JPH10159476A - Slurry flying curing device for excavator - Google Patents

Slurry flying curing device for excavator

Info

Publication number
JPH10159476A
JPH10159476A JP32433296A JP32433296A JPH10159476A JP H10159476 A JPH10159476 A JP H10159476A JP 32433296 A JP32433296 A JP 32433296A JP 32433296 A JP32433296 A JP 32433296A JP H10159476 A JPH10159476 A JP H10159476A
Authority
JP
Japan
Prior art keywords
excavation
curing
cage
excavating
excavator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP32433296A
Other languages
Japanese (ja)
Inventor
Yoshiharu Shimamura
好春 島村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP32433296A priority Critical patent/JPH10159476A/en
Publication of JPH10159476A publication Critical patent/JPH10159476A/en
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent flying of excavation slurry to an adjacent area when an excavation work is executed at an area adjacent to a side walk and houses and to remarkably improve an excavation work. SOLUTION: A curing cage 20 having a curing sheet 24 laminated to the side of a box-shaped frame body is arranged in a manner to surround the outer periphery of an excavation part 10. When the excavation part 10 is moved in an excavation hole to effect an excavation work, the curing cage 20 waits on a ground near the excavation hole. Further, when the excavation part 10 is raised to a ground, an excavation engaging part 32 of the excavation part 10 is engaged from below with the cage engaging part of the curing cage 20 and the curing cage 20 is also simultaneously raised and the upper part of the excavation part 10 is covered with the curing cage 20. This constitution prevents flying of excavation slurry even when an excavation work is executed at an area to which a side walk and houses are situated adjacently since the upper part of the excavation part 10 is covered with the curing cage 20 when the excavation part 10 is revolved to convey out soil.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、掘削機の掘削部
が土砂を搬出する際に、周囲に泥水が飛散するのを防止
する掘削機の泥水飛散養生装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a muddy splash curing device for an excavator which prevents muddy water from splashing around when the excavating section of the excavator carries out earth and sand.

【0002】[0002]

【従来の技術】図6は、歩道2近くの地面に連続壁を施
工するために、連壁掘削機4を使用して掘削溝を掘削し
ている様子を示したものである。
2. Description of the Related Art FIG. 6 shows a state in which a trench is excavated using a continuous wall excavator 4 in order to construct a continuous wall on the ground near a sidewalk 2.

【0003】連壁掘削機4は自走式機械であり、ブーム
6の先端まで掛け渡されたワイヤロープ8に、掘削部1
0が昇降自在に吊り下げられている。掘削部10は、深
い掘削溝16を掘削するために上下方向に長尺な構造体
であり、下端部に開閉式のバケット14を設けている。
なお、図中符号15は、ワイヤロープ8や下方に延びる
油圧ホース等の周囲を囲っている蛇腹である。
[0003] The wall excavator 4 is a self-propelled machine, and a wire rope 8 extended to the tip of a boom 6 is attached to an excavation unit 1.
0 is hung up and down freely. The excavation unit 10 is a vertically long structure for excavating a deep excavation groove 16, and has an openable / closable bucket 14 at a lower end.
Reference numeral 15 in the drawing denotes a bellows surrounding the wire rope 8 and a hydraulic hose extending downward.

【0004】そして、掘削溝16の開口部に埋設したガ
イドウォール12にスライドさせながら掘削部10を下
降していき、掘削底部の土砂をバケット14でつかみ取
る動作を行い、次いで、地上まで上昇した掘削部10を
土砂搬出位置17まで旋回し、バケット14内の土砂を
排出する動作を繰り返し行うことにより所定深さの掘削
溝16が掘削されていく。
The excavating section 10 is lowered while sliding on the guide wall 12 buried in the opening of the excavation groove 16, and the earth and sand at the bottom of the excavation is grabbed by the bucket 14, and then the ground is raised to the ground. The excavation part 10 is turned to the earth and sand discharge position 17, and the operation of discharging the earth and sand in the bucket 14 is repeatedly performed, so that the excavation groove 16 having a predetermined depth is excavated.

