JPH1017223A - Control board replacing method for elevator - Google Patents

Control board replacing method for elevator

Info

Publication number
JPH1017223A
JPH1017223A JP8173659A JP17365996A JPH1017223A JP H1017223 A JPH1017223 A JP H1017223A JP 8173659 A JP8173659 A JP 8173659A JP 17365996 A JP17365996 A JP 17365996A JP H1017223 A JPH1017223 A JP H1017223A
Authority
JP
Japan
Prior art keywords
control panel
new
pull box
existing
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8173659A
Other languages
Japanese (ja)
Other versions
JP3195241B2 (en
Inventor
Yoshinori Hirota
喜則 広田
Masahito Sado
昌仁 佐度
Katsunori Ishizaka
勝則 石坂
Takashi Fukuzawa
隆 福沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP17365996A priority Critical patent/JP3195241B2/en
Publication of JPH1017223A publication Critical patent/JPH1017223A/en
Application granted granted Critical
Publication of JP3195241B2 publication Critical patent/JP3195241B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Elevator Control (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a control board replacing method for an elevator, which allows quick restarting of car operation, gives less troublesomeness to users, shorten the working time to a great extent, and generates less noises. SOLUTION: Before removing an existing control board 2, a new pull box 5 is installed on cylinder concrete 11 using a long stretching anchor 13 which penetrates the cylinder concrete 11 and is driven to a position where it is locked by the structural frame 10 of the floor of machine room, and upon installing a new control board 3 on the pull box 5, the old control board 2 is removed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、昇降機(エレベー
タ)の機械室に設置されている既設制御盤を新規のもの
と交換する際に適用される、昇降機の制御盤交換方法に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for exchanging a control panel of an elevator, which is applied when replacing an existing control panel installed in a machine room of an elevator (elevator) with a new one.

【0002】[0002]

【従来の技術】昇降機を構成する各種機器や部品は、長
年使用すると経年劣化して信頼性や安全性に支障をきた
すようになる。特に、機械室に設置されている制御盤
は、乗かごの呼び登録信号や階床表示信号などの電気信
号を出力したり、乗かごの運行制御を行ったりする極め
て重要な機器であるが、この制御盤には、経年劣化しや
すい接触器や開閉器のコイル部、接点部等が組み込まれ
ているので、長期間経過すると既設制御盤が故障して、
乗かご内に乗客が閉じ込められてしまう等の重大事故を
引き起こす危険性がある。そのため、不具合が懸念され
るようになった既設制御盤は、速やかに新規の制御盤と
交換する必要がある。
2. Description of the Related Art Various equipment and parts constituting an elevator are deteriorated with time when used for a long time, so that reliability and safety are hindered. In particular, the control panel installed in the machine room is an extremely important device that outputs electric signals such as a car registration signal and a floor display signal, and controls the operation of the car. This control panel incorporates a contactor, a switch coil, a contact point, etc., which are susceptible to aging.
There is a risk of causing serious accidents such as passengers being trapped in the car. Therefore, it is necessary to replace the existing control panel with a new control panel promptly when there is a concern about the malfunction.

【0003】従来、かかる制御盤の交換作業は、概略次
のような手順で行われていた。
Conventionally, such control panel replacement work has been generally performed in the following procedure.

【0004】すなわち、機械室に設置されている既設制
御盤には昇降路側からケーブルが接続されているので、
まず、このケーブルを既設制御盤の近傍で切断してか
ら、既設制御盤を撤去し、次いで、それまで既設制御盤
が設置されていた場所に新設制御盤を据え付けて、この
新設制御盤に昇降路側からの前記ケーブルを接続する。
そして、通常は制御盤の交換時に昇降路内の機器類の交
換も行われるので、新設制御盤への交換作業が完了した
なら、乗かごを作業床として、昇降路内の機器や部品等
の交換作業を行う。
That is, since a cable is connected to the existing control panel installed in the machine room from the hoistway side,
First, cut this cable near the existing control panel, remove the existing control panel, and then install the new control panel in the place where the existing control panel was installed, and move up and down the new control panel. Connect the cable from the roadside.
Normally, the equipment in the hoistway is also replaced when the control panel is replaced, so if the replacement work for the new control panel is completed, the car as a work floor will be used as the equipment and parts in the hoistway. Perform replacement work.

