jet pump 11 has a riser tube 12 as shown in FIG. 17 in which the main part of FIG. 16 is enlarged, and this riser tube 12 is fixed to the reactor pressure vessel 1.
The coolant 2 supplied from the recirculation inlet nozzle 13 of the recirculation pump is introduced into the furnace. In the upper part of the riser tube 12,
A pair of elbows 15 via the transition piece 14
(15A, 15B) are connected.
【0008】これらエルボ15A,15Bには、それぞ
れ一対の混合ノズル16(16A,16B)を介して一
対のインレットスロート17(17A,17B)が接続
されている。この一対のインレットスロート17A,1
7Bには、それぞれディフューザ18(18A,18
B)が接続されている。A pair of inlet throats 17 (17A, 17B) are connected to the elbows 15A, 15B via a pair of mixing nozzles 16 (16A, 16B). This pair of inlet throats 17A, 1
7B includes diffusers 18 (18A, 18A), respectively.
B) is connected.
【0009】そして、混合ノズル16A,16Bにより
冷却材2が噴射され、その際周囲から炉水が巻き込ま
れ、この噴射された冷却材2および巻き込まれた水は、
インレットスロート17A,17B内でそれぞれ混合さ
れる。その後、ディフューザ18A,18Bにより静水
頭の回復がなされる。[0009] The coolant 2 is injected by the mixing nozzles 16A and 16B. At that time, the reactor water is entrained from the surroundings, and the injected coolant 2 and the entrained water are
They are mixed in the inlet throats 17A and 17B, respectively. Thereafter, the hydrostatic head is restored by the diffusers 18A and 18B.
【0010】ところで、上記の構成において、再循環ポ
ンプから送り込まれる冷却材の流れにより、流体振動が
発生する。この流体振動に対処するためにライザー管1
2は前述したようにその下端を再循環入口ノズル13に
溶着されており、上端はライザブレース20を介して原
子炉圧力容器1に固定されている。By the way, in the above configuration, fluid vibration is generated by the flow of the coolant sent from the recirculation pump. In order to cope with this fluid vibration, riser pipe 1
As described above, the lower end 2 is welded to the recirculation inlet nozzle 13, and the upper end is fixed to the reactor pressure vessel 1 via the riser brace 20.
【0011】また、インレットスロート17A,17B
は、上述したようにその上端を混合ノズル16A,16
B、およびベンドを介してトランジションピース14に
機械的に接続されるとともに、その下端はディフューザ
18A,18Bの上端に挿入されている。このようにラ
イザー管12およびインレットスロート17A,17B
は、ともに流体振動に十分対処可能に構成されている。Also, inlet throats 17A and 17B
As described above, the upper ends thereof are mixed nozzles 16A and 16A.
B, and mechanically connected to the transition piece 14 via the bend, the lower end of which is inserted into the upper ends of the diffusers 18A, 18B. Thus, the riser tube 12 and the inlet throats 17A, 17B
Are configured to sufficiently cope with fluid vibration.
【0012】次いで、混合ノズル16A,16Bの上方
の構成について説明すると、トランジションピース14
の両側には、一対の耳部21がそれぞれ形成されてお
り、これらの耳部21は上方に突出し、その上端部の内
側には溝部22が形成されている。この溝部22には、
長さ方向中央部に沿って増大する長方形断面を有する一
対のジェットポンプビーム23が両端部を溝部22に嵌
合して固定されている。Next, the configuration above the mixing nozzles 16A and 16B will be described.
A pair of ears 21 is formed on both sides of the head, and these ears 21 project upward, and a groove 22 is formed inside the upper end thereof. In this groove 22,
A pair of jet pump beams 23 having a rectangular cross section that increases along the center in the length direction are fixed by fitting both ends to the groove 22.
【0013】ジェットポンプビーム23の中央には、鉛
直方向に図示しないねじ穴が形成されており、このねじ
穴にはヘッドボルト24が螺合している。このヘッドボ
ルト24の上端には六角頭が形成されており、また下端
には半丸頭が形成されている。一方、エルボ15A,1
5Bには、上端面が水平な台座部(図示せず)が形成さ
れており、この台座部には座ぐり穴(図示せず)が形成
されている。この座ぐり穴内には球面座金を介してヘッ
ドボルト24の半丸頭が嵌合している。At the center of the jet pump beam 23, a screw hole (not shown) is formed in a vertical direction, and a head bolt 24 is screwed into the screw hole. A hexagonal head is formed at the upper end of the head bolt 24, and a semi-round head is formed at the lower end. On the other hand, elbows 15A, 1
5B, a pedestal portion (not shown) having a horizontal upper end surface is formed, and a counterbore (not shown) is formed in this pedestal portion. The semi-round head of the head bolt 24 is fitted into the counterbore via a spherical washer.
【0014】なお、インレットスロート17A,17B
は原子炉圧力容器1に固着されていないため、その上端
部およびエルボ15A,15Bにはライザー管12を介
して供給される駆動水の流入水圧が作用する。また、エ
ルボ15A,15Bの他端に接続する図示しないノズル
からディフューザ18A,18B内に向かって噴出され
る駆動水の噴出水圧などの反力が上向きに作用する。こ
の荷重に対向するためにヘッドボルト24がジェットポ
ンプビーム23に螺合されている。The inlet throats 17A and 17B
Is not fixed to the reactor pressure vessel 1, the inflow pressure of the driving water supplied via the riser pipe 12 acts on the upper end and the elbows 15 </ b> A and 15 </ b> B. In addition, a reaction force such as a jet pressure of driving water jetted from the nozzle (not shown) connected to the other ends of the elbows 15A and 15B into the diffusers 18A and 18B acts upward. A head bolt 24 is screwed to the jet pump beam 23 to oppose this load.
【0015】なお、耳部21が定位置に固定されている
ので、ヘッドボルト24を螺合していくと、ジェットポ
ンプビーム23の上方に移動させられ、その両端は溝部
22の上壁面に当接した状態となる。これにより、上向
きの荷重を受ける。Since the ear portion 21 is fixed at a fixed position, when the head bolt 24 is screwed, the head bolt 24 is moved above the jet pump beam 23, and both ends thereof contact the upper wall surface of the groove portion 22. It will be in contact. Thereby, an upward load is received.
【0016】これとは逆に、エルボ15A,15Bの上
端部には、ヘッドボルト24を介して下向きの荷重が加
わり、その大きさは駆動水の反力などによる上向きの荷
重との関連により決定される。ヘッドボルト24の六角
頭にはキーパ(図示せず)が着脱自在に嵌合している。
このキーパは支持板(図示せず)上に点溶接により固着
されている。この支持板は四角形をなしており、2本の
ボルトによりジェットポンプビーム23の上面に固定さ
れている。Conversely, a downward load is applied to the upper ends of the elbows 15A and 15B via the head bolts 24, and the magnitude thereof is determined in relation to an upward load due to the reaction force of the driving water. Is done. A keeper (not shown) is detachably fitted to the hexagonal head of the head bolt 24.
The keeper is fixed on a support plate (not shown) by spot welding. This support plate has a rectangular shape and is fixed to the upper surface of the jet pump beam 23 with two bolts.
【0017】インレットスロート17A,17Bは、ラ
イザー管12に固着したライザーブランケット25に取
り付けられている。また、ディフューザ18A,18B
は、原子炉圧力容器1に溶着されているシュラウドサポ
ート(バッフルプレート)26に固定されている。The inlet throats 17A and 17B are attached to a riser blanket 25 fixed to the riser tube 12. Diffusers 18A and 18B
Are fixed to a shroud support (baffle plate) 26 welded to the reactor pressure vessel 1.
【0018】ジェットポンプ11は、冷却材を循環させ
るために他の機器に比較して厳しい状況下で使用され
る。そのため、各部材には大きな負荷が作用し、特にラ
イザー管12をその中間にて支持するライザーブレース
20には厳しい応力が作用することになる。The jet pump 11 is used under a severe condition to circulate the coolant, as compared with other devices. Therefore, a large load acts on each member, and severe stress acts particularly on the riser brace 20 that supports the riser tube 12 in the middle.
【0019】ライザーブレース20は、ライザー管12
に発生する原子炉運転中の流体振動を抑制するととも
に、炭素鋼である原子炉圧力容器1とオーステナイト系
ステンレス鋼製であるライザー管12との間の熱膨張差
を吸収する。したがって、原子炉運転中には、上記熱膨
張差を吸収した状態で変形状態にある。The riser brace 20 is connected to the riser tube 12.
Of the fluid vibration during the operation of the reactor during the operation of the reactor, and absorbs the difference in thermal expansion between the reactor pressure vessel 1 made of carbon steel and the riser pipe 12 made of austenitic stainless steel. Therefore, during the operation of the reactor, the reactor is in a deformed state while absorbing the difference in thermal expansion.
【0020】ところで、原子力プラントの出力制御を行
う上で、通常運転中のジェットポンプ流量を測定するこ
とは重要であり、このためディフューザ18A,18B
の上下部に測定用配管19を設けて、運転中のディフュ
ーザ18の上下部の静圧差を測定し、この測定値をプラ
ント使用前に測定した較正値とによりジェットポンプ流
量を算出している。In controlling the output of a nuclear power plant, it is important to measure the flow rate of the jet pump during normal operation. For this reason, the diffusers 18A, 18B
A measuring pipe 19 is provided in the upper and lower portions of the diffuser 18 to measure a static pressure difference between the upper and lower portions of the diffuser 18 during operation, and a jet pump flow rate is calculated based on the measured value and a calibration value measured before using the plant.
【0021】この測定用配管19はディフューザ18の
上下部の静圧孔に溶接され、ディフューザ18に固着さ
れているサポート27により溶接支持され、さらにジェ
ットポンプ11の下部において複雑な状態で配置され、
ジェットポンプ計測用ノズルを経て炉外配管と接続され
ている。The measuring pipe 19 is welded to the static pressure holes at the upper and lower portions of the diffuser 18, is welded and supported by a support 27 fixed to the diffuser 18, and is arranged in a complicated state below the jet pump 11.
It is connected to the piping outside the furnace via a nozzle for jet pump measurement.
【0022】このジェットポンプ計測用ノズルは、原子
炉圧力容器1に対象位置に2箇所設けられている。この
ような構成のジェットポンプ11は、再循環ポンプから
送り込まれる冷却時の流れにより、他の機器に比較して
厳しい条件下で使用される。このため、各部材には大き
な負荷が作用し、流体振動の影響を受け、厳しい応力が
作用することとなり、したがって配管破断を生じること
が十分予想される。The nozzles for measuring the jet pump are provided at two target positions in the reactor pressure vessel 1. The jet pump 11 having such a configuration is used under severe conditions compared to other devices due to the flow at the time of cooling sent from the recirculation pump. For this reason, a large load acts on each member, which is affected by the fluid vibration, and a severe stress acts. Therefore, it is sufficiently expected that pipe breakage will occur.