【0005】[0005]

【発明が解決しようとする課題】ところで、図6に示す
ように、歩道2と掘削位置との境界には、所定高さの養
生シート18が配設されている。これは、掘削部10が
旋回するときに掘削部10に付着した泥水が歩道2側に
飛散するのを防止するために養生シート18を配設して
いる。
As shown in FIG. 6, a curing sheet 18 having a predetermined height is provided at the boundary between the sidewalk 2 and the excavation position. In this configuration, a curing sheet 18 is provided to prevent muddy water attached to the excavation unit 10 from scattering toward the sidewalk 2 when the excavation unit 10 turns.

【0006】この養生シート18は、境界位置に設置し
た仮囲いに張っているが、図5の掘削現場では、深い掘
削溝16を掘削するために上下方向に長尺な掘削部10
が旋回するので、歩道2側へ泥水を飛散させないために
は、仮囲いに替えて背の高い養生足場に養生シート18
を貼らなければならない。
[0006] The curing sheet 18 is stretched over a temporary enclosure installed at the boundary position. However, in the excavation site shown in FIG.
In order to prevent muddy water from splashing to the sidewalk 2 side, the curing sheet 18 is placed on a tall curing scaffold instead of the temporary enclosure.
Must be stuck.

【0007】しかしながら、歩道2と掘削位置との間の
限られたスペースでは、養生足場を組むことが難しい。
また、高い養生足場を組むと、強風により養生シート1
8が煽われやすく、歩道2上の通行人の安全性の面で問
題がある。
However, it is difficult to form a curing scaffold in a limited space between the sidewalk 2 and the excavation position.
In addition, if a high curing scaffold is assembled, the curing sheet 1
8 is easily swayed, and there is a problem in the safety of passers-by on sidewalk 2.

【0008】そのため、現時点では、旋回する前に掘削
部10を所定時間停止させ、掘削部10に付着した泥水
を十分に落としてから掘削部10を旋回させるようにし
ているが、掘削作業の能率化の面で問題がある。
For this reason, at present, the excavating section 10 is stopped for a predetermined time before turning, and the muddy water adhering to the excavating section 10 is sufficiently dropped before the excavating section 10 is turned. There is a problem in terms of conversion.

【0009】この発明は上記事情に鑑みてなされたもの
であり、歩道や家屋等が隣接している地域で掘削作業を
行う際に、隣接地域への掘削泥水の飛散を防止し、掘削
作業の能率を大幅に改善することが可能な掘削機の泥水
飛散養生装置を提供することを目的とする。
The present invention has been made in view of the above circumstances, and when digging work is performed in an area where a sidewalk, a house, or the like is adjacent, scattering of drilling muddy water to an adjacent area is prevented, and An object of the present invention is to provide a muddy water splash curing device of an excavator capable of greatly improving efficiency.

【0010】[0010]

【課題を解決するための手段】上記課題を解決するため
に、本発明の掘削機の泥水飛散養生装置は、下端にグラ
ブ式バケットを備えた掘削部により掘削穴を掘削し、前
記バケットがつかみ取った土砂を、地上に上昇した前記
掘削部が土砂搬出位置まで旋回した後に排出するように
した掘削機において、函形状の枠体の側面に養生シート
を貼設した養生籠を、前記掘削部の外周を囲むように付
設し、前記掘削部が前記掘削穴に入り込んで掘削作業を
行うときに、前記養生籠が前記掘削穴近くの地上で待機
し、前記掘削部が地上に上昇するときに、前記養生籠に
設けた籠係合部に前記掘削部に設けた掘削部係合部が下
側から係合して前記養生籠も同時に上昇し、当該養生籠
が前記掘削部の上部を覆うようにした装置である。
In order to solve the above-mentioned problem, a muddy water splash curing device of an excavator according to the present invention excavates an excavation hole by an excavation unit having a grab-type bucket at a lower end, and the bucket is grasped. In an excavator configured to discharge the taken earth and sand after the excavation unit ascended to the ground turns to a sediment discharge position, a curing cage having a curing sheet attached to a side surface of a box-shaped frame body is attached to the excavation unit. When the excavation part enters the excavation hole and performs excavation work, the curing basket waits on the ground near the excavation hole, and the excavation part rises to the ground. The excavating part engaging part provided on the excavating part engages with the cage engaging part provided on the curing cage from below, and the curing cage rises at the same time, and the curing cage covers the upper part of the excavating part. It is the device which did in this way.