【0005】[0005]

【発明が解決しようとする課題】ところで、上述した従
来の制御盤交換方法は、既設制御盤の撤去作業を行った
後、新設制御盤の据付け作業を行うというものである
が、これら一連の作業が完了するまでの間、乗かごを運
行させることはできない。また、乗かごの運行が再開さ
れても通常は、昇降路内機器類の交換作業を行わなけれ
ばならない。それゆえ、かかる従来技術を適用した場
合、三日間程度は昇降機の一般利用を禁止せざるを得
ず、その間、利用者に対して迷惑をかけることになる。
とりわけ、昇降機が一台しか設置されていないオフィス
ビルや集合住宅などの場合、このように長い時間にわた
って昇降機を利用できなくさせると多大な迷惑を及ぼし
てしまうので、その改善が望まれていた。。
The above-mentioned conventional control panel replacement method involves removing the existing control panel and then installing the new control panel. Until is completed, the car cannot be operated. In addition, even if the operation of the car is resumed, it is usually necessary to replace the equipment in the hoistway. Therefore, when such a conventional technique is applied, general use of the elevator must be prohibited for about three days, and during that time, the user is inconvenienced.
In particular, in the case of an office building or an apartment house where only one elevator is installed, if the elevator cannot be used for such a long period of time, it will cause a great deal of inconvenience. .

【0006】また、既設制御盤を設置するために機械室
床の躯体上に据え付けられる既設プルボックスは、据付
け後に周囲にシンダーコンクリートを流し込んで仕上げ
られることが多いが、その場合、機械室床の躯体上に敷
設されたシンダーコンクリートに既設プルボックスが埋
め込まれた状態となる。したがって、このような既設プ
ルボックスを撤去するとなると、その周囲のシンダーコ
ンクリートを削り取るという煩雑で騒音の大きな作業を
行わねばならず、しかも、既設プルボックスを撤去した
場所に新設プルボックスを据え付ける際には、シンダー
コンクリートを削り取って生じたすき間をモルタル等で
補修しておかねばならない。それゆえ、既設プルボック
スがシンダーコンクリートに包囲されている場合、従来
の制御盤交換方法を適用すると作業時間が大幅に増加し
てしまい、且つ、騒音によりビル居住者等に迷惑をかけ
やすいという問題点があった。
In addition, an existing pull box, which is installed on a frame of a machine room floor to install an existing control panel, is often finished by pouring cinder concrete around after installation. The existing pull box is embedded in the cinder concrete laid on the skeleton. Therefore, when removing such an existing pull box, it is necessary to perform complicated and loud work of scraping the surrounding cinder concrete, and when installing a new pull box in the place where the existing pull box was removed. Must be repaired with a mortar or the like to create a gap created by scraping cinder concrete. Therefore, when the existing pull box is surrounded by cinder concrete, the application of the conventional control panel replacement method greatly increases the work time, and the noise tends to bother building residents and the like. There was a point.

【0007】本発明は上述した従来技術の課題に鑑みて
なされたもので、その目的は、乗かごの運行が速やかに
再開できて利用者に迷惑をかけることが少なく、且つ作
業時間が大幅に短縮できて騒音も発生しにくい、昇降機
の制御盤交換方法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems of the prior art, and has as its object that the operation of a car can be restarted promptly so that there is little inconvenience to the user and the work time is greatly reduced. An object of the present invention is to provide a method of exchanging a control panel of an elevator, which can be shortened and noise is hardly generated.

