JPH10184004A - Construction method for shuttering for structure - Google Patents

Construction method for shuttering for structure

Info

Publication number
JPH10184004A
JPH10184004A JP35067996A JP35067996A JPH10184004A JP H10184004 A JPH10184004 A JP H10184004A JP 35067996 A JP35067996 A JP 35067996A JP 35067996 A JP35067996 A JP 35067996A JP H10184004 A JPH10184004 A JP H10184004A
Authority
JP
Japan
Prior art keywords
pipe
support
pipes
formwork
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP35067996A
Other languages
Japanese (ja)
Inventor
Masayoshi Takayama
正義 高山
Yutaka Miyamoto
宮本  裕
Masamichi Shimoe
正道 下江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IGETA KENZAI KK
SHIMOE RASU KATAWAKU KOGYO KK
TAKAYAMA KINZOKU KOGYO KK
Original Assignee
IGETA KENZAI KK
SHIMOE RASU KATAWAKU KOGYO KK
TAKAYAMA KINZOKU KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IGETA KENZAI KK, SHIMOE RASU KATAWAKU KOGYO KK, TAKAYAMA KINZOKU KOGYO KK filed Critical IGETA KENZAI KK
Priority to JP35067996A priority Critical patent/JPH10184004A/en
Publication of JPH10184004A publication Critical patent/JPH10184004A/en
Pending legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To serve for the convenience of subsequent work and improve work efficiency by making possible to support a pipe in an upright condition reliably. SOLUTION: After a reinforcement arrangement is formed by assembling reinforcements on a surface G for iristalling a foundation, shutterings 4 are fixed on both sides of the reinforcement arrangement in a detachable manner by fixing means. In addition, after the main body of a supporting device having multiple supporting bodies that are made wider toward the lower end, is fixed to the installation surface G, pipes P are inserted into every supporting bodies, and made to contact the outside of the shutterings 4. After a transverse pipe P' are placed astride the pipes P, concrete is placed in a space 21 formed between the shutterings 4, and after the concrete sets, a concrete body is formed by removing the pipes P, P' and the shutterings 4.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、基礎、地中梁、壁
面等のコンクリート躯体を施工する型枠工法の改良に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement of a formwork method for constructing a concrete frame such as a foundation, an underground beam, a wall surface, or the like.

【0002】[0002]

【従来の技術】周知の如く、基礎等のコンクリート躯体
を施工する場合に於いては、型枠工法と称される施工法
が幅広く採用されている。
2. Description of the Related Art As is well known, when a concrete body such as a foundation is constructed, a construction method called a formwork method is widely used.

【0003】そして、当該工法に於いては、対面配置し
た型枠の外側面にパイプからなる複数の縦ばたを上下方
向に配すると共に、これに交差させて横ばたとしての横
パイプを複数配して桟木の節約が図られる場合がある。
[0003] In this method, a plurality of vertical ribs made of pipes are vertically arranged on the outer surface of a facing formwork, and a horizontal pipe serving as a horizontal pipe is crossed with the vertical ribs. In some cases, a plurality of piers may be arranged to save the pier.

【0004】この場合、縦方向に配されるパイプP”
は、図8のように対面配置した型枠(図示せず)の下部
外方に位置する基礎等の設置面G' に帯板状の支持具11
aを固定し、該支持具11aに切欠形成した複数の支持片
22を切起してパイプP”を挿着せしめ、その起立状態を
維持させている。
In this case, a pipe P ″ arranged in the vertical direction
A strip-shaped support 11 is attached to an installation surface G 'of a foundation or the like located outside a lower portion of a formwork (not shown) arranged face to face as shown in FIG.
a, and a plurality of support pieces cut out in the support tool 11a.
22 is cut and raised, and the pipe P "is inserted, and the standing state is maintained.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上記従
来の工法は、切起し形成した支持片22によりパイプP”
を支持するものであり、通常支持片22の幅はパイプP”
の内径よりも小寸に形成されるため、パイプP”が前後
左右に振れる不安定な状態で支持されることになる。
However, in the above-mentioned conventional method, the pipe P "is formed by the support piece 22 which is cut and raised.
And the width of the support piece 22 is usually a pipe P ″
Since the pipe P ″ is formed smaller than the inner diameter of the pipe P ″, the pipe P ″ is supported in an unstable state swinging back and forth and right and left.