【0011】[0011]

【発明の実施の形態】以下、本発明の一実施形態につい
て、図面に基づいて説明する。なお、図6に示した構成
と同一構成部分には、同一符号を付してその説明を省略
する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to the drawings. The same components as those shown in FIG. 6 are denoted by the same reference numerals, and description thereof will be omitted.

【0012】図1は、掘削部10に付設される泥水飛散
養生籠(以下、単に養生籠と略称する。)20の外観を
示すものである。この養生籠20は、複数本のアングル
材により形成された直方体状の枠体22と、この枠体2
2の三方の側部開口部を覆うように貼られたメッシュシ
ート(養生シート)24と、枠体22の上部開口部22
aを横切るように枠体22に着脱自在に連結されている
一対の桟部材26、28とで構成されている。
FIG. 1 shows an appearance of a muddy water scattering curing basket (hereinafter simply referred to as a curing basket) 20 attached to the excavation unit 10. The curing basket 20 includes a rectangular frame 22 formed of a plurality of angle members, and a frame 2.
2, a mesh sheet (curing sheet) 24 attached so as to cover the three side openings, and an upper opening 22 of the frame 22.
and a pair of cross members 26 and 28 which are detachably connected to the frame 22 so as to cross the line a.

【0013】前記枠体22の上部開口部22aは、掘削
部10の平面視形状より大きな矩形開口部として形成さ
れている。また、枠体22の高さHは、掘削部10の全
長(上下方向の長さ)の半分以上に設定されている。
The upper opening 22a of the frame 22 is formed as a rectangular opening which is larger than the shape of the excavated portion 10 in a plan view. In addition, the height H of the frame 22 is set to be equal to or more than half of the entire length (length in the vertical direction) of the excavated portion 10.

【0014】また、一対の桟部材26、28は、同一長
さのアングル材により構成されており、長手方向中央部
の一方の辺部を切断することにより係合切欠き部26
a、28aを形成している。そして、これら一対の桟部
材26、28は、係合切欠き部26a、28aどうしが
対向しないように他方の辺部どうしを向き合わせ、上部
開口部22aを形成しているアングル材に互いに平行に
連結されている。そして、係合切欠き部26a、28a
の間の寸法は、長さSに設定されている。
Further, the pair of cross members 26 and 28 are formed of angle members having the same length, and by cutting one side of the central portion in the longitudinal direction, the engagement notch 26 is formed.
a, 28a. The pair of cross members 26 and 28 face each other so that the engagement notches 26a and 28a do not face each other, and are connected in parallel to the angle member forming the upper opening 22a. Have been. Then, the engagement notches 26a, 28a
Are set to the length S.

【0015】また、図2は、掘削部10の上部構造を示
すものであり、この掘削部10の上面には一対の桟係合
部材30、32が固定されている。これら一対の桟係合
部材30、32は、湾曲した板部材であり、それらの下
端部は、前述した係合切欠き部26a、28a間の寸法
Sと略同一距離となるように掘削部10の上面に固定さ
れているとともに、それら一対の桟係合部材30、32
の上部どうしは、互いに寸法Sより増大して離間するよ
うに外側に湾曲して延びている。
FIG. 2 shows the upper structure of the digging portion 10, and a pair of beam engaging members 30 and 32 are fixed to the upper surface of the digging portion 10. The pair of crosspiece engaging members 30 and 32 are curved plate members, and the lower ends of the pair of crosspiece engaging members 30 and 32 of the excavating portion 10 are arranged so as to be substantially the same distance as the dimension S between the engaging notch portions 26a and 28a. The pair of beam engaging members 30 and 32 are fixed to the upper surface.
Are curved outward and extend so as to be spaced apart from each other by more than the dimension S.