【0008】[0008]

【課題を解決するための手段】本発明の上述した目的
は、既設制御盤の撤去前に機械室に新設プルボックスを
据え付け、この新設プルボックス上に新設制御盤を設置
した後、既設制御盤を撤去することによって達成され
る。このようにすれば、既設制御盤を運転させたまま、
新設制御盤の据付け作業や、これに仮設配線用ケーブル
等を接続する作業を行うことができるので、撤去に先立
ち既設制御盤の運転を停止させても、すぐに新設制御盤
を運転させることができて、乗かごの運行が速やかに再
開できる。したがって、既設制御盤の撤去作業と同時進
行で、乗かごを作業床とする昇降路内機器類の交換作業
を行うことも可能となる。
SUMMARY OF THE INVENTION It is an object of the present invention to install a new pull box in a machine room before removing an existing control panel, install the new control panel on the new pull box, and then remove the existing control panel. Is achieved by removing In this way, with the existing control panel running,
It is possible to install the new control panel and connect temporary wiring cables to it, so that even if the operation of the existing control panel is stopped prior to removal, the new control panel can be operated immediately. The operation of the car can be resumed promptly. Therefore, it becomes possible to carry out the work of exchanging the equipment in the hoistway using the car as the work floor simultaneously with the work of removing the existing control panel.

【0009】また、既設制御盤用のプルボックスがシン
ダーコンクリートに埋め込まれている場合には、このシ
ンダーコンクリートを貫通して機械室床の躯体に到達す
るように穿孔作業を行った後、長尺ボルトアンカーを前
記躯体に係止される位置まで打設し、この長尺ボルトア
ンカーにて新設プルボックスをシンダーコンクリート上
に据え付けるようにすれば、この新設プルボックスに対
して十分大きな据付け強度を確保することができ、且
つ、シンダーコンクリートを削り取ったり補修したりす
る必要がなくなる。
In the case where the pull box for the existing control panel is embedded in the cinder concrete, a perforation operation is performed to penetrate the cinder concrete to reach the frame of the machine room floor, and then the elongate work is performed. If the bolt anchor is driven to the position where it is locked to the skeleton and the new pull box is installed on the cinder concrete with this long bolt anchor, a sufficiently large installation strength is secured for this new pull box. And there is no need to scrape or repair the cinder concrete.

【0010】[0010]

【発明の実施の形態】以下、本発明方法の実施形態を図
面に基づいて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, embodiments of the method of the present invention will be described with reference to the drawings.

【0011】まず、本発明方法が適用される昇降機の全
体構成について簡単に説明すると、図7に示すように、
上部の機械室1には、制御盤(既設制御盤)2や巻上機
7等が配設されていて、昇降路14には、ロープ18に
て連結された乗かご15および釣合いおもり19が懸吊
されている。そして、このロープ18が巻上機7のシー
ブ7Aに巻き掛けられているので、制御盤2により制御
される巻上機7の電動機6がシーブ7Aを回転駆動させ
ると、ロープ18を介して乗かご15が昇降路14内を
昇降するようになっている。また、昇降路14内には、
乗かご15の呼び登録信号や階床表示信号などの各種電
気信号を送信するため、塔内配線16やテールコード1
7が設けられており、これらは機械室1に引き回されて
制御盤2に接続されている。
First, the overall structure of an elevator to which the method of the present invention is applied will be briefly described. As shown in FIG.
A control panel (existing control panel) 2, a hoisting machine 7, and the like are disposed in the upper machine room 1. A hoistway 14 is provided with a car 15 and a counterweight 19 connected by a rope 18. It is suspended. Since the rope 18 is wound around the sheave 7A of the hoisting machine 7, when the electric motor 6 of the hoisting machine 7 controlled by the control panel 2 drives the sheave 7A to rotate, the rope 18 is The car 15 moves up and down in the hoistway 14. Also, in the hoistway 14,
In order to transmit various electric signals such as a call registration signal of the car 15 and a floor display signal, the tower wiring 16 and the tail cord 1
7 are provided and these are routed to the machine room 1 and connected to the control panel 2.

【0012】かかる昇降機において、経年劣化した既設
制御盤2を新規のものと交換する作業は、次のような手
順で実施する。
In such an elevator, the operation of replacing the existing control panel 2 which has deteriorated over time with a new one is performed in the following procedure.