【0006】従って、パイプP”の起立状態を維持すべ
くこれを把持しながら型枠等との取付作業を行わねばな
らず、その作業が非常に煩雑なものとなって作業性に著
しく欠けるという大なる問題点を有していたのである。
[0006] Accordingly, in order to maintain the standing state of the pipe P ", the work of mounting the pipe P" on the mold or the like must be performed while grasping the pipe P ", and the work becomes very complicated and the workability is remarkably lacking. It had a great problem.

【0007】それ故に、本発明は上記従来の問題点を解
決するためになされたものであり、パイプを起立状態で
確実に支持できるようにして、その後の作業の便に供
し、一連の作業の効率化を図ることを課題とする。
SUMMARY OF THE INVENTION Therefore, the present invention has been made to solve the above-mentioned conventional problems, and it is intended to surely support a pipe in an upright state, to provide a convenience for a subsequent operation, and to perform a series of operations. The task is to improve efficiency.

【0008】[0008]

【課題を解決するための手段】即ち、上記課題を解決す
るために本発明が採った手段は、基礎等の設置面G上に
鉄筋1を組立てて配筋2を形成した後、該配筋2の両側
に固定手段により型枠4を着脱可能に固定し、さらに下
端部側程幅広な支持体13が上面に複数突設された支持具
本体12を前記設置面Gに固定した後、前記各支持体13に
パイプPを挿着して該パイプPを前記型枠4の外側面に
当接させて配し、さらにパイプP間に横パイプP' を架
設した後、前記型枠4間に形成された空間21にコンクリ
ートを打設せしめ、該コンクリートの硬化後に前記両パ
イプP,P' 及び型枠4を除去してコンクリート躯体を
形成する点にある。
Means for solving the above problems are as follows. The means adopted by the present invention is to assemble a reinforcing bar 1 on an installation surface G such as a foundation to form a reinforcing bar 2 and then apply the reinforcing bar. After the form 4 is detachably fixed to both sides of the support member 2 by a fixing means, and further, the support body 12 having a plurality of support members 13 wider than the lower end side is fixed to the installation surface G, A pipe P is inserted into each of the supports 13, the pipe P is arranged so as to be in contact with the outer surface of the mold 4, and a horizontal pipe P ′ is erected between the pipes P. Concrete is poured into the space 21 formed in the above, and after the concrete is hardened, the pipes P and P 'and the formwork 4 are removed to form a concrete frame.

【0009】従って、上記発明特定事項からなる型枠工
法にあっては、パイプPは設置面Gに固定した支持具本
体12の支持体13に挿着されるのであるが、かかる支持体
13は下端部側程幅広に形成されてなるため、パイプPの
内周面が支持体13に係合して起立状態に支持されること
になる。
Therefore, in the formwork method according to the invention, the pipe P is inserted into the support 13 of the support body 12 fixed to the installation surface G.
Since the lower end 13 is formed to be wider toward the lower end, the inner peripheral surface of the pipe P is engaged with the support 13 and is supported in an upright state.

【0010】[0010]

【発明の実施の形態】以下、本発明に係る型枠工法の一
実施形態について図面に従って説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of a formwork method according to the present invention will be described below with reference to the drawings.

【0011】先ず、図1のように基礎等の設置面G上に
施工すべきコンクリート躯体の形状の応じて複数の鉄筋
1を用いて従来通り所望形状の配筋2を組立てた後、そ
の両側に金属板に多数の孔3が穿設された網状の型枠4
を対面配置する。
First, as shown in FIG. 1, a reinforcing bar 2 having a desired shape is conventionally assembled by using a plurality of reinforcing bars 1 according to the shape of a concrete frame to be constructed on an installation surface G of a foundation or the like. Mesh form 4 in which a large number of holes 3 are formed in a metal plate
Face to face.