【0016】また、前記養生籠20を掘削部10に付設
するには、上部開口部22aに一対の桟部材26、28
を連結せず、上部開口部22aが矩形状に開口した状態
の養生籠20を、図3に示すように、既に掘削した掘削
溝16のガイドウォール12上にセットする。そして、
上方から養生籠22に向けて下降させた掘削部10を、
上部開口部22aから下部開口部22bへ通過させる。
そして、掘削部10の上部が上部開口部22aを通過し
た時点で、上部開口部22aに一対の桟部材26、28
を連結する。
In order to attach the curing basket 20 to the excavating section 10, a pair of cross members 26, 28 are formed in the upper opening 22a.
Are connected, and the curing cage 20 with the upper opening 22a opened in a rectangular shape is set on the guide wall 12 of the excavated trench 16 as shown in FIG. And
The excavating part 10 lowered from above toward the curing basket 22
The liquid is passed from the upper opening 22a to the lower opening 22b.
When the upper portion of the excavation portion 10 passes through the upper opening 22a, the pair of cross members 26, 28 are inserted into the upper opening 22a.
Concatenate.

【0017】次に、掘削部10に付設した養生籠20の
作用効果について、図3から図5を参照しながら説明す
る。図3に示すように、掘削部10を掘削溝16内に下
降していくと、養生籠20はガイドウォール12上で待
機する。そして、バケット14の開閉動作により掘削底
部の土砂をつかみ取った後、掘削部10を上昇させてい
くと、図4に示すように、掘削部10の上面に固定した
一対の桟係合部材30、32が、養生籠20の一対の桟
部材26、28に設けた係合切欠き部26a、28aに
下側から係合していく。これら一対の桟係合部材30、
32及び係合切欠き部26a、28aが係合することに
より、養生籠20は掘削部10とともに上昇していく。
これにより、図5に示すように、養生籠20は、地上ま
で上昇した掘削部10に吊り下がった状態で掘削部10
の上部を覆う。
Next, the operation and effect of the curing cage 20 attached to the excavation part 10 will be described with reference to FIGS. As shown in FIG. 3, when the excavating unit 10 is lowered into the excavation groove 16, the curing basket 20 waits on the guide wall 12. Then, after the sediment at the bottom of the excavation is grasped by the opening and closing operation of the bucket 14 and the excavation part 10 is raised, as shown in FIG. , 32 are engaged with engagement notches 26a, 28a provided on the pair of crosspiece members 26, 28 of the curing basket 20 from below. These pair of beam engaging members 30,
The curing cage 20 moves up together with the excavation unit 10 by the engagement of the engagement notch 32 and the engagement notches 26a, 28a.
As a result, as shown in FIG. 5, the curing cage 20 is suspended from the excavating section 10 that has risen to the ground.
Cover the top of

【0018】次いで、掘削部10を土砂搬出位置17ま
で旋回するが、そのとき、掘削部10の上部を覆ってい
る養生籠20は、その3方の側部開口部に貼ったメッシ
ュシート24によって掘削部10に付着した泥水が周囲
に飛散するのを防止する。土砂搬出位置17まで旋回し
た掘削部10は、バケット12を開いて土砂を排出す
る。
Next, the excavating unit 10 is turned to the earth and sand discharge position 17. At this time, the curing cage 20 covering the upper part of the excavating unit 10 is moved by the mesh sheet 24 stuck to the three side openings. It prevents muddy water adhering to the excavation part 10 from scattering around. The excavating unit 10 that has turned to the earth and sand discharge position 17 opens the bucket 12 and discharges the earth and sand.

【0019】そして、掘削溝16を形成する方向に掘削
機16を間欠的に移動し、図3から図5で示した動作を
繰り返し行うことにより、連続壁用の掘削溝16が形成
されていく。
Then, the excavator 16 is intermittently moved in the direction in which the excavation groove 16 is formed, and the operations shown in FIGS. 3 to 5 are repeatedly performed, whereby the excavation groove 16 for the continuous wall is formed. .