【0013】まず、図1に示すように、機械室1内の既
設制御盤2の設置場所とは別の場所に新設制御盤3を据
え付けて、この新設制御盤3に図示せぬ電源線やアース
線を接続しておく。また、この新設制御盤3に取り付け
た仮設配線用ケーブル9を、巻上機7の電動機6近傍に
引き回しておく。そして、既設制御盤2および電動機6
の運転を停止させた状態で、前記仮設配線用ケーブル9
を電動機6に接続してから、新設制御盤3および電動機
6の運転を開始させる。したがって、既設制御盤2に運
行制御されていた乗かご15は、仮設配線用ケーブル9
を電動機6に接続するために必要な僅かな時間(10分
間程度)だけ運行不能となるものの、その後はすぐに新
設制御盤3に運行制御されることとなる。それゆえ、こ
の後、機械室1において既設制御盤2や配管8内の既設
ケーブルの撤去作業を行いつつ、これと同時進行で、低
速運転が可能な乗かご15を作業床とする昇降路14内
の機器や部品等の交換作業、例えば塔内配線16やテー
ルコード17やかご機器等の交換作業を行うことができ
る。
First, as shown in FIG. 1, a new control panel 3 is installed in a place different from the place where the existing control panel 2 is installed in the machine room 1, and a power line (not shown) is connected to the new control panel 3. Connect the ground wire. Further, the temporary wiring cable 9 attached to the newly installed control panel 3 is routed near the electric motor 6 of the hoisting machine 7. Then, the existing control panel 2 and the electric motor 6
In a state where the operation of the temporary wiring is stopped,
Is connected to the motor 6, and then the operation of the new control panel 3 and the motor 6 is started. Therefore, the car 15 whose operation is controlled by the existing control panel 2 is replaced with the temporary wiring cable 9.
Although the operation becomes impossible for a short time (about 10 minutes) necessary for connecting the motor to the electric motor 6, the operation is immediately controlled by the new control panel 3. Therefore, after this, while removing the existing control panel 2 and the existing cable in the pipe 8 in the machine room 1, at the same time, the hoistway 14 using the car 15 capable of low-speed operation as a work floor is simultaneously operated. It is possible to carry out an exchange work of equipment and parts inside the tower, for example, an exchange work of the tower wiring 16, the tail cord 17 and the car equipment.

【0014】こうして既設制御盤2を撤去したなら、そ
の既設プルボックス4と新設制御盤3との間に、図2に
示すように配線用ダクト8Aを設置し、このダクト8A
内および前記配管8内に本設配線用ケーブル(図示せ
ず)を配設しておき、該ケーブルを接続し終えたなら、
既設プルボックス4にプルボックスカバー4Aを取り付
けておく。しかる後、運転を一旦停止させた電動機6に
対し、仮設配線用ケーブル9の取外しおよび前記本設配
線用ケーブルの取付を行ってから、この電動機6の運転
を開始させることにより、仮設配線から本設配線への切
替が完了する。これにより、既設制御盤2を新設制御盤
3に交換した後も、既設プルボックス4や既設配管8
を、本設配線用の中継ボックスや配管として活用するこ
とができる。なお、仮設配線用ケーブル9の取外し作業
や本設配線用ケーブルの取付作業を行う際に必要な電動
機6の運転停止時間は、10分間程度であり、その後は
すぐに本設配線用ケーブルを介して乗かご15の運行を
再開させることができる。
When the existing control panel 2 is removed in this way, a wiring duct 8A is installed between the existing pull box 4 and the new control panel 3 as shown in FIG.
A main wiring cable (not shown) is provided in the inside and the pipe 8, and when the connection of the cable is completed,
The pull box cover 4A is attached to the existing pull box 4. Thereafter, after removing the temporary wiring cable 9 and attaching the permanent wiring cable to the motor 6 once stopped, the operation of the motor 6 is started, so that the temporary wiring is removed from the temporary wiring. Switching to the installation wiring is completed. As a result, even after the existing control panel 2 is replaced with the new control panel 3, the existing pull box 4 and the existing piping 8
Can be used as a relay box or piping for permanent wiring. The operation stoppage time of the electric motor 6 required for removing the temporary wiring cable 9 and attaching the permanent wiring cable is about 10 minutes, and then immediately after the temporary wiring cable is connected. The operation of the car 15 can be resumed.