【0023】[0023]
【発明が解決しようとする課題】ところで、上記の構成
において、例えばジェットポンプシステムの本体や溶接
部などに何等かの原因によってクラックや破断が生じた
場合、その補修作業は高放射線管理区域である炉心真上
から遠隔で行う必要がある。したがって、その配管部へ
の接近は極めて困難である。In the above structure, if a crack or a break occurs in the jet pump system body or a welded portion due to any cause, the repair work is performed in a high radiation control area. It needs to be performed remotely from directly above the core. Therefore, it is extremely difficult to access the piping.
【0024】このように破損したジェットポンプ11の
補修手段としては、溶接により行うことが考えられる
が、その補修作業は一般に水中での作業となるため、補
修装置として大掛かりなものが必要になり、かつ長期間
の工事になる課題がある。As a repairing means for the jet pump 11 broken as described above, welding can be considered. However, since the repairing work is generally performed underwater, a large-scale repairing device is required. There is also a problem of long-term construction.
【0025】また、これらの工事を放置しておくと、一
段と進行してジェットポンプ11に亀裂が生じたりする
可能性があり、原子炉の出力を制御するジェットポンプ
11がそのような状態になることは、他の構造物に悪影
響を与えることも考えられ、好ましくないという課題が
ある。Also, if these works are left unchecked, there is a possibility that the jet pump 11 will progress further and cracks will occur, and the jet pump 11 for controlling the output of the nuclear reactor will be in such a state. This may adversely affect other structures, which is not preferable.
【0026】本発明は上述した事情を考慮してなされた
もので、ジェットポンプのライザー管の下部とこのライ
ザー管に連結されたサーマルスリーブとの溶接部に生じ
る流体振動による応力を低減可能なジェットポンプクラ
ンプ装置を提供することを目的とする。The present invention has been made in view of the above-described circumstances, and is directed to a jet pump capable of reducing stress caused by fluid vibration generated at a weld between a lower portion of a riser pipe of a jet pump and a thermal sleeve connected to the riser pipe. It is an object to provide a pump clamp device.
【0027】また、本発明の他の目的とするところは、
ジェットポンプのライザー管の下部とサーマルスリーブ
との溶接部にジェットポンプクランプ装置を容易に装着
することのできるジェットポンプクランプ装置の取扱装
置を提供することにある。Another object of the present invention is as follows.
An object of the present invention is to provide a handling device for a jet pump clamp device that can easily attach the jet pump clamp device to a weld between a lower portion of a riser pipe of a jet pump and a thermal sleeve.
【0028】[0028]
【課題を解決するための手段】上述した課題を解決する
ために、本発明の請求項1は、原子炉圧力容器内に設置
されたジェットポンプのライザー管の溶接部に生じる流
体振動による応力を低減するためのジェットポンプクラ
ンプ装置において、前記ライザー管の下部とこのライザ
ー管に連結されたサーマルスリーブとの溶接部の外周に
当接する2分割リングと、この2分割リングの一方に係
合凹部を形成するとともにその他方に前記係合凹部に係
合する係合凸部を形成した開閉用ガイド部と、この開閉
用ガイド部に取り付けられ前記2分割リングを開閉させ
る締付けボルトとを備えたことを特徴とする。In order to solve the above-mentioned problems, a first aspect of the present invention is to reduce a stress caused by fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel. In a jet pump clamp device for reducing the pressure, a two-part ring abutting on the outer periphery of a welded portion between the lower part of the riser pipe and a thermal sleeve connected to the riser pipe, and an engagement recess in one of the two-part rings An opening / closing guide formed on the other side and having an engaging projection engaged with the engaging recess; and a tightening bolt attached to the opening / closing guide for opening and closing the two-piece ring. Features.
【0029】請求項2は、請求項1記載の2分割リング
の開口部が、ライザー管の下部の外周面と同一形状に形
成されたことを特徴とする。A second aspect of the present invention is characterized in that the opening of the two-piece ring according to the first aspect is formed in the same shape as the outer peripheral surface of the lower portion of the riser tube.
【0030】請求項3は、原子炉圧力容器内に設置され
たジェットポンプのライザー管の溶接部に生じる流体振
動による応力を低減するためのジェットポンプクランプ
装置において、前記ライザー管と前記原子炉圧力容器の
炉心シュラウドとの間に介挿される上部プレートと、こ
の上部プレートを前記ライザー管と前記炉心シュラウド
との間に圧接させる押付け部材とを備えたことを特徴と
する。A third aspect of the present invention relates to a jet pump clamp apparatus for reducing stress caused by fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel. An upper plate inserted between the core shroud of the vessel and a pressing member for pressing the upper plate between the riser tube and the core shroud are provided.
【0031】請求項4は、請求項3記載のジェットポン
プクランプ装置において、上部プレートにそれぞれピン
により一端が結合された複数の長尺ロッドと、これらの
長尺ロッドの他端にそれぞれピンにより結合されジェッ
トポンプのバッフルプレートに支持される下部プレート
とを有し、前記上部プレート,複数の長尺ロッドおよび
下部プレートにて平行リンク機構を構成したことを特徴
とする。According to a fourth aspect of the present invention, there is provided the jet pump clamping apparatus according to the third aspect, wherein a plurality of long rods each having one end connected to the upper plate by a pin, and the other end of each of the long rods being connected to each other by a pin. And a lower plate supported by a baffle plate of the jet pump, wherein the upper plate, a plurality of long rods and the lower plate constitute a parallel link mechanism.
【0032】請求項5は、請求項3または4記載のジェ
ットポンプクランプ装置において、上部プレートと複数
の長尺ロッドとを結合するピンに、平行リンク機構が閉
じた際、その閉じ加減を制限するストッパを設けたこと
を特徴とする。According to a fifth aspect of the present invention, in the jet pump clamp device according to the third or fourth aspect, when the parallel link mechanism is closed by the pin connecting the upper plate and the plurality of long rods, the closing adjustment is limited. A stopper is provided.
【0033】請求項6は、請求項3または4記載のジェ
ットポンプクランプ装置において、上部プレートに吊り
耳が取り付けられ、この吊り耳を吊り上げた際に平行リ
ンク機構が自重で閉じる一方、前記吊り耳を吊り下げて
下部プレートがバッフルプレートに着座した際に前記平
行リンク機構が開くように構成したことを特徴とする。According to a sixth aspect of the present invention, in the jet pump clamp device according to the third or fourth aspect, a hanging ear is attached to the upper plate, and when the hanging ear is lifted, the parallel link mechanism is closed by its own weight while the hanging ear is closed. And the parallel link mechanism is opened when the lower plate is seated on the baffle plate by suspending the lower plate.
【0034】請求項7は、請求項4記載のジェットポン
プクランプ装置において、複数の長尺ロッドの軸方向中
間部にサポートを少なくとも一つ設け、このサポートを
介して前記複数の長尺ロッドを原子炉圧力容器の炉心シ
ュラウドで支持したことを特徴とする。According to a seventh aspect of the present invention, in the jet pump clamp apparatus according to the fourth aspect, at least one support is provided at an axially intermediate portion of the plurality of long rods, and the plurality of long rods are atomized through the support. The furnace pressure vessel is supported by a core shroud.
【0035】請求項8は、原子炉圧力容器内に設置され
たジェットポンプのライザー管の溶接部に生じる流体振
動による応力を低減するためのジェットポンプクランプ
装置において、前記ライザー管の下部とこのライザー管
に連結されたサーマルスリーブとの溶接部の外周に当接
する2分割リングと、この2分割リングの一方に係合凹
部を形成するとともにその他方に前記係合凹部に係合す
る係合凸部を形成した開閉用ガイド部と、この開閉用ガ
イド部に取り付けられ前記2分割リングを開閉させる締
付けボルトと、前記ライザー管と前記原子炉圧力容器の
炉心シュラウドとの間に介挿される上部プレートと、こ
の上部プレートを前記ライザー管と前記炉心シュラウド
との間に圧接させる押付け部材と、前記2分割リングと
前記上部プレートとを連結する連結アームとを備えたこ
とを特徴とする。In a jet pump clamping apparatus for reducing stress caused by fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel, a lower portion of the riser pipe and this riser are provided. A two-part ring abutting on the outer periphery of the welded portion with the thermal sleeve connected to the pipe; and an engaging projection that forms an engagement recess on one of the two rings and engages the engagement recess on the other side An opening / closing guide portion, a tightening bolt attached to the opening / closing guide portion for opening and closing the two-piece ring, and an upper plate interposed between the riser tube and a core shroud of the reactor pressure vessel. A pressing member for pressing the upper plate between the riser tube and the core shroud, the two-part ring and the upper plate Characterized in that a connecting arm for connecting.
【0036】請求項9は、原子炉圧力容器内に設置され
たジェットポンプのライザー管の溶接部に生じる流体振
動による応力を低減するためのジェットポンプクランプ
装置において、前記ライザー管と前記原子炉圧力容器の
炉心シュラウドとの間に介挿される支持ブロックと、こ
の支持ブロックに締付けボルトを介して取り付けられこ
の締付けボルトの締付けにて前記支持ブロックを前記ラ
イザー管と前記炉心シュラウドとの間に圧接させる押付
け用楔とを備えたことを特徴とする。A ninth aspect of the present invention is directed to a jet pump clamp apparatus for reducing a stress caused by fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel. A support block interposed between the core shroud of the container and a support bolt attached to the support block via a tightening bolt to press the support block between the riser tube and the core shroud by tightening the tightening bolt; And a pressing wedge.
【0037】請求項10は、請求項9記載のジェットポ
ンプクランプ装置において、支持ブロックにライザー管
を把持する把持レバーを設けたことを特徴とする。According to a tenth aspect, in the jet pump clamp device according to the ninth aspect, a grip lever for gripping the riser pipe is provided on the support block.
【0038】請求項11のジェットポンプクランプ装置
の取扱装置は、原子炉圧力容器内に設置されたジェット
ポンプのライザー管の溶接部に生じる流体振動による応
力を低減するジェットポンプクランプ装置を取り扱うジ
ェットポンプクランプ装置の取扱装置であって、前記ラ
イザー管の下部とこのライザー管に連結されたサーマル
スリーブとの溶接部の外周に当接可能な2分割リングを
開いた状態で保持する保持部材と、この保持部材に設け
られ前記保持部材を旋回させる旋回駆動手段と、この旋
回駆動手段に取り付けられた吊り板と、前記保持部材に
設けられ前記2分割リングを押し出す押出し駆動手段と
を備えたことを特徴とする。According to a eleventh aspect of the present invention, there is provided a jet pump clamping apparatus for handling a jet pump clamp apparatus for reducing stress caused by fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel. A handling device for a clamping device, comprising: a holding member that holds an open state of a two-part ring that can abut on an outer periphery of a welded portion between a lower portion of the riser tube and a thermal sleeve connected to the riser tube; A swing drive unit provided on the holding member for rotating the holding member; a suspension plate attached to the swing drive unit; and an extrusion drive unit provided on the holding member and extruding the two-piece ring. And
【0039】[0039]
【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて説明する。Embodiments of the present invention will be described below with reference to the drawings.