【0020】このように、本実施形態では、土砂を搬出
するために掘削部10が旋回するときに、養生籠20が
掘削部10の上部を覆って周囲に泥水が飛散するのを防
止しているので、歩道2と掘削位置との境界に配設した
養生シート18を高い位置まで配設しなくてよい。した
がって、歩道2と掘削位置との境界には、広いスペース
に養生足場を組む必要がなく、仮囲いに養生シート18
を貼るだけで十分なので、作業環境を良好とすることが
できる。
As described above, in the present embodiment, when the excavating unit 10 turns to carry out the earth and sand, the curing cage 20 covers the upper portion of the excavating unit 10 to prevent the muddy water from scattering around. Therefore, the curing sheet 18 disposed at the boundary between the sidewalk 2 and the excavation position does not need to be disposed up to a high position. Therefore, it is not necessary to form a curing scaffold in a wide space at the boundary between the sidewalk 2 and the excavation position, and the curing sheet 18 is provided in the temporary enclosure.
Is sufficient, and the working environment can be improved.

【0021】また、養生籠20は、掘削部10が掘削溝
16内へ下降していくと、掘削溝16の地上開口部に設
けたガイドウォール12上で待機し、掘削部10が上昇
していくと、掘削部10の桟係合部材30、32と係合
切欠き部26a、28aとが係合して掘削部10の上部
を覆いながら上昇していくので、上昇させた掘削部10
をすぐに土砂搬出位置17まで旋回させることができ
る。これにより、従来のように付着した泥水を十分に落
とすため掘削部10を所定時間停止させる必要がなく、
掘削作業の能率を大幅に改善することができる。
When the excavating part 10 descends into the excavation groove 16, the curing cage 20 stands by on the guide wall 12 provided at the above-ground opening of the excavation groove 16, and the excavating part 10 rises. Then, the bar engaging members 30 and 32 of the excavating section 10 engage with the engagement notches 26a and 28a to cover the upper portion of the excavating section 10 and move upward.
Can be immediately turned to the earth and sand discharge position 17. Thereby, it is not necessary to stop the excavation part 10 for a predetermined time in order to sufficiently remove the muddy water adhered as in the related art,
Drilling work efficiency can be greatly improved.

【0022】なお、養生籠20の上部開口部22を横切
るように連結した一対の桟部材26、28が、本発明の
籠係合部に相当し、掘削部10の上部に固定した桟係合
部材30、32が、本発明の掘削部係合部に相当する。
ここで、籠係合部及び掘削部係合部は、本実施形態の構
造に限るものではなく、掘削部10が上昇するときに養
生籠20も同時に上昇する構造であれば、他の構造であ
っても同様の作用効果を得ることができる。
A pair of crosspieces 26 and 28 connected across the upper opening 22 of the curing basket 20 correspond to the cage engaging portion of the present invention, and the crosspieces fixed to the upper portion of the excavating portion 10 are provided. The members 30 and 32 correspond to the excavating portion engaging portion of the present invention.
Here, the cage engaging portion and the excavating portion engaging portion are not limited to the structure of the present embodiment, and other structures may be used as long as the curing cage 20 simultaneously rises when the excavating portion 10 rises. Even if there is, the same operation and effect can be obtained.

【0023】[0023]

【発明の効果】以上説明したように、本発明の掘削機の
泥水飛散養生装置によると、土砂を搬出するために掘削
部が旋回するときに、掘削部の上部は養生籠に覆われて
いるので、歩道や家屋等が隣接している地域で掘削作業
を行う場合であっても、隣接地域への掘削泥水の飛散を
防止することができる。したがって、隣接地域との境界
に広いスペースに養生足場を組む必要がなく、作業環境
を良好とすることができる。
As described above, according to the mud splashing curing device of the excavator of the present invention, when the excavating portion turns to carry out the earth and sand, the upper portion of the excavating portion is covered with the curing basket. Therefore, even when excavation work is performed in an area where a sidewalk, a house, or the like is adjacent, it is possible to prevent the drilling muddy water from scattering to the adjacent area. Therefore, it is not necessary to form a curing scaffold in a wide space at the boundary with the adjacent area, and the working environment can be improved.