【0015】このように本実施形態においては、既設制
御盤2を運転させたまま、新設制御盤3の据付け作業
や、これに仮設配線用ケーブル9等を接続する作業を行
うことができるので、撤去に先立ち既設制御盤2の運転
を停止させても、すぐに新設制御盤3を運転させること
ができ、それゆえ、乗かご15の運行を停止させなけれ
ばならない稼働停止時間が極めて短くなっている。しか
も、本実施形態は、既設制御盤2等の撤去作業と同時進
行で、乗かご15を作業床とする昇降路14内の機器類
の交換作業が行えるようになっていて、且つ、既設プル
ボックス4や既設配管8が活用できて撤去不要となって
いるため、作業効率が良好で作業内容も簡素化されてい
る。それゆえ、全体の作業時間が従来技術に比して大幅
に短縮できて、この昇降機の一般利用を長時間禁止する
必要がなくなり、よって利用者に多大な迷惑を及ぼすこ
となく作業を完了させることができる。
As described above, in the present embodiment, the operation of installing the new control panel 3 and the operation of connecting the temporary wiring cable 9 and the like thereto can be performed while the existing control panel 2 is operated. Even if the operation of the existing control panel 2 is stopped prior to the removal, the new control panel 3 can be operated immediately, so that the operation stoppage time in which the operation of the car 15 must be stopped becomes extremely short. I have. Moreover, in the present embodiment, the replacement work of the equipment in the hoistway 14 using the car 15 as a work floor can be performed simultaneously with the removal work of the existing control panel 2 and the like. Since the box 4 and the existing pipe 8 can be utilized and the removal is unnecessary, the work efficiency is good and the work content is simplified. Therefore, the overall work time can be significantly reduced as compared with the prior art, and there is no need to prohibit the general use of the elevator for a long time, thereby completing the work without causing much trouble to the user. Can be.

【0016】また、本実施形態では、新設制御盤3用の
新設プルボックス5を、図3,4に示すように、機械室
床の躯体10に到達する長尺ボルトアンカー13を用い
て据え付けている。
In this embodiment, the new pull box 5 for the new control panel 3 is installed using a long bolt anchor 13 which reaches the frame 10 on the floor of the machine room as shown in FIGS. I have.

【0017】すなわち、既設プルボックス4は図3に示
すように、機械室床の躯体10上に敷設されたシンダー
コンクリート11に埋め込まれた状態になっているが、
このシンダーコンクリート11にボルトアンカーを打ち
込むだけでは十分な引っ張り強度(据付け強度)を確保
することはできないので、新設プルボックス5の据付け
に際して本実施形態では、シンダーコンクリート11を
貫通して躯体10に到達するように穿孔作業を行った
後、長尺ボルトアンカー13を該躯体10に直接係止さ
れる位置まで打設してナット13Cを締結することによ
り、この長尺ボルトアンカー13にて新設プルボックス
5をシンダーコンクリート11上に据え付けることとし
た。このようにしてあると、通常のボルトアンカー12
を用いて既設プルボックス4を躯体10に据え付けた場
合と同等の引っ張り強度が得られるので、新設プルボッ
クス5を強固に据え付けることができる。
That is, as shown in FIG. 3, the existing pull box 4 is embedded in the cinder concrete 11 laid on the frame 10 of the machine room floor.
Since a sufficient tensile strength (installation strength) cannot be ensured only by driving a bolt anchor into the cinder concrete 11, in the present embodiment, when the new pull box 5 is installed, it reaches the frame 10 through the cinder concrete 11 in this embodiment. After the drilling work is performed, the long bolt anchor 13 is driven to a position where the long bolt anchor 13 is directly locked to the frame 10, and the nut 13C is fastened. 5 was installed on the cinder concrete 11. In this way, the normal bolt anchor 12
Thus, the same pulling strength as that obtained when the existing pull box 4 is installed on the skeleton 10 can be obtained, so that the new pull box 5 can be installed firmly.