【0040】図1は本発明に係るジェットポンプクラン
プ装置の第1実施形態を示す断面図、図2は図1のA−
A線断面図、図3は図1のB−B線断面図である。な
お、原子炉圧力容器およびジェットポンプの構成は図1
6および図17と同様であるので、同一の符号を用いて
説明する。FIG. 1 is a sectional view showing a first embodiment of a jet pump clamp device according to the present invention, and FIG.
FIG. 3 is a sectional view taken along line A-B of FIG. 1. The structures of the reactor pressure vessel and the jet pump are shown in FIG.
6 and FIG. 17, and the description will be made using the same reference numerals.
【0041】本発明に係るジェットポンプクランプ装置
は、原子炉圧力容器1内に設置されたジェットポンプ1
1のライザー管12下部のエルボ28とこのエルボ28
に連結されたサーマルスリーブ29との溶接部に生じる
流体振動による応力を低減するためのものである。The jet pump clamp device according to the present invention is a jet pump clamp device installed in a reactor pressure vessel 1.
The elbow 28 at the lower part of the riser tube 12 and the elbow 28
This is to reduce stress due to fluid vibration generated at a welded portion with the thermal sleeve 29 connected to the thermal sleeve 29.
【0042】図1に示すように、第1実施形態ではライ
ザー管12と原子炉圧力容器1の炉心シュラウド10と
の間に介挿され、ライザー管12の振動を防止するため
の平行リンク機構30と、ライザー管12下部のエルボ
28とサーマルスリーブ29との溶接部の外周に当接
し、この溶接部に生じる流体振動による応力を低減する
ための2分割リング50とがそれぞれ単独でジェットポ
ンプクランプ装置を構成している。As shown in FIG. 1, in the first embodiment, a parallel link mechanism 30 inserted between the riser pipe 12 and the core shroud 10 of the reactor pressure vessel 1 to prevent the riser pipe 12 from vibrating. And a two-part ring 50 that abuts on the outer periphery of the weld between the elbow 28 and the thermal sleeve 29 at the lower part of the riser pipe 12 and reduces the stress caused by fluid vibration generated at this weld. Is composed.
【0043】平行リンク機構30は、ライザー管12と
炉心シュラウド10との間に介挿される上部プレート3
1と、この上部プレート31にそれぞれピン32により
一端が結合された複数(4本)の長尺ロッド33と、こ
れらの長尺ロッド33の他端にそれぞれピン34により
結合されジェットポンプ11のバッフルプレート26に
支持される下部プレート35とから構成されている。The parallel link mechanism 30 is connected to the upper plate 3 inserted between the riser tube 12 and the core shroud 10.
1, a plurality of (four) long rods 33 each having one end connected to the upper plate 31 by a pin 32, and a baffle of the jet pump 11 connected to the other end of each of the long rods 33 by a pin 34. And a lower plate 35 supported by the plate 26.
【0044】上部プレート31は、図2に示すように一
側面にライザー管12と同一の曲率半径の円弧面部36
が形成され、この円弧面部36からライザー管12に押
付け部材としてのばね37が3つ突出するように設けら
れ、これらのばね37がライザー管12を押圧すること
により、上部プレート31をライザー管12の外周面と
炉心シュラウド10の外壁面との間に圧接させ、ライザ
ー管12下部のエルボ28の水平方向の荷重を保持し、
ライザー管12および炉心シュラウド10の熱膨張を吸
収するとともに、衝撃を緩和している。As shown in FIG. 2, the upper plate 31 has an arcuate surface portion 36 having the same radius of curvature as the riser tube 12 on one side surface.
Are formed so that three springs 37 as pressing members protrude from the arc surface portion 36 to the riser tube 12, and these springs 37 press the riser tube 12, thereby causing the upper plate 31 to move the riser tube 12. Between the outer peripheral surface of the core shroud 10 and the outer wall surface of the core shroud 10 to maintain the horizontal load of the elbow 28 below the riser tube 12;
The thermal expansion of the riser tube 12 and the core shroud 10 is absorbed, and the impact is reduced.
【0045】また、上部プレート31には、上記のよう
に4本のピン32によりそれぞれ長尺ロッド33一端が
回転可能に結合され、この4本のピン32のうち2本の
ピン38は平行リンク機構30が閉じた際、その閉じ加
減を制限するストッパとしての機能を備えている。As described above, one end of the long rod 33 is rotatably connected to the upper plate 31 by the four pins 32, and two pins 38 of the four pins 32 are parallel links. When the mechanism 30 is closed, it has a function as a stopper for limiting the degree of closing.
【0046】さらに、上部プレート31は、長手方向両
端部近傍にそれぞれ吊り耳39が取り付けられ、この吊
り耳39を吊り上げた際に平行リンク機構30は自重で
閉じる一方、吊り耳39を吊り下げて下部プレート35
がバッフルプレート26に着座した際に平行リンク機構
30は開くように構成されている。そして、上部プレー
ト31は、2本の連結アーム40を介して後述する2分
割リング50と連結されている。Further, the upper plate 31 is provided with hanging ears 39 near both ends in the longitudinal direction. When the hanging ears 39 are lifted, the parallel link mechanism 30 is closed by its own weight, while the hanging ears 39 are hung. Lower plate 35
The parallel link mechanism 30 is configured to open when the user sits on the baffle plate 26. The upper plate 31 is connected to a later-described two-part ring 50 via two connection arms 40.
【0047】4本の長尺ロッド33は、それぞれ角柱状
に形成されるとともに、その軸方向中間部に中間サポー
ト41が図示しないピンにより結合され、この中間サポ
ート41を介して4本の長尺ロッド33を炉心シュラウ
ド10の外壁面で支持している。なお、図1では中間サ
ポート41を1つ設けたが、これに限らず複数設けるよ
うにしてもよい。Each of the four long rods 33 is formed in the shape of a prism, and an intermediate support 41 is connected to an axially intermediate portion thereof by a pin (not shown). The rod 33 is supported on the outer wall surface of the core shroud 10. Although one intermediate support 41 is provided in FIG. 1, the invention is not limited to this, and a plurality of intermediate supports 41 may be provided.
【0048】下部プレート35は、図3に示すように4
本のピン34によりそれぞれ長尺ロッド33の他端が回
転可能に結合されるとともに、略三角形状に形成されて
おり、炉心シュラウド10と同一の曲率半径の円弧面部
42と、2つの平面部43とを有し、円弧面部42が炉
心シュラウド10の外壁面に当接し、かつ2つの平面部
43がそれぞれディフューザ18に当接することで、水
平方向に移動できないように固定支持される。As shown in FIG. 3, the lower plate 35
The other ends of the long rods 33 are rotatably connected to each other by the pins 34 and are formed in a substantially triangular shape. The arc surface portions 42 have the same radius of curvature as the core shroud 10, and the two flat portions 43. When the arc surface portion 42 abuts on the outer wall surface of the core shroud 10 and the two flat portions 43 abut on the diffuser 18, they are fixedly supported so as not to move in the horizontal direction.
【0049】次に、平行リンク機構30の作用を説明す
る。Next, the operation of the parallel link mechanism 30 will be described.
【0050】上記のように構成された平行リンク機構3
0は、図4に示すように吊り耳39を吊り上げることに
より、自重で菱形に閉じた状態となり炉心シュラウド1
0とディフューザ18との間を挿通しつつ徐々に吊り下
ろされ、下部プレート35がバッフルプレート26に着
座した際に平行リンク機構30が図1に示すように開
く。The parallel link mechanism 3 configured as described above
The core shroud 1 is closed in a diamond shape by its own weight by lifting the lifting ear 39 as shown in FIG.
When the lower plate 35 is seated on the baffle plate 26, the parallel link mechanism 30 is opened as shown in FIG.
【0051】これにより、下部プレート35が水平の状
態となって炉心シュラウド10の外壁面に円弧面部42
が当接し、かつディフューザ18に2つの平面部43が
当接して固定支持される一方、上部プレート31も水平
の状態となって3つのばね37によりライザー管12の
外周面と炉心シュラウド10の外壁面との間に圧接され
る。同様に、中間サポート41も水平の状態となって4
本の長尺ロッド33を炉心シュラウド10の外壁面で支
持する。As a result, the lower plate 35 is in a horizontal state, and the outer wall surface of the core shroud 10
And the two flat portions 43 abut against the diffuser 18 and are fixed and supported. On the other hand, the upper plate 31 is also in a horizontal state, and the outer peripheral surface of the riser tube 12 and the outside of the core shroud 10 are moved by three springs 37. It is pressed against the wall. Similarly, the intermediate support 41 is in a horizontal state and
The long rods 33 are supported on the outer wall surface of the core shroud 10.
【0052】その結果、平行リンク機構30によりライ
ザー管12とサーマルスリーブ29との溶接部に生じる
流体振動を、ジェットポンプ11を据え付けた状態で水
中遠隔操作により確実かつ短時間で防止することができ
る。As a result, fluid vibration generated at the welded portion between the riser pipe 12 and the thermal sleeve 29 by the parallel link mechanism 30 can be reliably and quickly prevented by underwater remote operation with the jet pump 11 installed. .
【0053】また、上部プレート31と長尺ロッド33
とを結合するピン38が、平行リンク機構30が閉じた
際、その閉じ加減を制限するストッパとしての機能を有
するので、平行リンク機構30が閉じた場合、長尺ロッ
ド33が互いに完全に密着することがなくなり、平行リ
ンク機構30の開閉動作を円滑に行うことができる。The upper plate 31 and the long rod 33
When the parallel link mechanism 30 is closed, the long rods 33 come into close contact with each other because the pin 38 that couples the parallel link mechanism 30 has a function as a stopper that limits the degree of closing when the parallel link mechanism 30 is closed. And the opening and closing operation of the parallel link mechanism 30 can be performed smoothly.
【0054】図5および図6は2分割リング50を示し
ており、この2分割リング50は図1に示すようにライ
ザー管12下部のエルボ28とサーマルスリーブ29と
の溶接部の外周に当接し、この溶接部に生じる流体振動
による応力を低減させるためのものである。FIGS. 5 and 6 show a two-part ring 50, which comes into contact with the outer periphery of the welded portion between the elbow 28 and the thermal sleeve 29 at the lower part of the riser tube 12 as shown in FIG. The purpose of this is to reduce the stress due to the fluid vibration generated in the weld.