【0024】また、養生籠は、掘削部が掘削穴に入り込
むと掘削穴近くの地上で待機し、掘削部が地上に上昇す
るときに、養生籠の籠係合部に掘削部の掘削部係合部が
下側から係合し、掘削部とともに上昇して掘削部の上部
を覆うので、上昇した掘削部を、すぐに土砂搬出位置ま
で旋回させることができる。これにより、従来のように
付着した泥水を十分に落とすため掘削部を所定時間停止
させる必要がなく、掘削作業の能率を大幅に改善するこ
とができる。
When the excavated part enters the excavation hole, the curing cage waits on the ground near the excavation hole, and when the excavated part rises to the ground, the excavation part engaging part of the excavating part is engaged with the cage engaging part of the curing cage. Since the joint portion engages from below and rises with the excavation portion to cover the upper portion of the excavation portion, the raised excavation portion can be immediately turned to the earth and sand discharge position. As a result, it is not necessary to stop the excavation section for a predetermined time in order to sufficiently remove the attached muddy water as in the related art, and the efficiency of excavation work can be greatly improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る養生籠を示す斜視図である。FIG. 1 is a perspective view showing a curing basket according to the present invention.

【図2】本発明に係る掘削部の上部構造と、その上部に
設けた掘削部係合部を示す斜視図である。
FIG. 2 is a perspective view showing an upper structure of a digging portion according to the present invention and a digging portion engaging portion provided on the upper portion.

【図3】掘削部が掘削穴に入り込み、養生籠が地上で待
機している状態を示す図である。
FIG. 3 is a diagram showing a state in which a digging part has entered a digging hole and a curing cage is waiting on the ground.

【図4】養女籠に設けた籠係合部に、掘削部に設けた掘
削部係合部が係合している状態を示す斜視図である。
FIG. 4 is a perspective view showing a state in which a digging section engaging section provided on the excavating section is engaged with a basket engaging section provided on the adoption basket.

【図5】掘削部が地上に上昇し、養生籠も上昇して掘削
部の上部を覆っている状態を示す図である。
FIG. 5 is a view showing a state in which the excavated portion rises to the ground, and the curing basket also ascends and covers the upper portion of the excavated portion.

【図6】歩道近くの地面に連続壁を施工するために、従
来の掘削機を使用して掘削溝を掘削している状態を示す
図である。
FIG. 6 is a diagram showing a state in which a conventional excavator is used to excavate an excavation trench in order to construct a continuous wall on the ground near a sidewalk.

【符号の説明】[Explanation of symbols]

2 歩道 4 連壁掘削機(掘削機) 6 ブーム 10 掘削部 14 バケット 16 掘削溝(掘削穴) 17 土砂搬出位置 20 養生籠(泥水飛散養生籠) 22 函状枠体 22a 上部開口部 22b 下部開口部 24 メッシュシート(養生シート) 26、28 桟部材 26a、28b 係合切欠き部 30、32 桟係合部材 Reference Signs List 2 sidewalk 4 continuous wall excavator (excavator) 6 boom 10 excavator 14 bucket 16 excavation groove (excavation hole) 17 earth and sand carry-out position 20 curing basket (mud splashing curing cage) 22 box-shaped frame 22a upper opening 22b lower opening Part 24 Mesh sheet (curing sheet) 26, 28 Cross member 26a, 28b Engagement notch 30, 32 Cross member