【0018】なお、図4に示すように、本実施形態で採
用した長尺ボルトアンカー13は、ボルト部と略同等の
長さの長尺スリーブ13Aを備えている。その理由は、
仮に図5に示すように、スリーブ13Bの長さが通常の
ボルトアンカー並みの長尺ボルトアンカー13を採用し
たとすると、シンダーコンクリート11との間に生じる
すき間によって、該長尺ボルトアンカー13に損傷をき
たすような大きな曲げモーメントが発生しやすくなるか
らである。換言するなら、本実施形態のように長尺スリ
ーブ13Aを有する長尺ボルトアンカー13を用いれ
ば、シンダーコンクリート11との間にすき間を生じる
ことがないので、曲げモーメントが軽減できて損傷が防
止できる。
As shown in FIG. 4, the long bolt anchor 13 employed in this embodiment includes a long sleeve 13A having a length substantially equal to that of the bolt portion. The reason is,
As shown in FIG. 5, if a long bolt anchor 13 having a length similar to that of a normal bolt anchor is used as the sleeve 13B, the long bolt anchor 13 is damaged by a gap created between the sleeve 13B and the cinder concrete 11. This is because a large bending moment, which causes the bending, is likely to be generated. In other words, if the long bolt anchor 13 having the long sleeve 13A is used as in the present embodiment, no gap is generated between the long bolt anchor 13 and the cinder concrete 11, so that the bending moment can be reduced and damage can be prevented. .

【0019】また、このような長尺ボルトアンカー13
を用いることなく、仮に図6に示すように、通常のボル
トアンカー12を用いて新設プルボックス5を機械室床
の躯体10上に据え付けようとすると、据付け前にシン
ダーコンクリート11を削り取り、且つ据付け後にはシ
ンダーコンクリート11の欠損個所をモルタル11Aに
て補修しなければならないので、極めて煩雑で騒音の大
きな作業を余儀なくされる。したがって、長尺ボルトア
ンカー13を用いて新設プルボックス5をシンダーコン
クリート11上に据え付けてやれば、作業時間ならびに
騒音発生を大幅に低減することができる。
Further, such a long bolt anchor 13
If the new pull box 5 is to be installed on the frame 10 on the floor of the machine room using a normal bolt anchor 12 as shown in FIG. 6 without using slab concrete, the cinder concrete 11 is scraped off and installed. Later, the defective portion of the cinder concrete 11 must be repaired with the mortar 11A, so that a very complicated and noisy operation is required. Therefore, if the new pull box 5 is installed on the cinder concrete 11 using the long bolt anchor 13, the working time and the generation of noise can be significantly reduced.

【0020】[0020]

【発明の効果】本発明は以上説明したような形態で実施
され、以下に記載されるような効果を奏する。
The present invention is embodied in the form described above, and has the following effects.

【0021】既設制御盤を運転させたまま、新設制御盤
の据付け作業を行うことができるので、撤去に先立ち既
設制御盤の運転を停止させても、すぐに新設制御盤を運
転させて乗かごの運行再開が行える。したがって、既設
制御盤の撤去作業と同時進行で、乗かごを作業床とする
昇降路内機器類の交換作業を行うことができて、作業時
間の大幅な短縮化が図れ、利用者に迷惑をかけることが
少なくなる。
[0021] Since the installation work of the new control panel can be performed while the existing control panel is in operation, even if the operation of the existing control panel is stopped prior to removal, the new control panel is immediately operated and the car is operated. Service can be resumed. Therefore, at the same time as the removal work of the existing control panel, it is possible to replace the equipment in the hoistway with the car as the work floor, greatly shortening the work time and inconveniencing users. It is less likely to apply.