【0012】この場合は、例えば図2の如く両端にネジ
部5aを有する棒状のセパレーター5を配筋2の厚さ方向
に挿通して固定具6により固定し、さらにセパレーター
5の端部側に取付けた一対の板状ワッシャ7の凹部8を
型枠4のリブ9に嵌合せしめると共に、型枠4の孔3か
ら前記セパレーター5の端部を挿入する。そして、セパ
レーター5のネジ部5aにナット10を螺合せしめ型枠4を
接続する。
In this case, for example, as shown in FIG. 2, a rod-shaped separator 5 having screw portions 5a at both ends is inserted in the thickness direction of the reinforcing bar 2 and fixed by a fixture 6, and furthermore, the separator 5 is attached to the end side of the separator 5. The recesses 8 of the attached plate-like washers 7 are fitted into the ribs 9 of the mold 4, and the ends of the separator 5 are inserted through the holes 3 of the mold 4. Then, the nut 10 is screwed into the screw portion 5a of the separator 5, and the mold 4 is connected.

【0013】その後、型枠4の外方側部に位置する設置
面Gに支持具11を固定するのであるが、かかる支持具11
は図3及び図4のように長尺状の金属製帯板からなる支
持具本体12と、該支持具本体12に所定間隔を有して下端
部側程幅広となるべく山形状に折曲形成した支持体13と
からなり、その上端部側には略水平な一対の段部14を介
して鋭角状の頂部15が形成され、且つ支持具本体12の支
持体13間に形成される水平部16の略中央には取付孔17が
穿設されており、図5の如く支持体13が上部に突出する
ようにして取付孔17に釘等の固定具18を挿通し、これを
基礎等の設置面Gに打込んで固定する。
Thereafter, the support 11 is fixed to the installation surface G located on the outer side of the formwork 4.
As shown in FIGS. 3 and 4, a support body 12 made of a long metal strip is bent at a predetermined interval in the support body 12 so as to be wider toward the lower end side. A horizontal portion formed between the supports 13 of the support main body 12 is formed at the upper end side thereof with an acute-angled top 15 formed on a pair of substantially horizontal steps 14 at the upper end side. A mounting hole 17 is formed substantially at the center of the hole 16. A fixture 18 such as a nail is inserted into the mounting hole 17 so that the support 13 projects upward as shown in FIG. Driving into the installation surface G and fixing.

【0014】次に、複数本のパイプPを支持具11の各支
持体13に設けた頂部15に挿着すると、該頂部15にパイプ
Pの内周縁が係合すると共に、その下端面が支持体13の
段部14上に載置された状態でセットされることになるた
め、パイプPは振れることなく起立状態に確実に支持さ
れるのである。
Next, when a plurality of pipes P are inserted into the tops 15 provided on the respective supports 13 of the support 11, the inner peripheral edge of the pipes P is engaged with the tops 15, and the lower end surfaces of the pipes P are supported. Since the pipe P is set while being placed on the step portion 14 of the body 13, the pipe P is reliably supported in the upright state without swinging.

【0015】尚、頂部15の下端の幅DをパイプPの内径
dよりも大きく形成した場合は、パイプPの下端面は段
部14には接触しないが、頂部15が下部側程幅広に形成さ
れているので、これにパイプPの内周縁が係合してこの
場合も振れは生じない。
When the width D of the lower end of the top portion 15 is made larger than the inner diameter d of the pipe P, the lower end surface of the pipe P does not contact the step portion 14, but the top portion 15 is formed wider toward the lower side. As a result, the inner peripheral edge of the pipe P is engaged with this, and in this case, no run-out occurs.

【0016】そして、図5及び図6の如くパイプPに交
差させてその外側横方向に複数本の横パイプP' を結束
線等の仮止めし、さらに前記セパレーター5にフォーム
タイ(登録商標)19を挿通して固定した後に、フォーム
タイ19の内周面に横パイプP' に嵌合し、セパレーター
5のネジ部5aにナット20を螺合して横パイプP' をパイ
プP間に架設する。
Then, as shown in FIGS. 5 and 6, a plurality of horizontal pipes P 'are temporarily fixed such as binding wires in the lateral direction outside the pipe P, and a foam tie (registered trademark) is attached to the separator 5. After inserting and fixing the horizontal pipe P 'to the inner peripheral surface of the foam tie 19, the horizontal pipe P' is installed between the pipes P by screwing the nut 20 to the threaded portion 5a of the separator 5. I do.

【0017】次に、型枠4間に形成される空間21にコン
クリートを打設し、その硬化後に各パイプP,P' と型
枠4等を除去すれば、コンクリート躯体が形成されるこ
ととなる。
Next, concrete is poured into the space 21 formed between the molds 4 and, after curing, the pipes P, P 'and the mold 4 are removed to form a concrete frame. Become.

【0018】而して、パイプPは確実に起立状態を維持
し得るため、横パイプP' や型枠4の取付作業が簡易な
ものとなり、その結果一連の施工作業が効率的に行え
て、工期の短縮化にも寄与し得ることとなる。
Since the pipe P can be reliably maintained in the upright state, the work of attaching the horizontal pipe P 'and the formwork 4 is simplified, and as a result, a series of construction work can be performed efficiently. This can contribute to shortening the construction period.

【0019】また、下端部側程幅広となる支持具Aの頂
部15には内径の異なるパイプPを挿着して支持できると
いう融通性を備えており、作業上大変利便である。
Further, since the top part 15 of the support A, which becomes wider toward the lower end, has the flexibility of being able to insert and support pipes P having different inner diameters, the operation is very convenient.

【0020】尚、上記実施形態に於いては、支持具本体
12を折曲せしめて支持体13を形成したが、本発明は決し
てこれに限定されず、例えば図7のように支持体13を別
体に形成してこれを帯状の支持具本体12の上面に所定間
隔を有して固着してもよい。
In the above embodiment, the support body is
Although the support member 13 is formed by bending the support member 12, the present invention is not limited thereto. For example, the support member 13 is formed separately as shown in FIG. May be fixed at predetermined intervals.

【0021】また、支持体13には上記実施形態の如き段
部14を設ける必要はなく、単に逆V字状の山形に形成し
てもよい他、支持体13を下端側程幅広となる棒状体で構
成して支持具本体12の上面に突設することも可能であ
る。
Further, it is not necessary to provide the step portion 14 in the support 13 as in the above embodiment, and the support 13 may be simply formed in an inverted V-shaped mountain shape. It is also possible to form a body and project from the upper surface of the support body 12.

【0022】さらに、パイプPの外側に型枠4を配して
該パイプPの周囲にコンクリート等を打設して施工され
る場合もあるが、上述したようにパイプPの下端部は支
持具11の支持体13により確実に支持されてなるため、コ
ンクリート等の打設によってパイプPが傾倒するような
こともなく、その起立状態が維持されつつ打設作業を行
うことができる。
Further, there is a case where the form 4 is disposed outside the pipe P and concrete or the like is cast around the pipe P in some cases. However, as described above, the lower end of the pipe P is Since the pipe P is securely supported by the support 13 of 11, the pipe P is not tilted by the casting of concrete or the like, and the casting operation can be performed while the standing state is maintained.

【0023】また、配筋2と型枠4との固定手段も決し
て上記実施形態に限定されず、型枠4を配筋2に着脱自
在に固定し得る固定手段であればよい。
The means for fixing the reinforcing bars 2 to the formwork 4 is not limited to the above embodiment, but may be any fixing means capable of removably fixing the formwork 4 to the reinforcing bars 2.

【0024】また、本発明は在来の所謂合板型枠工法に
適用することも勿論可能である。
The present invention can of course be applied to a conventional so-called plywood formwork method.

【0025】[0025]

【発明の効果】叙上のように、本発明は縦ばたとしての
パイプを下端部側程幅広となる支持体に挿着して保持す
るものであるために、パイプの内周面が支持体と係合し
てパイプに振れを生ぜしめることなく起立状態に支持さ
れる。従って、その後に行われる一連の作業の便に供す
ることとなり、工期の短縮化に大いに寄与し得るという
格別の効果を得るに至った。
As described above, since the present invention inserts and holds a pipe as a vertical flap on a support which becomes wider toward the lower end, the inner peripheral surface of the pipe is supported. The pipe is engaged and supported in an upright state without causing the pipe to sway. Therefore, it is possible to provide a convenience for a series of operations to be performed thereafter, and it is possible to obtain a special effect that can greatly contribute to shortening of the construction period.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る型枠工法の一実施形態としての施
工状態を示す側面図。
FIG. 1 is a side view showing a construction state as one embodiment of a formwork method according to the present invention.

【図2】同要部拡大正面図。FIG. 2 is an enlarged front view of the main part.

【図3】本発明に使用する支持具の一実施形態を示し、
(イ) は正面図、(ロ) は平面図。
FIG. 3 shows an embodiment of a support used in the present invention,
(A) is a front view, (B) is a plan view.

【図4】同要部拡大断面図。FIG. 4 is an enlarged sectional view of the main part.

【図5】施工状態を示す一部断面正面図。FIG. 5 is a partial cross-sectional front view showing a construction state.

【図6】施工状態を示す正面図。FIG. 6 is a front view showing a construction state.

【図7】支持具の他の実施形態を示す要部拡大正面図。FIG. 7 is an enlarged front view of a main part showing another embodiment of the support.

【図8】従来例を示す一部断面正面図。FIG. 8 is a partial cross-sectional front view showing a conventional example.

【符号の説明】[Explanation of symbols]

1…鉄筋 2…配筋 4…型枠 12…支持具本体 13…支持体 14…段部 21…空間 G…設置面 P…パイプ P'…横パイプ DESCRIPTION OF SYMBOLS 1 ... Rebar 2 ... Reinforcement 4 ... Form 12 ... Support body 13 ... Support 14 ... Step 21 ... Space G ... Installation surface P ... Pipe P '... Horizontal pipe

フロントページの続き (72)発明者 宮本 裕 東京都中央区日本橋小伝馬町7番2号 イ ゲタ建材株式会社内 (72)発明者 下江 正道 大阪府岸和田市春木本町7−4 有限会社 下江ラス型枠工業内Continued on the front page. (72) Inventor Hiroshi Miyamoto 7-2, Kodenmacho, Nihonbashi, Chuo-ku, Tokyo Inside Igeta Building Materials Co., Ltd. (72) Inventor Masamichi Shimoe 7-4 Haruki Honcho, Kishiwada-shi, Osaka Limited Ras Shimoe Limited Formwork industry

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 基礎等の設置面(G) 上に鉄筋(1) を組立
てて配筋(2) を形成した後、該配筋(2) の両側に固定手
段により型枠(4) を着脱可能に固定し、さらに下端部側
程幅広な支持体(13)が上面に複数突設された支持具本体
(12)を前記設置面(G) に固定した後、前記各支持体(13)
にパイプ(P) を挿着して該パイプ(P) を前記型枠(4) の
外側面に当接させて配し、さらにパイプ(P) 間に横パイ
プ(P')を架設した後、前記型枠(4) 間に形成された空間
(21)にコンクリートを打設せしめ、該コンクリートの硬
化後に前記両パイプ(P),(P')及び型枠(4) を除去してコ
ンクリート躯体を形成することを特徴とする構造物の型
枠工法。
After assembling a reinforcing bar (1) on an installation surface (G) of a foundation or the like to form a reinforcing bar (2), a formwork (4) is fixed to both sides of the reinforcing bar (2) by fixing means. A support body that is detachably fixed and has a plurality of support members (13) protruding from the upper surface that are wider toward the lower end.
After fixing (12) to the installation surface (G), each of the supports (13)
After the pipe (P) is inserted into the pipe (P), the pipe (P) is placed in contact with the outer surface of the formwork (4), and the horizontal pipe (P ') is erected between the pipes (P). The space formed between the formwork (4)
(21), concrete is poured, and after the concrete is hardened, the two pipes (P), (P ') and the formwork (4) are removed to form a concrete frame. Frame method.
【請求項2】 前記支持具本体(12)が帯板からなり且つ
該支持具本体(12)を折曲せしめて山形状の支持体(13)が
形成されてなる請求項1記載の構造物の型枠工法。
2. The structure according to claim 1, wherein said support body (12) is formed of a strip and said support body (12) is bent to form a mountain-shaped support (13). Formwork method.
【請求項3】 前記支持体(13)の上端部側に段部(14)が
形成されてなる請求項2記載の構造物の型枠工法。
3. The method according to claim 2, wherein a step (14) is formed on an upper end side of the support (13).
【請求項4】 前記支持体(13)が所定間隔を有して支持
具本体(12)に複数設けられてなる請求項1乃至3の何れ
に記載の構造物の型枠工法。
4. The method according to claim 1, wherein a plurality of the supports (13) are provided on the support body (12) at predetermined intervals.
JP35067996A 1996-12-27 1996-12-27 Construction method for shuttering for structure Pending JPH10184004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35067996A JPH10184004A (en) 1996-12-27 1996-12-27 Construction method for shuttering for structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35067996A JPH10184004A (en) 1996-12-27 1996-12-27 Construction method for shuttering for structure

Publications (1)

Publication Number Publication Date
JPH10184004A true JPH10184004A (en) 1998-07-14

Family

ID=18412118

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35067996A Pending JPH10184004A (en) 1996-12-27 1996-12-27 Construction method for shuttering for structure

Country Status (1)

Country Link
JP (1) JPH10184004A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108582426A (en) * 2018-04-23 2018-09-28 中国建筑第七工程局有限公司 A kind of producing device and production method of stiffened column
CN110593553A (en) * 2019-09-17 2019-12-20 中建八局轨道交通建设有限公司 End template reinforcing apparatus
KR102288211B1 (en) * 2020-12-23 2021-08-10 주식회사 대흥종합엔지니어링건축사사무소 Reinforce facility of form for building construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108582426A (en) * 2018-04-23 2018-09-28 中国建筑第七工程局有限公司 A kind of producing device and production method of stiffened column
CN108582426B (en) * 2018-04-23 2023-06-27 中国建筑第七工程局有限公司 Manufacturing device and manufacturing method of stiff column
CN110593553A (en) * 2019-09-17 2019-12-20 中建八局轨道交通建设有限公司 End template reinforcing apparatus
KR102288211B1 (en) * 2020-12-23 2021-08-10 주식회사 대흥종합엔지니어링건축사사무소 Reinforce facility of form for building construction

Similar Documents

Publication Publication Date Title
KR100558596B1 (en) Slab Form System
JPH10184004A (en) Construction method for shuttering for structure
JPH0280747A (en) Girder structure
JPH0742369A (en) Steel column construction method
CN213114970U (en) Sinking type composite assembly type building beam column node structure of reclaimed water plant
JP2000234410A (en) Driven form and slab construction method making use thereof
JPH10306582A (en) Formwork method of structure
JP2002339496A (en) Construction method of slab and construction method of ceiling
KR101078292B1 (en) Concrete slab mold assembly and method for constructing slab
JP3649663B2 (en) Residential foundation
KR20050112913A (en) A construction system of the wall/dome and the the method thereof it
JPH09268708A (en) Separator with retaining metal tool for reinforcements
JPH0754361A (en) Construction method of wall for slope face, building, or the like, and built-up reinforcement used therefor
KR0145358B1 (en) Method of building slabs
JPH06272378A (en) Supporting structure for precast concrete form
KR200317314Y1 (en) Bracket for supporting beam-forms
JP2713085B2 (en) Wall formwork mounting structure
JP3042513B2 (en) Reinforcing bar holder
KR0152383B1 (en) Device for connecting wall-forms
JPH06341167A (en) Working method for concrete structure
JPS6320780Y2 (en)
JP6700384B2 (en) Formwork panel assembly
JP4071142B2 (en) Beam formwork with beams
JP2651477B2 (en) Structure for mounting the outer frame of the building
JPH08109643A (en) Installation method of retaining wall