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 下端にグラブ式バケットを備えた掘削部
により掘削穴を掘削し、前記バケットがつかみ取った土
砂を、地上に上昇した前記掘削部が土砂搬出位置まで旋
回した後に排出するようにした掘削機において、 函形状の枠体の側面に養生シートを貼設した養生籠を、
前記掘削部の外周を囲むように付設し、前記掘削部が前
記掘削穴に入り込んで掘削作業を行うときに、前記養生
籠が前記掘削穴近くの地上で待機し、前記掘削部が地上
に上昇するときに、前記養生籠に設けた籠係合部に前記
掘削部に設けた掘削部係合部が下側から係合して前記養
生籠も同時に上昇し、当該養生籠が前記掘削部の上部を
覆うようにしたことを特徴とする掘削機の泥水飛散養生
装置。
An excavation hole is excavated by an excavation part provided with a grab bucket at a lower end, and sediment caught by the bucket is discharged after the excavation part raised to the ground turns to a sediment discharge position. In the excavator, the curing cage with the curing sheet stuck on the side of the box-shaped frame is
It is attached so as to surround the outer periphery of the digging portion, and when the digging portion enters the digging hole and performs digging work, the curing basket waits on the ground near the digging hole, and the digging portion rises to the ground. When doing, the excavating part engaging part provided in the excavating part engages with the cage engaging part provided in the curing cage from below, and the curing cage also rises at the same time, and the curing cage is A mud splashing curing device for an excavator, wherein an upper portion is covered.
JP32433296A 1996-12-04 1996-12-04 Slurry flying curing device for excavator Pending JPH10159476A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32433296A JPH10159476A (en) 1996-12-04 1996-12-04 Slurry flying curing device for excavator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32433296A JPH10159476A (en) 1996-12-04 1996-12-04 Slurry flying curing device for excavator

Publications (1)

Publication Number Publication Date
JPH10159476A true JPH10159476A (en) 1998-06-16

Family

ID=18164609

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32433296A Pending JPH10159476A (en) 1996-12-04 1996-12-04 Slurry flying curing device for excavator

Country Status (1)

Country Link
JP (1) JPH10159476A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012047003A (en) * 2010-08-30 2012-03-08 Tenox Corp Drip receiving device of hydraulic solidifying liquid and construction method of column replaced with hydraulic solidifying liquid using the device
JP2013234557A (en) * 2011-08-25 2013-11-21 Japan Inspection Organization Excavation head of excavation rod and excavating equipment for constructing hydraulic solidification material liquid substitution column
JP2020090853A (en) * 2018-12-06 2020-06-11 株式会社竹中工務店 Cover tool

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012047003A (en) * 2010-08-30 2012-03-08 Tenox Corp Drip receiving device of hydraulic solidifying liquid and construction method of column replaced with hydraulic solidifying liquid using the device
JP2013234557A (en) * 2011-08-25 2013-11-21 Japan Inspection Organization Excavation head of excavation rod and excavating equipment for constructing hydraulic solidification material liquid substitution column
JP2016211369A (en) * 2011-08-25 2016-12-15 株式会社日本住宅保証検査機構 Device for producing hydraulic solidification material liquid substitution column
JP2020090853A (en) * 2018-12-06 2020-06-11 株式会社竹中工務店 Cover tool

Similar Documents

Publication Publication Date Title
CN106760900B (en) Automatic pole erecting device
JPH0377887B2 (en)
KR20100070864A (en) Temporary retaining wall structure for water works
US6672408B2 (en) System and apparatus for excavating contaminated pilings
JPH10159476A (en) Slurry flying curing device for excavator
CN112796690B (en) Mud splash-proof device for construction of punched bored pile and construction method
KR102424715B1 (en) The earth retaining structure for pipe construction for worker safety
CN111851510B (en) Earth rock foundation pit blasting excavation system and construction method applying same
JPH08209686A (en) Pile head processing tool and pile head processing construction method for cast-in-place pile
JP4465808B2 (en) Construction method for underwater foundation
KR101940812B1 (en) excavation method using propulsion of caisson
JP3745645B2 (en) Earth drill
US3379265A (en) Pile extractor and setter
CN212026394U (en) Wall brushing device for I-steel joint attached to grab bucket of underground diaphragm wall
KR102679249B1 (en) Bucket
KR102571807B1 (en) Earth frame for the pipe laying
JP2018028180A (en) Earthen wall dropping method
JP2540639Y2 (en) Utility pole installation tool
KR950007008B1 (en) Method for installation of truck lifter
JPS5847091Y2 (en) Earth retention shoring device for excavated trenches
KR20230009585A (en) Bucket
JP2713112B2 (en) Construction method of waste disposal site
JPH0352844Y2 (en)
JP2553987B2 (en) Deep foundation foundation excavation construction method
WO2006067248A1 (en) Pit excavation method and device