【0022】また、既設制御盤用のプルボックスがシン
ダーコンクリートに埋め込まれている場合には、このシ
ンダーコンクリートを貫通して機械室床の躯体に到達す
るように穿孔作業を行った後、長尺ボルトアンカーを前
記躯体に係止される位置まで打設し、この長尺ボルトア
ンカーにて新設プルボックスをシンダーコンクリート上
に据え付けるようにすれば、この新設プルボックスに対
して十分大きな据付け強度を確保することができ、且
つ、シンダーコンクリートを削り取ったり補修したりす
る必要がなくなることから、作業時間が一層短縮できて
騒音も発生しにくくなる。
In the case where the pull box for the existing control panel is embedded in the cinder concrete, drilling work is performed so as to penetrate the cinder concrete and reach the frame of the machine room floor, and then perform a long operation. If the bolt anchor is driven to the position where it is locked to the skeleton and the new pull box is installed on the cinder concrete with this long bolt anchor, a sufficiently large installation strength is secured for this new pull box. In addition, since it is not necessary to scrape or repair the cinder concrete, the working time can be further reduced and noise is less likely to be generated.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本実施形態において既設制御盤の撤去前に新設
制御盤を据え付けた様子を示す説明図である。
FIG. 1 is an explanatory diagram showing a state in which a new control panel is installed before removing an existing control panel in the present embodiment.

【図2】本実施形態において既設制御盤を撤去した後の
様子を示す説明図である。
FIG. 2 is an explanatory diagram showing a state after removing an existing control panel in the present embodiment.

【図3】本実施形態における新設プルボックスおよび既
設プルボックスの据付け構造を示す説明図である。
FIG. 3 is an explanatory diagram showing an installation structure of a new pull box and an existing pull box in the present embodiment.

【図4】図3に示す新設プルボックスの据付け構造の拡
大断面図である。
FIG. 4 is an enlarged cross-sectional view of the installation structure of the new pull box shown in FIG.

【図5】プルボックス据付け構造の比較例である。FIG. 5 is a comparative example of a pull box installation structure.

【図6】プルボックス据付け構造の他の比較例である。FIG. 6 is another comparative example of the pull box installation structure.

【図7】本発明が適用される昇降機の全体構成を示す説
明図である。
FIG. 7 is an explanatory diagram showing an overall configuration of an elevator to which the present invention is applied.

【符号の説明】[Explanation of symbols]

1 機械室 2 既設制御盤 3 新設制御盤 4 既設プルボックス 5 新設プルボックス 6 電動機 7 巻上機 8 配管 8A 配線用ダクト 9 仮設配線用ケーブル 10 躯体 11 シンダーコンクリート 13 長尺ボルトアンカー 13A 長尺スリーブ 13C ナット 14 昇降路 15 乗かご DESCRIPTION OF SYMBOLS 1 Machine room 2 Existing control panel 3 New control panel 4 Existing pull box 5 New pull box 6 Electric motor 7 Hoisting machine 8 Piping 8A Wiring duct 9 Temporary wiring cable 10 Body 11 Cinder concrete 13 Long bolt anchor 13A Long sleeve 13C nut 14 hoistway 15 car