【0055】2分割リング50は、図5に示すように上
部リング51および下部リング52を有し、これら上部
リング51および下部リング52の一端には図6に示す
ように開閉用の上下動ガイドとなる開閉用ガイド部53
が設けられ、この開閉用ガイド部53は上部リング51
の端部に形成された係合凹部54と、この係合凹部54
に係合し下部リング52の端部に形成された係合凸部5
5とから構成されている。The two-part ring 50 has an upper ring 51 and a lower ring 52 as shown in FIG. 5, and one end of the upper ring 51 and the lower ring 52 has a vertical movement guide for opening and closing as shown in FIG. Opening and closing guide 53
The opening and closing guide 53 is provided with an upper ring 51.
And an engagement recess 54 formed at the end of the
Engaging projection 5 formed at the end of lower ring 52
And 5.
【0056】開閉用ガイド部53には、2分割リング5
0を開閉させる締付けボルト56が取り付けられ、この
締付けボルト56は軸方向略中間にフランジ57が固定
されているとともに、下部リング52に嵌着した雌ねじ
カラー58に螺合している。また、上部リング51の他
端には、開閉ブロック59が設けられ、この開閉ブロッ
ク59には締付けボルト60および緩み止めボルト61
が取り付けられている。The opening / closing guide 53 has a two-part ring 5
A tightening bolt 56 for opening and closing the bolt 0 is attached. The tightening bolt 56 has a flange 57 fixed substantially at the center in the axial direction, and is screwed to a female screw collar 58 fitted to the lower ring 52. An opening / closing block 59 is provided at the other end of the upper ring 51, and the opening / closing block 59 has a tightening bolt 60 and a locking bolt 61.
Is attached.
【0057】さらに、開閉ブロック59には、図7に示
すように締付けボルト60の上部軸62を挿入する上部
軸穴63と、緩み止めボルト61の戻し部材64を挿入
する大径穴65と、緩み止めボルト61のねじ部66を
螺合させるねじ穴67がそれぞれ形成されている。そし
て、上部リング51および下部リング52には、締付け
ボルト60のねじ部68を螺合させるねじ穴69および
70がそれぞれ形成されている。Further, the opening / closing block 59 has, as shown in FIG. 7, an upper shaft hole 63 into which the upper shaft 62 of the tightening bolt 60 is inserted, a large-diameter hole 65 into which the return member 64 of the locking bolt 61 is inserted. Screw holes 67 for screwing the screw portions 66 of the locking bolts 61 are formed. The upper ring 51 and the lower ring 52 are formed with screw holes 69 and 70 for screwing the screw portions 68 of the tightening bolts 60, respectively.
【0058】締付けボルト60の上部軸62とねじ部6
8との間には、外れ防止用フランジ71が設けられ、締
付けボルト60の上端部に設けたナット72の締付けに
より折り座金73が開閉ブロック59の上面との間に介
在される。The upper shaft 62 of the tightening bolt 60 and the screw portion 6
8 is provided with a flange 71 for preventing disengagement, and a fold washer 73 is interposed between an upper surface of the opening / closing block 59 by tightening a nut 72 provided on an upper end portion of the tightening bolt 60.
【0059】この折り座金73は、緩み止めボルト61
に形成された斜面を有する折り曲げ部材74の下降によ
って下方に折り曲げられ、この折り曲げ部により締付け
ボルト60の回転を抑制し、戻し部材64の上昇によっ
て折り座金73の折り曲げ部は反対側に折り曲げられて
戻される。なお、符号75はストッパで、緩み止めボル
ト61を緩めた場合、つまり上昇させた場合に折り曲げ
部材74の上面が当接して抜けるのを防止する。The folding washer 73 is provided with a locking bolt 61.
The bending member 74 having a slope formed at the bottom is bent downward by the downward movement, the rotation of the tightening bolt 60 is suppressed by this bent portion, and the bent portion of the folding washer 73 is bent to the opposite side by the rise of the return member 64. Will be returned. Reference numeral 75 denotes a stopper, which prevents the upper surface of the bending member 74 from coming off due to contact when the locking bolt 61 is loosened, that is, when it is raised.
【0060】一方、2分割リング50の開口部、すなわ
ち上部リング51と下部リング52とで形成される円孔
76は、ライザー管12下部のエルボ28の外周面と同
一形状に形成されており、この円孔76にはライザー管
12とサーマルスリーブ29との溶接部が係合する凹部
77が形成されている。これにより、2分割リング50
はエルボ28部分に隙間なく固定されることになる。On the other hand, the opening of the two-part ring 50, that is, the circular hole 76 formed by the upper ring 51 and the lower ring 52 is formed in the same shape as the outer peripheral surface of the elbow 28 below the riser tube 12. A concave portion 77 is formed in the circular hole 76 so that a welded portion between the riser tube 12 and the thermal sleeve 29 is engaged. Thereby, the two-part ring 50
Is fixed to the elbow 28 without any gap.
【0061】次に、2分割リング50の開閉動作を説明
する。Next, the opening and closing operation of the two-piece ring 50 will be described.
【0062】2分割リング50の開動作は、まず締付け
ボルト60を緩めて下部リング52のねじ穴70からね
じ部68を取り外した後、さらに締付けボルト60を緩
めると、上部リング51のねじ穴69に対して締付けボ
ルト60のねじ部68が上昇し、これに伴い開閉ブロッ
ク59が上昇して2分割リング50の他端に開口部が形
成される。The opening operation of the two-part ring 50 is performed by first loosening the tightening bolt 60 and removing the screw portion 68 from the screw hole 70 of the lower ring 52, and then further loosening the tightening bolt 60. Then, the screw portion 68 of the tightening bolt 60 is raised, and the opening / closing block 59 is raised accordingly, so that an opening is formed at the other end of the two-piece ring 50.
【0063】次いで、締付けボルト56を緩めて雌ねじ
カラー58から上昇させると、上部リング51が下部リ
ング52に対し離反し、2分割リング50の他端に形成
された開口部が一段と大きくなる。この場合、上部リン
グ51の係合凹部54が下部リング52の係合凸部55
に係合しているため、上部リング51は確実にガイドさ
れつつ鉛直方向に上昇移動することになる。Next, when the tightening bolt 56 is loosened and lifted from the female screw collar 58, the upper ring 51 is separated from the lower ring 52, and the opening formed at the other end of the two-part ring 50 is further increased. In this case, the engaging concave portion 54 of the upper ring 51 is
Therefore, the upper ring 51 moves upward in the vertical direction while being reliably guided.
【0064】このようにして2分割リング50をライザ
ー管12とサーマルスリーブ29との溶接部に挿入させ
ることが可能となる。その結果、ライザー管12とサー
マルスリーブ29との溶接部に生じる流体振動による応
力を著しく低減させることができる。In this manner, the two-piece ring 50 can be inserted into the weld between the riser tube 12 and the thermal sleeve 29. As a result, stress due to fluid vibration generated at the weld between the riser tube 12 and the thermal sleeve 29 can be significantly reduced.
【0065】また、2分割リング50の閉動作は、締付
けボルト56および締付けボルト60を交互に締付け、
上部リング51を下部リング52に当接させるととも
に、開閉ブロック59の下端部を下部リング52に当接
させて2分割リング50を閉じた後、緩み止めボルト6
1を締付けることにより行う。The closing operation of the two-piece ring 50 is performed by alternately tightening the tightening bolts 56 and the tightening bolts 60.
The upper ring 51 is brought into contact with the lower ring 52, and the lower end of the opening / closing block 59 is brought into contact with the lower ring 52 to close the two-part ring 50.
1 by tightening.
【0066】なお、上述した平行リンク機構30および
2分割リング50の取付順序は、いずれを先に行っても
よく、これら平行リンク機構30および2分割リング5
0を取り付けた後に、両者が連結アーム40を介して連
結される。The order of mounting the parallel link mechanism 30 and the split ring 50 described above may be any order.
After attaching 0, both are connected via the connecting arm 40.
【0067】図8および図9は本発明に係るジェットポ
ンプクランプ装置の取扱装置の一実施形態を示す正面図
および側面図である。図8および図9に示すように、ジ
ェットポンプクランプ装置の取扱装置80は、ジェット
ポンプクランプ装置としての2分割リング50を取り扱
うものである。なお、図8および図9では2分割リング
50の面が図5および図6と逆向きに示されている。FIGS. 8 and 9 are a front view and a side view, respectively, showing an embodiment of a handling device for a jet pump clamp device according to the present invention. As shown in FIGS. 8 and 9, the handling device 80 of the jet pump clamp device handles the split ring 50 as the jet pump clamp device. 8 and 9, the surface of the two-piece ring 50 is shown in the opposite direction to FIGS.
【0068】また、取扱装置80は、ライザー管12の
エルボ28とサーマルスリーブ29との溶接部の外周に
当接可能な2分割リング50を開いた状態で保持する保
持部材としての保持枠81と、この保持枠81の上部に
設けられ保持枠81を旋回させる旋回駆動手段としての
旋回用モータ82と、この旋回用モータ82に取り付け
られたポール83と、このポール83に連結された吊り
板84,85と、保持枠81の下部に設けられ2分割リ
ング50を押し出す押出し駆動手段としてのシリンダ8
6とを備えている。The handling device 80 includes a holding frame 81 serving as a holding member for holding an open state of a two-piece ring 50 that can be brought into contact with the outer periphery of the welded portion between the elbow 28 of the riser tube 12 and the thermal sleeve 29. A turning motor 82 provided on the holding frame 81 to turn the holding frame 81 as a turning drive means, a pole 83 attached to the turning motor 82, and a suspension plate 84 connected to the pole 83. , 85 and a cylinder 8 provided as a driving means for pushing out the two-piece ring 50 provided below the holding frame 81.
6 is provided.
【0069】さらに、保持枠81上部の一端には、図1
0に示すように2分割リング50に取り付けられた締付
けボルト56が挿入される切欠溝87が形成される一
方、保持枠81上部の他端には締付けボルト60が挿入
される切欠孔88および緩み止めボルト61が挿入され
る切欠孔89がそれぞれ形成されている。Further, at one end of the upper part of the holding frame 81, FIG.
As shown in FIG. 0, a notch groove 87 is formed in which the tightening bolt 56 attached to the two-piece ring 50 is inserted. Notch holes 89 into which the fixing bolts 61 are inserted are respectively formed.
【0070】また、保持枠81の下部には、図8および
図9に示すようにシリンダ86に連結された移動部材9
0が設けられ、この移動部材90上に2分割リング50
が支持される。そして、シリンダ86を駆動することに
より、移動部材90が保持枠81に対して水平方向に移
動することで、2分割リング50が押し出されることに
なる。The moving member 9 connected to the cylinder 86 as shown in FIGS.
0 on the moving member 90,
Is supported. Then, by driving the cylinder 86, the moving member 90 moves in the horizontal direction with respect to the holding frame 81, whereby the two-piece ring 50 is pushed out.
【0071】さらに、ポール83と吊り板84,85と
は、互いに3次元的に90度の角度を有して連結されて
クランク形状に形成されている。そして、吊り板85に
は吊り耳91が固定されている。Further, the pole 83 and the suspension plates 84 and 85 are three-dimensionally connected to each other at an angle of 90 degrees to form a crank shape. The hanging ears 91 are fixed to the hanging plate 85.
【0072】次に、取扱装置80の動作を説明する。Next, the operation of the handling device 80 will be described.
【0073】まず、2分割リング50が開いた状態で保
持枠81にセットされる。この状態で保持枠81を図1
1に示すようにディフューザ18近傍に吊り下ろしてい
く(一点鎖線の位置)。次いで、旋回用モータ82を駆
動させて保持枠81を旋回させ、原子炉圧力容器1の内
壁面に沿った位置(実線位置)まで移動させる。First, the two-piece ring 50 is set on the holding frame 81 in an opened state. In this state, the holding frame 81 is
As shown in FIG. 1, it is suspended near the diffuser 18 (the position indicated by the dashed line). Next, the rotation motor 82 is driven to rotate the holding frame 81 and move to a position (solid line position) along the inner wall surface of the reactor pressure vessel 1.
【0074】さらに、図8に示すようにシリンダ86を
駆動することにより、移動部材90が保持枠81に対し
て水平方向に移動することで、2分割リング50を押し
出してライザー管12に係合させる。この状態で締付け
ボルト56および締付けボルト60を締付けることによ
り、2分割リング50がライザー管12に挟み込まれ
る。Further, as shown in FIG. 8, by driving the cylinder 86, the moving member 90 moves in the horizontal direction with respect to the holding frame 81, thereby pushing out the two-piece ring 50 and engaging with the riser tube 12. Let it. By tightening the tightening bolt 56 and the tightening bolt 60 in this state, the two-part ring 50 is sandwiched between the riser tubes 12.
【0075】すると、2分割リング50が保持枠81か
ら外れることになる。すなわち、締付けボルト56およ
び締付けボルト60を締付けていくと、2分割リング5
0の上下方向の長さが保持枠81より短くなり、さらに
締付けると、締付けボルト56および締付けボルト60
も保持枠81内に納まることになる。Then, the two-part ring 50 comes off the holding frame 81. That is, when the tightening bolt 56 and the tightening bolt 60 are tightened, the two-part ring 5
0 is shorter than the holding frame 81 and further tightened, the tightening bolt 56 and the tightening bolt 60
Is also stored in the holding frame 81.
【0076】これにより、締付けボルト60は切欠孔8
8から、また締付けボルト56は切欠溝87から抜き出
されることになり、保持枠81を水平方向に移動させる
だけで外れることになる。さらに、取扱装置80だけを
回収することにより、2分割リング50をライザー管1
2に取り付けることができる。As a result, the tightening bolt 60 is inserted into the notch 8
8, the fastening bolt 56 is pulled out from the notch groove 87, and is released only by moving the holding frame 81 in the horizontal direction. Further, by collecting only the handling device 80, the two-piece ring 50 can be connected to the riser tube 1
2 can be attached.
【0077】このように取扱装置80によれば、ライザ
ー管12の下部とサーマルスリーブ29との溶接部にジ
ェットポンプクランプ装置である2分割リング50を容
易に装着することができる。As described above, according to the handling device 80, the two-part ring 50, which is a jet pump clamp device, can be easily attached to the welded portion between the lower portion of the riser tube 12 and the thermal sleeve 29.
【0078】次に、上記構成のジェットポンプクランプ
装置の作用について図12および図13に基づいて説明
する。Next, the operation of the jet pump clamp device having the above configuration will be described with reference to FIGS.
【0079】図12は第1実施形態のジェットポンプク
ランプ装置を原子炉圧力容器1内に設置する場合の吊り
下ろし状態を示す構成図である。図12に示すように、
原子炉圧力容器1内には、円筒状の炉心シュラウド10
が設置され、この炉心シュラウド10内においては、図
示しない燃料集合体の上端を支持する上部格子板100
と、図示しない燃料支持金具を介して燃料集合体の下方
を支持する炉心支持板101とが配設されている。そし
て、原子炉圧力容器1の上方には燃料交換機103が配
設されている。FIG. 12 is a configuration diagram showing a suspended state when the jet pump clamp device according to the first embodiment is installed in the reactor pressure vessel 1. As shown in FIG.
In the reactor pressure vessel 1, a cylindrical core shroud 10 is provided.
In the core shroud 10, an upper grid plate 100 supporting an upper end of a fuel assembly (not shown) is provided.
And a core support plate 101 that supports the lower portion of the fuel assembly via a fuel support (not shown). A refueling machine 103 is disposed above the reactor pressure vessel 1.
【0080】この燃料交換機103にポール取扱い機構
104を介してポール105が吊り下ろされている。す
なわち、ポール取扱い機構104は燃料交換機103に
取り付けられているホイスト106と、このホイスト1
06に巻回されているワイヤ107とからなり、このワ
イヤ107にポール接続部108を介してポール105
が接続されている。A pole 105 is suspended from the fuel exchanger 103 via a pole handling mechanism 104. That is, the pole handling mechanism 104 includes the hoist 106 attached to the fuel exchanger 103 and the hoist 1
06, and a wire 105 is connected to the wire 107 via a pole connecting portion 108.
Is connected.
【0081】ポール105は、例えば一定長さのものが
複数本、ポール継手を介して連結された構成となってお
り、このポール105の下端に上述した平行リンク機構
30または2分割リング50が接続されている。The pole 105 has, for example, a plurality of fixed lengths connected via a pole joint. The parallel link mechanism 30 or the two-piece ring 50 described above is connected to the lower end of the pole 105. Have been.
【0082】次に、第1実施形態のジェットポンプクラ
ンプ装置を固定保持する場合には、以下の順序に従って
行う。Next, when the jet pump clamp device of the first embodiment is fixedly held, it is performed in the following order.
【0083】まず、原子炉の停止後に、原子炉圧力容器
1の上蓋を取り外す、その後蒸気乾燥器およびシュラウ
ドヘッドを機器貯蔵プールに移動し、その後に作業を行
う。この場合、平行リンク機構30では図13に示すよ
うに燃料交換機103のホイスト106によりポール1
05を操作して上述したように炉心シュラウド10とラ
イザー管12との間の所定位置に設置する。First, after shutting down the reactor, the upper lid of the reactor pressure vessel 1 is removed, and then the steam dryer and the shroud head are moved to the equipment storage pool, and thereafter the work is performed. In this case, the parallel link mechanism 30 uses the hoist 106 of the fuel exchanger 103 as shown in FIG.
05 is set at a predetermined position between the core shroud 10 and the riser tube 12 as described above.
【0084】また、2分割リング50の場合は燃料交換
機103のホイスト106によりポール105を操作し
て取扱装置80の保持枠81に保持した状態でディフュ
ーザ18近傍に吊り下ろして仮設置する。以下、2分割
リング50のライザー管12への取付順序は上述した通
りである。なお、締付けボルト56,60は、ナットラ
ンナ109を下端に組み込んだポール105をホイスト
106のワイヤ107で吊り下げて操作し、ナットラン
ナ109にて締付けたり緩めたりする。さらに、平行リ
ンク機構30および2分割リング50を取り付けた後、
これらは連結アーム40により連結される。In the case of the two-piece ring 50, the pole 105 is operated by the hoist 106 of the fuel exchanger 103, and is suspended and temporarily installed near the diffuser 18 while being held on the holding frame 81 of the handling device 80. Hereinafter, the order of attaching the two-piece ring 50 to the riser tube 12 is as described above. The tightening bolts 56 and 60 are operated by suspending a pole 105 having a nut runner 109 at the lower end thereof with a wire 107 of a hoist 106, and tightening or loosening the nut 105 with the nut runner 109. Furthermore, after attaching the parallel link mechanism 30 and the split ring 50,
These are connected by a connecting arm 40.
【0085】このように第1実施形態のジェットポンプ
クランプ装置によれば、原子炉圧力容器1内に設置した
ライザー管12の下部とサーマルスリーブ29との溶接
部にに生じる流体振動による応力を低減させ、プラント
の稼働率向上を図ることができる。As described above, according to the jet pump clamp device of the first embodiment, the stress due to the fluid vibration generated at the welded portion between the lower part of the riser pipe 12 installed in the reactor pressure vessel 1 and the thermal sleeve 29 is reduced. As a result, the operation rate of the plant can be improved.
【0086】図14は本発明に係るジェットポンプクラ
ンプ装置の第2実施形態を示す断面図である。なお、前
記第1実施形態と同一の部分には同一の符号を用いて説
明する。FIG. 14 is a sectional view showing a second embodiment of the jet pump clamp device according to the present invention. The same parts as those in the first embodiment will be described using the same reference numerals.
【0087】図14に示すように、第2実施形態のジェ
ットポンプクランプ装置110は、ライザー管12と炉
心シュラウド10との間に介挿される支持ブロック11
1と、この支持ブロック111に締付けボルト112を
介して取り付けられ、この締付けボルト112の締付け
にて支持ブロック111をライザー管12と炉心シュラ
ウド10との間に圧接させる押付け用楔113とを備え
ている。As shown in FIG. 14, the jet pump clamp device 110 according to the second embodiment includes a support block 11 inserted between a riser pipe 12 and a core shroud 10.
1 and a pressing wedge 113 that is attached to the support block 111 via a tightening bolt 112 and presses the support block 111 between the riser tube 12 and the core shroud 10 by tightening the tightening bolt 112. I have.
【0088】また、支持ブロック111は、図15に示
すように平面半円状に形成され、その内周面がライザー
管12の曲率半径と略一致するよう曲率を有している。
そして、支持ブロック111の両先端には、それぞれレ
バー固定用ボルト114,114によりライザー管12
を把持する把持レバー115,115が取り付けられて
いる。この把持レバー115の曲率もライザー管12の
曲率半径と略一致するように設定されている。The support block 111 is formed in a plane semicircular shape as shown in FIG. 15, and has a curvature such that the inner peripheral surface thereof substantially matches the radius of curvature of the riser tube 12.
At both ends of the support block 111, the riser pipe 12 is fixed by lever fixing bolts 114 and 114, respectively.
Gripping levers 115, 115 for gripping are mounted. The curvature of the gripping lever 115 is also set to substantially match the radius of curvature of the riser tube 12.
【0089】次に、第2実施形態のジェットポンプクラ
ンプ装置110の作用を説明する。Next, the operation of the jet pump clamp device 110 according to the second embodiment will be described.
【0090】支持ブロック111がライザー管12と炉
心シュラウド10との間に介挿され、その後、締付けボ
ルト112を締付けて押付け用楔113を押し上げて支
持ブロック111と炉心シュラウド10との間に圧入さ
せて固定する。The support block 111 is inserted between the riser tube 12 and the core shroud 10, and then the tightening bolt 112 is tightened to push up the pressing wedge 113 to be pressed between the support block 111 and the core shroud 10. And fix it.
【0091】さらに、レバー固定用ボルト114,11
4を回転させて把持レバー115,115を閉じること
で、支持ブロック111がライザー管12に取付固定さ
れる。次に、支持ブロック111を連結アーム40を介
して2分割リング50に連結することにより、支持ブロ
ック101を確実に固定することができる。Furthermore, lever fixing bolts 114 and 11
The support block 111 is attached and fixed to the riser tube 12 by rotating the rotation lever 4 and closing the grip levers 115 and 115. Next, by connecting the support block 111 to the two-part ring 50 via the connection arm 40, the support block 101 can be securely fixed.
【0092】このように第2実施形態のジェットポンプ
クランプ装置110によれば、第1実施形態と比較して
部品点数が少なく簡単な構成で、ライザー管12の流体
振動による応力を防止することができる。As described above, according to the jet pump clamp device 110 of the second embodiment, it is possible to prevent the stress due to the fluid vibration of the riser pipe 12 with a simple configuration having a smaller number of parts as compared with the first embodiment. it can.
【0093】また、支持ブロック111の両先端に、そ
れぞれレバー固定用ボルト114,114によりライザ
ー管12を把持する把持レバー115,115を取り付
けたので、ライザー管12に支持ブロック111を一段
と強固に固定することができる。Further, since the gripping levers 115 and 115 for gripping the riser tube 12 are attached to both ends of the support block 111 by lever fixing bolts 114 and 114, respectively, the support block 111 is further firmly fixed to the riser tube 12. can do.
【0094】[0094]
【発明の効果】以上説明したように、本発明の請求項1
によれば、原子炉圧力容器内に設置されたジェットポン
プのライザー管の溶接部に生じる流体振動による応力を
低減するためのジェットポンプクランプ装置において、
ライザー管の下部とこのライザー管に連結されたサーマ
ルスリーブとの溶接部の外周に当接する2分割リング
と、この2分割リングの一方に係合凹部を形成するとと
もにその他方に係合凹部に係合する係合凸部を形成した
開閉用ガイド部と、この開閉用ガイド部に取り付けられ
2分割リングを開閉させる締付けボルトとを備えたこと
により、ジェットポンプのライザー管とサーマルスリー
ブとの溶接部に生じる流体振動を、ジェットポンプを据
え付けた状態で、水中遠隔操作により確実かつ短時間で
防止することができる。その結果、作業員の放射線被爆
量を大幅に低減させることができ、かつ原子炉の健全性
を確認することができ、原子力発電プラントの稼働率を
向上させることができる。As described above, according to the first aspect of the present invention,
According to the jet pump clamp device for reducing the stress due to fluid vibration generated in the welded portion of the riser pipe of the jet pump installed in the reactor pressure vessel,
A two-part ring abutting on the outer periphery of the welded portion between the lower part of the riser pipe and the thermal sleeve connected to the riser pipe; an engaging recess formed in one of the two split rings and engaged with the other in the other part; An opening / closing guide portion having a mating engaging projection and a tightening bolt attached to the opening / closing guide portion for opening and closing a two-piece ring, thereby providing a welded portion between the riser pipe of the jet pump and the thermal sleeve. Can be reliably and quickly prevented by underwater remote control with the jet pump installed. As a result, the radiation exposure dose of the workers can be significantly reduced, the soundness of the reactor can be confirmed, and the operation rate of the nuclear power plant can be improved.
【0095】また、2分割リングの一方に係合凹部を形
成するとともにその他方に係合凹部が形成されているの
で、2分割リングの開閉を確実に行うことができる。Further, since the engagement recess is formed on one of the two split rings and the engagement recess is formed on the other, the opening and closing of the two split rings can be reliably performed.
【0096】請求項2によれば、請求項1記載の2分割
リングの開口部が、ライザー管の下部の外周面と同一形
状に形成されたことにより、ライザー管の下部とサーマ
ルスリーブとの溶接部の外周に2分割リングを隙間なく
固定することができ、ライザー管とサーマルスリーブと
の溶接部に生じる流体振動による応力を著しく低減させ
ることができる。According to the second aspect, the opening of the split ring according to the first aspect is formed in the same shape as the outer peripheral surface of the lower part of the riser pipe, so that the lower part of the riser pipe and the thermal sleeve are welded. The two-part ring can be fixed to the outer periphery of the part without any gap, and the stress due to fluid vibration generated at the weld between the riser pipe and the thermal sleeve can be significantly reduced.
【0097】請求項3によれば、原子炉圧力容器内に設
置されたジェットポンプのライザー管の溶接部に生じる
流体振動による応力を低減するためのジェットポンプク
ランプ装置において、ライザー管と原子炉圧力容器の炉
心シュラウドとの間に介挿される上部プレートと、この
上部プレートをライザー管と炉心シュラウドとの間に圧
接させる押付け部材とを備えたことにより、ライザー管
の下部とサーマルスリーブとの溶接部に生じる流体振動
による応力を低減させることができる。According to a third aspect of the present invention, there is provided a jet pump clamp apparatus for reducing stress due to fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel. By providing an upper plate inserted between the core shroud of the vessel and a pressing member for pressing the upper plate between the riser tube and the core shroud, a welded portion between the lower portion of the riser tube and the thermal sleeve is provided. The stress caused by the fluid vibration generated in the above can be reduced.
【0098】請求項4によれば、請求項3記載のジェッ
トポンプクランプ装置において、上部プレートにそれぞ
れピンにより一端が結合された複数の長尺ロッドと、こ
れらの長尺ロッドの他端にそれぞれピンにより結合され
ジェットポンプのバッフルプレートに支持される下部プ
レートとを有し、上部プレート,複数の長尺ロッドおよ
び下部プレートにて平行リンク機構を構成したことによ
り、流体振動による応力を低減させるためのクランプ装
置を確実かつ短時間で据え付けることができる。According to the fourth aspect, in the jet pump clamp device according to the third aspect, a plurality of long rods each having one end connected to the upper plate by a pin, and a pin connected to the other end of each of the long rods. And a lower plate supported by a baffle plate of a jet pump, and a parallel link mechanism comprising an upper plate, a plurality of long rods, and a lower plate. The clamp device can be reliably and quickly installed.
【0099】請求項5によれば、請求項3または4記載
のジェットポンプクランプ装置において、上部プレート
と複数の長尺ロッドとを結合するピンに、平行リンク機
構が閉じた際、その閉じ加減を制限するストッパを設け
たことにより、平行リンク機構が閉じた場合、長尺ロッ
ドが互いに完全に密着することがなくなり、平行リンク
機構の開閉動作を円滑に行うことができる。According to the fifth aspect, in the jet pump clamp device according to the third or fourth aspect, when the parallel link mechanism is closed by the pin connecting the upper plate and the plurality of long rods, the closing is adjusted. By providing the restricting stopper, when the parallel link mechanism is closed, the long rods do not completely adhere to each other, and the opening and closing operation of the parallel link mechanism can be performed smoothly.
【0100】請求項6によれば、請求項3または4記載
のジェットポンプクランプ装置において、上部プレート
に吊り耳が取り付けられ、この吊り耳を吊り上げた際に
平行リンク機構が自重で閉じる一方、吊り耳を吊り下げ
て下部プレートがバッフルプレートに着座した際に平行
リンク機構が開くように構成したことにより、請求項4
と同様の効果が得られる。According to the sixth aspect, in the jet pump clamp device according to the third or fourth aspect, a hanging ear is attached to the upper plate, and when the hanging ear is lifted, the parallel link mechanism is closed by its own weight while the hanging link is closed. The parallel link mechanism is configured to open when the ear is suspended and the lower plate is seated on the baffle plate.
The same effect can be obtained.
【0101】請求項7によれば、請求項4記載のジェッ
トポンプクランプ装置において、複数の長尺ロッドの軸
方向中間部にサポートを少なくとも一つ設け、このサポ
ートを介して複数の長尺ロッドを原子炉圧力容器の炉心
シュラウドで支持したことにより、長尺ロッドの剛性を
著しく向上させることができる。According to a seventh aspect of the present invention, in the jet pump clamp device according to the fourth aspect, at least one support is provided at an intermediate portion in the axial direction of the plurality of long rods, and the plurality of long rods are connected via the support. The rigidity of the long rod can be remarkably improved by being supported by the core shroud of the reactor pressure vessel.
【0102】請求項8によれば、上部プレートと2分割
リングとを連結アームにより連結したことにより、ジェ
ットポンプを強固に固定することができる。According to the eighth aspect, the jet pump can be firmly fixed by connecting the upper plate and the two-piece ring by the connecting arm.
【0103】請求項9によれば、ライザー管と原子炉圧
力容器の炉心シュラウドとの間に介挿される支持ブロッ
クと、この支持ブロックに締付けボルトを介して取り付
けられこの締付けボルトの締付けにて支持ブロックをラ
イザー管と炉心シュラウドとの間に圧接させる押付け用
楔とを備えたことにより、部品点数が少なく簡単な構成
で、ライザー管の流体振動による応力を防止することが
できる。According to the ninth aspect, a support block inserted between the riser tube and the core shroud of the reactor pressure vessel, and the support block is attached to the support block via a tightening bolt and is supported by tightening the tightening bolt. By providing the pressing wedge for pressing the block between the riser tube and the core shroud, it is possible to prevent stress due to fluid vibration of the riser tube with a simple configuration with a small number of parts.
【0104】請求項10によれば、請求項9記載のジェ
ットポンプクランプ装置において、支持ブロックにライ
ザー管を把持する把持レバーを設けたことにより、ライ
ザー管に支持ブロックを一段と強固に固定することがで
きる。According to the tenth aspect, in the jet pump clamp device according to the ninth aspect, the support block is provided with a gripping lever for gripping the riser pipe, so that the support block can be more firmly fixed to the riser pipe. it can.
【0105】請求項11のジェットポンプクランプ装置
の取扱装置によれば、原子炉圧力容器内に設置されたジ
ェットポンプのライザー管の溶接部に生じる流体振動に
よる応力を低減するジェットポンプクランプ装置を取り
扱うジェットポンプクランプ装置の取扱装置であって、
ライザー管の下部とこのライザー管に連結されたサーマ
ルスリーブとの溶接部の外周に当接可能な2分割リング
を開いた状態で保持する保持部材と、この保持部材に設
けられ保持部材を旋回させる旋回駆動手段と、この旋回
駆動手段に取り付けられた吊り板と、保持部材に設けら
れ2分割リングを押し出す押出し駆動手段とを備えたこ
とにより、ライザー管の下部とサーマルスリーブとの溶
接部にジェットポンプクランプ装置である2分割リング
を容易に装着することができる。According to the apparatus for handling a jet pump clamp apparatus according to the eleventh aspect, a jet pump clamp apparatus for reducing stress caused by fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel is handled. A handling device for a jet pump clamp device,
A holding member for holding an open state of a two-part ring that can be brought into contact with the outer periphery of a welded portion between a lower portion of the riser tube and a thermal sleeve connected to the riser tube, and turning the holding member provided on the holding member By providing a swing drive means, a suspension plate attached to the swing drive means, and an extrusion drive means provided on the holding member and extruding a two-piece ring, a jet is formed at a welding portion between the lower portion of the riser pipe and the thermal sleeve. A two-piece ring as a pump clamp device can be easily mounted.
【図1】本発明に係るジェットポンプクランプ装置の第
1実施形態を示す断面図。FIG. 1 is a cross-sectional view showing a first embodiment of a jet pump clamp device according to the present invention.
【図2】図1のA−A線断面図。FIG. 2 is a sectional view taken along line AA of FIG.
【図3】図1のB−B線断面図。FIG. 3 is a sectional view taken along line BB of FIG. 1;
【図4】第1実施形態の平行リンク機構の移動時の状態
を示す断面図。FIG. 4 is a cross-sectional view showing a state when the parallel link mechanism according to the first embodiment is moved.
【図5】第1実施形態の2分割リングを示す断面図。FIG. 5 is a sectional view showing a two-part ring according to the first embodiment;
【図6】第1実施形態の2分割リングを示す側面図。FIG. 6 is a side view showing the two-part ring according to the first embodiment.
【図7】第1実施形態の2分割リングを示す部分拡大断
面図。FIG. 7 is a partially enlarged cross-sectional view showing a two-piece ring according to the first embodiment.
【図8】本発明に係るジェットポンプクランプ装置の取
扱装置の一実施形態を示す正面図。FIG. 8 is a front view showing one embodiment of a handling device of the jet pump clamp device according to the present invention.
【図9】図8の側面図。FIG. 9 is a side view of FIG. 8;
【図10】図8の取扱装置の保持枠を示す平面図。FIG. 10 is a plan view showing a holding frame of the handling device of FIG. 8;
【図11】図8の取扱装置の動作を示す概略平面図。FIG. 11 is a schematic plan view showing the operation of the handling device of FIG.
【図12】本発明に係るジェットポンプクランプ装置の
第1実施形態を原子炉内での使用状態を説明するための
概略図。FIG. 12 is a schematic diagram for explaining a use state of the jet pump clamp device according to the first embodiment of the present invention in a nuclear reactor.
【図13】図12のC部を拡大して一部縦断面で示す側
面図。FIG. 13 is an enlarged side view of a portion C in FIG.
【図14】本発明に係るジェットポンプクランプ装置の
第2実施形態を示す断面図。FIG. 14 is a sectional view showing a second embodiment of the jet pump clamp device according to the present invention.
【図15】第2実施形態の支持ブロックを示す平面図。FIG. 15 is a plan view showing a support block according to a second embodiment.
【図16】一般の沸騰水型原子炉の構成を示す断面図。FIG. 16 is a sectional view showing a configuration of a general boiling water reactor.
【図17】従来のジェットポンプを一部切り欠いて示す
斜視図。FIG. 17 is a partially cutaway perspective view showing a conventional jet pump.
1 原子炉圧力容器 2 冷却材 3 炉心 4 気水分離器 5 蒸気乾燥器 6 主蒸気管 7 ダウンカマ部 8 制御棒案内管 9 制御棒駆動機構 10 炉心シュラウド 11 ジェットポンプ 12 ライザー管 13 再循環入口ノズル 14 トランジションピース 15 エルボ 16 混合ノズル 17 インレットスロート 18 ディフューザ 19 計測用配管 20 ライザーブレース 21 耳部 22 溝部 23 ジェットポンプビーム 24 ヘッドボルト 25 ライザーブランケット 26 バッフルプレート 27 サポート 28 エルボ 29 サーマルスリーブ 30 平行リンク機構 31 上部プレート 32 ピン 33 長尺ロッド 34 ピン 35 下部プレート 36 円弧面部 37 ばね(押付け部材) 38 ピン 39 吊り耳 40 連結アーム 41 中間サポート 42 円弧面部 43 平面部 50 2分割リング 51 上部リング 52 下部リング 53 開閉用ガイド部 54 係合凹部 55 係合凸部 56 締付けボルト 57 フランジ 58 雌ねじカラー 59 開閉ブロック 60 締付けボルト 61 緩み止めボルト 62 上部軸 63 上部軸穴 64 戻し部材 65 大径穴 66 ねじ部 67 ねじ穴 68 ねじ部 69 ねじ穴 70 ねじ穴 71 外れ防止用フランジ 72 ナット 73 折り座金 74 折り曲げ部材 75 ストッパ 76 円孔 80 取扱装置 81 保持枠 82 旋回用モータ(旋回駆動手段) 83 ポール 84 吊り板 85 吊り板 86 シリンダ(押出し駆動手段) 87 切欠溝 88 切欠孔 89 切欠孔 90 移動部材 91 吊り耳 100 上部格子板 101 炉心支持板 103 燃料交換機 104 ポール取扱い機構 105 ポール 106 ホイスト 107 ワイヤ 108 ポール接続部 109 ナットランナ 110 ジェットポンプクランプ装置 111 支持ブロック 112 締付けボルト 113 押付け用楔 114 レバー固定用ボルト 115 把持レバー REFERENCE SIGNS LIST 1 reactor pressure vessel 2 coolant 3 reactor core 4 steam separator 5 steam dryer 6 main steam pipe 7 downcomer section 8 control rod guide pipe 9 control rod drive mechanism 10 core shroud 11 jet pump 12 riser pipe 13 recirculation inlet nozzle Reference Signs List 14 transition piece 15 elbow 16 mixing nozzle 17 inlet throat 18 diffuser 19 measurement pipe 20 riser brace 21 ear 22 groove 23 jet pump beam 24 head bolt 25 riser blanket 26 baffle plate 27 support 28 elbow 29 thermal sleeve 30 parallel link mechanism 31 Upper plate 32 Pin 33 Long rod 34 Pin 35 Lower plate 36 Arc surface part 37 Spring (pressing member) 38 Pin 39 Hanging ear 40 Connecting arm 41 Intermediate support 42 Arc Part 43 flat part 50 two-part ring 51 upper ring 52 lower ring 53 opening and closing guide part 54 engaging concave part 55 engaging convex part 56 fastening bolt 57 flange 58 female screw collar 59 opening and closing block 60 fastening bolt 61 locking bolt 62 upper shaft 63 Upper shaft hole 64 Return member 65 Large diameter hole 66 Screw part 67 Screw hole 68 Screw part 69 Screw hole 70 Screw hole 71 Detachment prevention flange 72 Nut 73 Folding washer 74 Folding member 75 Stopper 76 Circular hole 80 Handling device 81 Holding frame 82 Slewing motor (slewing drive means) 83 Pole 84 Suspension plate 85 Suspension plate 86 Cylinder (extrusion drive means) 87 Notch groove 88 Notch hole 89 Notch hole 90 Moving member 91 Hanging ear 100 Upper grid plate 101 Core support plate 103 Fuel exchanger 104 Pole handling mechanism 10 Paul 106 Hoist 107 wire 108 pole connecting unit 109 the nut runner 110 jet pump clamping device 111 support block 112 clamping bolts 113 pressing wedge 114 lever fixing bolt 115 gripping lever
Claims (11)
ポンプのライザー管の溶接部に生じる流体振動による応
力を低減するためのジェットポンプクランプ装置におい
て、前記ライザー管の下部とこのライザー管に連結され
たサーマルスリーブとの溶接部の外周に当接する2分割
リングと、この2分割リングの一方に係合凹部を形成す
るとともにその他方に前記係合凹部に係合する係合凸部
を形成した開閉用ガイド部と、この開閉用ガイド部に取
り付けられ前記2分割リングを開閉させる締付けボルト
とを備えたことを特徴とするジェットポンプクランプ装
置。1. A jet pump clamp device for reducing stress due to fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel, wherein the lower part of the riser pipe is connected to the riser pipe. A two-part ring that abuts the outer periphery of the welded portion with the thermal sleeve, and an engagement recess formed on one of the two rings and an engagement projection engaged with the engagement recess on the other side. A jet pump clamp device comprising: an opening / closing guide portion; and a tightening bolt attached to the opening / closing guide portion to open and close the two-piece ring.
下部の外周面と同一形状に形成されたことを特徴とする
請求項1記載のジェットポンプクランプ装置。2. The jet pump clamp device according to claim 1, wherein the opening of the two-part ring is formed in the same shape as the outer peripheral surface of the lower part of the riser pipe.
ポンプのライザー管の溶接部に生じる流体振動による応
力を低減するためのジェットポンプクランプ装置におい
て、前記ライザー管と前記原子炉圧力容器の炉心シュラ
ウドとの間に介挿される上部プレートと、この上部プレ
ートを前記ライザー管と前記炉心シュラウドとの間に圧
接させる押付け部材とを備えたことを特徴とするジェッ
トポンプクランプ装置。3. A jet pump clamp apparatus for reducing stress caused by fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel, wherein the riser pipe and a reactor core of the reactor pressure vessel are provided. A jet pump clamp apparatus comprising: an upper plate interposed between a shroud; and a pressing member for pressing the upper plate between the riser tube and the core shroud.
装置において、上部プレートにそれぞれピンにより一端
が結合された複数の長尺ロッドと、これらの長尺ロッド
の他端にそれぞれピンにより結合されジェットポンプの
バッフルプレートに支持される下部プレートとを有し、
前記上部プレート,複数の長尺ロッドおよび下部プレー
トにて平行リンク機構を構成したことを特徴とするジェ
ットポンプクランプ装置。4. The jet pump clamp device according to claim 3, wherein a plurality of long rods each having one end connected to the upper plate by a pin, and the other end of each of the long rods being connected to each other by a pin. A lower plate supported by a baffle plate,
A jet pump clamp device, wherein a parallel link mechanism is constituted by the upper plate, a plurality of long rods and a lower plate.
クランプ装置において、上部プレートと複数の長尺ロッ
ドとを結合するピンに、平行リンク機構が閉じた際、そ
の閉じ加減を制限するストッパを設けたことを特徴とす
るジェットポンプクランプ装置。5. The jet pump clamp device according to claim 3, wherein a pin for connecting the upper plate and the plurality of long rods is provided with a stopper for restricting the degree of closing when the parallel link mechanism is closed. A jet pump clamp device, characterized in that:
クランプ装置において、上部プレートに吊り耳が取り付
けられ、この吊り耳を吊り上げた際に平行リンク機構が
自重で閉じる一方、前記吊り耳を吊り下げて下部プレー
トがバッフルプレートに着座した際に前記平行リンク機
構が開くように構成したことを特徴とするジェットポン
プクランプ装置。6. The jet pump clamp device according to claim 3, wherein a hanging ear is attached to the upper plate, and when the hanging ear is lifted, the parallel link mechanism is closed by its own weight, and the hanging ear is hung. A jet pump clamping device, wherein the parallel link mechanism is opened when the lower plate is seated on the baffle plate.
装置において、複数の長尺ロッドの軸方向中間部にサポ
ートを少なくとも一つ設け、このサポートを介して前記
複数の長尺ロッドを原子炉圧力容器の炉心シュラウドで
支持したことを特徴とするジェットポンプクランプ装
置。7. The jet pump clamp device according to claim 4, wherein at least one support is provided at an axially intermediate portion of the plurality of long rods, and the plurality of long rods are connected to the reactor pressure vessel via the support. A jet pump clamp device supported by a core shroud.
ポンプのライザー管の溶接部に生じる流体振動による応
力を低減するためのジェットポンプクランプ装置におい
て、前記ライザー管の下部とこのライザー管に連結され
たサーマルスリーブとの溶接部の外周に当接する2分割
リングと、この2分割リングの一方に係合凹部を形成す
るとともにその他方に前記係合凹部に係合する係合凸部
を形成した開閉用ガイド部と、この開閉用ガイド部に取
り付けられ前記2分割リングを開閉させる締付けボルト
と、前記ライザー管と前記原子炉圧力容器の炉心シュラ
ウドとの間に介挿される上部プレートと、この上部プレ
ートを前記ライザー管と前記炉心シュラウドとの間に圧
接させる押付け部材と、前記2分割リングと前記上部プ
レートとを連結する連結アームとを備えたことを特徴と
するジェットポンプクランプ装置。8. A jet pump clamp apparatus for reducing stress due to fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel, wherein the lower part of the riser pipe is connected to the riser pipe. A two-part ring that abuts the outer periphery of the welded portion with the thermal sleeve, and an engagement recess formed on one of the two rings and an engagement projection engaged with the engagement recess on the other side. An opening / closing guide portion, a tightening bolt attached to the opening / closing guide portion for opening and closing the two-part ring, an upper plate inserted between the riser tube and a core shroud of the reactor pressure vessel, A pressing member for pressing a plate between the riser tube and the core shroud, and connecting the two-piece ring and the upper plate A jet pump clamp device comprising a connecting arm.
ポンプのライザー管の溶接部に生じる流体振動による応
力を低減するためのジェットポンプクランプ装置におい
て、前記ライザー管と前記原子炉圧力容器の炉心シュラ
ウドとの間に介挿される支持ブロックと、この支持ブロ
ックに締付けボルトを介して取り付けられこの締付けボ
ルトの締付けにて前記支持ブロックを前記ライザー管と
前記炉心シュラウドとの間に圧接させる押付け用楔とを
備えたことを特徴とするジェットポンプクランプ装置。9. A jet pump clamp apparatus for reducing stress caused by fluid vibration generated at a welded portion of a riser pipe of a jet pump installed in a reactor pressure vessel, wherein the riser pipe and a reactor core of the reactor pressure vessel are provided. A support block inserted between the shroud and a pressing wedge which is attached to the support block via a tightening bolt and presses the support block between the riser tube and the core shroud by tightening the tightening bolt; And a jet pump clamp device comprising:
プ装置において、支持ブロックにライザー管を把持する
把持レバーを設けたことを特徴とするジェットポンプク
ランプ装置。10. The jet pump clamp device according to claim 9, wherein a gripping lever for gripping the riser tube is provided on the support block.
トポンプのライザー管の溶接部に生じる流体振動による
応力を低減するジェットポンプクランプ装置を取り扱う
ジェットポンプクランプ装置の取扱装置であって、前記
ライザー管の下部とこのライザー管に連結されたサーマ
ルスリーブとの溶接部の外周に当接可能な2分割リング
を開いた状態で保持する保持部材と、この保持部材に設
けられ前記保持部材を旋回させる旋回駆動手段と、この
旋回駆動手段に取り付けられた吊り板と、前記保持部材
に設けられ前記2分割リングを押し出す押出し駆動手段
とを備えたことを特徴とするジェットポンプクランプ装
置の取扱装置。11. A handling apparatus for a jet pump clamp apparatus for handling a jet pump clamp apparatus for reducing stress caused by fluid vibration generated in a weld of a riser pipe of a jet pump installed in a reactor pressure vessel, wherein the riser is provided. A holding member that holds an open state of a two-part ring that can contact an outer periphery of a welded portion between a lower portion of the pipe and a thermal sleeve connected to the riser pipe; and a rotating member provided on the holding member. An apparatus for handling a jet pump clamp device, comprising: a swing drive means; a suspension plate attached to the swing drive means; and an extrusion drive means provided on the holding member and extruding the two-piece ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35096296A JP3514931B2 (en) | 1996-12-27 | 1996-12-27 | Jet pump clamp device and its handling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP35096296A JP3514931B2 (en) | 1996-12-27 | 1996-12-27 | Jet pump clamp device and its handling device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10186080A true JPH10186080A (en) | 1998-07-14 |
JP3514931B2 JP3514931B2 (en) | 2004-04-05 |
Family
ID=18414103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP35096296A Expired - Fee Related JP3514931B2 (en) | 1996-12-27 | 1996-12-27 | Jet pump clamp device and its handling device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3514931B2 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005345477A (en) * | 2004-06-04 | 2005-12-15 | General Electric Co <Ge> | Method and apparatus for reducing vibration in component of nuclear reactor |
JP2006071638A (en) * | 2004-08-31 | 2006-03-16 | General Electric Co <Ge> | Method and device for fixing riser brace assembly in nuclear reactor |
JP2008046020A (en) * | 2006-08-17 | 2008-02-28 | Toshiba Corp | Reinforcing device and reinforcement method of jet pump riser |
JP2011027657A (en) * | 2009-07-29 | 2011-02-10 | Hitachi-Ge Nuclear Energy Ltd | Clamping device for jet pump measurement piping |
US8142145B2 (en) | 2009-04-21 | 2012-03-27 | Thut Bruno H | Riser clamp for pumps for pumping molten metal |
JP2012233817A (en) * | 2011-05-06 | 2012-11-29 | Hitachi-Ge Nuclear Energy Ltd | Jet pump beam attachment state checking method |
-
1996
- 1996-12-27 JP JP35096296A patent/JP3514931B2/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005345477A (en) * | 2004-06-04 | 2005-12-15 | General Electric Co <Ge> | Method and apparatus for reducing vibration in component of nuclear reactor |
JP2006071638A (en) * | 2004-08-31 | 2006-03-16 | General Electric Co <Ge> | Method and device for fixing riser brace assembly in nuclear reactor |
JP2008046020A (en) * | 2006-08-17 | 2008-02-28 | Toshiba Corp | Reinforcing device and reinforcement method of jet pump riser |
JP4580913B2 (en) * | 2006-08-17 | 2010-11-17 | 株式会社東芝 | Jet pump riser reinforcement device |
US8718222B2 (en) | 2006-08-17 | 2014-05-06 | Kabushiki Kaisha Toshiba | Apparatus and method for reinforcing jet pump riser |
US9966155B2 (en) | 2006-08-17 | 2018-05-08 | Kabushiki Kaisha Toshiba | Apparatus and method for reinforcing jet pump riser |
US8142145B2 (en) | 2009-04-21 | 2012-03-27 | Thut Bruno H | Riser clamp for pumps for pumping molten metal |
JP2011027657A (en) * | 2009-07-29 | 2011-02-10 | Hitachi-Ge Nuclear Energy Ltd | Clamping device for jet pump measurement piping |
JP2012233817A (en) * | 2011-05-06 | 2012-11-29 | Hitachi-Ge Nuclear Energy Ltd | Jet pump beam attachment state checking method |
Also Published As
Publication number | Publication date |
---|---|
JP3514931B2 (en) | 2004-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5032404B2 (en) | Fixing device for measuring pipe in reactor and fixing method using the same | |
US5675619A (en) | Reactor core shroud repair using splice plate to bridge weld seam | |
US7185798B2 (en) | Apparatus and method for mechanically reinforcing the welds between riser pipes and riser braces in boiling water reactors | |
US4238291A (en) | Device for coupling pipelines in nuclear reactor pressure vessels, especially in boiling water reactors | |
JPH10186080A (en) | Jet pump clamp device and its handling device | |
JP2002277583A (en) | Jet pump beam fixing device | |
JP2010286484A (en) | Simple riser brace clamp for jet pump | |
US6421406B1 (en) | Core spray upper T-box to safe end attachment | |
JP2011127925A (en) | Welded structure of structural body in nuclear reactor, and method for welding the welded structure | |
JP5021041B2 (en) | Mechanical assembly to ensure structural integrity of pipe fittings | |
JP3372145B2 (en) | Pipe clamp device for measurement in reactor | |
US5602887A (en) | Tool for pushing tie rod assembly suspended in downcomer annulus of boiling water reactor | |
JP3425262B2 (en) | Jet pump sealing device and jet pump inspection and repair method using the same | |
JP4108878B2 (en) | Jet pump riser brace reinforcement device | |
JP4351812B2 (en) | Reactor pump seal device | |
JP4080641B2 (en) | Reactor pump seal device | |
JP2000162362A (en) | Jet pump-sealing device | |
JP4469520B2 (en) | Reactor piping seal device, its handling tool, and reactor piping seal method | |
JP2004212336A (en) | Clamping device and clamping method for jet pump instrumentation tube | |
JPH0638114B2 (en) | Replacement riser brace structure | |
JP2994084B2 (en) | Riser tube holding device | |
US5677936A (en) | Tool for vertically supporting tie rod assembly on lower support fixture toggle-bolted to shroud support plate | |
JPS6315833Y2 (en) | ||
JP3492818B2 (en) | Manhole inner lid mounting device | |
JP4393011B2 (en) | Replacement method of core spray system equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040106 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040114 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080123 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090123 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100123 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110123 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120123 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130123 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130123 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140123 Year of fee payment: 10 |
|
LAPS | Cancellation because of no payment of annual fees |