───────────────────────────────────────────────────── フロントページの続き (72)発明者 福沢 隆 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステムサービス内 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Takashi Fukuzawa 1-6-6 Kandanishikicho, Chiyoda-ku, Tokyo Within Hitachi Building System Service Co., Ltd.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 昇降機の既設制御盤を新設制御盤と交換
する制御盤交換方法において、既設制御盤の撤去前に機
械室に新設プルボックスを据え付け、この新設プルボッ
クス上に新設制御盤を設置した後、既設制御盤を撤去す
ることを特徴とする昇降機の制御盤交換方法。
In a control panel replacement method for replacing an existing control panel of an elevator with a new control panel, a new pull box is installed in a machine room before removing the existing control panel, and the new control panel is installed on the new pull box. And then removing the existing control panel. 3. A method for replacing a control panel of an elevator.
【請求項2】 請求項1の記載において、機械室床の躯
体上に敷設されて既設プルボックスを包囲しているシン
ダーコンクリートを貫通して該躯体に到達するように穿
孔作業を行った後、長尺ボルトアンカーを前記躯体に係
止される位置まで打設し、この長尺ボルトアンカーにて
前記新設プルボックスを前記シンダーコンクリート上に
据え付けることを特徴とする昇降機の制御盤交換方法。
2. The method according to claim 1, wherein the drilling work is performed after penetrating the cinder concrete laid on the frame of the machine room floor and surrounding the existing pull box to reach the frame. A method for exchanging a control panel of a lift, wherein a long bolt anchor is cast to a position where the long bolt anchor is locked to the frame, and the new pull box is mounted on the cinder concrete with the long bolt anchor.
【請求項3】 請求項2の記載において、前記長尺ボル
トアンカーが、そのボルト部と略同等の長さの長尺スリ
ーブを備えていることを特徴とする昇降機の制御盤交換
方法。
3. The method according to claim 2, wherein the long bolt anchor includes a long sleeve having substantially the same length as the bolt portion.
JP17365996A 1996-07-03 1996-07-03 Elevator control panel replacement method Expired - Fee Related JP3195241B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17365996A JP3195241B2 (en) 1996-07-03 1996-07-03 Elevator control panel replacement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17365996A JP3195241B2 (en) 1996-07-03 1996-07-03 Elevator control panel replacement method

Publications (2)

Publication Number Publication Date
JPH1017223A true JPH1017223A (en) 1998-01-20
JP3195241B2 JP3195241B2 (en) 2001-08-06

Family

ID=15964724

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17365996A Expired - Fee Related JP3195241B2 (en) 1996-07-03 1996-07-03 Elevator control panel replacement method

Country Status (1)

Country Link
JP (1) JP3195241B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015027908A (en) * 2013-07-30 2015-02-12 東芝エレベータ株式会社 Control panel for elevator
JP2018118797A (en) * 2017-01-23 2018-08-02 三菱電機ビルテクノサービス株式会社 Elevator device attaching tool and elevator device attaching method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015027908A (en) * 2013-07-30 2015-02-12 東芝エレベータ株式会社 Control panel for elevator
JP2018118797A (en) * 2017-01-23 2018-08-02 三菱電機ビルテクノサービス株式会社 Elevator device attaching tool and elevator device attaching method

Also Published As

Publication number Publication date
JP3195241B2 (en) 2001-08-06

Similar Documents

Publication Publication Date Title
JP3195241B2 (en) Elevator control panel replacement method
JP2002138659A (en) Simple knockdown gondola suspension type work apparatus
CN110997540B (en) Elevator renewing method and auxiliary disc
JP2023171488A (en) Elevator renewal method and elevator
KR20190027422A (en) Low noise elevator
JP4592464B2 (en) Control operation system during earthquake for elevators
JP3494582B2 (en) Elevator control panel
JP4610386B2 (en) Elevator control panel renewal method
JP3409997B2 (en) Elevator control device
JP5105994B2 (en) Broken pole repair device and broken pole repair method using the same
JPS63258385A (en) Method of renewal construction of elevator
JP2869055B1 (en) Iron plate reinforcement method of concrete ceiling surface and its winch
CN220449650U (en) Cable hoisting auxiliary device
JP2944025B2 (en) Cast-in-place pile reinforced cage construction equipment
JP2002003126A (en) Repairing method of elevator
JPH07285754A (en) Modifying work method for elevator
JP3570054B2 (en) Operation display for elevator platform
WO2019064400A1 (en) Replacement work method and signal conversion device
JP3202422B2 (en) How to modify the elevator
JPS63258384A (en) Method of renewal construction of elevator
JPH08209849A (en) Installation construction of ceiling and attic facility
JPH1087222A (en) Renewal method for elevator
JP2886414B2 (en) Building and building renovation methods
CN116812719A (en) Application method of construction lifter and construction lifter
JPH11106161A (en) Governor rope hooking preventive bracket of elevator

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees